Att. I) Specifications Volume 2.pdf
PDF 4 MB Posted
- Solicitation number
- N6247026R0012
About this file
This document is a detailed specification section for spray-applied fireproofing to be used at structural elements of Building 60 at Portsmouth Naval Shipyard. The specification requires a two-component epoxy-based intumescent fire protective coating system that forms a flexible, ceramic-like barrier to provide thermal protection during a fire. The coating must be capable of protecting structural steel members with a two-hour fire resistance rating for columns supporting one floor and floor supports.
Key technical requirements include the fireproofing system must: transform into an insulating ceramic-like char during fire events, protect substrates from corrosion, retain fire protection properties in aggressive chemical environments, and be resistant to solvents, acids, alkalis, salts, and abrasion. The specification mandates strict quality assurance requirements, including qualification of installers with a minimum of three years experience, use of an independent testing inspector, and detailed surface preparation and application procedures. The coating must be applied by manufacturer-certified installers and will be subject to comprehensive testing to verify density, cohesion/adhesion, and thickness in accordance with industry standards.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION STATEMENT F. Further dissemination only as directed by Portsmouth Naval Shipyard, NAVFAC (December 3, 2018) or higher DoD authority.
NAVFAC MIDLANT, Public Works Department, Maine eProjects Work Order No.: 1740579
SPECIFICATIONS
B60: PRODUCTION FACILITY REPAIRS - SIOP
At the
Portsmouth Naval Shipyard, Kittery, Maine
Volume 2 of 3
PREPARED BY:
NAVFAC Midlant PWD ME Building 59
Portsmouth Naval Shipyard Kittery, Maine 03801-2032
REQUEST FOR PROPOSAL PREPARED BY:
Architectural: Josh Riley, R.A. Electrical: Dale Lincoln, P.E.
Civil: Dan Philipps, P.E. Fire Protection: Jeff DeMaine, P.E.
Structural: David N. Martin, P.E., S.E. Environmental: N/A Mechanical: Rick Creswell, P.E. Estimating: Toscano Clements Taylor
Cost Consultants, LLC
Submitted By: Scott Hughes, R.A. Signature Date: October 1, 2025
Approved By PME Signature Date: (Submittal Date) (Printed Name of CIBL/PMEB Head)
Design Manager: Signature Date: (Submittal Date) (Printed Name of NAVFAC DM)
NAVFAC MIDLANT, Public Works Department, Maine eProjects Work Order No.: 1740579
SPECIFICATIONS
B60: PRODUCTION FACILITY REPAIRS - SIOP
At the
Portsmouth Naval Shipyard, Kittery, Maine
B60: PRODUCTION FACILITY REPAIRS - SIOP 1740579
PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 22 SUMMARY OF WORK (PWD ME)
01 14 00.00 22 WORK RESTRICTIONS (PWD-ME)
01 20 00.00 22 PRICE AND PAYMENT PROCEDURES (PWD ME)
01 30 00.00 22 ADMINISTRATIVE REQUIREMENTS (PWD ME)
01 30 10.00 22 COORDINATION PROCEDURES AND COORDINATION DRAWINGS (PWD ME)
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM (eCMS)
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00.00 22 SUBMITTAL PROCEDURES (PWD ME)
01 33 10.00 22 PROCUREMENT SUBSTITUTION REQUIREMENTS (PWD ME)
01 33 29.00 22 SUSTAINABILITY REQUIREMENTS AND REPORTING (PWD ME)
01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 44 00.00 22 ARCHAEOLOGICAL MONITORING (PWD ME)
01 45 00.00 22 QUALITY CONTROL (PWD ME)
01 45 35.00 22 SPECIAL INSPECTIONS (PWD ME)
01 50 00.00 22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS (PWD ME)
01 57 19.00 22 TEMPORARY ENVIRONMENTAL CONTROLS - PORTSMOUTH NAVAL
SHIPYARD (PWD ME)
01 58 00.00 22 PROJECT IDENTIFICATION (PWD ME)
01 74 19.00 22 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL (PWD ME)
01 78 00.00 22 CLOSEOUT SUBMITTALS (PWD ME)
01 78 23.00 22 OPERATION AND MAINTENANCE DATA (PWD ME)
01 78 24.00 22 FACILITY DATA WORKBOOK (FDW)(PWD ME)
01 91 00.15 22 TOTAL BUILDING COMMISSIONING
01 91 19 BUILDING ENCLOSURE COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 42 91 REMOVAL AND SALVAGE OF HISTORIC CONSTRUCTION MATERIALS
02 82 00.00 22 ASBESTOS REMEDIATION (PNS PROJECTS)
02 83 00.00 22 MANAGEMENT OF LEAD, CADMIUM, AND CHROMIUM (VI) DURING
RENOVATION, DEMOLITION, REMOVAL, AND ABATEMENT (PNS
PROJECTS)
02 84 16.00 22 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY (PWD ME)
02 84 33.00 22 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS
(PCBs)(PWD ME)
DIVISION 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 01 00.91 22 RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES
(PWD ME)
04 20 00 UNIT MASONRY
PROJECT TABLE OF CONTENTS Page 1
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 31 13 ASPHALT SHINGLES
07 42 13 METAL WALL PANELS
07 42 63 METAL WALL PANEL ASSEMBLIES
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 57 14 SPRAYED POLYURETHANE FOAM (SPF) INSULATION
07 62 13 COPPER SHEET METAL FLASHING AND TRIM
