E123_R2_AD2___WING_G__ELECTRICAL_DEMOLITION_P.pdf
PDF 2 MB Posted
- Attached to
- RFP for Ridgeland High School Renovations
- Solicitation number
- PE-55462-NONST-2026-000000017
- Issued by
- Wilcox County, Georgia
About this file
This is an electrical demolition plan for Ridgeland High School Renovations prepared by Southern A&E, LLC for Walker County Schools in Georgia. The plan details comprehensive electrical demolition work for Wing G of the facility located at 2478 Happy Valley Road, Rossville, GA 30741. The scope includes disconnection and removal of existing lighting fixtures, switches, and associated circuit conductors; removal of unused conduit where exposed; disconnection and removal of mechanical equipment circuits and associated raceways; and complete removal of lighting relay panels and associated wiring. The project involves multiple designated zones marked with keynotes (D1, D3, D4, D5, D13, D18) that specify different demolition actions for various electrical systems and mechanical equipment. A mandatory pre-proposal meeting is scheduled for Thursday, November 20, 2025 at 9:00 AM on the project site, with sealed proposals due by 2:00 PM on Thursday, December 11, 2025 to the Walker County Board of Education Facilities and Operations Department at 298 Culberson Avenue, LaFayette, GA 30728. Attendance at the mandatory pre-proposal meeting is required; any entity failing to attend will not be permitted to submit a proposal.
The demolition plan includes critical coordination requirements to maintain communications and power system functions throughout occupied building portions during demolition and renovation phases, with any necessary system outages kept to a minimum and coordinated with the owner in advance. The contractor is responsible for reviewing equipment to be demolished with the owner to determine items to preserve, managing existing raceways and boxes suitable for reuse, replacing any painted or damaged receptacles with grounding straps as required, and properly supporting ceiling-mounted devices during ceiling removal or replacement. General demolition notes address protection of existing mechanical units, temporary support of ceiling-mounted devices, removal of abandoned cable per NEC Article 800.25, lowering lighting switches to 46 inches above finished floor, and installation of stainless steel blank covers and switch location covers as appropriate. The project documents reference mechanical demolition plans and electrical power plans for coordination, with the drawing issued for construction on 10-31-2025 as Bid Package BP-1.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F O
R C
O N
T
IN
U A
T
IO
N
R E
F E
R T
O
E
FOR CONTINUATION REFER TO: 1/ E119
D3
D3
D1
D1
D1
D1
D1 D1
D1
D1
D1
D1 D1 D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1 D1
D1 D1
D1 D1 D1
D1
D1D1D1 D1
D1
D1
D1
D1
D1
D1
D1
D1 D1
D1
STOR.
OFFICE
LIB.
OFFICE
DARK ROOM
OFFICE
STAIR
VEST.
STAIR
VEST.
BOYS P.E.
TOILET
GIRLS VARSITY
TOILET
MECH.
SERVING
TOILET
CONF.
STOR.
CONCESSIONS
STOR.
STOR.
R.O.T.C.
SUP.S
ELEC.
LOCKERS
LOCKERS
LOCKERS
LOCKERS
ART
A.F.J.R.O.T.C.
MECH.
C.B.V.I.
MECH.
LAUNDRY
OFFICE
604EQUIP. STOR.
STOR.
626WEIGHT ROOM
625OFFICE
EQUIP. STOR.
COLONNADE
LOBBY
PASS.
PASS.
GYMNASIUM
STOR.
MENS
STAIR
STAIR
STOR.
JAN.
CORRIDOR
500A
WOMENS
MENS
CORRIDOR
WOMEN
VEST.
500F
BOILER
GIRLS P.E.
SHOWERS
SHOWERS
SHOWERS
SHOWERS
BOYS VARSITY
TOILET
TOILET
D4
D4
D4
D13
HPB
MSB
HPA
HPA1
LPA
LPA1
ELPA
EHPA
ATS D18
D13
LPA2
D1
D4
D5
D1
TYP FOR
EXTERIOR LTS
TYP FOR
EXTERIOR LTS
D1
D1
GENERAL DEMOLITION PLAN NOTES
A. PRIOR TO DEMOLITION, REVIEW ALL EQUIPMENT TO BE DEMOLISHED WITH OWNER TO DETERMINE WHICH EQUIPMENT THE OWNER DESIRES TO KEEP. REMOVE THIS EQUIPMENT WITH CARE AND TURN OVER TO OWNER. ITEMS NOT DESIRED BY THE OWNER SHALL BE DISPOSED IN ACCORDANCE WITH APPLICABLE
REGULATIONS.
B. WHERE EXISTING RACEWAY AND BOXES ARE CONCEALED IN WALLS OR CEILINGS AND ARE SUITABLE FOR
REUSE, CONTRACTOR MAY UTILIZE THEM FOR NEW WIRING AND/OR DEVICES.
C. CONTRACTOR SHALL REMOVE ANY UNUSED RACEWAY WHERE EXPOSED AND PROVIDE STAINLESS STEEL
BLANK COVERS FOR ALL ABANDONED OUTLET BOXES.
D. CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS TO MAINTAIN COMMUNICATIONS AND POWER SYSTEM FUNCTIONS THROUGHOUT THE OCCUPIED PORTIONS OF THE BUILDING DURING DEMOLITION AND
RENOVATION PHASES. ANY NECESSARY SYSTEM OUTAGES SHALL BE KEPT TO A MINIMUM AND
COORDINATED WITH THE OWNER IN ADVANCE.
E. UNLESS OTHERWISE NOTED, ALL ELECTRICAL PANELS AND GEAR SHALL REMAIN.
F. CONTRACTOR SHALL FIELD VERIFY EXISTING RECEPTACLES AND ASSOCIATED FACEPLATE IN ALL SPACES
AND REPLACE ANY THAT ARE PAINTED AND/OR DAMAGED. PROVIDE GROUNDING STRAP AS REQUIRED.
