2.01 Amend 0011 Q&A.pdf
PDF 22 MB Posted
- Attached to
- YON-285 Outfit
- Solicitation number
- N6264926R0013
About this file
This is a Questions and Answers (Q&A) document related to Amendment 0011 for the YON-285 Outfit solicitation (N6264926R0013), a Firm-Fixed-Price contract for repair and continuous maintenance of the YON-285 Craft at Commander, Fleet Activities Sasebo (CFAS) in Sasebo Naval Base, Japan. The document does not contain the actual Q&A responses but rather provides technical specification tables and requirements for welding, fabrication, and inspection work.
The file establishes detailed welding and fabrication requirements organized in Table 1, which specifies applicable standards and procedures across five material categories: Class P-1, P-2, and P-LT piping; Class P-3a piping; hard-facing valve parts; Class A pressure vessels; and propulsion boilers with bronze propellers. For each category, the table identifies mandatory requirements for welder and brazer qualifications, welding procedures, brazing procedures, welding requirements, filler material, joint design, heat treatment, workmanship requirements, visual inspection of joint fit-up, and visual inspection, referencing specific military standards (S9074-AQ-GIB-010/248, S9074-AR-GIB-010/278, MIL-STD-2035, MIL-STD-2185, DOD-STD-2185, S9221-C1-GTP-010/020, and 0900-LP-001-7000). The document also includes a material list for socket-welded joint components (1/2" and 3/4" x 1/2" couplings and 316 stainless steel pipe) and provides optional compliance pathways allowing the shipbuilder to utilize alternative standards such as MIL-STD-1689 or previously ABS-accepted procedures, provided such alternatives result in no additional government cost and are approved by the supervisor.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6B1
FY26
* - PARAGRAPH 3.4.4 APPLIES 6 of 30 ITEM NO: 009- 12
** - PARAGRAPH 3.10 APPLIES FY-26
TABLE 1
WELDING, FABRICATION, AND INSPECTION OF PIPING, PRESSURE VESSELS, PROPELLERS, AND MACHINERY
COLUMN A B C D E
L I N E
SITUATION
EVOLUTION
CLASS P-1, P-2
AND P-LT PIPING
CLASS P-3a
SPECIAL
CATEGORY,
OTHER CLASS P-
3a, AND P-3b
PIPING
HARD
FACING
VALVE
PARTS
CLASS A
PRESSURE
VESSEL
** PROPULSION
BOILERS
*PROPELLE
RS
(BRONZE)
1 WELDER AND
BRAZER
QUALIFICATI
ON
S9074-AQ-GIB-
010/248, PARAGRAPH 5
0900-LP-001-7000,
SECTION 4
S9074-AQ-GIB-010/248,
PARAGRAPH 5
S9221-C1-GTP-
010/020
2 WELDING
PROCEDURE
S9074-AQ-GIB-
010/248, PARAGRAPH 4
NOT
APPLICABLE
S9074-AQ-GIB-010/248,
PARAGRAPH 4
S9221-C1-GTP-
010/020
DOD-STD-
2185, PARAGRAP
H 4
3 BRAZING
PROCEDURE
NOT APPLICABLE 0900-LP-001-7000,
SECTION 4
NOT APPLICABLE
4 WELDING
REQUIREMEN
TS
S9074-AR-GIB-
010/278, PARAGRAPH 6
NOT
APPLICABLE
S9074-AR-GIB-010/278,
PARAGRAPH 6