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00.00 22 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 01 52 OPERATION AND MAINTENANCE OF WOOD WINDOWS AND DOORS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 51 13 STORM WINDOWS - REPAIR AND REHABILITATION
08 51 70 STEEL WINDOWS - REPAIR AND REHABILITATION
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL LOUVERS
DIVISION 09 - FINISHES
09 01 90.50 PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR
PAINTING
09 01 90.60 PREPARATION OF WOOD STRIP FLOOR FOR REFINISHING
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 RESINOUS FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 00 01.00 20 FURNITURE, FIXTURES AND EQUIPMENT (FF&E) PACKAGE
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00 COMMISSIONING OF MECHANICAL AND PLUMBING SYSTEMS
23 09 00.00 22 INSTRUMENTATION AND CONTROL FOR HVAC (PWD-MAINE) (J&A)
23 09 13.00 22 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 22 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS (PWD-MAINE)
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS
23 23 00 REFRIGERANT PIPING (UNDER DEVELOPMENT)
23 30 00 HVAC AIR DISTRIBUTION
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 29 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS (UNDER DEVELOPMENT)
23 82 00.00 20 TERMINAL HEATING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10.00 22 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND
INTEGRATION (PWD-MAINE)
DIVISION 26 - ELECTRICAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
PROJECT TABLE OF CONTENTS Page 3
26 32 15 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH
AUXILIARIES
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 32 50 ELEVATOR LANDING TWO-WAY COMMUNICATION SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING (BID OPTION
4)
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS) (BID OPTION 4)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00.00 22 EARTHWORK
31 21 13 RADON MITIGATION
31 32 11 SOIL SURFACE EROSION CONTROL
31 63 29 MICROPILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 LANDSCAPE ESTABLISHMENT
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 03 01 00
REHABILITATION OF CONCRETE
02/18
PART 1 GENERAL
1.1 SCOPE
This specification governs the rehabilitation of structural concrete.
1.2 DEFINITIONS
1.2.1 Delamination
A planar separation in a material that is roughly parallel to the surface of the material.
1.2.2 Rehabilitation
Repairing or modifying an existing structure to a desired useful condition.
1.2.3 Repair
The reconstruction or renewal of concrete parts of an existing structure for its maintenance or to correct deterioration, damage, or faulty construction of members or systems of a structure.
1.2.4 Unsound Concrete
Concrete that is fractured, delaminated, spalled, deteriorated, defective, contaminated or otherwise damaged.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 117 (2010; R 2015) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 503.2-503.4 (2010, R 2003) Three Epoxy Specifications
ACI 503.7 (2007) Specification for Crack Repair by Epoxy Injection
ACI 548.4 (2011) Standard Specification for Latex-Modified Concrete (LMC) Overlays
ASTM INTERNATIONAL (ASTM)
ASTM A780/A780M (2020) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
SECTION 03 01 00 Page 1
ASTM C33/C33M (2023) Standard Specification for Concrete Aggregates
ASTM C387/C387M (2023) Standard Specification for Packaged, Dry, Combined Materials for Concrete and High Strength Mortar
ASTM C881/C881M (2020a) Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete
ASTM C928/C928M (2020a) Standard Specification for Packaged, Dry, Rapid-Hardening Cementitious Materials for Concrete Repairs
ASTM C1077 (2024) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation
ASTM C1600/C1600M (2017) Standard Specification for Rapid Hardening Hydraulic Cement
ASTM C1602/C1602M (2022) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM D4580/D4580M (2012) Standard Practice for Measuring Delaminations in Concrete Bridge Decks by Sounding
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00.00 22 SUBMITTAL PROCEDURES (PWD ME):
SD-01 Preconstruction Submittals
Qualifications; G
Work Plan; G
Quality Control Plan; G
SD-03 Product Data
Polymers; G
Integral Color Admixture; G
Miscellaneous Materials And Equipment
SD-04 Samples
Mockup; G
SECTION 03 01 00 Page 2
Color Chart; G
SD-05 Design Data
Formwork; G
Repair Procedures; G
Mixture Proportioning; G
SD-06 Test Reports
Mixture Proportioning; G
Quality Control; G
Polymers; G
Miscellaneous Materials and Equipment
SD-07 Certificates
Qualifications
Polymers
SD-08 Manufacturer's Instructions
Equipment for Concrete Preparation
Polymers
Miscellaneous Materials and Equipment
1.5 QUALITY ASSURANCE
1.5.1 General Requirements
a. Follow the requirements of Section 03 30 00 CAST-IN-PLACE CONCRETE for Work involving portland cement concrete.
b. To protect personnel from overexposure to toxic materials, conform to the applicable manufacturer's Safety data sheets or local regulations.
