This is an architectural drawing set for expansion joint details at Portsmouth Naval Shipyard in Kittery, Maine, prepared by Naval Facilities Engineering Systems Command (NAVFAC) for Building 60 repairs. The document contains detailed technical specifications and cross-sectional diagrams for various expansion joint systems throughout the facility, including elevator/floor expansion joints, mezzanine floor expansion joints, window expansion joints, and wall expansion joints.
The drawing specifies materials and installation requirements including continuous aluminum isolation joint covers, foam seals, preformed silicone facing, mineral wool insulation, metal studs, gypsum board, and concrete slabs. Key installation notes indicate that expansion joint covers must not be attached to existing flooring systems, that fastening must occur to wood blocking or historic masonry mortar joints as appropriate, and that all expansion joint systems must be smoke-rated with fire-rated systems provided where indicated. The document includes plan details, section details, and a typical foam expansion joint system diagram with dimensions showing 2-inch horizontal and vertical joints and 1/8-inch to 1/4-inch gaps. The drawing was finalized on October 1, 2025, with Amendment 009 approved on March 16, 2026, and is classified as UNCLASSIFIED with reference to related architectural sheets AE001, AE601, and AE602 for wall types, door schedules, and repair specifications.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONT ALUM ISOLATION
JOINT COVER - FASTEN
TO HISTORIC MASONRY
MORTAR JOINTS, DO
NOT ATTACH TO
FLOORING
FLOOR FINISH AS
SCHEDULED (TYP)
CONC SLAB (TYP)
- SEE STRUCT
SHEETS
EXIST EXTERIOR
BRICK MASONRY
WALL
FOAM SEAL
ISOLATION JOINT
COVER BEYOND
JOINT
2"
FIRST FLOOR MEZZANINE
ELEV=20.86'
EXPANSION JOINT
SYSTEM - SEE DETAIL D4/AE530
CONT ALUM EXPANSION
JOINT COVER - DO NOT
ATTACH TO EXISTING FLOOR
SYSTEM
FLOOR FINISH AS
SCHEDULED (TYP)
CONC SLAB (TYP) -
SEE STRUCT SHEETS
EXISTING STRUCTURE-
SEE STRUCT SHEETS
EXISTING WOOD FLOORING
FOAM SEAL
ISOLATION JOINT
COVER BEYOND
JOINT
2"
FLOOR FINISH AS
SCHEDULED (TYP)
FIRST FLOOR MEZZANINE
ELEV=20.86'
EXPANSION JOINT
SYSTEM - SEE DETAIL D4/AE530
EXPANSION JOINT
SYSTEM - SEE DETAIL D4/AE530
CONC SLAB (TYP) - SEE
STRUCT SHEETS
FLOOR FINISH AS
SCHEDULED (TYP)
FASTEN MTL STUD WALL
TO CMU
SEE FLOOR PLANS FOR
WALL TYPES
JOINT
2"
5/8" GYP BD
1/ 2"
FIRST FLOOR MEZZANINE
ELEV=20.86'
J BEAD (TYP)
CONT SEALANT (TYP)
CONT ALUM ISOLATION JOINT
COVER - FASTEN TO WOOD
BLOCKING, DO NOT ATTACH
TO FLOORING
FLOOR FINISH AS
SCHEDULED (TYP)
CONC SLAB (TYP)
- SEE STRUCT
SHEETS
2x10 WOOD SUPPORT (FOR
CONTINOUS WIDTH OF
WINDOW) FASTEN TO
WINDOW JAMB, PAINT BLACK
SURFACES EXPOSED TO
WINDOW PRIOR TO
INSTALLATION
FOAM SEAL
ISOLATION JOINT
COVER BEYOND
EXISTING WINDOW
JOINT
2"
FIRST FLOOR MEZZANINE
ELEV=20.86'
EXPANSION JOINT
SYSTEM - SEE DETAIL D4/AE530
5/8" GYP BD (PNT)
3-5/8" METAL STUDS
AT 1'-4" OC
MINERAL WOOL
INSULATION
EXIST EXTERIOR
BRICK MASONRY
WALL
5/8" GYP BD (PNT)
EXPANSION JOINT
SYSTEM - SEE
DETAIL D4/AE530
J BEAD (TYP)
5/8" TYPE "X" GYP BD (PNT)
6" METAL STUDS
AT 1'-4" OC
MINERAL WOOL
INSULATION
EXISTING WINDOW
SEE WINDOW
SCHEDULE
5/8" TYPE "X" GYP BD (PNT)
CORNER BEAD (TYP)
1D
FIRE RATED EXPANSION
JOINT SYSTEM - SEE
SIMILAR DETAIL D4/AE530
EXPANSION JOINT
SYSTEM - SEE DETAIL
D4/AE530
5/8" GYP BD (PNT)
8" CMU WALL - SEE
STRUCTURAL SHEETS
EDGE OF FLOOR
SLAB
GYP BD RETURN
JOINT
2"ALIGN
J BEAD (TYP)
NB
NF NE
1A
8" CMU WALL - SEE
STRUCTURAL SHEETS
EDGE OF FLOOR
SLAB BELOW
EXPANSION DETAIL
FOR PORTION OF
WALL HEIGHT
J BEAD (TYP)
1A
NE
EXPANSION JOINT SYSTEM -
SEE DETAIL D4/AE530
NF
NF
NA
PREFORMED SILICONE
FACING
2" HORIZONTAL/VERTICAL JOINT
EXPANDING FOAM
ANCHORING SYSTEM
SEALANT (TYP
EA SIDE)
JOINT
2"
1/
2"
1/ 8"
1/
4"
NOTES:
1. EXPANSION JOINT SYSTEM
MUST BE SMOKE RATED.