MIL-STD-
2185, PARAGRAP
H 5
* - PARAGRAPH 3.4.4 APPLIES 7 of 30 ITEM NO: 009- 12
** - PARAGRAPH 3.10 APPLIES FY-26
TABLE 1
WELDING, FABRICATION, AND INSPECTION OF PIPING, PRESSURE VESSELS, PROPELLERS, AND MACHINERY
COLUMN A B C D E
L I N E
SITUATION
EVOLUTION
CLASS P-1, P-2
AND P-LT PIPING
CLASS P-3a
SPECIAL
CATEGORY,
OTHER CLASS P-
3a, AND P-3b
PIPING
HARD
FACING
VALVE
PARTS
CLASS A
PRESSURE
VESSEL
** PROPULSION
BOILERS
*PROPELLE
RS
(BRONZE)
5 FILLER
MATERIAL
S9074-AR-GIB-
010/278, PARAGRAPH 5
0900-LP-001-7000,
SECTION 5 S9074-AR-GIB-010/278,
PARAGRAPH 5
S9221-C1-GTP-
010/020
DOD-STD-
2185, PARAGRAP
H 5
6 JOINT
DESIGN
S9074-AR-GIB-
010/278, PARAGRAPH 9
MIL-STD-22
0900-LP-001-7000,
SECTION 5
NOT
APPLICABLE
S9074-AR-
GIB-010/278,
PARAGRAP
H 9 MIL-
STD-22
S9221-C1-GTP-
010/020
* - PARAGRAPH 3.4.4 APPLIES 8 of 30 ITEM NO: 009- 12
** - PARAGRAPH 3.10 APPLIES FY-26
TABLE 1
WELDING, FABRICATION, AND INSPECTION OF PIPING, PRESSURE VESSELS, PROPELLERS, AND MACHINERY
COLUMN A B C D E
L I N E
SITUATION
EVOLUTION
CLASS P-1, P-2 AND
P-LT PIPING
CLASS P-3a
SPECIAL
CATEGORY,
OTHER CLASS
P-3a, AND P-3b
PIPING
HARD
FACING
VALVE
PARTS
CLASS A
PRESSURE
VESSEL
** PROPULSION
BOILERS
*PROPELLER
S (BRONZE)
7 HEAT
TREATMENT
S9074-AR-GIB-
010/278, PARAGRAPH 6
0900-LP-001-
7000, SECTION 5
S9074-AR-
GIB-010/278,
PARAGRAPH
S 6 AND 11.6 S9074-AR-
GIB-010/278,
PARAGRAP
H 6
S9221-C1-GTP-
010/020
S9074-AR-
GIB-010/278,
PARAGRAPH
DOD-STD-
2185, PARAGRAPH
8 WORKMANS
HIP
REQUIREMEN
TS
S9074-AR-GIB-
010/278, PARAGRAPH 7
0900-LP-001-
7000, SECTION 5
S9074-AR-
GIB-010/278,
PARAGRAPH
S 7 AND 11.6
S9074-AR-
GIB-010/278,
PARAGRAP
H 7
S9221-C1-GTP-
010/020 S9074-AR-
GIB-010/278,
PARAGRAPH
* - PARAGRAPH 3.4.4 APPLIES 9 of 30 ITEM NO: 009- 12
** - PARAGRAPH 3.10 APPLIES FY-26
TABLE 1
WELDING, FABRICATION, AND INSPECTION OF PIPING, PRESSURE VESSELS, PROPELLERS, AND MACHINERY
COLUMN A B C D E
L I N E
SITUATION
EVOLUTION
CLASS P-1, P-2 AND
P-LT PIPING
CLASS P-3a
SPECIAL
CATEGORY,
OTHER CLASS
P-3a, AND P-3b
PIPING
HARD
FACING
VALVE
PARTS
CLASS A
PRESSURE
VESSEL
** PROPULSION
BOILERS
*PROPELLER
S (BRONZE)
9 VISUAL
INSPECT
JOINT FIT-UP
S9074-AR-GIB-
010/278, PARAGRAPH 9
MIL-STD-22
0900-LP-001-
7000, SECTION 7
NOT
APPLICABLE
S9074-AR-
GIB-010/278,
PARAGRAP
H 9 MIL-
STD-22
S9221-C1-GTP-
010/020 DOD-STD-
2185, PARAGRAPH
10 VISUAL
INSPECTION
S9074-AR-GIB-
010/278, PARAGRAPH 10
MIL-STD-2035,
PARAGRAPH 4
0900-LP-001-
7000, SECTION 7
AND 8
S9074-AR-
GIB-010/278,
PARAGRAPH
11.6.3
MIL-STD-
2035, PARAGRAPH
S9074-AR-GIB-010/278,
PARAGRAPH 10
MIL-STD-2035,
PARAGRAPH 4
MIL-STD-
2035, PARAGRAPH
22 of 30 ITEM NO: 009- 12
FY-26
WELDING/NDT PROCEDURE AND PERSONNEL QUALIFICATION REQUIREMENTS, OR TO DEFINE OTHER
ATTRIBUTES LISTED IN THE "MATERIAL EVOLUTION" LINE OF TABLE 3.
