This is a Job Specification document for naval shipyard work on the SHIPAL T YON-122D barge (Ship/HULL NO. YON-286). The work is being prepared by the Sasebo shipyard facility and covers multiple functional areas organized into five parts: Hull Work (Parts I, II, and III), Electrical Work (Part IV), and Preservation Work (Part V). The anticipated award date is September 1, 2026, with a production completion date of April 2, 2027. The Period of Performance (POP) runs from September 28, 2026, through May 30, 2027.

The document assigns responsibility for different work segments to specific planners: Y. Hamabe oversees Parts I and II (Hull Work, pages 2-21), N. Nagato manages Parts III (Hull Work, pages 22-30) and V (Preservation Work, pages 36-38), and S. Nishino handles Part IV (Electrical Work, pages 31-35). The work was prepared by Y. Hamabe on January 29, 2028, and approved by S. Murakami (S225) and S. Morooka (S231). The specification is identified by ICN 89MVA15003, Revision 1, with Key Operation A01. The S/Force Contact is T. Escritor-Yamada (PMS 320), and the SRF Control Number is 1301348511.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926R00130016 SF 30.pdf PDF
LETTER-130-0011-26.pdf PDF
2.01 Soli Amendment 0013 LAR explaination for KTR.pdf PDF
Solicitation Amendment N6264926R00130013 SF 30.pdf PDF
Solicitation Amendment N6264926R00130012 SF 30.pdf PDF
2.01 Solicitation Amendment N6264926R00130011 SF 30.pdf PDF
Solicitation Amendment N6264926R00130011 SF 30.pdf PDF
2.01 Amend 0011 LETTER-130-0008-26.pdf PDF
Solicitation Amendment N6264926R00130010 SF 30.pdf PDF
Solicitation Amendment N6264926R00130010 SF 30.pdf PDF
Q_A_Amend 0009.pdf PDF
89MVA12301_00_A01 v2.pdf PDF
89MVA86401_00_A01 v2.pdf PDF
89MVA15004_00_A01 v2.pdf PDF
89MVA11001_00_A01 v2.pdf PDF
89MVA86301_00_A01 v2.pdf PDF
2.01 Solicitation Amendment N6264926R00130006 SF 30.pdf PDF
Solicitation Amendment N6264926R00130005 SF 30.pdf PDF
Q_A.pdf PDF
YON Location Akasaki.pdf PDF
Attachment II Price Proposal Form N6264926R0013_Final.xlsx XLSX spreadsheet
89MVA15003_00_A01.pdf PDF
89MVA15006_00_A01.pdf PDF
89MVA86401_00_A01.pdf PDF
89MVA15005_00_A01.pdf PDF
Solicitation Amendment N6264926R00130003 SF 30.pdf PDF
89MVA15004_00_A01.pdf PDF
89MVA11001_00_A01.pdf PDF
89MVA15002_00_A01.pdf PDF
89MVA12301_00_A01.pdf PDF
Attachment 2 YON 285 6B1 PROPOSAL BREAKDOWN.xlsx XLSX spreadsheet
2.01 Solicitation Amendment N6264926R00130001 SF 30.pdf PDF
Attachment 5 YON 285 6B1 MILESTONE DSRA.xlsx XLSX spreadsheet
DD1423 YON-285 6B1 DSRA CDRL A010 KTR DEFICIENCY REPORTING.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A002 QUALITY ASSURANCE PROGRAM PLAN.pdf PDF
YON 285 6B1 Specs 5-8.pdf PDF
Attachment 3 YON 285 6B1 CONTRACTOR QUESTIONS.pdf PDF
Attachment 4 YON 285 6B1 DSRA PERL.xlsx XLSX spreadsheet
Attachment 6 YON 285 6B1 CONTRACT DATA SHEET.docx DOCX document
DD1423 YON-285 6B1 DSRA CDRL A005 WEEKLY PROGRESS REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A004 DAILY REPORT.pdf PDF
Attachment 2 YON 285 6B1 PROPOSAL BREAKDOWN.xlsx XLSX spreadsheet
DD1423 YON-285 6B1 DSRA CDRL A007 KEY EVENT REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A003 IPS.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A001 GFMnot.pdf PDF
2.01 Solicitation - N6264926R0013.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A006 CONFERENCE REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A008 TEMPORARY SERVICES.pdf PDF
YON 285 6B1 Specs 1-4.pdf PDF
YON 285 6B1 Specs 9-11.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shi HULLNO. Shi HULL NAME

YON-285 BARGE JON:

ICN:

89MVA15003

, Rev:

I I

Key Op:

A01

TITLE:

SHIPAL T YON-122D; accomplish

JOB SPECIFICATION

Anticipated Award Dm: Production Completion Daw: PREPARING ACTIVITY:

7/J//~~t 02/02/2027 POP Start Dm: POP End Data: SASEBO

9/28/2026 Y./ .Jo/ ~.,).. ?

PREPARED BY: CODE DATE

Y.HAMABE H HA 1/29/2028

APPROVED BY:

CODE

S.MURAKAMI S225

CONCURRED BY: l\~7/v CODE

S.MOROOKA S231

ASSIST PLANNER'S NAME: . . CODE

N.NAGATO H NA

ASSIST PLANNER'S NAME: CODE

S.NISHINO ENI

ASSIST PLANNER'S NAME: CODE

K.SAITO M SK

PART-I Hull Work: Y. HAMABE (H_HA) ---------- Page 2 through 5 PART-II Hull Work: Y. HAMABE (H_HA) --------- Page 8 through 21 PART-Ill Hull Work: N. NAGATO (H_NA) -------- Page 22 through 30 PART-JV Electrlcal Work: S. NISHINO (E_NI) --· --- Page 31 through 35 PART-V Preservation Work: N. NAGATO (H_NA) ---------- Page 38 through 38

DESCRIPTION:

JIN(lli CYBl;P# I

S/F CONTACJi CWPI CCNI# I

T. ESCRITOR-YAMADA

681 PMS320 2--b-iu,__~ Approved by S300/8900

Data; Ayl; ::flt: I blr!lC; I

Work Completed

S/Force: Rag: Data; I

Ship Supt: Q1ta; SRF CONTROL NO.: 1301348511

WOBts; C~BIIFIC6T1Otl lliNML!BEI

COMPLETION OF VVORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

Tasuku.Nagano.ja Text Box 9/1/2026

Tasuku.Nagano.ja Text Box 4/2/2027

Tasuku.Nagano.ja Text Box 5/30/2027