About this file

This is a mechanical removals plan for Building 60 at Portsmouth Naval Shipyard in Kittery, Maine, prepared by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic. The drawing is dated October 1, 2025, with Amendment 008 dated March 10, 2026, and depicts the first floor mezzanine mechanical systems scheduled for removal.

The plan specifies comprehensive removal of industrial process equipment and associated mechanical systems under Contract Line Item Number (CLIN) 002, including: make-up air unit (MUA-E) with condensate pump, dust collection system with baghouse and exhaust fan, unit heaters, paddle-type ceiling fans, window air conditioning units, hydronic radiant ceiling panels, and industrial process exhaust systems with air handling units, controls, ductwork, and piping. The mechanical subcontractor must identify, cut loose, and cap all items designated for demolition, with the general contractor responsible for final removal to authorized salvage facilities. The plan references coordination requirements with architectural drawings for patching penetrations, hazmat drawings for removal compliance, and specification section 02 41 00 for demolition procedures. Special requirements include EPA-compliant refrigerant recovery from air conditioning units with documentation via MIDLANT ODS forms, testing of the existing pumped steam condensate system return line back pressure prior to removals, and retention of certain HPS and PCR piping infrastructure along the north wall as indicated on sheet M-401.

View the file

Other files

File Type Posted
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
01 91 00.15 22_R1_AMENDMENT 009.pdf PDF
129_AE530_R1_AMENDMENT 009.pdf PDF
246_ES101_R1_AMENDMENT 009.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
257_EP503_R1_AMENDMENT 009.pdf PDF
261_EP602_R1_AMENDMENT 009.pdf PDF
266_EL102_R1_AMENDMENT 009.pdf PDF
273_EL702_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
AMD 0002 PPI responses.pdf PDF
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA

MUA

E

DC

E

40ø ø

S A ø

S A ø

S-E

E

(TYP 4)

S-E

E

(TYP 4)

HWS/R UP

WINDOW AC

1" HWS/R UP

UH

E

UH

E

HWS/R DN TO UH-E HWS/R DN TO UH-E HWS/R DN TO UH-E HWS/R DN TO UH-E

1 1/4" HWS/R DN HWS/R DROP & UP

1" STM/COND

1 1/2" STM/COND

HWS/R DN

UH

E

HV

E

FH

E

24x2420x20

20x12 DN

12x16

20ø

20ø ø

EF

E

1" LPC DN

1 1/2" LPS DN

UH

E

UH

E

RS/RL DN

16ø

16ø CAPPED AT BOTTOM

FT-E

ELOCKERS

M102

OPEN

OFFICE

M103

OPEN

OFFICE

M104

CORRIDOR

M105

SPRINKLER

M106

BREAK

LOCKER

M101

STAIR

MEZZANINE

M107

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW

OFFICE

M108

FT-E

E

12ø

S-E

E

(TYP 2)

20ø DN

EF

E

CU

E

1 1/2" PCR DN

2" PCR DN

1 1/2" PCR DN

3" HPC DN

2" HWS UP&DN

1 1/2"

HWS/R UP

1 1/2"

HWS/R UP

1 1/2"

HWS/R UP

2 1/2" HWS UP

1 1/2" HWR UP&DN

(ASBESTOS)

1 1/2" HWR UP&DN

(ASBESTOS)

2" HWS/R DN

2" LPS DN

2" HWS/R DN 1 1/2" LPS/LPC

HWS/R

DROP

LPS

LPC

3" HWS/R

DROP

1 1/2" HWS/R

REMOVE STEAM AND COND TO/FROM

PRV STATION (STACKED ON WALL)

(ABANDONED)

HPS &

PCR DN

EF

E

(ABOVE)

EF

E6

CEILING FAN

(TYP 3)

(60" DIAMETER)

WINDOW AC 9

FT-E

E

C-E 8

1 1/2" LPC

2 1/2" LPS

TRAP

3/4" LPS/LPCABANDONED LPC DN

HWS

HWR

DN

m l i h e7 p e6 n k j g.1 g f.1 f

M3

5.6

4.2 e4 e3

3.5

2.8 n.9 n.5 k.9 k.5

2.5

2.4

2.1 e2 e1 k.1 e d c b a i.1

STAIR

LPS AND PCR TO/FROM MUA-E

(ALONG WALL, UNDER EAVE)

4" V UP/DN

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:1

:3

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V m d o n o v a n

V F

X R

.r v t

MD106

B R

E P

A

IR

S

F

IR

S T

F L O

O R

M E

Z Z

A N

IN

E

M E

C H

A N

IC

A

L R

E M

O V

A L S

P L A

N

W E

S T

MSA

RNC

CBM

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

M D

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE

KEY PLAN

CHECK GRAPHIC SCALE BEFORE USING

MATCH LINE

PLAN

NORTH

SCALE: 1/8" = 1'-0"

B1

FIRST FLOOR MEZZANINE MECHANICAL REMOVALS PLAN - WEST

GENERAL NOTES REMOVALS KEYNOTES

1 [CLIN 002] REMOVE MAKE UP AIR UNIT MUA-E AND ASSOCIATED PRESSURE

POWERED CONDENSATE PUMP, CONTROLS, WIRING, DUCTWORK AND PIPING.

THE EXISTING CONCRETE SERVICE PAD MUST REMAIN IN PLACE FOR REUSE.

