M115_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf

PDF 367 KB Posted

Attached to
RFP for Ridgeland High School Renovations
Solicitation number
PE-55462-NONST-2026-000000017
Issued by
Wilcox County, Georgia

About this file

This is a Mechanical Demolition Plan document for the Ridgeland High School Renovations project prepared by Southern A&E, LLC for Walker County Schools, located in Lafayette, Georgia. The plan outlines the scope of mechanical demolition work required across Wing K of the facility, including the removal of all existing air distribution devices, ductwork, HVAC equipment, controls, and accessories. The document includes three floor plans (Level 1, Level 2, and Roof) with detailed keynote designations indicating specific demolition tasks. Key work items include removal of existing packaged rooftop heat pump units (RTHP) with associated accessories and controls, roof curb preparation or patching, and field verification of curb dimensions for modification as required for new unit installations. The plan is drawn at 1/8" = 1'-0" scale and was issued for construction on the original sheet size of ARCH E1 (30" X 42"). Several demolition tasks are conditional, with notes indicating that scope of work for specific areas will only be performed if the alternate is taken. The document references Bid Package BP-1 and includes revision documentation dated from 11-13-2025 to 11-21-2025.

The document does not contain information regarding pricing terms, contract duration, set-asides, funding sources, or other financial considerations. The project is under the professional engineering oversight of Southern A&E, LLC, holding Engineer Firm License No. PEF003374 with an expiration date of 06-30-2026. The drawing specifications and technical requirements are governed by the State Board of Registration for Professional Engineers and Land Surveyors. No bidder meeting dates, response deadlines, or award information are specified in this demolition plan document.

View the file

Other files

File Type Posted
P203_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
E003_R2_AD2___MECHANICAL_EQUIPMENT_CONNECTION.pdf PDF
M113_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M126_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E123_R2_AD2___WING_G__ELECTRICAL_DEMOLITION_P.pdf PDF
Advertisement _ RHS Renovations.pdf PDF
E135_R2_AD2___WING_F_G_K__ROOF__POWER_PLAN.pdf PDF
P106_R1_AD2___PLUMBING_ROOF_PLAN__ALTERNATE.pdf PDF
E117_R1_AD2___WING_E__POWER_PLAN.pdf PDF
ADDENDUM_2__COMPLETE.pdf PDF
E103_R2_AD2___WING_A__POWER_PLAN.pdf PDF
M128_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M112_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M130_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
P102_R1_AD2___PLUMBING_RENOVATION_PLAN__PHASE.pdf PDF
P201_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
M127_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M125_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E129_R2_AD2___MEZZ_LEVEL__WING_G__POWER_PLAN.pdf PDF
M129_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M602_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
M110_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M601_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
E125_R2_AD2___WING_G__POWER_PLAN.pdf PDF
P202_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
P103_R1_AD2___PLUMBING_RENOVATION_FLOOR_PLAN_.pdf PDF
M503_R2_AD2_MECHANICAL_EQUIPMENT_DETAILS.pdf PDF
Project Award Recommendation _ RHS HVAC.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LECTURE ROOM

MECH.

STOR.

BOYS TOILET

GIRLS TOILET

GIRLS TOILET

VEST.

BOYS LOCKER ROOM

CONCESSIONS

OFFICE

OFFICE

REFEREE LOUNGE

STAIR

VEST.

STOR.

STOR.

STOR.

PASSAGE

TOILET

GIRLS LOCKER ROOM

BOYS TOILET

D31

NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.

STOR.

TOILET

OFFICE

PASSAGE

LOCKER ROOM

CORRIDOR

CONFERENCE ROOM

STOR.

STAIR

MECH.

MENS RESTROOM

WOMENS RESTROOM

LOCKER ROOM

LOCKER ROOM

LOCKER ROOM

CORRIDOR

TRAINER OFFICE

TOILET

UNIFORM ROOM

LAUNDRY

CORRIDOR

CORRIDOR

UNIFORM ROOM

SECURITY

D31

NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.

D36

D32

D32

D37

NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.

DRAWING NUMBER

REVISIONS

COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.

THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL

NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT

EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.

10-31-2025

BID PACKAGE BP-1

SA&E PROJECT NUMBER

ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")

A

TRUE

NORTH

2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

B

C

D

E

F

G

H

I

J

K

L

M

N

KEYPLAN

RIDGELAND HIGH SCHOOL

RENOVATIONS TO:

WALKER COUNTY SCHOOLS

301 N CHEROKEE ST, LAFAYETTE, GA 30728

2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741

746-0190

01-920-045

ISSUED FOR CONSTRUCTION

STATE BOARD OF REGISTRATION

FOR PROFESSIONAL ENGINEERS AND

LAND SURVEYORS

SOUTHERN A & E, LLC

ENGINEER FIRM

LICENSE NO: PEF003374

EXP. DATE - 06/30/2026

B

A

C

D E

F

G

H

J

K

M115

MECHANICAL DEMOLITION PLAN - WING K

SCALE: = 1'-0"

0 8 168

1/8"

KEYNOTE SCHEDULE

# KEYNOTE DESCRIPTION

D31 REMOVE ALL EXISTING AIR DISTRIBUTION DEVICES, DUCTWORK, HVAC EQUIPMENT,

CONTROLS, AND ACCESSORIES IN THIS BUILDING.

D32 REMOVE EXISTING PACKAGED ROOFTOP HEAT PUMP UNIT (RTHP), ASSOCIATED

ACCESSORIES, AND CONTROLS. PREPARE EXISTING ROOF CURB FOR NEW RTHP

INSTALLATION. FIELD VERIFY CURB DIMENSIONS AND MODIFY AS REQUIRED FOR NEW UNIT.

D36 REMOVE EXISTING PACKAGED ROOFTOP HEAT PUMP UNIT (RTHP), ASSOCIATED

ACCESSORIES, AND CONTROLS. EXISTING ROOF CURB TO BE PATCHED. NEW RTHP

INSTALLATION WILL NEED NEW CURB.

D37 REMOVE EXISTING PACKAGED ROOFTOP HEAT PUMP UNIT (RTHP), ASSOCIATED

ACCESSORIES, AND CONTROLS. PREPARE EXISTING ROOF CURB FOR NEW ENERGY

RECOVERY UNIT INSTALLATION. FIELD VERIFY CURB DIMENSIONS AND MODIFY AS REQUIRED

FOR NEW UNIT.

1/8" = 1'-0"M115

1 MECHANICAL DEMOLITION PLAN - WING K LEVEL 1

1/8" = 1'-0"M115

2 MECHANICAL DEMOLITION PLAN - WING K LEVEL 2

1/8" = 1'-0"M115

3 MECHANICAL DEMOLITION PLAN - WING K ROOF

# Doc # Date

1 AD1 11-13-2025

2 AD2 11-21-2025

File details come from the government source that posted it. Updated .