This document summarizes a pre-proposal conference for a federal construction contract solicitation. The solicitation seeks design-build services for a $25-100 million project to construct a 36,139 square foot National Guard Readiness Center in Barrigada, Guam. Offerors must submit technical and past performance proposals, as well as a price proposal including a bid bond of $3 million or 20% of the proposed price. The performance period is 880 calendar days. The Navy is the contracting agency, and questions must be submitted to the points of contact by the stated deadlines.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL CONFERENCE
04 May 2022
Solicitation N4019222R2012 FY22 MILCON PROJECT P-052, National Guard Readiness Center
Barrigada, Guam
Administrative Matters Solicitation Overview Basis for Award RFP Highlights
Instructions to Proposers Evaluation Factors for Award Proposal Submission Requirements Project Overview Requests for Information Closing Statement
CONTENTS
ADMINISTRATIVE MATTERS
POINTS OF CONTACT
Doris Castro Contracting Officer
(671) 339-8465 doris.castro@fe.navy.mil
Juvee Pangelinan Contract Specialist
(671) 339-8098 juvee.pangelinan@fe.navy.mil
Due to COVID-19 restrictions, the pre-proposal conference is available in written format only.
A one-time site visit of the project location will be held for contractor verification purposes.
The site visit attendance sheet and pre-proposal conference presentation slides will be posted on the SAM website at https://www.SAM.gov.
All questions MUST be submitted in writing using the Request for Information (RFI) form in the RFP.
A consolidated list of all RFI questions and responses will be posted to the SAM website.
The terms and conditions of the solicitation remain unchanged unless the solicitation is amended in writing.
Any change to the solicitation will be made by amendment and will be posted to the SAM website.
SOLICITATION OVERVIEW
The contract resulting from this solicitation will be awarded to the responsible Offeror whose offer, conforming to the solicitation, is determined to be the most advantageous to the Government considering price and non-price evaluation factors.
The lowest price technically acceptable (LPTA) process is selected as appropriate for this acquisition. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-price factors.
BASIS FOR AWARD
The Government reserves the right to:
Eliminate from consideration for award any or all offers at any time prior to award
Negotiate with Offerors in the competitive range
Award the contract to the Offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered
Offerors are advised that an award may be made without discussions or any contact concerning the proposals received.
Offerors shall not assume that they will be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of the proposals or conduct discussions.
The number of proposals to be evaluated for technical acceptability may be limited to the lowest priced offer at the discretion of the contracting officer. If the number of proposals to be evaluated is limited, the technical proposal shall be provided to the evaluator(s) without any identification of price. If the lowest priced proposal is not found to be technically acceptable then the next lowest price proposal shall be evaluated. If that proposal is also not found to be technically acceptable, then the process described will be conducted again as many times as necessary, until such time as the Government identifies a technically acceptable proposal.
RFP HIGHLIGHTS
This is an unrestricted construction procurement.
North American Industry Classification System (NAICS):
236220, Commercial and Institutional Building Construction
Size Standard: $39.5 million
Project Magnitude: $25 million and $100 million
SF 1442 Block 10:
Description of Work
This is a design-build project to design and construct a 36,139 SF National Guard Readiness Center for the 1224th Engineer Support Company (ESC) and the 1-244 Aviation Regiment (AVN) at Barrigada, Guam which will support training, administrative, and logistical requirements of the Guam Army National Guard (GUARNG).
The supporting development includes utilities, a backup emergency generator, paved parking, and other necessary site improvements.
Function areas include: ESC Administrative, Arms Vaults and Cages, Classrooms, Unit Locks.
SF 1442 Block 13:
Proposals are due no later than 4:30pm Guam time on June 7, 2022.
Proposals must be received and date/time stamped by the Contracting Officer on or before that date and time.
Late submittals will not be considered unless it meets the requirements in FAR 52.215-1 Instructions to Offerors – Competitive Acquisition.
INSTRUCTIONS TO PROPOSERS
RFP PART A
SF1442 SECTION 00 21 16 INSTRUCTIONS TO PROPOSERS:
Read this entire section carefully!