** - THE SUPERVISOR MAY ALSO ALLOW THE SHIPBUILDER TO CHOOSE FROM THE FOLLOWING OPTIONS, PROVIDING:
- THE SHIPBUILDER'S UTILIZATION OF THE FOLLOWING OPTIONS MUST RESULT IN NO ADDITIONAL COST
TO THE GOVERNMENT.
- THE SHIPBUILDER MUST UTILIZE THE FABRICATION DOCUMENT SELECTED FOR THE ENTIRE
AVAILABILITY AND MUST NOT SWITCH BACK AND FORTH BETWEEN DOCUMENTS.
- THE SHIPBUILDER MUST NOTIFY THE SUPERVISOR OF WHICH FABRICATION DOCUMENT HAS BEEN
SELECTED.
OPTIONS:
A) MIL-STD-1689 MAY BE UTILIZED BY THE SHIPBUILDER AT THE SHIPBUILDER'S DISCRETION. THE
REQUIREMENTS OF TABLE 2 ABOVE WOULD THEN APPLY.
B) FOR DETERMINATION OF NDT METHOD(S) AND EXTENT OF NDT INSPECTION WHEN REPAIRS ARE TO BE ACCOMPLISHED, THE SHIPBUILDER MAY REQUEST TO UTILIZE THE SAME NDT REQUIREMENTS THAT WERE INVOKED IN CONSTRUCTION OF THE VESSEL. IN SUCH CASES, THE SHIPBUILDER MUST BE RESPONSIBLE TO DETERMINE THE ORIGINAL NDT REQUIREMENTS AND SUBMIT EVIDENCE SUCH AS
DRAWINGS OR SPECIFICATIONS WHICH DETAIL THE REQUIREMENTS TO THE SUPERVISOR ALONG
WITH A REQUEST FOR APPROVAL.
C) THE SHIPBUILDER MAY REQUEST TO UTILIZE PRE-ESTABLISHED WELDING AND/OR NDT PROCEDURES AND PERSONNEL QUALIFICATION PROGRAM(S) WHICH HAVE BEEN PREVIOUSLY UTILIZED IN THE PERFORMANCE OF SIMILAR ABS-ACCEPTED WORK. IN SUCH CASES, THE SHIPBUILDER MUST SUBMIT EVIDENCE OF SUCH ABS ACCEPTABILITY TO THE SUPERVISOR ALONG WITH DESCRIPTIVE DETAILS AND SUPPORTING DOCUMENTATION FOR THE PROPOSED PROGRAM(S). SUCH DOCUMENTATION MUST
INCLUDE THE WELDING/NDT PROCEDURES AND METHODS OF WELDING/NDT PERSONNEL
QUALIFICATION THAT WERE UTILIZED IN FORMER ABS-ACCEPTED WORK. THE SHIPBUILDER MUST
ALSO SUBMIT OTHER SUPPORTING EVIDENCE THAT MAY BE REQUESTED BY THE SUPERVISOR TO
23 of 30 ITEM NO: 009- 12
FY-26
ESTABLISH THAT THE PROPOSED PROGRAMS HAVE BEEN PREVIOUSLY UTILIZED FOR SIMILAR ABS-
ACCEPTED WORK.
*** - PARAGRAPH 3.8 APPLIES.
ICN: 89MVA15007_00_A01
TITLE: Knukle Crane; install (Part-3, Piping Work)
11. Requirement for Socket welded joint
MATERIAL LIST
PC No. Description STOCK
NUMBER QTY
F-15
COUPLING, 1/2", COUPLING,
6000#, SWLDG X FPT, 316 SS,
ASTM A182
9B 4730 2/EA
P-7
PIPE, 1/2" PIPE, 0.840" OD X
0.187" THK, SCH 80, ASTM A312,
316 SS, SEAMLESS
9B 4730 3/FT
F-9
RDC COUPLING, 3/4" X 1/2",
REDUCING COUPLING, 6000#,
SWLDG, 316 SS, ASTM A182
9B 4730 2/EA
2. Change of requirements
CLASS: ABS/NK
Drawing No.: WPR-20-SUSPI-000
Filler Metal: TG-S308L/316L, DW-308L/316L
(Pipe: K304LTP/K316LPT)
Title: The Welding Procedure Test Result TIG oneside butt welding with gas backing for SUS pipe and CO2 semi-automatic fillet welding without gas backing for SUS pipe
SOLI Q&A Option A_1_Redacted1.pdf
File details come from the government source that posted it. Updated .