About this file

This is an electrical lighting plan document for the first floor of Building 60, showing detailed fixture placement, control requirements, and installation specifications. The plan covers the west section at a scale of 1/8" = 1'-0" and includes general notes and numbered keynotes specifying fixture mounting heights, coordination requirements, and control system details.

Key specifications include: lighting fixtures mounted at 8' to 9' above finished floor (AFF) with pendant mounting accessories, coordinated with mechanical equipment and ductwork; emergency lighting and exit signs connected to branch circuits ahead of switches and occupancy sensors; a lighting bypass relay system to activate lights upon fire alarm activation in egress paths; separate local area controllers managing fixtures in Shop 111 and Corridors 102, 103, and 104 with individual corridor control capability; shielded low-voltage lighting control cables required in Shop 111, routed minimum 15 feet from heat sealers; conduit routing through fixture backs to avoid exposed exterior conduit; emergency power via inverter for specified fixtures; and emergency drivers integrated into corridor fixtures. The plan references related sheets EL701, EL702, and EL104 for fixture schedules, details, and overhead lighting information, with field coordination required for exact fixture placement and mounting heights relative to communications cabinets, cable trays, elevator equipment, and mechanical systems.

View the file

Other files

File Type Posted
Att. GG) Amendment 0011 Attachment Table of Contents.pdf PDF
Solicitation Amendment N6247026R00120010 SF 30.pdf PDF
Att. T) Price Schedule AMD 0010.pdf PDF
01 30 10.00 22_AMENDMENT 010.pdf PDF
115_AE402_R1_AMENDMENT 010.pdf PDF
161_Q-601_R2_AMENDMENT 010.pdf PDF
170_P-102_R1_AMENDMENT 010.pdf PDF
171_P-103_R1_AMENDMENT 010.pdf PDF
175_P-107_R1_AMENDMENT 010.pdf PDF
677 attach Attic_AFPR.pdf PDF
Att. Y) PPI responses AMD 0009.pdf PDF
_B60_Continuation Sheet_Amendment 0009.pdf PDF
07 27 10_AMENDMENT 009.pdf PDF
95_AE104_R1_AMENDMENT 009.pdf PDF
216_M505_R1_AMENDMENT 009.pdf PDF
217_M601_R1_AMENDMENT 009.pdf PDF
262_EP603_R1_AMENDMENT 009.pdf PDF
268_EL104_R1_AMENDMENT 009.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
Att.pdf PDF
Att. Y) PPI responses AMD 0008.pdf PDF
_B60_Continuation Sheet_Amendment 008.pdf PDF
01 11 00.00 22_R1_AMENDMENT 008.pdf PDF
72_SF506_R1_AMENDMENT 008.pdf PDF
220_M-701_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Att. CC) Site Visit Log.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
AMD 0002 PPI responses.pdf PDF
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

S

S

S

SS

S

S

S

S

S

S

S

SS

S

S

S

S

S

S

S

S

S

S

S

AA

FGHIJKLMNO

E6

E7

STAIR

003A

WOMEN

CORRIDOR

OFFICE

SHOP

STORAGE

VEST

STAIR

002A

ELEV

SHOP

ANNEX

ANNEX

D1 D1

D1 D1

LV

D1 D1

3 4 D1

W

WP

LVb

W

D1 D1 D1 D1

D1 D1 D1 D1

D1 D1 D1 D1

D1 D1 D1

D1 D1 D1

D1 D1 D1

LCP

NETWORK

ELECTRICAL

MECH

D1 D1 D1 D1 D1 D1

D1D1D1D1D1D1 a a a a a a a a a a a a

10 aa d d d d d d d d d d d d d d d d d d d d d

D

D

MEN

ELEV MACHINE

001A

CORRIDOR

CORRIDOR

INSPECTION

CUSTODIAL

d d d

LV

3 3

LVa

LV

LCP

D1 D1

11 4

LVc

LVd

LVc12

LV

LVb

LV

LV

D1

D1

D1

D1

D1

PL6-4

LVb b

D1

11 15

PL1-8

D1

D1

D1

D1 D1

D117

D

PL4-14

1 14

D1 D1

D111

MDP-12

D

D

D

D

PL2-8

P/O

D1

D1

D1

PL6-6

INV

PL6-17

INV

PL5-33

P/O

PL6-8

B

B

PL6-10

P/O

B

B

PL5-12

P/O

B

B

PL2-14

P/O

D

D

D D

D

D D

D

D

F1

F1

F1

F1

INV

F

F

INV

LV

LV

D21

STAIR

004A

LV

c c cc c c b c b b bb

11 11 c b

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/1

/2

:4

:2

A

M

C U s e rs \b d a ig le \D o c u m e n ts

\2

.2

B

L D

G

E

L E

C -V b d a ig le

Q U

X G

.r v t

EL102

B R

E P

A

IR

S

F

IR

S T

F L O

O R

L

IG

H T

IN

G

P A

R T

P L A

N

W E

S T

DCL

HRM

RSW

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

E L

SCALE: 1/8" = 1'-0"

B1

FIRST FLOOR LIGHTING PART PLAN - WEST

PLAN

NORTH

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLANGENERAL NOTES KEYNOTES

1. REFER TO SHEETS EL701 AND EL702 FOR LIGHTING FIXTURE

SCHEDULE AND DETAILS.