G. IN EXISTING WALLS SHOWN TO BE DEMOLISHED, DISCONNECT AND REMOVE ALL EXISTING ELECTRICAL
DEVICES, WIRING AND CONDUIT. CONTRACTOR SHALL RESTORE CONTINUITY TO ANY RECEPTACLE OR
POWER CIRCUIT ONLY PARTIALLY REMOVED.
H. THROUGHOUT RENOVATED AREAS, ABANDONED CABLE (INCLUDING CABLE ON ROOF) SHALL BE REMOVED
IN ACCORDANCE WITH NEC ARTICLE 800.25.
I. WHERE NEW LIGHTING CONTROL DEVICES ARE BEING INSTALLED, CONTRACTOR SHALL LOWER ALL LIGHTING SWITCHES TO 46"AFF. REFER TO LIGHT SWITCH RETROFIT DETAIL WERE UTILIZING EXISTING
SWITCH BOX.
J. IN AREAS WHERE EXISTING CEILINGS ARE BEING REMOVED OR REPLACED:
a. CONTRACTOR SHALL TEMPORARILY SUPPORT ALL EXISTING CEILING MOUNTED DEVICES FROM
STRUCTURE. ONCE NEW CEILING IS INSTALLED, EXISTING DEVICES SHALL BE RE-INSTALLED IN THEIR EXISTING LOCATIONS. PROVIDE TILE BRIDGE OR T-GRID BOX HANGER FOR ANY DEVICES
FORMERLY SUPPORTED BY CEILING TILES.
b. CONTRACTOR SHALL PROVIDE J-HOOKS SECURED TO WALL OR SUPPORTED FROM STRUCTURE
ABOVE FOR ANY LOW-VOLTAGE CABLING LAYING ON EXISTING CEILING OR CEILING GRID.
K. ALL AREAS DESIGNATED FOR LIGHTING TO BE REMOVED, WALL AND/OR CEILING MOUNTED EXIT SIGNS AND
ASSSOCIATED WIRING SHALL BE REMOVED IN THEIR ENTIRETY.
L. LIGHTING RELAY PANELS AND ALL ASSOCIATED SWITCHES AND WIRING SHALL BE REMOVED IN THEIR
ENTIRETY. PROVIDE STAINLESS STEEL COVER AT EXISTING SWITCH LOCATIONS.
SCALE: = 1'-0"
DRAWING NUMBER
REVISIONS
COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.
THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL
NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT
EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.
10-31-2025
BID PACKAGE BP-1
SA&E PROJECT NUMBER
ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")
A
TRUE
NORTH
0 8 168
1/8"
2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
B
C
D
E
F
G
H
I
J
K
L
M
N
KEYPLAN
RIDGELAND HIGH SCHOOL
RENOVATIONS TO:
WALKER COUNTY SCHOOLS
301 N CHEROKEE ST, LAFAYETTE, GA 30728
2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741
746-0190
01-920-045
ISSUED FOR CONSTRUCTION
STATE BOARD OF REGISTRATION
FOR PROFESSIONAL ENGINEERS AND
LAND SURVEYORS
SOUTHERN A & E, LLC
ENGINEER FIRM
LICENSE NO: PEF003374
EXP. DATE - 06/30/2026
B
A
C
D E
F
G
H
J
K
E123
WING G - ELECTRICAL DEMOLITION PLAN
1/8" = 1'-0"E123
1 LEVEL 01 - WING G - ELECTRICAL DEMOLITION PLAN
KEYNOTE SCHEDULE - THIS SHEET
# KEYNOTE DESCRIPTION
D1 DISCONNECT AND REMOVE EXISTING LIGHTING FIXTURES AND SWITCHES
IN THIS SPACE/AREA/ZONE. REMOVE ALL LIGHTING CIRCUIT
CONDUCTORS. REMOVE ALL UNUSED CONDUIT, WHERE EXPOSED.
D3 EXISTING MECHANICAL EQUIPMENT TO BE REMOVED. DISCONNECT AND
REMOVE CIRCUIT CONDUCTORS, EXPOSED RACEWAY AND DISCONNECT
SWITCHES ASSOCIATED WITH MECHANICAL EQUIPMENT TO BE REMOVED.
D4 EXISTING MECHANICAL EQUIPMENT TO BE REPLACED. REMOVE
DISCONNECT, LEAVE CONDUIT AND CIRCUIT CONDUCTORS INTACT FOR
RECONNECTION TO NEW EQUIPMENT. REFER TO MECHANICAL
DEMOLITION PLANS, AND ELECTRICAL POWER PLANS. PROVIDE NEW LOAD
SIDE CONDUIT AND CONDUCTORS AS REQUIRED FOR CONNECTION TO
NEW EQUIPMENT.
D5 EXISTING MECHANICAL UNIT TO REMAIN. PROTECT FROM DAMAGE
THROUGH ALL PHASES OF CONSTRUCTION.
D13 EXISTING MECHANICAL EQUIPMENT TO BE REPLACED. REMOVE
DISCONNECT, MAINTAIN BRANCH CIRCUIT CONDUCTORS/ RACEWAY FOR
CONNECTION TO NEW EQUIPMENT PER RENOVATION PLAN.
D18 LIGHTING RELAY PANEL AND ALL ASSOCIATED WIRING ARE TO BE
REMOVED IN THEIR ENTIRETY. COORDINATE DEMOLITION W/ PHASING OF
THIS PROJECT.
# Doc # Date
1 AD1 11/13/25
2 AD2 11/21/25
File details come from the government source that posted it. Updated .