This document is an architectural floor plan with Furniture, Fixtures, and Equipment (FF&E) schedule for the second floor of Building 60, dated March 10, 2026. The plan is drawn at a scale of 1/8" = 1'-0" and is marked as UNCLASSIFIED. The document includes a detailed layout showing the spatial arrangement of various rooms and work areas, including custodial, men's and women's facilities, upholstery, shop, and expressing areas, with an elevator and stairwell.

The FF&E schedule itemizes 26 distinct furnishings and equipment pieces designated with codes C1 through C5 (chairs), D1 through D5 (desks and workstations), T1 through T4 (tables), S1 and S2 (storage), and A1 through A16 (appliances and accessories). Specific items include task chairs, training chairs, lounge chairs, guest chairs, various desk configurations ranging from 24" x 60" to 7' x 6' workstations, break room and training tables, lateral file storage, lockers, appliances such as refrigerators, microwaves, coffee makers, and fire extinguishers, as well as technology components including 65" and 75" televisions, TV mounts, whiteboards, ATMs, and under-counter refrigeration units. General notes on the plan reference that tagged items are included in the FF&E package and direct reference to the sheet index for room finish schedules.

View the file

Other files

File Type Posted
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
01 91 19_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
260_EP601_R1_AMENDMENT 009.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att.pdf PDF
Solicitation Amendment N6247026R00120008 SF 30.pdf PDF
Att. S) FFE Final Package-R1_AMENDMENT 008.pdf PDF
_ATTAC1.PDF PDF
02 82 00.00 22_R1_AMENDMENT 008.pdf PDF
31_CS101_R1_AMENDMENT 008.pdf PDF
47_SD102_R1_AMENDMENT 008.pdf PDF
65_SF105_R1_AMENDMENT 008.pdf PDF
68_SF502_R1_AMENDMENT 008.pdf PDF
152_G-004B_R1_AMENDMENT 008.pdf PDF
182_P-601_R1_AMENDMENT 008.pdf PDF
190_MD106_R1_AMENDMENT 008.pdf PDF
192_MD108_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REF.

TRAINING

UPHOLSTERY

STAIR

CUSTODIAL

MEN

WOMEN

AA

SHOP

OPEN OFFICE

MULTI-PURPOSE

OFFICE

CORRIDOR

ELECTRICAL

STAIR

004C

EXPRESSING

A7

T4

T4

C5

T4

T4

D1 C1

C2

C2

C1

D2

A1

D1

D1

C1

D1

D1

D1

D1

D1

D1

D1

D1

D1

C3

T3 A6

A4

A4

A4 A4

A4

A4

A4

A4

A4

A4

A4

A4

A4

ELEV

A7 C2

(6 TOTAL)A4

T2

S1

S1

A4

A9

A2

(8 TOTAL)

(11 TOTAL)

D4

A6

S1

A12 A14

A15

A13 A13

A14

A15 A14

A15

A4

A7

1. TAGGED ITEMS ( ) ARE IN THE FF&E PACKAGE. FF&E ITEMS

NOT LISTED IN THE SCHEDULE ARE NOT IN CONTRACT (NIC) AND

SHOWN FOR COORDINATION PURPOSES.

2. SEE FF&E PACKAGE DOCUMENT FOR ITEM DESCRIPTION.

3. SEE SHEET AE640 FOR ROOM FINISH SCHEDULE.

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/1

/2

:4

:0

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

AE804

B

R

E P

A

IR

S

S E

C O

N D

F L O

O R

F F

E

P L A

N

O P

T

IO

N

RSH

JMR

CJE

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

A E

SCALE: 1/8" = 1'-0"

B1

SECOND FLOOR FF&E PLAN

1/8" = 1' - 0" 0 5' 10' 15' 30'

GENERAL NOTES

GRAPHIC SCALE(S)

A16 APPLIANCE REFRIGERATOR

A15 ACCESSORY WALL MOUNT ACCESSORY

A14 TV MOUNT UNIVERSAL SWING ATM

A13 TV 65"

A12 TV 75"

A11 NOT USED

A10 NOT USED

A9 WHITEBOARD MOVEABLE WHITEBOARD

A8 TRASH RECYCLE

A7 APPLIANCE FIRE EXTINGUISHER

A6 APPLIANCE UNDER COUNTER FRIDGE

A5 TRASH WASTEBASKET-BREAKROOM

A4 TRASH WASTEBASKET

A3 APPLIANCE COFFEE MAKER

A2 APPLIANCE MICROWAVE

A1 APPLIANCE REFRIGERATOR/FREEZER

ITEM NAME DESCRIPTION

FF&E SCHEDULE

S2 LOCKER 15" x 18" SINGLE TIER LOCKER

S1 STORAGE LATERAL FILE

T4 TABLE TRAINING TABLE

T3 TABLE OCCASIONAL TABLE

T2 TABLE 36" x 72"BREAK ROOM TABLE

T1 TABLE 36" x 60" BREAK TABLE

D5 DESK 24" x 60" DESK WITH (1) FILE CABINET

D4 DESK INSTRUCTOR PODIUM

D3 DESK 24" x 60" DESK WITH (2) FILE CABINET

D2 DESK PRIVATE OFFICE DESK

D1 WORKSTATION 7' x 6' WORKSTATION

C5 CHAIR TRAINING CHAIR

C4 CHAIR BREAK ROOM CHAIR

C3 CHAIR LOUNGE CHAIR

C2 CHAIR GUEST CHAIR

C1 CHAIR TASK CHAIR

ITEM NAME DESCRIPTION

FF&E SCHEDULE CONT.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/1

0/

R

S H

Sheets
AE102 - FIRST FLOOR PART PLAN - WEST
AE104 - FIRST FLOOR MEZZANINE PART PLAN - WEST
AE131 - TYPICAL SIGNAGE DETAILS
AE202 - EXTERIOR ELEVATIONS 1
AE804 - SECOND FLOOR FF&E PLAN (OPTION 1)
G-004A - ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 1
G-004B - ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 2
Q-601 - EQUIPMENT SCHEDULE (OPTION 2)

File details come from the government source that posted it. Updated .