Submit manufacturer's Safety Data Sheets for all polymers as well as other potentially hazardous materials.
c. Submit the repair procedures for executing the work as well as the test data and documentation on materials used for repair. Submittal must include component materials, mixture proportions, and supplier's quality control program.
d. Inspection and testing of surface preparation must be in accordance with provisions included herein and the Contract Document.
e. Sampling and testing of materials, as well as inspection and testing of work, must be in accordance with established procedures, manufacturer's instructions, specific instructions from the Contracting Officer if given, or recommended practices as referenced herein and the Contract Documents.
SECTION 03 01 00 Page 3
f. The testing agency must inspect, sample, and test repair materials and concrete production as required. When it appears that material furnished or work performed by Contractor fails to conform to Contract Documents the testing agency will immediately report such deficiency.
1.5.2 Quality Control Plan
Submit a quality control plan as specified in Sections 01 45 00.00 22
QUALITY CONTROL (PWD ME).
1.5.3 Qualifications
The submittals must where applicable, identify agencies and individuals who will be working on this contract and their relevant experience. Do not make changes in approved agencies or personnel without prior approval of the Contracting Officer.
1.5.3.1 Testing Agencies
In addition to the requirements of Section 01 45 00.00 22 QUALITY CONTROL (PWD ME), agencies that test concrete materials must meet the requirements of ASTM C1077. Submit data on qualifications of Contractor's proposed testing agency for acceptance.
1.5.3.2 Quality Control Personnel
Field tests of repair materials required must be made by an ICRI Concrete Surface Repair Technician Tier 2. Submit resumes, pertinent information, past experience, training and education of all operators of specialized demolition equipment if needed for this and the three paragraphs above.
1.5.3.3 Contractor Qualifications
The contractor performing the repair work must have been involved in a minimum of three concrete repair projects similar in size and scope to this project for at least five years. Submit information, including name, dollar value, date, and point-of-contact for similar projects which demonstrates the required experience and/or training.
1.5.3.4 Worker Qualifications
a. Each worker engaged in the use of specialized removal or application equipment must have satisfactorily completed an instruction program and three years of experience in the operation of the equipment.
1.5.3.5 Regulatory Requirements
Perform all work in accordance with applicable Federal, State, and local safety, health, and environmental requirements. The Contractor is responsible for obtaining all permits required by Federal, State, and local agencies for the performance of the work.
1.5.4 Work Plan
Prepare a work plan describing the methods of concrete removal and repair, including methods, equipment and materials to be used for each feature.
Submit the work plan for approval at least 30 days prior to the start of the work. The plan must include, but not be limited to, repair materials
SECTION 03 01 00 Page 4 to be used with specific information on products and/or constituents, and requirements for handling, storage, etc., equipment to be used, surface preparation, and requirements for placement, finishing, curing and protection specific to the materials used. Include a description of field demonstrations in the work plan. Do not commence work until the work plan and field demonstration representative of the type of work are approved.
1.5.5 Mock-Up
Provide mock-up to establish that proposed materials and construction techniques provide acceptable visual effect. Materials used for mock-up should be those proposed for actual construction. Provide Color Chart from manufacturers full range of standard and custom colors to obtain an approved color match. Apply specified products to determine acceptability of appearance and optimum coverage rate required for application.
a. Finish areas designated by Contracting Officer.
b. Mockup must cure for 28-days before determining if color match is approved.
c. Pressure wash existing concrete surfaces for determining color match.
d. Do not proceed with remaining work until workmanship, color, and detail are approved buy Contracting Officer.
1) Job Mock Up Panel: Minimum 2 feet by 2 feet.
1.6 ACCEPTANCE OF REHABILITATION WORK
1.6.1 General Requirements
a. Completed concrete rehabilitation work must conform to applicable requirements of Contract Document and this specification. The Contractor is responsible to bring Work into compliance with requirements of Contract Documents if the Concrete repair work fails to meet one or more requirements of Contract Documents.
b. Correct rejected repair work by removing and replacing or by strengthening with additional construction acceptable to the Contracting Officer. Use repair methods that meet applicable requirements for function, durability, dimensional tolerances, and appearance.
c. Submit proposed work plan, repair methods, materials, and modifications to the Work needed to correct rejected repair work to meet the requirements of Contract Documents.
1.6.2 Tolerances
a. Construction tolerances for repairs must conform to ACI 117 and must conform to the details and materials for such conditions as indicated in the Contract Documents. For conditions not shown or that are different than indicated in the Contract Documents, notify the Contracting Officer before proceeding with the work at those locations.
b. Inaccurately formed concrete surfaces resulting in concrete members with dimensions that exceed ACI 117 tolerances are subject to rejection.
SECTION 03 01 00 Page 5
1.6.3 Appearance
Concrete surfaces not meeting the requirements of the Contract Documents must be brought into compliance.
1.7 PROTECTION OF COMPLETED REHABILITATION WORK
a. Protect repaired and adjacent areas from damage by construction traffic, equipment, and materials. During the curing period, protect repair materials from damage by mechanical disturbances, including load-induced stresses, shock, and vibration.
b. Protect repair materials from environmental damage by weather events during the length of the curing period.