Proposals shall be submitted in three ring binders or bound, with tabs or separators.
Page limits, where stipulated, must be adhered to. A page refers to one printed side of a piece of paper.
Proposals shall be submitted on 8.5” x 11” paper, utilizing both sides of the paper.
Proposals shall follow the format in the RFP.
Offerors must submit:
Cover Letter
RFP Part A Documents (SF1442; joint venture agreement, binding teaming agreement, or other contractual agreement;
and completed Section 00 45 00 Reps & Certs of RFP)
Non-Price Proposal (Factors 1 through 5)
Price Proposal (Factor 6)
Price proposals are to be provided in a sealed envelope and shall contain the following :
Completed Schedule of Prices for all CLINs in Section 00 10 00 of the SF1442
Bid Bond in the amount of $3 million or 20% of the total proposed price, whichever is less
NOTE: RFP Part A Documents may be submitted with the Price Proposal, as any documents with prices should be submitted separately from the Non-Price Proposal.
Proposal submission shall consist of:
Non-Price Proposal: One (1) original, three (3) hard copies, and one (1) electronic copy in Adobe Acrobat PDF format provided on compact disc (CD)
Price Proposal (In Sealed Envelope): One (1) original, three (3) hard copies, and one (1) electronic copy in Adobe Acrobat PDF format provided on CD. Place the CD in the sealed envelope, along with the copies of the Price Proposal
NOTE: RFP Part A Documents may be submitted with the Price Proposal, as any documents with prices should be submitted
System for Award Management (SAM)
Firms must be registered in SAM prior to award of a DoD contract.
Firms shall also ensure to obtain a registered Unique Entity Identifier (UEI) prior to award.
IMPORTANT: Contractors shall complete both FAR and DFARS provisions associated with the annual representations and certifications in order to participate in this RFP.
EVALUATION FACTORS FOR AWARD
RFP PART A
SF1442 SECTION 00 22 16 EVALUATION FACTORS FOR AWARD:
Factor 1 – Experience Factor 2 – Past Performance Factor 3 – Technical Approach Factor 4 – Small Business Utilization Factor 5 – Safety Factor 6 – Price
Evaluation factors are divided into two categories:
Non-Price (Factors 1 through 5) and Price (Factor 6)
The contract resulting from this solicitation will be awarded to the responsible Offeror whose offer, conforming to the solicitation, is determined to be the most advantageous to the Government considering price and non-price evaluation factors.
Proposals shall contain a response to each of the evaluation factors and shall be in the form prescribed in the solicitation.
FACTOR 1: Experience
The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP.
BASIS OF EVALUATION
FACTOR 2: Past Performance
This evaluation considers how well the Offeror’s team performed on the relevant projects submitted under Factor 1, Experience, and may also consider past performance on other projects currently documented in known sources.
The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.
FACTOR 2: Past Performance (cont’d)
CPARS, interim CPARs and PPQs submitted with an overall rating of marginal or less must be accompanied with an explanation, refer to Note
(2) of this evaluation factor. Failure to provide the explanation will result in an unacceptable rating.
CPARS, interim CPARs and PPQs submitted with an overall rating of unsatisfactory are considered unacceptable.
FACTOR 3: Technical Approach
Composition and management of the proposed design-build (DB) team:
The Offeror’s approach will be used as a means to assess the Offeror’s understanding of the contract requirements; the organizational structure and teaming relationships demonstrating meaningful involvement in the performance of the contract by all proposed team members.
Technical Narrative: The Government will evaluate the technical narrative considering the extent to which the Offeror proposes realistic and executable solutions that demonstrate a clear understanding of the requirements of the project. The Government will evaluate the Offeror's technical capability and methodology to determine the likelihood the work will be performed in accordance with the technical requirements.
