M115_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf
PDF 367 KB Posted
- Attached to
- RFP for Ridgeland High School Renovations
- Solicitation number
- PE-55462-NONST-2026-000000017
- Issued by
- Wilcox County, Georgia
About this file
This is a Mechanical Demolition Plan document for the Ridgeland High School Renovations project prepared by Southern A&E, LLC for Walker County Schools, located in Lafayette, Georgia. The plan outlines the scope of mechanical demolition work required across Wing K of the facility, including the removal of all existing air distribution devices, ductwork, HVAC equipment, controls, and accessories. The document includes three floor plans (Level 1, Level 2, and Roof) with detailed keynote designations indicating specific demolition tasks. Key work items include removal of existing packaged rooftop heat pump units (RTHP) with associated accessories and controls, roof curb preparation or patching, and field verification of curb dimensions for modification as required for new unit installations. The plan is drawn at 1/8" = 1'-0" scale and was issued for construction on the original sheet size of ARCH E1 (30" X 42"). Several demolition tasks are conditional, with notes indicating that scope of work for specific areas will only be performed if the alternate is taken. The document references Bid Package BP-1 and includes revision documentation dated from 11-13-2025 to 11-21-2025.
The document does not contain information regarding pricing terms, contract duration, set-asides, funding sources, or other financial considerations. The project is under the professional engineering oversight of Southern A&E, LLC, holding Engineer Firm License No. PEF003374 with an expiration date of 06-30-2026. The drawing specifications and technical requirements are governed by the State Board of Registration for Professional Engineers and Land Surveyors. No bidder meeting dates, response deadlines, or award information are specified in this demolition plan document.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LECTURE ROOM
MECH.
STOR.
BOYS TOILET
GIRLS TOILET
GIRLS TOILET
VEST.
BOYS LOCKER ROOM
CONCESSIONS
OFFICE
OFFICE
REFEREE LOUNGE
STAIR
VEST.
STOR.
STOR.
STOR.
PASSAGE
TOILET
GIRLS LOCKER ROOM
BOYS TOILET
D31
NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.
STOR.
TOILET
OFFICE
PASSAGE
LOCKER ROOM
CORRIDOR
CONFERENCE ROOM
STOR.
STAIR
MECH.
MENS RESTROOM
WOMENS RESTROOM
LOCKER ROOM
LOCKER ROOM
LOCKER ROOM
CORRIDOR
TRAINER OFFICE
TOILET
UNIFORM ROOM
LAUNDRY
CORRIDOR
CORRIDOR
UNIFORM ROOM
SECURITY
D31
NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.
D36
D32
D32
D37
NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.
DRAWING NUMBER
REVISIONS
COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.
THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL
NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT
EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.
10-31-2025
BID PACKAGE BP-1
SA&E PROJECT NUMBER
ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")
A
TRUE
NORTH
2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
B
C
D
E
F
G
H
I
J
K
L
M
N
KEYPLAN
RIDGELAND HIGH SCHOOL
RENOVATIONS TO:
WALKER COUNTY SCHOOLS
301 N CHEROKEE ST, LAFAYETTE, GA 30728
2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741
746-0190
01-920-045
ISSUED FOR CONSTRUCTION
STATE BOARD OF REGISTRATION
FOR PROFESSIONAL ENGINEERS AND
LAND SURVEYORS
SOUTHERN A & E, LLC
ENGINEER FIRM
LICENSE NO: PEF003374
EXP. DATE - 06/30/2026
B
A
C
D E
F
G
H
J
K
M115
MECHANICAL DEMOLITION PLAN - WING K
SCALE: = 1'-0"
0 8 168
1/8"
KEYNOTE SCHEDULE
# KEYNOTE DESCRIPTION
D31 REMOVE ALL EXISTING AIR DISTRIBUTION DEVICES, DUCTWORK, HVAC EQUIPMENT,
CONTROLS, AND ACCESSORIES IN THIS BUILDING.
D32 REMOVE EXISTING PACKAGED ROOFTOP HEAT PUMP UNIT (RTHP), ASSOCIATED
ACCESSORIES, AND CONTROLS. PREPARE EXISTING ROOF CURB FOR NEW RTHP
INSTALLATION. FIELD VERIFY CURB DIMENSIONS AND MODIFY AS REQUIRED FOR NEW UNIT.
D36 REMOVE EXISTING PACKAGED ROOFTOP HEAT PUMP UNIT (RTHP), ASSOCIATED
ACCESSORIES, AND CONTROLS. EXISTING ROOF CURB TO BE PATCHED. NEW RTHP
INSTALLATION WILL NEED NEW CURB.
D37 REMOVE EXISTING PACKAGED ROOFTOP HEAT PUMP UNIT (RTHP), ASSOCIATED
ACCESSORIES, AND CONTROLS. PREPARE EXISTING ROOF CURB FOR NEW ENERGY
RECOVERY UNIT INSTALLATION. FIELD VERIFY CURB DIMENSIONS AND MODIFY AS REQUIRED
FOR NEW UNIT.
1/8" = 1'-0"M115
1 MECHANICAL DEMOLITION PLAN - WING K LEVEL 1
1/8" = 1'-0"M115
2 MECHANICAL DEMOLITION PLAN - WING K LEVEL 2
1/8" = 1'-0"M115
3 MECHANICAL DEMOLITION PLAN - WING K ROOF
# Doc # Date
1 AD1 11-13-2025
2 AD2 11-21-2025
File details come from the government source that posted it. Updated .