N4019222R2012_Amend0002_Attach(3)_E1_NGRC_Elect_Site_Plan_20220614_Rev1.pdf

PDF 270 KB Posted

Attached to
FY22 MILCON P-052 National Guard Readiness Center, Barrigada, Guam
Solicitation number
N4019222R2012
Issued by

About this file

This document contains a solicitation for a construction contract and site plan related to the opportunity. The solicitation seeks construction services to design and build a 36,139 square foot National Guard Readiness Center in Barrigada, Guam to support training, administrative, and logistical needs of the Guam Army National Guard. The scope of work includes utility infrastructure, an emergency backup generator, paved parking, and necessary site improvements. Functional areas within the new facility comprise administrative space, arms vaults and cages, classrooms, and unit locks. Offerors must submit pricing and past performance information by the response deadline and include a bid bond of $3 million or 20% of the bid price, whichever is less. A pre-proposal conference and site visit will be held on specified dates to address questions. The point of contact for the solicitation is provided.

View the file

Other files

File Type Posted
N4019222R2012_Amend0007_Encl(1)_RFI_Notice_7.pdf PDF
N4019222R2012_Amend0007_Attach(1)_Civil_C2toC4_Rev_ 20220727.pdf PDF
N4019222R2012_Amendment_0007.pdf PDF
N4019222R2012_Amend0006_Attach(1)_6_ESR_C10._Rev4.pdf PDF
N4019222R2012_Amend0006_Encl(1)_RFI_Notice_6.pdf PDF
N4019222R2012_Amendment_0006.pdf PDF
N4019222R2012_Amend0006_Attach(2)_6_ESR_G20_Rev2.pdf PDF
N4019222R2012_Amendment_0005.pdf PDF
N4019222R2012_Amend0005_Attach(1)_6_ESR_C10._Rev3.pdf PDF
N4019222R2012_Amend0005_Encl(1)_RFI_Notice_5.pdf PDF
N4019222R2012_Amend0004_Attach(1)_6_ESR_C10._Rev3.pdf PDF
N4019222R2012_Amend0004_Encl_(1)_RFI_Notice_4.pdf PDF
N4019222R2012_Amend0004_Attach(2)_5_Room_Requirements_Rev3.pdf PDF
N4019222R2012_Amendment_0004.pdf PDF
N4019222R2012_Amendment_0003.pdf PDF
N4019222R2012_Amend0003_Attach(8)_6_ESR_D30_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(6)_5_Room_Requirements_Rev2.pdf PDF
N4019222R2012_Amend0003_Attach(7)_6_ESR_C10._Rev2.pdf PDF
N4019222R2012_Amend0003_Encl (1)_RFI_Notice_3.pdf PDF
N4019222R2012_Amend0003_Attach(3)_6_ESR_G20_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(10)_6_ESR_G20_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(1)_NGRC_C2 Site Layout Plan_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(5)_4_Figure 1_Space Tabulation_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(9)_6_ESR_E20_Rev2.pdf PDF
N4019222R2012_Amend0003_Attach(2)_6_ESR_C10_doneF._Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(4)_01 50 00.05 20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(7)_6_ESR_D40_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(5)_5_Room_Requirements_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(3)_RFI_Notice_2.pdf PDF
N4019222R2012_Amend0002_Attach(9)_6_ESR_E20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(2)__AS1_Architectural_Site_Plan_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(4)_P1_NGRC_Enlarged_Plumbing_Plan_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(2)_NGRC_CID_20211228_Final.pdf PDF
N4019222R2012_Amend0002_Attach(6)_6_ESR_C30_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(10)_PTS_SECTION_G20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(1)_A4_NGRC_Building_Elevations_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(1)_Price Proposal Schedule_REV1.pdf PDF
N4019222R2012_Amend0002_Attach(8)_6_ESR_D50_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(4)_1224th_laydown_sketch.pdf PDF
N4019222R2012_Amendment_0002.pdf PDF
Amendment_0001_N4019222R2012.pdf PDF
N4019222R2012_Amendment0001_Encl (1)_RFI_Notice_1.pdf PDF
N4019222R2012_Pre-proposal_Conference_Slides.pdf PDF
N4019222R2012_Site_Visit_Attendance_Sheet.pdf PDF
N4019222R2012_RFP_Part_A_Proposal_Forms_and_Documents.pdf PDF
N4019222R2012_RFP_Part_A_Attachment _1_Request_for_Information_(RFI)_Form.pdf PDF
N4019222R2012_RFP_Part_B_Part_3_Project_Program.pdf PDF
N4019222R2012_RFP_Part_C_Drawings.pdf PDF
N4019222R2012_RFP_Part_B_Part_2_Specification_01_57_19_03_20_SUPP_TEMP_ENVI_CON_JRM_ESS.pdf PDF
N4019222R2012_RFP_Part_B_Prelim-Draft Munitions_Response_ESS_Guam_Construction_AMD7.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING

