This is a Standard Form 30 (SF 30) Amendment of Solicitation, issued by the Naval Supply Fleet Logistics Center Yokosuka on August 3, 2026, to reopen solicitation N6264926R0013 for thirty calendar days with a new response due date of September 3, 2026 at 10:00 AM Japan Standard Time. The amendment changes the purchase requisition number to N6275826PRY013 and extends the original deadline of July 28, 2026. The contracting office is located at PSC 473 BOX 11, FPO, AP 96349-1500, with Jason Rankin identified as the point of contact.
The amendment provides three key clarifications regarding the scope of work: contractors should bid only on work to be performed at their facility, with government responsibility for transportation of the craft to and from the facility; the Period of Performance is flexible and can be proposed based on contractor resource availability; and the use of Mechanically Attached Fittings (MAF) is governed by NSI 009-095 standards, which may be implemented post-award through a Condition Found Report process subject to supervisor approval, with required procedures to be submitted at least seven days before installation begins. All other terms and conditions of the original solicitation remain unchanged unless modified by this amendment. Offerors must acknowledge receipt of this amendment by completing the form and returning it, acknowledging receipt on their offer copies, or submitting separate written communication referencing the solicitation and amendment numbers prior to the September 3, 2026 deadline.
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Created On:
03 Aug 2026, 23:43 PM Greenwich Mean Time
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification):
The purpose of this amendment is to:
Reopen the solicitation for thirty (30) calendar days with a close date and time of 03-Sep-2026 10:00 AM JST.
To also provide further clarification:
1. Please bid on the work only to be accomplished at your facility. Transportation of the craft to and from your facility will be covered separately by the government.
2. POP for the work is open and can be proposed by KTR based on their available resources.
3. The criteria for contractor utilization of Mechanically Attached Fittings (MAF) are governed by NSI 009-095 (a Category II NSI), which must be referenced within the work specification. To facilitate timely contract solicitations and preserve the ship's availability schedule, current work specifications are written to invoke only NSI 009-012 (Weld, Fabricate, and Inspect; accomplish). Post-award, the contractor may submit a Condition Found Report (CFR) requesting to implement NSI 009-095, subject to approval by the SUPERVISOR. Following CFR approval, the contractor must submit a written MAF procedure that meets the criteria of NSI 009-095 (paragraph 3.2.1) and MIL-STD 777 (Schedule of Piping Systems, Valves, Fittings, and Associated Piping Components for Naval Surface Ships). This procedure must be submitted to the SUPERVISOR for review and approval a minimum of 7 days prior to the start of the first installation. Utilizing the CFR process for this transition ensures administrative efficiency;
revising active, executable work specifications during the solicitation phase to cover every potential engineering permutation is inefficient and counterproductive to SRF-JRMC Detachment Sasebo's procurement timelines.
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Header only - Purchase Requisition Number
N6275826PRYN013
Response Due Date 28 Jul 2026 03 Sep 2026
N6264926R00130003
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0011 |
| EffDate: 04 Aug 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N62649 |
| AdmCode: |
| IssuedBy: NAVSUP FLT LOG CTR YOKOSUKA |
PSC 473 BOX 11, FPO AP 96349-1500
FPO, AP 96349-1500
UNITED STATES
Jason Rankin, Email: jason.m.rankin6.civ@us.navy.mil Telephone: 0956-50-2873 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6264926R0013 |
| SolDate: 22 Apr 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .