89MVA15003_00_A01 v2.pdf
PDF 40 KB Posted
- Attached to
- YON-285 Outfit
- Solicitation number
- N6264926R0013
About this file
This is a Job Specification document for naval shipyard work on the SHIPAL T YON-122D barge (Ship/HULL NO. YON-286). The work is being prepared by the Sasebo shipyard facility and covers multiple functional areas organized into five parts: Hull Work (Parts I, II, and III), Electrical Work (Part IV), and Preservation Work (Part V). The anticipated award date is September 1, 2026, with a production completion date of April 2, 2027. The Period of Performance (POP) runs from September 28, 2026, through May 30, 2027.
The document assigns responsibility for different work segments to specific planners: Y. Hamabe oversees Parts I and II (Hull Work, pages 2-21), N. Nagato manages Parts III (Hull Work, pages 22-30) and V (Preservation Work, pages 36-38), and S. Nishino handles Part IV (Electrical Work, pages 31-35). The work was prepared by Y. Hamabe on January 29, 2028, and approved by S. Murakami (S225) and S. Morooka (S231). The specification is identified by ICN 89MVA15003, Revision 1, with Key Operation A01. The S/Force Contact is T. Escritor-Yamada (PMS 320), and the SRF Control Number is 1301348511.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shi HULLNO. Shi HULL NAME
YON-285 BARGE JON:
ICN:
89MVA15003
, Rev:
I I
Key Op:
A01
TITLE:
SHIPAL T YON-122D; accomplish
JOB SPECIFICATION
Anticipated Award Dm: Production Completion Daw: PREPARING ACTIVITY:
7/J//~~t 02/02/2027 POP Start Dm: POP End Data: SASEBO
9/28/2026 Y./ .Jo/ ~.,).. ?
PREPARED BY: CODE DATE
Y.HAMABE H HA 1/29/2028
APPROVED BY:
CODE
S.MURAKAMI S225
CONCURRED BY: l\~7/v CODE
S.MOROOKA S231
ASSIST PLANNER'S NAME: . . CODE
N.NAGATO H NA
ASSIST PLANNER'S NAME: CODE
S.NISHINO ENI
ASSIST PLANNER'S NAME: CODE
K.SAITO M SK
PART-I Hull Work: Y. HAMABE (H_HA) ---------- Page 2 through 5 PART-II Hull Work: Y. HAMABE (H_HA) --------- Page 8 through 21 PART-Ill Hull Work: N. NAGATO (H_NA) -------- Page 22 through 30 PART-JV Electrlcal Work: S. NISHINO (E_NI) --· --- Page 31 through 35 PART-V Preservation Work: N. NAGATO (H_NA) ---------- Page 38 through 38
DESCRIPTION:
JIN(lli CYBl;P# I
S/F CONTACJi CWPI CCNI# I
T. ESCRITOR-YAMADA
681 PMS320 2--b-iu,__~ Approved by S300/8900
Data; Ayl; ::flt: I blr!lC; I
Work Completed
S/Force: Rag: Data; I
Ship Supt: Q1ta; SRF CONTROL NO.: 1301348511
WOBts; C~BIIFIC6T1Otl lliNML!BEI
COMPLETION OF VVORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
Tasuku.Nagano.ja Text Box 9/1/2026
Tasuku.Nagano.ja Text Box 4/2/2027
Tasuku.Nagano.ja Text Box 5/30/2027
File details come from the government source that posted it. Updated .