FACTOR 3: Technical Approach (cont’d)
Design and Construction Schedule: The Government will evaluate the design-build schedule based on the Offeror’s understanding of the project schedule constraints. Offerors will be evaluated upon their plan showing effective management of the project with associated material, labor, quality control, environmental, and other logistics challenges critical for timely completion. Offerors must demonstrate a realistic, comprehensive, efficient, and executable approach to successfully accomplish key project milestones within the project schedule constraints prescribed n the RFP.
FACTOR 4: Small Business Utilization
Offerors will be evaluated on the extent to which their proposals and other performance information available to the Government demonstrate a history of successfully supporting Government policies concerning utilization of small business concerns as subcontractors including, when applicable, achievements against established small business subcontracting plan goals.
Offerors will also be evaluated on the levels of small business participation proposed and the degree of commitment to use named sources.
The anticipated benefits of proposed initiatives and tools to enhance small business participation and capabilities will be considered. The Government will assess proposal realism and the likelihood of success in achieving the small business objectives of this acquisition.
FACTOR 5: Safety The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
The evaluation will collectively consider the following:
Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate Total Case Rate (TCR) Technical Approach to Safety Narrative Other sources of information available to the Government
Refer to RFP for complete details of the Basis of Evaluation for this factor.
FACTOR 6: Price
In accordance with FAR 52.217-5, Evaluation of Options Exercised, except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate the offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
The price proposal will be evaluated in accordance with DFARS
252.236-7010 Overseas Military Construction – Preference for United States firms and FAR 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (DEVIATION 2020-O0008), if applicable.
FACTOR 6: Price (cont’d)
Price will be evaluated for reasonableness based on:
Comparison of proposed prices received in response to the solicitation.
Comparison of proposed prices with the Independent
Government Cost Estimate (IGCE).
PROPOSAL SUBMISSION REQUIREMENTS
FACTOR 1: Experience In Volume I Tab 1 of the proposal, the Offeror shall complete the attached Construction & Design Experience Project Data Sheet (Exhibit A) for each construction and design project submitted and complete all individual blocks.
The Construction & Design Experience Project Data Sheet in Exhibit A is MANDATORY and SHALL be used to submit project information for relevant projects. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed four (4) pages. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.:
unique features, area, construction methods). Project Data Sheets that do not comply with these requirements will not be evaluated.
FACTOR 1: Experience (cont’d)
Construction Experience. Submit a minimum of two (2) and a maximum of five (5) relevant construction projects for the Offeror that best demonstrates design build construction experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as new construction, renovation, or repair work total construction costs of at least $20 million. If the Offeror submits more than five (5) construction projects for evaluation, the Government will evaluate the first five (5) projects and disregard all other projects.
A relevant construction project is further defined as a design build construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a single task order as a project.
Relevant projects shall have been completed or substantially completed within the last five (5) years of the date of issuance of this RFP.
“Substantially Complete” is defined as at least 90% physically complete.
Refer to RFP for complete Proposal Submission Requirements for this factor.
Design Experience. Submit a minimum of two (2) and a maximum of five (5) relevant design projects for the Offeror that best demonstrates the Lead Design Firm (LDF)’s design experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as design of new construction, renovation, or repair work with total construction costs of at least $20 million. If the Offeror submits more than five (5) design projects for evaluation, the Government will evaluate the first five (5) projects and disregard all other projects.
Refer to RFP for complete Proposal Submission Requirements for this factor.
FACTOR 2: Past Performance
In Volume I Tab 2 of the proposal, the Offeror shall submit applicable Contractor Performance Assessment Reporting System (CPARS) evaluations or Past Performance Questionnaires (PPQ) and information on problems encountered on projects submitted under Factor 1, Experience, as follows:
CPARS Evaluations of PPQs.
If a completed CPARS evaluation is available, it shall be submitted with the proposal for each project included in Factor 1, Experience. If there is not a completed CPARS evaluation, then submit a completed PPQ (Exhibit B) for each project included in Factor 1 for construction experience.
1. CPARS Evaluations of PPQs. (cont’d)
If a completed architect-engineering CPARS evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 for design experience. If there is not a completed CPARS evaluation, then submit a completed PPQ (Exhibit B) for each project included in Factor 1 for design experience.