PART 2 PRODUCTS
Products or materials used must conform to the requirements included herein as well as the Contract Documents. The usage of other products or materials not covered by this requirement or specified in the Contract Documents are permitted upon approval by the Contracting Officer.
Additional information and submittals for products and materials not included in this document including product data, design data, test reports, certificates, manufacturer's instructions, and field reports must be submitted as requested by the Contracting Officer.
2.1 EQUIPMENT FOR CONCRETE PREPARATION
Means and methods used for concrete removal and surface preparation must be selected and used such as to minimize damage to the structure and to the concrete substrate that remains.
2.1.1 Equipment for Concrete Removal
Removal equipment and techniques must be suitable to produce concrete surface profiles and level of cleanliness in designated areas as required by this specification and the contract Documents.
2.1.2 Cleaning Equipment
Use equipment that delivers oil free air capable of cleaning loose material and debris from repair areas. If necessary to dry the concrete surface, clean, dry, compressed air may be used. Also, use vacuums capable of removing loose material and debris.
2.2 MATERIALS FOR FORMWORK
a. Formwork and embedded items must meet the requirements specified in Section 03 30 00 CAST-IN-PLACE CONCRETE.
b. Install and remove formwork without damaging or staining the existing structure or repair material.
c. Forms used for polymer concrete/mortars must be tight enough to hold the material that is used without leaking. All surfaces where bond is not desired, but which are exposed to the monomer or resin, must be treated with a form release agent.
SECTION 03 01 00 Page 6
2.3 POLYMERS
a. The requirements for the properties of polymers and aggregates used in polymers must meet the requirements specified in this paragraph as well as the properties specified in the referenced specifications and the Contract Documents.
b. Polymers used must be compatible with other polymers and materials used on the project. Unless repair materials are specified in the contract documents, the Contractor is responsible for verifying material compatibilities.
c. Submit product data, Integral Color Admixture, manufacturer's Safety Data Sheets,samples, design data, test reports, certificates, manufacturer's instructions, and field reports for materials as required by this document as well as the referenced specifications and the Contract Documents.
2.3.1 Epoxies
a. Epoxy mortars and epoxy compounds must conform to ASTM C881/C881M.
b. Epoxy mortars used for repairing defects in hardened portland cement concrete must meet the requirements of ACI 503.2-503.4 .
c. Epoxy used for crack repair must meet the requirements of ACI 503.7 .
d. Epoxy used for bonding freshly mixed concrete and hardened concrete must meet the requirements of ASTM C881/C881M, Type V, Grade 3, Class A.
2.4 MISCELLANEOUS MATERIALS AND EQUIPMENT
2.4.1 Packaged and Proprietary Materials
The required properties for the materials listed in this paragraph must meet the properties specified in the Contract Documents. Submit Product data, design data, test reports, certificates, manufacturer's instructions, and field reports as required by the Contracting Officer and the Contract Documents.
a. Packaged, rapid hardening concrete repair materials must conform to
ASTM C928/C928M.
b. Packaged, mortar and concrete must conform ASTM C387/C387M.
c. Rapid hardening cement must conform to ASTM C1600/C1600M .
Water used with packaged and proprietary materials must meet ASTM C1602/C1602M requirements. Aggregates must meet the repair material manufacturer's requirements if available and ASTM C33/C33M if such requirements are not specified.
2.4.2 Miscellaneous Equipment
a. Equipment designed specifically for the application of repair materials must be used as required by the repair material manufacturer.
b. Equipment must be clean and in good operating condition.
SECTION 03 01 00 Page 7
c. All supplies and equipment must be available in sufficient quantities to allow continuity in the installation project and quality assurance.
2.5 MIXTURE PROPORTIONING
a. Portland cement-based concrete mixtures must be in accordance with the requirements of Section 03 30 00 CAST-IN-PLACE CONCRETE.
b. Polymer concrete/mortar/resin/monomer proportioning, handling, and mixing procedures as well as equipment used for mixing these materials must conform to the requirements of the referenced material specifications and the repair material manufacturer's directions.
c. Polymer-modified portland cement concrete proportioning, handling, and mixing procedures as well as equipment used for mixing these materials must conform to the requirements provided by the repair material manufacturer as well as ACI 548.4 when such materials are used for overlays.
d. Proportioning and mixing materials not specified above must follow the requirements provided by the repair material manufacturer.
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Examination
Locate area of unsound concrete using hammer sounding method in accordance to ASTM D4580/D4580M . Denote and mark perimeter boundaries and notify the Contracting Officer to approve the unsound concrete layout boundaries.
3.1.2 Protection
Protect pedestrians, motorized traffic, mechanical, electrical, and plumbing equipment, surrounding construction, project site, landscaping, and surrounding buildings from damage or injury resulting from concrete rehabilitation work.
a. Construct dust and debris barriers surrounding repair work perimeter to control dust and to protect and control construction traffic.
b. Dispose of runoff from wet demolition or surface preparation operations in accordance with all local ordinances. Disposal methods must avoid soil erosion, avoid undermining pavements and foundations, damage to landscaping and vegetation, and minimize water penetration through other parts of buildings.
c. Collect and neutralize alkaline wastes and acid wastes and dispose in accordance with local, state, and federal regulations.
d. Comply with local noise ordinances during demolition operations.
e. Perform demolition work and surface preparation work in a manner that minimizes disturbances of operations. Coordinate work with the Contracting Officer.
f. Submit a proposed protection plan for approval by Contracting Officer.
