89MVA86301_00_A01 v2.pdf
PDF 29 KB Posted
- Attached to
- YON-285 Outfit
- Solicitation number
- N6264926R0013
About this file
Job Specification Summary
This Job Specification document pertains to docking or hauling out services for Barge YON-286, prepared by the U.S. Navy at Sasebo. The contract is identified under ICN 89MVA86301, Revision A01, with an anticipated award date of September 1, 2026. The Period of Performance begins September 28, 2026, and extends through May 30, 2027, with a production completion target of April 2, 2027.
The document is a work authorization form prepared by T. Baba on January 22, 2028, and approved by S. Murakami (Code S226) and S. Morooka (Code S231). The primary point of contact is T. Escritor-Yamada at PM S320. The SRF Control Number for this work order is 1301348511. The specification includes sections for work force rate confirmation, ship superintendent oversight, and work certification signatures upon completion. The document contains limited detail regarding the specific scope of services beyond the docking or hauling out operation required for the vessel.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ship/HULL NO. ShlDIHULL NAME ICN: Rev: Key Op:
YON-286 BARGE
JON: 89MVA86301 A01
TITLE:
Docking or Hauling Out YON-286; accompllah
JOB SPECIFICATION
Antlclpatad Award Data: Production Completion Data: PREPARING ACTIVITY:
)/J1/.-.. , 02/02/2027 POP Start Data: POP End Data: SASEBO
9/28/2026 ¥/ Jo/ ~o~)
PREPARED BY: CODE DATE
T.BABA H BA 1/22/2028
APPROVED BY: _Q,fa'\ CODE
S.MURAKAMI S226
CONCURRED BY: &,?Iv CODE
S.MOROOKA S231
ASSIST PLANNER'S NAME:
CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
DESCRIPTION:
JINHH: f!llA CMBEl?I
S/F CONTACT; CWI'# CCNS# I
T. ESCRITOR-YAMADA
~Ala;
1,,bf 'l(lyy
Approved by S300IS900 AV\,; :::ff4:::
I.WC;
Work Completed
S/Force: Rate; Date; •
Ship Supt: Dm; SRF CONTROL NO.: 13013485.11
WORK CERTIFICATION llgH~TYR~
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
Tasuku.Nagano.ja Text Box 9/1/2026
Tasuku.Nagano.ja Text Box 4/2/2027
Tasuku.Nagano.ja Text Box 5/30/2027
File details come from the government source that posted it. Updated .