This is a Job Specification document for shipyard work at Sasebo. The specification covers cleaning and maintenance work on a barge designated YON-285, with the primary task being the cleaning of a Cargo Oil Tank and 1-20-1-F Fuel Tank. The work is identified under Job Order Number (JON) 89MVA12301, Revision A01.
The anticipated award date is September 1, 2026, with a production completion date of April 2, 2027. The Period of Performance (POP) is scheduled to commence on September 28, 2026, and conclude on May 30, 2027. The work was prepared by K. Sato (Code H_SA) on January 29, 2026, and has been approved by S. Murakami (Code S225) and concurred by S. Morooka (Code S231). The preparing activity is identified as SASEBO. The document includes fields for work completion sign-offs, including supervisor authorization, SRF control number (1301305451), and work certification signatures with badge number and shop code verification requirements, though these signature blocks remain incomplete in the current version.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ShlD/HULL NO. ShlD/HULL NAME ICN: Rev: Key Op:
YON-285 BARGE
JON: 89MVA12301 A01
TITLE:
(8) Cargo 011 Tank and 1-20-1-F Fuel Tank; clean
JOB SPECIFICATION
Anticipated Award Date Production Completion Date: PREPARING ACTMTY:
7 /JI/ .:u,,..I, 02/02/2027 POP Start Date: POP End Date: SASEBO
?/ .l.i/ ~o~/, ¥1 ~o/ ... ~J
PREPARED BY: CODE DATE
K.SATO H SA 1/29/2026
APPROVED BY:
CODE
S.MURAKAMI S225 '
CONCURRED BY:
CODE
S.MOROOKA S231
ASSIST PLANNER'S NAME:
CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
DESCRIPTION:
JSN(Sli NIA C!§REP#
S/F CONTACTi N/A CWP# CCNS#
Appn,ved by S300/5900~ .~ oate: S/2t:/z,e 6~1 AVL: :::fBt:
LWC:
Work Completed
S/Force: Rate: Date:
Ship Supt: D!!!i SRF CONTROL NO.: ldo 1-i_ ~ l.Sll rtQBK CEBTIFICATIQ~ §l~NaJ:YBli§
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
Tasuku.Nagano.ja Text Box 9/1/2026
Tasuku.Nagano.ja Text Box 4/2/2027
Tasuku.Nagano.ja Text Box 5/30/2027