SECTION 03 01 00 Page 8
3.1.3 Formwork
Execution of formwork must meet the requirements specified in Section
03 30 00 CAST-IN-PLACE CONCRETE.
3.1.3.1 Formwork
a. Construct forms to sizes, shapes, lines, and dimensions to match existing adjacent surfaces and textures. Provide forms that match openings, offsets, chamfers, anchorages, inserts and other features as described on Contract Documents. Construct forms to accommodate installation of products by other trades. Provide forms for easy removal to minimize damage to concrete surfaces and adjacent surfaces.
Apply form release coating over formwork surfaces prior to each concrete placement. Form release agents must not be applied to or come in contact with the repair area concrete substrate or reinforcement.
b. Do not damage repair material during removal of formwork for walls and other parts not supporting weight of concrete or repair material.
Perform needed repair and treatment required on vertical surfaces at once and follow immediately with specified curing. Remove all formwork anchors embedded in existing concrete. Fill anchor holes and repair all damage to existing concrete at anchor holes.
3.1.4 Concrete Preparation
a. Remove concrete as needed per the removal requirements of this section. Limits on removal equipment are specified in the paragraph titled EQUIPMENT FOR CONCRETE PREPARATION.
b. Remove foreign material, such as dirt, oil, grease, or other chemicals, from the cracks before injection using compressed air, low-pressure water, or vacuuming. Allow wet surfaces to dry at least 24 hours.
c. Immediately before placing the repair material or installing formwork, make the repair area available for inspection by the Contracting Officer. Obtain acceptance by the Contracting Officer of surface preparation before proceeding with Work. If the Work is rejected, perform additional operations to the satisfaction of Contracting Officer.
3.1.5 Quality Control
3.1.5.1 Quality Control of Surface Preparation
Evaluation of prepared substrate must be continuously monitored to assure that the prepared substrate surface meets project requirements.
3.1.6 Curing
a. For portland cement concrete Work, follow the requirements indicated in 03 30 00 CAST-IN-PLACE CONCRETE.
b. For polymer concrete/mortar Work, follow manufacturer's requirements for curing.
c. For polymer modified portland cement concrete Work follow
SECTION 03 01 00 Page 9 manufacturer's requirements for curing.
3.1.7 Clean Up
a. Clean and remove all spills and leaks of injection adhesive and stains caused by the injection adhesives.
b. Dispose wastewater used for cutting and cleaning without staining or damaging the existing surfaces of the structure or the environment of the project area. The method of disposal must meet all the requirements of Section 01 57 19.00 22 TEMPORARY ENVIRONMENTAL
CONTROLS - PORTSMOUTH NAVAL SHIPYARD (PWD ME).
3.1.8 Safety
a. Provide Material Safety Data Sheets (MSDS) for products on site reviewing them before work begins.
b. Provide safety guards, maintenance, and warnings for all machinery and equipment.
c. Have personal protection equipment practice in place - eye protection and face guards.
d. Have all workers in contact with wet cementitious material wear protective gloves and clothing.
e. Provide eyewash facilities on-site with location signage.
f. Provide dust masks for workers operating mixers.
g. Provide secured storage available for all hazardous or flammable materials.
h. Conduct safety meetings prior to beginning repair operations.
3.2 CRACK REPAIR
3.2.1 Preparation
3.2.1.1 General Requirements
a. Clean all cracks in accordance with the paragraph titled Concrete Preparation.
b. Do not repair cracks when the temperature of the concrete is below freezing and moisture conditions indicate the possibility of ice on the internal surfaces of the crack.
c. Do not apply adhesive if the temperature of the concrete is not within the range of application temperatures recommended by the manufacturer of the adhesive.
3.2.1.2 Crack Routing
Inspect surfaces adjacent to crack to receive repair material. If deteriorated, route a V-groove section at the crack face until sound concrete is reached.
SECTION 03 01 00 Page 10
3.2.1.3 Sealing
a. For epoxy injection, apply a surface seal over all exterior faces of the crack that can be reached to contain the injection adhesive in the crack.
b. For gravity fill repairs, apply a surface seal along the bottom surface of the element that can be reached to contain the repair material in the crack.
3.2.2 Application
3.2.2.1 Epoxy Injection
a. Install the injection entry and venting ports using flush mounted or drilled fittings per proprietary manufacturer's instructions.
b. Space the ports at a distance equal to the thickness of the member.
c. Inject the epoxy using material manufacturer's recommended equipment.
d. Apply recommended manufacturer's injection pressure.
e. For vertical or inclined cracks, apply injection by pumping epoxy into entry ports at the lowest elevation, cap, and move upward.
f. For horizontal cracks, apply injection by proceeding from one end of the crack to the other until the crack is fully sealed.
g. After 10 min., repeat injection procedure until all ports refuse injection.
h. Remove ports and remove the surface seal by chipping, or grinding or other acceptable means after the injected epoxy has cured.