[CLIN 002] REMOVE DUST COLLECTION SYSTEM, INCLUDING EXHAUST FAN,

BAGHOUSE, BAGHOUSE SUPPORT STAND, CONTROLS, WIRING, AND DUCTWORK.

REMOVE UNIT HEATER AND ASSOCIATED BRANCH PIPING, CONTROLS AND

WIRING.

[CLIN 002] REMOVE LPS AND LPC PIPING FROM MAKE-UP AIR UNIT OUTSIDE OF

THE BUILDING AT GROUND LEVEL TO THE WALL PENETRATIONS AT THE ANNEX

WING OF THE BUILDING. REMOVE PIPING WALL SUPPORTS, AND COORDINATE

PATCHING / REPAIR OF BRICK WORK. SEE SHEET MD201 FOR ELEVATION VIEW

OF PIPING.

REMOVE HPS AND PCR PIPING FROM ANNEX WING WALL PENETRATIONS TO

CORNER OF EXTERIOR WALL OUTSIDE OF OPEN OFFICE AS SHOWN. REMOVE

PIPING WALL SUPPORTS, AND COORDINATE PATCHING / REPAIR OF BRICK

WORK.

[CLIN 002] REMOVE INDUSTRIAL PROCESS EXHAUST AND MAKE UP AIR SYSTEMS,

INCLUDING BUT NOT LIMITED TO AIR HANDLING UNITS, FANS, CONTROLS,

MIRING, DUCTWORK, HOODS, AND PIPING.

(THIS SHEET ONLY)

1.

2.

3.

4.

5.

6.

7.

8.

SEE M-001 FOR MECHANICAL LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

REMOVE ALL INDUSTRIAL PROCESS EQUIPMENT AND ASSOCIATED CONTROLS, WIRING AND PIPING THROUGHOUT THE SPACES SHOWN ON THIS SHEET, UNLESS OTHERWISE NOTED.

COORDINATE WITH ARCHITECTURAL DRAWINGS FOR PATCHING OF OPEN FLOOR, WALL, AND CEILING PENETRATIONS ASSOCIATED WITH REMOVALS.

MECHANICAL SUBCONTRACTOR SHALL IDENTIFY, MAKE SAFE CUT LOOSE AND CAP ALL ITEMS SPECIFIED TO BE DEMOLISHED. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OFF SITE TO AN AUTHORIZED SALVAGE FACILITY.

REFER TO CLIN 002 LIST OF INDUSTRIAL EQUIPMENT REMOVAL REQUIREMENTS.

COORDINATE REMOVAL WITH HAZMAT DRAWINGS AND REQUIREMENTS.

EXISTING MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING THROUGHOUT THE BUILDING TO BE REMOVED, UNLESS OTHERWISE NOTED.

CONDUCT TESTING OF EXISTING PUMPED STEAM CONDENSATE SYSTEM RETURN LINE BACK PRESSURE AND REPORT RESULTS TO CONTRACTING

OFFICER PRIOR TO COMMENCING WITH REMOVALS IN BUILDING 60.

REMOVE PADDLE TYPE CEILING FANS AND ASSOCIATED CONTROLS AND

WIRING.

REMOVE TERMINAL HEATING UNIT AND ASSCOIATED BRANCH PIPING,

CONTROLS, AND WIRING.

REMOVE AIR CONDITIONER UNIT: DISPOSAL OF UNITS CONTAINING

REFRIGERANT SHALL BE DONE IN ACCORDANCE WITH CLEAN AIR ACT,

LOCAL, STATE, AND FEDERAL REGULATIONS. ALL REFRIGERANT MUST BE

REMOVED PRIOR TO EQUIPMENT REMOVAL. THE USED REFRIGERANT

SHALL BE RECLAIMED BY EPA APPROVED, SPECIALIZED EQUIPMENT AND

DISPOSED OF BY CONTRACTOR. THE CONTRACTOR MUST PROVIDE THE

MIDLANT ODS FORMS TO DOCUMENT REFRIGERANT RECOVERY, DISPOSAL,

AND CHARGE ACTIVITIES. SEE SPECIFICATION SECTION 02 41 00

"DEMOLITION AND DECONSTRUCTION".

REMOVE HYDRONIC RADIANT CEILING PANELS AND ASSOCIATED

HYDRONIC BRANCH PIPING, CONTROLS, AND WIRING.

[CLIN 002] HPS AND PCR PIPING TO REMAIN IN PLACE. REFER TO SHEET

M-401 FOR PLAN SHOWING HPS AND PCR CONNECTIONS TO THE EXISTING

PIPING TO IDENTIFY HOW MUCH OF THE EXISTING PIPING ALONG THE

NORTH WALL SHOULD REMAIN. PIPE SUPPORTS FOR THESE PIPES MUST

REMAIN IN PLACE.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/10 /2

R S

H

Sheets
M-701 - MECHANICAL CONTROL DIAGRAMS 1
MD106 - FIRST FLOOR MEZZANINE MECHANICAL REMOVALS PLAN - WEST
MD108 - SECOND FLOOR MEZZANINE MECHANICAL REMOVALS PLAN
MD109 - ATTIC MECHANICAL REMOVALS PLAN
MP107 - ATTIC MECHANICAL PIPING PLAN
P-401 - ENLARGED PLUMBING PART PLANS 1
P-601 - PLUMBING SCHEDULES AND DETAIL

File details come from the government source that posted it. Updated .