This is a Job Specification document for naval shipyard work related to ship alteration YON-0123D on the barge YON-286. The document establishes the scope and timeline for alteration work to be performed at Sasebo shipyard, with an anticipated award date of September 1, 2026, and a production completion date of April 2, 2027. The Period of Performance (POP) runs from September 28, 2026, through May 30, 2027.

The work is to be completed in drydock or dry-berthing conditions, though the specific description of work tasks is not detailed in this template section of the document. The job is identified by ICN 89MVA15004 (Revision A01) and assigned SRF Control Number 1301348511. The document includes approval signatures from S.Murakami and S.Morooka, with supporting coordination from multiple assistant planners (T.Sato, K.Ichiriki, Y.Kataoka, and A.Hamada). The document was prepared by Y.Shimizu on January 29, 2028, and approved by the S300/8900 authority with T. Escritor-Yamada as the S/F contact. The specification includes space for work certification signatures, completion documentation, and a ship superintendent sign-off, but these sections remain incomplete on this version of the form.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926R00130016 SF 30.pdf PDF
LETTER-130-0011-26.pdf PDF
Solicitation Amendment N6264926R00130013 SF 30.pdf PDF
2.01 Soli Amendment 0013 LAR explaination for KTR.pdf PDF
Solicitation Amendment N6264926R00130012 SF 30.pdf PDF
2.01 Solicitation Amendment N6264926R00130011 SF 30.pdf PDF
2.01 Amend 0011 LETTER-130-0008-26.pdf PDF
Solicitation Amendment N6264926R00130011 SF 30.pdf PDF
Solicitation Amendment N6264926R00130010 SF 30.pdf PDF
Solicitation Amendment N6264926R00130010 SF 30.pdf PDF
Q_A_Amend 0009.pdf PDF
89MVA11001_00_A01 v2.pdf PDF
89MVA86301_00_A01 v2.pdf PDF
89MVA12301_00_A01 v2.pdf PDF
89MVA15003_00_A01 v2.pdf PDF
89MVA86401_00_A01 v2.pdf PDF
2.01 Solicitation Amendment N6264926R00130006 SF 30.pdf PDF
Solicitation Amendment N6264926R00130005 SF 30.pdf PDF
Q_A.pdf PDF
YON Location Akasaki.pdf PDF
Solicitation Amendment N6264926R00130003 SF 30.pdf PDF
89MVA15004_00_A01.pdf PDF
89MVA11001_00_A01.pdf PDF
89MVA15002_00_A01.pdf PDF
89MVA12301_00_A01.pdf PDF
Attachment II Price Proposal Form N6264926R0013_Final.xlsx XLSX spreadsheet
89MVA15003_00_A01.pdf PDF
89MVA15006_00_A01.pdf PDF
89MVA86401_00_A01.pdf PDF
89MVA15005_00_A01.pdf PDF
Attachment 2 YON 285 6B1 PROPOSAL BREAKDOWN.xlsx XLSX spreadsheet
2.01 Solicitation Amendment N6264926R00130001 SF 30.pdf PDF
Attachment 2 YON 285 6B1 PROPOSAL BREAKDOWN.xlsx XLSX spreadsheet
DD1423 YON-285 6B1 DSRA CDRL A007 KEY EVENT REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A003 IPS.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A001 GFMnot.pdf PDF
2.01 Solicitation - N6264926R0013.pdf PDF
Attachment 5 YON 285 6B1 MILESTONE DSRA.xlsx XLSX spreadsheet
DD1423 YON-285 6B1 DSRA CDRL A010 KTR DEFICIENCY REPORTING.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A002 QUALITY ASSURANCE PROGRAM PLAN.pdf PDF
YON 285 6B1 Specs 5-8.pdf PDF
Attachment 3 YON 285 6B1 CONTRACTOR QUESTIONS.pdf PDF
Attachment 4 YON 285 6B1 DSRA PERL.xlsx XLSX spreadsheet
Attachment 6 YON 285 6B1 CONTRACT DATA SHEET.docx DOCX document
DD1423 YON-285 6B1 DSRA CDRL A005 WEEKLY PROGRESS REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A004 DAILY REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A006 CONFERENCE REPORT.pdf PDF
DD1423 YON-285 6B1 DSRA CDRL A008 TEMPORARY SERVICES.pdf PDF
YON 285 6B1 Specs 1-4.pdf PDF
YON 285 6B1 Specs 9-11.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ShlDIHULL NO. ShlDIHULL NAME ICN: Rev: Key Op:

YON-286 BARGE JON: 89MVA15004 A01

TITLE:

SHIPALT YON-0123D; accompll■h

JOB SPECIFICATION

Antlclpatad Award Om: Production Completlon Date: PREPARING ACTMTY:

"I/~•/ ~~t. 02/02/2027 POP Start Date: POP End Date: SASEBO

9/28/2026 ¥-I iJO / ~ ... ., PREPARED BY: CODE DATE

Y.SHIMIZU H SH 1/29/2028

APPROVED BY: ,< 1.!/\i CODE

S.MURAKAMI S2215

CONCURRED BY: - .tS,;11-\7 CODE

S.MOROOKA S231

ASSIST PLANNER'S NAME:

CODE

T.SATO HST

ASSIST PLANNER'S NAME: CODE

K.ICHIRIKI H IK

ASSIST PLANNER'S NAME: CODE

Y.KATAOKA M KA

ASSIST PLANNER'S NAME: CODE

A.HAMADA p HA

WORK TO BE DONE IN DRYDOCK/DRY-BERTHING

DESCRIPTION:

JIN(ll: NIA cgs~Pt

S/F CONTACT: CWP# CCNS#

T. ESCRITOR-YAMADA

;;L/'3-/ ~..,_"

Approved by S300/8900

Pitt; Av!: :fBt::

!.WC:

Work Completed

S/Force: Rate; Dpt;

Ship Supt: 12111; SRF CONTROL NO.: 1301348511

WORIS Cl;BTIFICATJON IISi~ATf.!81;1

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

Tasuku.Nagano.ja Text Box 9/1/2026

Tasuku.Nagano.ja Text Box 4/2/2027

Tasuku.Nagano.ja Text Box 5/30/2027

File details come from the government source that posted it. Updated .