3.2.2.2 Gravity Fill
a. Mix resin or monomer per material manufacturer's instructions.
b. Pre-fill cracks at least 0.125 in. wide with aggregate.
c. Pour resin or monomer onto the surface, over the cracks and spread with brooms, rollers, or squeegees.
d. Work material back and forth over the cracks to maximize fill in crack.
e. Allow at least 20 minutes for material to penetrate cracks.
f. Remove excess material once cracks have been filled to refusal.
g. Allow material to cure per material manufacturer's recommendations.
3.2.3 Quality Control
a. Conduct quality tests for metering accuracy and mixing effectiveness of the continuous mixing pump in accordance with ACI 503.7 .
b. Qualify the test injection procedures in accordance with ACI 503.7 .
SECTION 03 01 00 Page 11
3.2.4 Acceptance Criteria
Work is acceptable if at least 90 percent of the depth of the crack is filled with adhesive.
3.3 CORROSION AND SURFACE REPAIR
3.3.1 Preparation
3.3.1.1 Identification of Extent of Concrete Removal
a. Configure geometry of removal area to maximize the use of right-angle geometry, avoiding reentrant corners, and to obtain uniformity of depth. Determine the depth, location, and size of reinforcing bars prior to removal of concrete.
b. Perform visual inspection and hammer tapping, chain drag sounding, or other methods acceptable by the Contracting Officer to identify cracked, delaminated, spalled, disintegrated, and otherwise unsound concrete for removal. Mark boundaries of repair area before concrete removal.
c. Inspect the marked boundaries with the Contracting Officer prior to commencing with the concrete removal. Revise the repair area boundaries as instructed by the Contracting Officer.
3.3.1.2 Formwork
a. Provide formwork per the paragraph titled Formwork.
3.3.1.3 Concrete Removal
a. Remove concrete from repair areas to indicated depth. Notify Contracting Officer if additional delaminated, fractured, or unsound concrete is present.
b. Do not damage embedded reinforcing and adjacent concrete. The removal methods must produce minimal microcracking (bruising) of the prepared substrate surfaces. Avoid directly striking reinforcing steel with impact tools used for concrete removal.
c. Provide perpendicular edges at perimeter of repair area. The perimeter of the repair areas must be saw cut to a depth of 0.50 to 0.75 in. For vertical surfaces, provide 45-degree slope at repair boundaries to facilitate air and rebound escape. Do not cut or damage embedded reinforcement or other embedded items. If embedded reinforcing steel or other embedded items are too close to the surface to provide the perpendicular edge cut, notify the Contracting Officer for direction before proceeding.
d. Extend concrete removal to a point where there is no further delamination or concrete cracking.
3.3.1.4 Preparation of Concrete Substrate Surface
a. Confirm perpendicular edges at repair area perimeter, and reinstate if damaged by concrete removal process. Remove loosely bonded concrete, bruised or fractured concrete, and bond-inhibiting materials such as dirt, concrete slurry, or any other detrimental materials from the
SECTION 03 01 00 Page 12 concrete substrate using approved methods. Where concrete has been removed by impact methods, abrasive blasting must be used to prepare the surface and remove bruised concrete.
b. Visually inspect and sound substrate surface to confirm that no further delaminations or otherwise unsound concrete remains. If encountered, notify the Contracting Officer.
c. Clean the substrate per the paragraph titled Concrete preparation.
3.3.2 Application
3.3.2.1 Existing Reinforcement Preparation
a. Clean existing reinforcement that will remain. Remove corrosion and/or other laitance and notify the Contracting Officer if section loss is greater than 20 percent.
b. Replace coating on reinforcement per ASTM A780/A780M . Exposed areas must not exceed 2 percent of surface area in each linear foot of each bar.
c. Permit evaluation of existing reinforcement by the Contracting Officer.
3.3.2.2 Placement of Concrete
a. If portland cement concrete is used as the repair material, follow the requirements indicated in 03 30 00 CAST-IN-PLACE CONCRETE as well the Contract Document for proportioning, mixing, and placing concrete. For all other materials, follow material manufacturer's recommendations.
b. A bonding agent must be used.
c. Finish the surface to match existing adjacent surface finish and texture.
3.3.2.3 Placement of Other Repair Materials
a. Equilibrate repair material(s) and substrate to the temperature, cleanliness of substrate and reinforcement, and moisture requirements of the repair material manufacturer's requirements.
b. Comply with the repair material manufacturer's requirements for batching, mixing, placing and curing repair materials.
c. Review consistency of the mixed repair material(s) relative to the parameters documented in the repair material manufacturer product data sheet. If non-conforming, adjust consistency in compliance with the repair material manufacturer's requirements.
d. Apply or install repair material(s) within the application time frame (pot life) requirements of the repair material manufacturer's requirements, and place and consolidate to provide well-compacted repair.
e. Finish and tool repair materials, finished in accordance with the repair material manufacturer's written instructions and as indicated in Contract Documents.
SECTION 03 01 00 Page 13
f. Protect installed repair material(s) from damage, exposure to environmental conditions that are detrimental to the uncured or cured properties of the material. Cure in accordance with the requirements of the repair material manufacturer's requirements.