If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).
CPARS Evaluations of PPQs. (cont’d)
The Offeror should provide completed PPQs in the proposal. Offerors shall not incorporate by reference into their proposal previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
2. Information on Problems Encountered:
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1, Experience.
Offerors may also address any adverse past performance issues. Explanations shall not exceed two (2) pages total.
Refer to RFP for complete Proposal Submission Requirements for this factor.
FACTOR 3: Technical Approach
In Volume I Tab 3 of the proposal, the Offeror (as identified on the SF1442) shall submit a narrative describing the composition and management of the proposed design-build (DB) team and the technical approach for accomplishing the requirements of this contract.
1. Composition and management of the proposed design-build (DB) team:
The composition and management of the proposed design-build team must identify all proposed primary construction firms and primary design firms (e.g., joint venture member, partner, subcontractor, parent company, subsidiary, or other affiliated company, etc.); provide the rationale for proposing this arrangement; and specifically identify one (1) Lead Design Firm (LDF) for this contract. Provide the roles, responsibilities, and contractual relationships between the various entities (see FAR Subpart 9.6).
Composition and management of the proposed design-build (DB) team:
(cont’d):
If the experience and past performance of an entity is being claimed in
Factors 1, 2 and 4, that entity must be named in the narrative. This narrative must not exceed two (2) pages. The following information shall accompany the narrative and is not included in the page limitation:
Organizational Chart.
Teaming Agreement of Other Contractual Agreement.
Refer to RFP for complete Proposal Submission Requirements for this
2.Technical Narrative: Provide a narrative not to exceed six (6) pages describing the technical approach to the project in RFP Part 3 that meets the requirements of the RFP. Include the following:
Offeror's understanding of the scope of the requirements and an overall approach to provide the required services, including materials, construction methods, and proper abatement of hazardous materials and Munitions and Explosives of Concern – Explosive Safety Submission (MEC-ESS) compliance.
Details on the phasing of demolition, outages, temporary services to maintain continuous services of utilities, site preparation, safety measures, hazardous waste disposal, testing, and verification.
Demonstrated quality of workmanship in the execution of the miscellaneous work for the repair of sewage collection system in accordance with the current applicable codes will be ensured.
2.Technical Narrative: (cont’d)
Specific details on the means and methods that will be utilized to effectively and efficiently perform the repair/replacement work within the project constraints while meeting the project schedule.
Sufficient details to demonstrate an understanding of, and an ability to, comply with the requirements of the solicitation while located in the Guam vicinity and environment.
3. Design and Construction Schedule: Provide a Design-Build schedule on two
(2) pages of size 11”x17” paper as follows:
The schedule shall reflect no more than 50 construction line item activities in accordance with the proposed scope.
The schedule must demonstrate a timeline that adheres to phased construction approach for this requirement. Identify critical path activities, milestones, duration and other important activities and clearly show the logic and sequence of events necessary to support ongoing stakeholder operations in the construction area and successful execution of the project.
The schedule shall have a performance period not to exceed 880 calendar days, which includes all required design, review, approval of final design, procurement materials, construction, testing, correction (if required), final testing, acceptance, and other requirements necessary to deliver a complete and usable facility.
FACTOR 4: Small Business Utilization
In Volume I Tab 4 of the proposal, the Offeror shall submit the following information:
1. Achievements: All Offerors shall provide a narrative (limited to two pages) to describe their achievements in supporting the Government’s policy to provide maximum practicable opportunities for small business (SB), veteran-owned small business (VOSB), service-disabled veteran-owned small business (SDVOSB), historically underutilized business zone (HUBZone) small business, small disadvantaged business (SDB), and women-owned small business (WOSB) concerns to participate as subcontractors consistent with efficient contract performance.
Refer to RFP for complete Proposal Submission Requirements for this
FACTOR 4: Small Business Utilization (cont’d)
2. Small Business Participation and Commitment: All Offerors shall submit a small business participation and commitment strategy including all data elements shown in Exhibit C, Small Business Participation and Commitment Strategy.
