89MVA15005_00_A01 v2.pdf

PDF 34 KB Posted

Attached to
YON-285 Outfit
Solicitation number
N6264926R0013
Issued by

About this file

This is a Job Specification document for naval ship maintenance work prepared by the Sasebo Naval Base. The specification covers SIA 124D modifications to Manhole, Access, and Flood Alarm System on Barge YON-285 (ICN: 89MVA15005). The Period of Performance (POP) runs from September 28, 2026 through May 30, 2027, with an anticipated award date of September 1, 2026 and production completion date of April 2, 2027. The preparing activity is Sasebo, with S. Oohira listed as the preparer (Code E 00, dated January 26, 2026), S. Murakami as approver (Code S225), and A. Oka as concurrence (Code S233). K. Komatsu serves as Assist Planner (Code H_KO).

The work includes a Ship/Force completion section and Work Certification Signatures section for final review documentation. The primary point of contact is T. Escritor-Yamada, with approval routed through S300/S900 PMS320. The SRF Control Number is 1301348511. The document provides standard naval shipyard work order structure with designated completion review, badge number, shop/code, phone, and date fields for work certification signatures, though specific technical requirements, budget figures, and detailed scope details are not fully detailed in this specification sheet.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926R00130015 SF 30.pdf PDF
LETTER-130-0011-26.pdf PDF
Solicitation Amendment N6264926R00130014 SF 30.pdf PDF
2.01 Soli Amendment 0013 LAR explaination for KTR.pdf PDF
Solicitation Amendment N6264926R00130012 SF 30.pdf PDF
2.01 Solicitation Amendment N6264926R00130011 SF 30.pdf PDF
2.01 Amend 0011 Attachment.pdf PDF
Solicitation Amendment N6264926R00130011 SF 30.pdf PDF
2.01 Amend 0011 Q&A.pdf PDF
2.01 Solicitation Amendment N6264926R00130011 SF 30.pdf PDF
Solicitation Amendment N6264926R00130010 SF 30.pdf PDF
Q_A_Amend 0009.pdf PDF
Solicitation Amendment N6264926R00130009 SF 30.pdf PDF
89MVA12301_00_A01 v2.pdf PDF
89MVA15003_00_A01 v2.pdf PDF
89MVA86401_00_A01 v2.pdf PDF
89MVA15006_00_A01 v2.pdf PDF
89MVA15002_00_A01 v2.pdf PDF
89MVA86303_00_A01 v2.pdf PDF
89MVA15007_00_A01 v2.pdf PDF
Solicitation Amendment N6264926R00130008 SF 30.pdf PDF
2.01 Solicitation Amendment N6264926R00130006 SF 30.pdf PDF
2.01 RFP N6264926R00130006 Q&A YON 285 Outfit.pdf PDF
YON Location Akasaki.pdf PDF
Solicitation Amendment N6264926R00130004 SF 30.pdf PDF
Geographical Akasaki YONs.docx DOCX document
Attachment II Price Proposal Form N6264926R0013_Final.xlsx XLSX spreadsheet
89MVA15003_00_A01.pdf PDF
89MVA15006_00_A01.pdf PDF
89MVA86401_00_A01.pdf PDF
89MVA15005_00_A01.pdf PDF
2.01 Solicitation Amendment N6264926R00130002 SF 30.pdf PDF
89MVA15007_00_A01.pdf PDF
89MVA86301_00_A01.pdf PDF
89MVA86303_00_A01.pdf PDF
Attachment 5 YON 285 6B1 MILESTONE DSRA.xlsx XLSX spreadsheet
DD1423 YON-285 6B1 DSRA CDRL A010 KTR DEFICIENCY REPORTING.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A002 QUALITY ASSURANCE PROGRAM PLAN.pdf PDF
YON 285 6B1 Specs 5-8.pdf PDF
Attachment 3 YON 285 6B1 CONTRACTOR QUESTIONS.pdf PDF
Attachment 4 YON 285 6B1 DSRA PERL.xlsx XLSX spreadsheet
Attachment 6 YON 285 6B1 CONTRACT DATA SHEET.docx DOCX document
DD1423 YON-285 6B1 DSRA CDRL A005 WEEKLY PROGRESS REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A004 DAILY REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A006 CONFERENCE REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A008 TEMPORARY SERVICES.pdf PDF
YON 285 6B1 Specs 1-4.pdf PDF
YON 285 6B1 Specs 9-11.pdf PDF
Attachment 2 YON 285 6B1 PROPOSAL BREAKDOWN.xlsx XLSX spreadsheet
DD1423 YON-285 6B1 DSRA CDRL A007 KEY EVENT REPORT.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ship/HULL NO. ShlD/HULL NAME ICN: I Rev: Key Op:

YON-285 BARGE

JON: 89MVA15005 I - A01

TITLE:

SIA 124D, Modification• of Manhole, Acee•• and Flood Alann Syetem; accomplleh

JOB SPECIFICATION

Anticipated Award Date Production Completion Date: PREPARING ACTMTY:

1/dl /~.J.., 02/02/2027 POP Start Date: POP End Date: SASEBO

9/28/2026 I.J./ .30/ .>-o.?

PREPARED BY: CODE DATE

S.OOHIRA E 00 1/26/2026

APPROVED BY: ~ CODE

S.MURAKAMI - S225

CONCURRED BY: 'll l'ZJ. CODE A.OKA /'q .. ~ S233 ASSIST PLANNER'S NAME: r CODE

K.KOMATSU H KO

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

DESCRIPTION:

JSN(S): CASREP #

S/F CONTACTi CWP# CCNS#

T. ESCRITOR-YAMADA 6B1

Approved by S300/8900 PMS320 Date; I I z <d,-f)ut AYli ~

LWC;

Work Completed

S/Force: Rate; Date;

Ship Supt Date; SRF CONTROL NO.: 1301348511

WQRK Cl;j!TIFlgAIIQN SliNAI!.!RES

COMPLETION OF WORK REVIEW: I BADGE NO.: I SHOP/CODE: I PHONE: I DATE:

Tasuku.Nagano.ja Text Box 9/1/2026

Tasuku.Nagano.ja Text Box 4/2/2027

Tasuku.Nagano.ja Text Box 5/30/2027

File details come from the government source that posted it. Updated .