3.3.3 Quality Control
a. Protect concrete surfaces, beyond limits of surfaces receiving bonding agent adhesive, against spillage. Immediately remove any bonding agent adhesive that has spilled beyond desired area. Perform cleanup with material designated by bonding agent adhesive manufacturer. Avoid contamination of work area.
3.4 CONCRETE STRENGTHENING
For all other types of strengthening follow the requirements contained in this paragraph.
3.4.1 Preparation
a. Use equipment and methods specified in the paragraph titled EQUIPMENT FOR CONCRETE PREPARATION and the Contract Documents to produce a sound, rough, open-pore surface at locations where bonding between existing and new concrete is required.
b. Clean all surfaces from contaminant and remove unsound concrete using the prescribed cleaning equipment and methods in the paragraphs titled PRODUCTS. All laitance, dust, dirt, oil, curing compound, existing coatings, and any other matter that could interfere with bonding concrete to the repair material must be removed.
c. Follow the procedures of the paragraphs titled CRACK REPAIR and CORROSION AND SURFACE REPAIR. The concrete surface must be in good condition and all cracking, surface repair, and corrosion related problems must be adequately addressed prior to proceeding with concrete strengthening procedures.
d. Insure that materials used for repairs are compatible with materials used for strengthening. Consult with the repair material manufacturers for information concerning material compatibility.
e. Surfaces not intended to be strengthened must be covered as needed to protect against contamination and spills.
f. Surfaces intended to be strengthened must be protected before application so that no materials that can interfere with bond are redeposited on the surface.
3.4.2 Application
3.4.2.1 Section enlargement
a. Install formwork and shoring following the requirements of this section.
b. Follow the requirements of Section 03 30 00 CAST-IN-PLACE CONCRETE to place, consolidate, and finish concrete.
-- End of Section --
SECTION 03 01 00 Page 14
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
02/19, CHG 4: 08/22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 121R (2008) Guide for Concrete Construction Quality Systems in Conformance with ISO
ACI 301 (2016) Specifications for Structural Concrete
ACI 302.1R (2015) Guide for Concrete Floor and Slab Construction
ACI 304.2R (2017) Guide to Placing Concrete by Pumping Methods
ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI 305.1 (2014) Specification for Hot Weather Concreting
ACI 305R (2020) Guide to Hot Weather Concreting
ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting
ACI 306R (2016) Guide to Cold Weather Concreting
ACI 308.1 (2011) Specification for Curing Concrete
ACI SP-2 (2007; Abstract: 10th Edition) ACI Manual of Concrete Inspection
ACI SP-15 (2011) Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References
AMERICAN HARDBOARD ASSOCIATION (AHA)
AHA A135.4 (1995; R 2004) Basic Hardboard
SECTION 03 30 00 Page 1
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2022) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A615/A615M (2022) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A767/A767M (2016) Standard Specification for Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement
ASTM A780/A780M (2020) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A934/A934M (2022) Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars
ASTM A1060/A1060M (2016b) Standard Specification for Zinc-Coated (Galvanized) Steel Welded Wire Reinforcement, Plain and Deformed, for Concrete
ASTM A1064/A1064M (2022) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete
ASTM A1094/A1094M (2020) Standard Specification for Continuous Hot-Dip Galvanized Steel Bars for Concrete Reinforcement
ASTM C31/C31M (2023) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C33/C33M (2023) Standard Specification for Concrete Aggregates
ASTM C39/C39M (2023) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C42/C42M (2020) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C78/C78M (2022) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)
ASTM C94/C94M (2023) Standard Specification for Ready-Mixed Concrete
ASTM C143/C143M (2020) Standard Test Method for Slump of Hydraulic-Cement Concrete
SECTION 03 30 00 Page 2
ASTM C150/C150M (2022) Standard Specification for Portland Cement
ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C173/C173M (2023) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method
ASTM C231/C231M (2022) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C311/C311M (2022) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete
ASTM C330/C330M (2017a) Standard Specification for Lightweight Aggregates for Structural Concrete
ASTM C494/C494M (2019; E 2022) Standard Specification for Chemical Admixtures for Concrete
ASTM C618 (2023; E 2023) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants
ASTM C989/C989M (2022) Standard Specification for Slag Cement for Use in Concrete and Mortars
ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete
ASTM C1077 (2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation
ASTM C1107/C1107M (2020) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C1260 (2023) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)
ASTM C1293 (2008; R 2015) Standard Test Method for Determination of Length Change of Concrete Due to Alkali-Silica Reaction
SECTION 03 30 00 Page 3
ASTM C1567 (2023) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2022) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM C1778 (2016) Standard Guide for Reducing the Risk of Deleterious Alkali-Aggregate Reaction in Concrete
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D1751 (2018) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)
ASTM D1752 (2018) Standard Specification for Preformed Sponge Rubber, Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction
ASTM D5759 (2012; R 2020) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses
ASTM D6690 (2015) Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements
ASTM E96/E96M (2022a; E 2023) Standard Test Methods for Gravimetric Determination of Water Vapor Transmission Rate of Materials
ASTM E329 (2023) Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection
ASTM E1155 (2020) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers
ASTM E1643 (2018a) Standard Practice for Selection, Design, Installation, and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs
ASTM E1745 (2017) Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs
SECTION 03 30 00 Page 4
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
CRSI 10MSP (2018) Manual of Standard Practice
CRSI RB4.1 (2016) Supports for Reinforcement Used in Concrete
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST PS 1 (2009) DOC Voluntary Product Standard PS 1-07, Structural Plywood
1.2 DEFINITIONS
a. "Cementitious material" as used herein must include all portland cement, pozzolan, fly ash, and slag cement.
