Att. Z) B60 Continuation Sheet AMD 004.pdf
PDF 87 KB Posted
- Solicitation number
- N6247026R0012
About this file
This is Amendment 004 to a federal construction contract, effective January 27, 2026. The amendment updates contract drawings and specifications for what appears to be a Naval facility modification project involving foundation work and structural fireproofing.
The amendment deletes and replaces five drawings: G-006 (Site Constraints and Requirements Plan), G-008 (Outage Schedule), G-009 (Outage Schedule Continued), SB101 (Foundation Part Plan – East), and SB102 (Foundation Part Plan – West). No drawings were revised without reissuance, added, or deleted beyond those listed. Specification changes include revising the base bid period of performance to 622 calendar days, with contractor mobilization no sooner than 45 calendar days after contract award and construction activities commencing no sooner than 90 calendar days after award. The entire Work Restrictions specification section (01 14 00.00 22) is deleted and replaced with a revised version dated January 27, 2026, including deletion of Attachment E. Administrative requirement updates specify the Division 01 Specification Review Meeting must occur within 15 calendar days after contract award, and the NAVFAC PWD ME Internal Service Requirements List (Attachment 3) is replaced with a revised version. Additional changes include deletion of the Post Award Kickoff line item from the Electronic Construction and Facility Support Contract Management System meeting minutes module, removal of Coating Inspector and Protective Coating Specialist line items from Quality Control specialist requirements, and revision of fire resistance ratings to 1-hour for columns supporting one floor and floor supports in the Spray-Applied Fireproofing specification.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTINUATION SHEET (Amendment 004)
DRAWINGS:
DELETE and REPLACE the following drawings as of January, 27, 2026. These drawings accompany this Amendment:
G-006 – SITE CONSTRAINTS AND REQUIREMENTS PLAN
G-008 – OUTAGE SCHEDULE
G-009 – OUTAGE SCHEDULE CONTINUED
SB101 – FOUNDATION PART PLAN – EAST
SB102 – FOUNDATION PART PLAN – WEST
The following DRAWINGS have been REVISED but NOT REISSUED:
None
The following DRAWINGS have been ADDED:
None
The following DRAWINGS have been DELETED:
None
SPECIFICATIONS:
DOCUMENT 00 01 15 LIST OF DRAWINGS
1.2 CONTRACT DRAWINGS
DELETE and REPLACE the following drawings as of January, 27, 2026. These drawings accompany this Amendment.
VOL SHEET
NO.
DRAWING
NO.
REV
NO.
NAVFAC
DWG NO.
DRAWING TITLE
PPI Ref
1 6 G-006 1 -
SITE CONSTRAINTS AND
REQUIREMENTS PLAN
1 9 G-008 1 - OUTAGE SCHEDULE 13
1 9 G-009 1 -
OUTAGE SCHEDULE
CONTINUED
1 55 SB101 1 -
FOUNDATION PART
PLAN - EAST
1 56 SB102 1 -
FOUNDATION PART
PLAN - WEST
SPECIFICATION SECTION REVISIONS:
Spec No. Part / Subpart / Paragraph Summary of Revision PPI Ref 01 11 00.00 22
Summary of Work (PWD
ME)
1.3 Period of Performance
Revise Paragraph 1.3 first sentence to read: “Base Bid: Period of performance is 622 calendar days and Delete the second sentence starting with “The mobilization date..” in its entirety.
1, 53, 01 11 00.00 22 Summary of Work (PWD
ME)
1.3.1 Contractor Mobilization
After Contract Award
Revise Paragraph 1.3.1 by replacing the paragraph with the following: “Contractor to mobilize no sooner than 45 Calendar days after contract award and start construction activities no sooner than 90 Calendar days after contract award. 10
01 14 00.00 22 Work
Restrictions (PWD-ME) Entire Specification Section
Delete and Replace specification section 01 14
00.00 22 in its entirety with revised section dated 27
JAN 2026.
13, 14, 15, 16, 17, 18
01 14 00.00 22 Work
Restrictions
(PWD-ME)
Attachment E (NAVSHIPYD PTSMHINST 5500.6A) Delete Attachment E in its entirety. -
01 30 00.00 22 Administrative Requirements
(PWD ME)
1.7 Schedule of Major
Meetings (table)
Revise “Div 01 Spec Review” meeting “Schedule” line item to read: “Within 15 calendar days of Contract Award” -
01 30 00.00 22 Administrative Requirements
(PWD ME)
1.8 Division 01 Specification
Review Meeting
Revise paragraph 1.8 first sentence to read: The Specification Review Meeting must take place within 15 calendar days after Contract Award and prior to the Preconstruction Meeting.” -
01 30 00.00 22 Administrative Requirements
(PWD ME)
1.16.3 NAVFAC PWD ME
Internal Service Requirements
List
Revise first sentence to read: “An initial pre-edited draft of the NAVFAC PWD ME Internal Service Requirements List is included in Attachment 3 of this Section. -
01 30 00.00 22 Administrative Requirements (PWD ME) Attachment 3
Delete and Replace Attachment 3 with revised Attachment 3 ISRL document dated 27 JAN 2026. -
Spec No. Part / Subpart / Paragraph Summary of Revision PPI Ref 01 31 23.13 20
Electronic Construction and Facility
Support Contract
Management System 1.6.8 Meeting Minutes Module Delete “Post Award Kickoff (PAK) line item. 11, 12
01 45 00.00 22 Quality Control
(PWD ME)
1.6.6 Quality Control (QC)
Specialists (Experience Matrix
Table) Delete “Coating Inspector” and “Protective Coating Specialist (PCS)” line items. 59
07 81 00 Spray- Applied
Fireproofing
1.4.2 Fire Resistance Rating
(Fire Rating Schedule Table)
Revise Fire Rating Schedule Hourly Ratings to “1- Hr” for Columns supporting one floor and Floor supports line items. 64
--End of Amendment --
File details come from the government source that posted it. Updated .