2. EXPOSED CONDUIT AT EXTERIOR LIGHTING FIXTURES IS NOT

PERMITTED. ROUTE CONDUIT THROUGH THE BACK OF THE

FIXTURES.

3. CONNECT EMERGENCY LIGHTING AND EXIT SIGNS TO LOCAL

LIGHTING BRANCH CIRCUIT AHEAD OF SWITCHES, OCCUPANCY

SENSORS, AND LIGHTING CONTROLS.

REFER TO SHEET EL104 FOR LIGHTING ABOVE.

INSTALL ADJACENT TO THE PIT LADDER. COORDINATE EXACT LOCATION IN

THE FIELD.

PROVIDE LIGHTING BYPASS RELAY WITHIN THE PATHS OF EGRESS TO

TURN LIGHTS ON UPON FIRE ALARM ACTIVATION. REFER TO DETAIL

A2/EL702.

MOUNT FIXTURES AT 9' AFF. PROVIDE ACCESSORIES FOR PENDANT

MOUNTING, AND COOORDINATE WITH MECHANICAL EQUIPMENT, PIPING

AND DUCTWORK.

MOUNT FIXTURES AT 8' AFF. PROVIDE ACCESSORIES FOR PENDANT

MOUNTING, AND COOORDINATE WITH MECHANICAL EQUIPMENT, PIPING

AND DUCTWORK.

REFER TO LOCAL AREA CONTROLLER DIAGRAM A1/EL702. THIS

CONTROLLER AND ASSOCIATED SWITCHES MUST CONTROL THE FIXTURES

WITHIN SHOP 111.

COORDINATE EXACT LOCATION AND MOUNTING HEIGHT WITH THE

COMMUNICATIONS CABINETS AND CABLE TRAY.

MATCH LINE

TO LIGHTING FIXTURES ON THE MEZZANINE. PROVIDE ENGRAVED LABEL

INDICATING "MECHANICAL MEZZANINE LIGHTING". ADJACENT TO THE

ANNEX, COORDINATE EXACT LOCATION TO AVOID THE SLIDING DOOR.

MOUNT FIXTURES AT APPROXIMATELY 9' AFF. PROVIDE ACCESSORIES

FOR PENDANT MOUNTING AND COORDINATE EXACT LOCATION AND

MOUNTING HEIGHT WITH THE EQUIPMENT WITHIN THE ROOM.

MOUNT FIXTURES AT 9' AFF, BELOW MEZZANINE.

PROVIDE INTEGRAL EMERGENCY DRIVER.

REFER TO LOCAL AREA CONTROLLER DIAGRAM A3/EL702. THIS

CONTROLLER AND ASSOCIATED SWITCHES MUST CONTROL THE

FIXTURES WITHIN CORRIDORS 102, 103, AND 104. EACH CORRIDOR MUST

HAVE THE ABILITY TO BE SEPARATELY CONTROLLED.

ROUTE CONDUIT A MINIMUM OF 15 FEET AWAY FROM THE HEAT SEALERS

IN SHOP 111.

PROVIDE SHIELDED LOW VOLTAGE LIGHTING CONTROL CABLES IN SHOP

111.

WIRE FIXTURE TO TOGGLE SWITCH, NOT OCCUPANCY SENSOR, FOR USE

AT THE PANELBOARD.

PROVIDE TWO LIGHTING FIXTURES IN THE ELEVATOR PIT. PROVIDE ADDITIONAL

LIGHTING FIXTURES EVERY 10 FEET, VERTICALLY, UP THE HOISTWAY. COORDINATE

EXACT LOCATION WITH THE ELEVATOR INSTALLER. REFER TO SHEET AE411.

WIRE FIXTURE AS ALWAYS ON FOR ELEVATOR LOBBY LIGHTING.

FOR CONTINUATION, SEE SHEET EL104.

PROVIDE EMERGENCY POWER VIA INVERTER. INSTALL WITHIN MANUFACTURER'S

RECOMMENDED DISTANCE. COORDINATE EXACT LOCATION IN THE FIELD. PROVIDE

LABEL.

MOUNT LIGHTING FIXTURE AT APPROXIMATELY 9' AFF. COORDINATE EXACT LIGHTING

FIXTURE PLACEMENT AND MOUNTING HEIGHT WITH THE CONTRACTING OFFICER TO

AVOID CONFLICTS WITH THE INSPECTION RINGS LOCATED WITHIN THIS ROOM.

PROVIDE ACCESSORIES FOR PENDANT MOUNTING.

INSTALL ABOVE PLATFORM. COORDINATE EXACT LOCATION AND MOUNTING HEIGHT

IN THE FIELD.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/1

6/

R

H

Sheets
EL102 - FIRST FLOOR LIGHTING PART PLAN - WEST

File details come from the government source that posted it. Updated .