This is a Job Specification document for a temporary pier shack to be provided for Ship/Hull No. YON-285 (Barge). The work is being prepared by the Sasebo activity, with S. Oohira as the preparer, S. Murakami as the approver, and A. Oka providing concurrence. The specification is identified by ICN 89MVA86401, Revision A01.

The Period of Performance (POP) begins on September 28, 2026, and concludes on May 30, 2027, with a production completion date of April 2, 2027. The anticipated award date is September 1, 2026. The work was approved by 8300/8800 on February 2, 2026 (per signature of T. Escritor-Yamada, PM S320), with an assigned AVL code of 6B1. The SRF Control Number is 1301348511. The document includes sections for work completion documentation, including fields for S/Force rate and date, Ship Superintendent date, and work certification signatures with badge numbers and shop/code information, though these fields remain incomplete on the specification as presented.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926R00130016 SF 30.pdf PDF
LETTER-130-0011-26.pdf PDF
Solicitation Amendment N6264926R00130013 SF 30.pdf PDF
2.01 Soli Amendment 0013 LAR explaination for KTR.pdf PDF
Solicitation Amendment N6264926R00130012 SF 30.pdf PDF
2.01 Solicitation Amendment N6264926R00130011 SF 30.pdf PDF
2.01 Amend 0011 LETTER-130-0008-26.pdf PDF
Solicitation Amendment N6264926R00130011 SF 30.pdf PDF
Solicitation Amendment N6264926R00130010 SF 30.pdf PDF
Solicitation Amendment N6264926R00130010 SF 30.pdf PDF
Q_A_Amend 0009.pdf PDF
89MVA12301_00_A01 v2.pdf PDF
89MVA15003_00_A01 v2.pdf PDF
89MVA15004_00_A01 v2.pdf PDF
89MVA11001_00_A01 v2.pdf PDF
89MVA86301_00_A01 v2.pdf PDF
2.01 Solicitation Amendment N6264926R00130006 SF 30.pdf PDF
Solicitation Amendment N6264926R00130005 SF 30.pdf PDF
Q_A.pdf PDF
YON Location Akasaki.pdf PDF
Attachment II Price Proposal Form N6264926R0013_Final.xlsx XLSX spreadsheet
89MVA15003_00_A01.pdf PDF
89MVA15006_00_A01.pdf PDF
Solicitation Amendment N6264926R00130003 SF 30.pdf PDF
89MVA15004_00_A01.pdf PDF
89MVA11001_00_A01.pdf PDF
89MVA15002_00_A01.pdf PDF
89MVA12301_00_A01.pdf PDF
89MVA86401_00_A01.pdf PDF
89MVA15005_00_A01.pdf PDF
Attachment 2 YON 285 6B1 PROPOSAL BREAKDOWN.xlsx XLSX spreadsheet
2.01 Solicitation Amendment N6264926R00130001 SF 30.pdf PDF
Attachment 5 YON 285 6B1 MILESTONE DSRA.xlsx XLSX spreadsheet
DD1423 YON-285 6B1 DSRA CDRL A010 KTR DEFICIENCY REPORTING.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A002 QUALITY ASSURANCE PROGRAM PLAN.pdf PDF
YON 285 6B1 Specs 5-8.pdf PDF
Attachment 2 YON 285 6B1 PROPOSAL BREAKDOWN.xlsx XLSX spreadsheet
DD1423 YON-285 6B1 DSRA CDRL A007 KEY EVENT REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A003 IPS.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A001 GFMnot.pdf PDF
2.01 Solicitation - N6264926R0013.pdf PDF
Attachment 3 YON 285 6B1 CONTRACTOR QUESTIONS.pdf PDF
Attachment 4 YON 285 6B1 DSRA PERL.xlsx XLSX spreadsheet
Attachment 6 YON 285 6B1 CONTRACT DATA SHEET.docx DOCX document
DD1423 YON-285 6B1 DSRA CDRL A005 WEEKLY PROGRESS REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A004 DAILY REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A006 CONFERENCE REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A008 TEMPORARY SERVICES.pdf PDF
YON 285 6B1 Specs 1-4.pdf PDF
YON 285 6B1 Specs 9-11.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shi HULL NO. Shi HULL NAME

YON-285 BARGE

ICN:

JON: 89MVA86401

Rev: Key Op:

A01

TITLE:

Temporary Pier Shack; provide

JOB SPECIFICATION

Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:

'I/ 4 f/ ~ ..1.' 02/02/2027 POP Start Date: POP End Date: SASEBO

9/28/2026 'I/do/~)

PREPARED BY: CODE DATE

S.OOHIRA E 00 1/28/2028

APPROVED BY: ~wt, CODE

S.MURAKAMI S225

CONCURRED BY: /4 /fll- CODE

A.OKA ~ S233

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

DESCRIPTION:

JSN(SI; CASREP I

1/.F CQNTA5'!i sa,!P! ,~NI# I

T. ESCRITOR-YAMADA

App.....,bf 8300IS800~ 21YY&4 681 Pl!!; AYL; :::ff4- I

I.WC; I

Work Completed

S/Force: Rate; Date;

Ship Supt: Qlte; SRF CONTROL NO.: 1301348511 -:s

WQRK ,EBTIEICATIQN SliN~ TUBES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

Tasuku.Nagano.ja Text Box 9/1/2026

Tasuku.Nagano.ja Text Box 5/30/2027

Tasuku.Nagano.ja Text Box 4/2/2027