b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.
c. "Chemical admixtures" are materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.
d. "Supplementary cementing materials" (SCM) include coal fly ash, slag cement, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace the portland cement that result in improvement to sustainability and durability and reduced cost.
e. "Design strength" (f'c) is the specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.
f. "Mass Concrete" is any concrete system that approaches a maximum temperature of 158 degrees F within the first 72 hours of placement.
In addition, it includes all concrete elements with a section thickness of 3 feet or more regardless of temperature.
g. "Mixture proportioning" is the process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project while minimizing the initial and life-cycle cost.
h. "Mixture proportions" are the masses or volumes of individual ingredients used to make a unit measure (cubic meter or cubic yard) of concrete.
i. "Pozzolan" is a siliceous or siliceous and aluminous material, which in itself possesses little or no cementitious value but will, in finely divided form and in the presence of moisture, chemically react with calcium hydroxide at ordinary temperatures to form compounds possessing cementitious properties.
j. "Workability (or consistence)" is the ability of a fresh (plastic) concrete mix to fill the form/mould properly with the desired work (vibration) and without reducing the concrete's quality. Workability depends on water content, chemical admixtures, aggregate (shape and
SECTION 03 30 00 Page 5 size distribution), cementitious content and age (level of hydration).
1.3 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for Contractor Quality Control approval. Submit the following in accordance with Section
01 33 00.00 22 SUBMITTAL PROCEDURES (PWD ME):
SD-01 Preconstruction Submittals
Concrete Curing Plan; G
Quality Control Plan; G
Quality Control Personnel Certifications; G
Quality Control Organizational Chart; G
Laboratory Accreditation; G
SD-02 Shop Drawings
Reinforcing Steel; G
SD-03 Product Data
Joint Sealants; G
Joint Filler; G
Formwork Materials; G
Cementitious Materials; G
Vapor Retarder; G
Concrete Curing Materials; G
Reinforcement; G
Liquid Chemical Floor Hardeners and Sealers; G
Admixtures; G
Waterstops; G
Biodegradable Form Release Agent; G
Pumping Concrete; G
Nonshrink Grout; G
SD-05 Design Data
Concrete Mix Design; G
SD-06 Test Reports
SECTION 03 30 00 Page 6
Concrete Mix Design; G
Aggregates; G
Compressive Strength Tests; G
Air Content; G
Slump Tests; G
Water; G
SD-07 Certificates
Reinforcing Bars; G
VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers
Safety Data Sheets
Field Testing Technician and Testing Agency; G
SD-08 Manufacturer's Instructions
Liquid Chemical Floor Hardeners and Sealers
Joint Sealants
Curing Compound
1.4 MODIFICATION OF REFERENCES
Accomplish work in accordance with ACI publications except as modified herein. Consider the advisory or recommended provisions to be mandatory.
Interpret reference to the "Building Official," the "Structural Engineer," and the "Architect/Engineer" to mean the Contracting Officer.
1.5 DELIVERY, STORAGE, AND HANDLING
Follow ACI 301 , ACI 304R and ASTM A934/A934M requirements and recommendations. Do not deliver concrete until vapor retarder, forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement. Do not store concrete curing compounds or sealers with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions. Do not store concrete curing compounds or sealers in occupied spaces.
1.5.1 Reinforcement
Store reinforcement of different sizes and shapes in separate piles or racks raised above the ground to avoid excessive rusting. Protect from contaminants such as grease, oil, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.
SECTION 03 30 00 Page 7
1.6 QUALITY ASSURANCE
1.6.1 Design Data
1.6.1.1 Concrete Mix Design
Sixty days minimum prior to concrete placement, submit a mix design for each strength and type of concrete. Submit a complete list of materials including type; brand; source and amount of cement, supplementary cementitious materials, and admixtures; and applicable reference specifications. Submit mill test and all other test for cement, supplementary cementitious materials, aggregates, and admixtures. Provide documentation of maximum nominal aggregate size, gradation analysis, percentage retained and passing sieve, and a graph of percentage retained verses sieve size. Provide mix proportion data using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required. If source material changes, resubmit mix proportion data using revised source material. Provide only materials that have been proven by trial mix studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting Officer. Indicate clearly in the submittal where each mix design is used when more than one mix design is submitted. Resubmit data on concrete components if the qualities or source of components changes.
Required average strength can be documented by field experience if field strength test data are available and represent a single group of at least 10 consecutive strength tests for one mixture, using materials and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .