This is an electrical power plan drawing for renovations to Ridgeland High School facilities in Walker County Schools, located in Lafayette and Rossville, Georgia. The document, prepared by Southern A&E, LLC (Engineer Firm License No. PEF003374, expiring June 30, 2026), details the rooftop electrical infrastructure for Wings F, G, and K, issued for construction on January 10, 2025 as part of Bid Package BP-1. The drawing specifies the installation and routing of electrical power systems to support mechanical equipment on the rooftops, including disconnect switches, receptacles, branch circuits, conduit runs, and associated electrical connections. The plan includes two separate roof layouts for Wings F and G (at 1/16" = 1'-0" scale) and Wing K (at 1/8" = 1'-0" scale), with detailed keynotes and specifications for materials, sizing, and installation methods.

The technical specifications include detailed requirements for conductor types (XHHW on rooftops), raceway materials (GRS except LFMC within 18 inches of unit connections), circuit breaker sizes ranging from 20-ampere to 60-ampere configurations, and coordination requirements with the mechanical contractor. Materials specified include copper conductors of various gauges (#2 through #12), conduit sizes from 1/2 inch to 1-1/4 inches, rubber rooftop supports, and weatherproof GFCI receptacles with while-in-use covers. The drawing indicates connections to existing equipment, provisions for mechanical room junction boxes, and integration with panel schedules, requiring careful coordination between electrical and mechanical trades during installation.

View the file

Other files

File Type Posted
P203_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
E003_R2_AD2___MECHANICAL_EQUIPMENT_CONNECTION.pdf PDF
M113_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M126_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E123_R2_AD2___WING_G__ELECTRICAL_DEMOLITION_P.pdf PDF
Advertisement _ RHS Renovations.pdf PDF
P106_R1_AD2___PLUMBING_ROOF_PLAN__ALTERNATE.pdf PDF
E117_R1_AD2___WING_E__POWER_PLAN.pdf PDF
ADDENDUM_2__COMPLETE.pdf PDF
E103_R2_AD2___WING_A__POWER_PLAN.pdf PDF
M128_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M112_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M130_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
P102_R1_AD2___PLUMBING_RENOVATION_PLAN__PHASE.pdf PDF
P201_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
M115_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M127_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M125_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E129_R2_AD2___MEZZ_LEVEL__WING_G__POWER_PLAN.pdf PDF
M129_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M602_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
M110_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M601_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
E125_R2_AD2___WING_G__POWER_PLAN.pdf PDF
P202_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
P103_R1_AD2___PLUMBING_RENOVATION_FLOOR_PLAN_.pdf PDF
M503_R2_AD2_MECHANICAL_EQUIPMENT_DETAILS.pdf PDF
Project Award Recommendation _ RHS HVAC.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

w p

/g fi wp/gfiwp/gfi wp/gfi w p

/g fi

M M

M

M

M

M

M M

M

M

M

M

M wp/gfi w p

/g fi w p

/g fi wp/gfi wp/gfi w p

/g fi

CU

CU

CU

CU

CU

CU

CU

F

MHP

F

CU

CU

MHP

MHP

CU

CU

E2

E2

E2

E2

F

F

F

F

F

F

F

F

F

CU

CU

F

F

E13

E13

E14

E14 E14

E14

HPA-19

30A/3P

HPA-20

30A/3P

LPC1- 5,7

E13

E19

E13

E11

F O

R C

O N

T

IN

U A

T

IO

N

R E

F E

R T

O

E

E14

E13

E11

E11

E11

E11

E11

E11

E11

E11

E11

E11 E11

E13

E13

E19

E17

E11

E14

E13

E13

E13

E14

E13

E13

E14

E25

E25

RTHP

K1

RTHP

K2

RTHP

K3

E33

E33

E33

E7

E7

ERU

K1

E32

To DP-FH

To DP-FH

To DP-FH

To DP-FH

E34

E34

E34

E35

SCALE: = 1'-0"

DRAWING NUMBER

REVISIONS

COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.

THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL

NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT

EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.

10-31-2025

BID PACKAGE BP-1

SA&E PROJECT NUMBER

ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")

A

TRUE

NORTH

0 8 168

1/8"

2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

B

C

D

E

F

G

H

I

J

K

L

M

N

KEYPLAN

RIDGELAND HIGH SCHOOL

RENOVATIONS TO:

WALKER COUNTY SCHOOLS

301 N CHEROKEE ST, LAFAYETTE, GA 30728

2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741

746-0190

01-920-045

ISSUED FOR CONSTRUCTION

STATE BOARD OF REGISTRATION

FOR PROFESSIONAL ENGINEERS AND

LAND SURVEYORS

SOUTHERN A & E, LLC

ENGINEER FIRM

LICENSE NO: PEF003374

EXP. DATE - 06/30/2026

B

A

C

D E

F

G

H

J

K

E135

WING F,G,K - ROOF - POWER PLAN

KEYNOTE SCHEDULE - THIS SHEET

# KEYNOTE DESCRIPTION

E2 EXISTING MECHANICAL EQUIPMENT TO REMAIN, PROTECT ELECTRICAL CONNECTIONS

AND/OR EQUIPMENT FROM DAMAGE THROUGH ALL PHASES OF CONSTRUCTION.

E7 GFCI/WR RECEPTACLE WITH WHILE-IN-USE COVER MOUNTED ON SIDE OF ROOF TOP

UNIT, PROVIDE 120V POWER FROM EXISTING OR NEAREST 120V CIRCUIT BELOW ROOF

DECK VIA 3#12 CU THWN IN 1/2"C.

E11 CONNECT MECHANICAL EQUIPMENT TO CIRCUIT MAINTAINED FROM DEMOLITION

PHASE. EXTEND ASSOCIATED BRANCH CIRCUIT CONDUCTORS/RACEWAY AS

REQUIRED FOR CONNECTION TO NEW EQUIPMENT. SIZE CONDUCTORS TO MATCH

EXISTING BRANCH CIRCUIT.

E13 NEW DISCONNECT SWITCH INSTALLED ON ROOFTOP STRUT STAND. EXTEND BRANCH

CIRCUIT MAINTAINED FROM DEMOLITION PHASE UP THROUGH ROOF.

CONDUIT/CONDUCTORS SHALL BE SIZED TO MATCH EXISTING BRANCH CIRCUIT.

CONDUCTOR TYPE ON ROOF SHALL BE 'XHHW' AND RACEWAY TYPE ON ROOF SHALL

BE GRS (EXCEPT FOR WITHIN 18" OF CONNECTION TO UNIT. PROVIDE RUBBER

ROOFTOP SUPPORTS FOR SUPPORT OF POWER & CONTROL RACEWAYS. REFER TO

ROOFTOP STRUT STAND DETAIL FOR INSTALLATION METHOD.

E14 WP/GFI RECEPTACLE W/ CAST WHILE-IN-USE COVER INSTALLED ON STRUT STAND

WITH DISCONNECT SWITCH. REFER TO DETAIL FOR INSTALLATION METHOD.

E17 ROUTE TO PANEL AND BREAKER POSITION INDICATED. TERMINATE ON NEW 20A/2P

BREAKER. NEW BRANCH CIRCUIT SHALL BE 3#12 CU THWN IN A 1/2"C.

E19 EXTEND CIRCUIT TO J-BOX LOCATED IN MECHANICAL ROOM BELOW VIA 3#2 CU + #6CU

GND IN A 1-1/4"C. CONDUCTOR TYPE ON ROOF SHALL BE 'XHHW' AND RACEWAY TYPE

ON ROOF SHALL BE GRS (EXCEPT FOR WITHIN 18" OF CONNECTION TO UNIT).

PROVIDE RUBBER ROOFTOP SUPPORTS FOR SUPPORT OF POWER & CONTROL

RACEWAYS.

E25 EXTEND EXISTING BRANCH CIRCUIT/ RACEWAY LOCATED IN MECHANICAL ROOM UP

THROUGH PIPE PORTAL TO DISCONNECT LOCATION. ALL CONDUCTORS INSTALLED

THROUGH/ON ROOF SHALL BE TYPE #10 XHHW AND RACEWAY SHALL BE GRS -

EXCEPT FOR LFMC WITHIN 18" OF UNIT CONNECTION POINT. COORDINATE PIPE

PORTAL LOCATION W/ MECHANICAL CONTRACTOR.

E32 NEW DISCONNECT SWITCH INSTALLED ON ROOFTOP STRUT STAND. EXTEND BRANCH

CIRCUIT UP THROUGH ROOF. CONDUIT/CONDUCTORS SHALL BE SIZED PER NOTE

AND/OR PANEL SCHEDULE. CONDUCTOR TYPE ON ROOF SHALL BE 'XHHW' AND

RACEWAY TYPE ON ROOF SHALL BE GRS (EXCEPT FOR WITHIN 18" OF CONNECTION

TO UNIT). PROVIDE RUBBER ROOFTOP SUPPORTS FOR SUPPORT OF POWER &

CONTROL RACEWAYS. REFER TO ROOFTOP STRUT STAND DETAIL FOR INSTALLATION

METHOD.

E33 NEW DISCONNECT SWITCH MOUNTED TO SIDE OF ROOF TOP UNIT. ROUTE BRANCH

CIRCUIT CONDUCTORS/RACEWAY UP THROUGH BASE OF UNIT. COORDINATE

DISCONNECT LOCATION AND THROUGH BASE INSTALLATION REQUIREMENTS WITH

MECHNICAL CONTRACTOR PRIOR TO ROUGH-IN.

E34 ROUTE TO PANEL INDICATED TERMINATE ON NEW 60/3P BREAKER IN NEXT AVAILABLE

SPACE. NEW BRANCH CIRCUIT SHALL BE 3#6 CU THWN + #10CU GND IN A 3/4"C.

E35 ROUTE TO PANEL INDICATED TERMINATE ON NEW 30/3P BREAKER IN NEXT AVAILABLE

SPACE. NEW BRANCH CIRCUIT SHALL BE 4#10 CU THWN IN A 3/4"C.

1/16" = 1'-0"E135

1 ROOF - WING F,G - POWER PLAN

1/8" = 1'-0"E135

2 ROOF - WING K - POWER PLAN

# Doc # Date

1 AD1 11/13/25

2 AD2 11/21/25

File details come from the government source that posted it. Updated .