2. PROVIDE FIRE RATED
EXPANSION JOINT SYSTEM
WHERE INDICATED.
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/1
/2
:5
:3
A
M
C U s e rs \m d o n o v a n \D o c u m e n ts \2
.2
B L
D G
A
R C
H
IT
E C
T U
R A
L -V m d o n o v a n
V F
X R
.r v t
AE530
B
R
E P
A
IR
S
E X
P A
N S
IO
N
J O
IN
T
D E
T A
IL
S
RSH
JMR
MJD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
A E
SCALE: 3" = 1'-0" (AE223)
C1
MEZZANINE EXPANSION JOINT SECTION DETAIL
SCALE: 3" = 1'-0" (AE440)
D3
MEZZANINE FLOOR EXPANSION JOINT SECTION DETAIL
SCALE: 3" = 1'-0" (AE223)
D1
ELEVATOR/FLOOR EXPANSION JOINT SECTION DETAIL 1
SCALE: 3" = 1'-0" (AE221)
C3
MEZZANINE EXPANSION JOINT AT WINDOW DETAIL
3" = 1' - 0" 0 3" 6" 1'
GENERAL NOTES
GRAPHIC SCALE(S)
1. SEE SHEET AE001 FOR WALL TYPES.
2. SEE SHEET AE601 FOR DOOR SCHEDULE.
3. SEE SHEET AE602 FOR DOOR REPAIR AND RESTORATION
SCHEDULE.
SCALE: NOT TO SCALE
D4
TYP FOAM EXPANSION JOINT SYSTEM
SCALE: 3" = 1'-0"
A4
WALL EXPANSION JOINT PLAN DETAIL
SCALE: 3" = 1'-0" (AE440)
A1
WINDOW EXPANSION JOINT PLAN DETAIL
SCALE: 3" = 1'-0" (AE411)
A3
ELEVATOR/FLOOR EXPANSION JOINT PLAN DETAIL 2
SCALE: 3" = 1'-0" (AE411)
B4
ELEVATOR/FLOOR EXPANSION JOINT PLAN DETAIL 1
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/1
6/
R
S H
| Sheets |
| AD104 - SECOND FLOOR REMOVALS PLAN |
| AD105 - SECOND FLOOR MEZZANINE REMOVALS PLAN |
| AE104 - FIRST FLOOR MEZZANINE PART PLAN - WEST |
| AE105 - SECOND FLOOR PLAN |
| AE411 - ENLARGED ELEVATOR PLANS AND SECTIONS |
| AE441 - ENLARGED STAIR PLANS 2 |
| AE444 - STAIR DETAILS |
| AE511 - METAL PANEL DETAILS |
| AE530 - EXPANSION JOINT DETAILS 1 |
| AE531 - EXPANSION JOINT DETAILS 2 |
| AE601 - DOOR SCHEDULE AND DETAILS |
| AE640 - ROOM FINISH SCHEDULE |
| HM101 - FIRST FLOOR HAZARDOUS MATERIALS PART PLAN - EAST |
| SP101 - STRUCTURAL PROTECTION PART PLAN AND DETAILS |
File details come from the government source that posted it. Updated .