Refer to RFP for complete Proposal Submission Requirements for this
In Volume I Tab 5 of the proposal, the Offeror shall submit the following information:
The Offeror shall submit the Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described further below. For a partnership or joint venture, the Offeror shall submit separate DART rates and TCR for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.
Refer to RFP for complete Proposal Submission Requirements for this
FACTOR 6: Price
Submit the following in a sealed envelope:
Completed Schedule of Prices for all CLINs in Section 00 10 00 of the SF1442
Bid Bond in the amount of 20% of the total proposed price or $3 million, whichever is less
Refer to RFP for complete Proposal Submission Requirements for this factor.
NOTE: RFP Part A Documents may be submitted with the Price Proposal, as any documents with prices should be submitted
PROJECT OVERVIEW
FY22 MILCON PROJECT P-052, National Guard Readiness Center Barrigada Guam
(1) Preliminary Draft for Munitions Response Explosives Safety Submission Guam Construction Support, Amendment 7; (2) Supplemental Temporary Environmental Controls; (3) Project Program; and (4) Drawings are located in RFP Parts B and C.
This is a Design-Build project to design and construct a 36,139 SF National Guard Readiness Center.
The work is located at Barrigada, Guam.
Total performance period shall be 880 calendar days.
Scope of Work includes:
Construct a National Guard Readiness Center addition Supporting development includes utilities, a backup emergency generator, paved parking, and other necessary improvements.
Function areas include: ESC Administrative, Arms Vaults and
Cages, Classrooms, Unit Locks.
REQUESTS FOR INFORMATION (RFI)
REQUESTS FOR INFORMATION (RFI)
Responses to RFIs:
RFI Notice 01 – Question (Q)1: Will the government evaluate being local to
Guam or being a Guam-based firm as a strength in an offeror's proposal?
Answer (A)1: Contractor’s location is not an evaluation criteria.
Responses to all other RFIs are pending and will be posted to the SAM website when the responses are available.
REMINDER:
Participants shall submit all questions electronically using the Request for Information (RFI) form provided as
Attachment 1 in the RFP
Note: Submit RFIs to Ms. Juvee Pangelinan and Ms. Janeen Bais at juvee.pangelinan@fe.navy.mil and janeen.bais@fe.navy.mil, respectively.
The pre-proposal conference is available in written format only.
The site visit attendance sheet and pre-proposal conference presentation slides will be posted on the SAM website at https://www.SAM.gov.
The terms and conditions of the solicitation remain unchanged unless the solicitation is amended in writing.
CLOSING STATEMENT
Doris Castro Contracting Officer
(671) 339-8465 doris.castro@fe.navy.mil
Juvee Pangelinan Contract Specialist
(671) 339-8098 juvee.pangelinan@fe.navy.mil
POINTS OF CONTACT
| PRE-PROPOSAL CONFERENCE �04 May 2022� ��Solicitation N4019222R2012 �FY22 MILCON PROJECT P-052, National Guard Readiness Center �Barrigada, Guam |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| RFP HIGHLIGHTS |
| RFP HIGHLIGHTS |
| RFP HIGHLIGHTS |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Slide Number 31 |
| Slide Number 32 |
| Slide Number 33 |
| Slide Number 34 |
| Slide Number 35 |
| Slide Number 36 |
| Slide Number 37 |
| Slide Number 38 |
| Slide Number 39 |
| Slide Number 40 |
| Slide Number 41 |
| Slide Number 42 |
| Slide Number 43 |
| Slide Number 44 |
| Slide Number 45 |
| Slide Number 46 |
| Slide Number 47 |
| Slide Number 48 |
| Slide Number 49 |
| Slide Number 50 |
| Slide Number 51 |
| Slide Number 52 |
| Slide Number 53 |
| Slide Number 54 |
| Slide Number 55 |
| Slide Number 56 |
| Slide Number 57 |
| Slide Number 58 |
| Slide Number 59 |