This is a Job Specification document for naval shipyard work related to the installation of a temporary head (toilet facility) on Barge YON-285. The work is being conducted at the Sasebo naval facility and is identified by ICN 89MVA86303 with SRF Control Number 1301348511.
The anticipated award date is September 1, 2026, with a production completion date of April 2, 2027. The Period of Performance (POP) runs from September 28, 2026 through May 30, 2027. The work was prepared by H. Muta on January 23, 2026, approved by S. Murakami (Code S225), and concurred by S. Morooka (Code S231). The document includes approval by T. Escritor-Yamada under PMS320 and S300/S900 with a date of February 12, 2024. Additional coordination information is provided for contact and work certification purposes, with fields for completion of work review signatures, badge numbers, shop codes, and phone contact information. The document serves as the formal specification initiating the job order and establishing the timeline and responsible parties for this shipyard maintenance task.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shi /HULL NO. Shi /HULL NAME
YON-285 BARGE JON:
ICN:
89MVA86303
Rev:
TITLE:
Temporary Head; provide
JOB SPECIFICATION
Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:
,/.al/ ~o~, 02/02/2027 POP Start Date: POP End Date: SASEBO
19/28/2026 'I-/ dO/ -M~,-.
PREPARED BY: CODE DATE
H. MUTA H MU 1/23/2026
APPROVED BY: G).,/\ CODE
$.MURAKAMI S225
CONCURRED BY: /2.,#v CODE
S. MOROOKA S231
ASSIST PLANNER'S NAME:
CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
DESCRIPTION:
JSN(Sl: NIA CA§REP#
S/F CONTACT: N/A CWP# CCNS#
T. ESCRITOR-YAMADA
PMS320
Date: eh~ (yO Ht
Approved by S300/S900
Avl: ~
LWC:
Work Completed
S/Force: Rate: Date:
Ship Supt: Date: SRF CONTROL NO.: 1301348511
WQRK CERTIFICATION SIGNATURES
Key Op:
A01
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
Tasuku.Nagano.ja Text Box 9/1/2026
Tasuku.Nagano.ja Text Box 4/2/2027
Tasuku.Nagano.ja Text Box 5/30/2027