HELIPAD

GENERAL

PURPOSE

TRAINING BAY

POV

PARKING

EXISTING

BUILDING 900

TELECOMM.

ROOM

ELECTRICAL ROOM

P S

C

P

P

P

C

CP

C

C

UNHEATED

STORAGE

A C C E S S R O A D

PROPOSED READINESS

CENTER

GENERATOR

BLDG

FUEL TANK

NEW 4'X5' PHH1

TRAFFIC RATED

EXISTING

GPA PAD MTD

TRANSFORMER

NEW 4'X5' PHH3

NEW

4'X5' PHH2

NEW

4'X5' PHH4

NEW PAD MOUNTED

TRANSFORMER

NEW

2'X4' SHH1

NEW UNDERGROUND DUCT

WITH NEW PRIMARY CABLES

(CABLES BY GPA) TYPICAL

EXISTING

DUCTLINE

TYPICAL

EXISTING

1-4"C, 2#2AWG

1-4"C SPARE

TYPICAL

EXISTING

4'X5' PHH4

NEW

UNDERGROUND

DUCT

WITH NEW

SECONDARY

CABLES

EXISTING

COMMUNICATION

AND ELECTRICAL

UNDERGROUND

DUCT LINE

1 EXISTING AND

NEW DUCTLINE

CROSSING

EL

EC

TR

IC

AL

S

IT

E

PL

AN

P

S

C

LEGEND:

NEW 2'X4' COMMUNICATION HANDHOLE (CHH)

NEW 2'X4' SECONDARY HANDHOLE (SHH)

NEW 4'X5' PRIMARY HANDHOLE (PHH) P

C EXISTING 2'X4'

COMMUNICATION HANDHOLE

EXISTING 4'X5'

PRIMARY HANDHOLE

20' 40' 100' 200' 300'

E1

C3ELECTRICAL SITE PLAN

SCALE: 1" = 40'-0"

NORTH

PLAN

EXISTING TRANSFORMERNEW TRANSFORMER

NOTE:

1 CONCRETE ENCASE EXISTING COMMUNICATION AND ELECTRICAL UNDERGROUND DUCT AS REQUIRED.

CONTRACTOR TO VERIFY EXACT LOCATION/CONDITION DURING CONSTRUCTION.

N O

T

FO

R

CO

N

ST

RU

CT

IO

N

P R

E L

IM

IN

A

R Y

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M C

O M

M A

N D

M A

R

IA

N A

S

FY

M

IL

C O

N P

R O

JE

C

T P

N

N

A

TI

O N

A L

G U

A R

D R

E A

D

IN

E S

S C

E N

TE

R

AutoCAD SHX Text

EPI

AutoCAD SHX Text

EPI

AutoCAD SHX Text

EPI

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text

TEL :

AutoCAD SHX Text

FAX :

AutoCAD SHX Text

357 ROUTE 8

AutoCAD SHX Text

MAITE, GUAM 96910-2007

AutoCAD SHX Text 477-3559

AutoCAD SHX Text 477-3556

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING SYSTEM COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 31 JANUARY 2017

AutoCAD SHX Text

REV

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

GUAM

AutoCAD SHX Text

BARRIGADA

AutoCAD SHX Text

PM/DM

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

CHIEF ENG/ARCH

AutoCAD SHX Text

AutoCAD SHX Text 1674991

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

AutoCAD SHX Text THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

AutoCAD SHX Text

IF SHEET IS LESS THAN 34" X 22" REDUCED PRINT - USE GRAPHIC SCALES

AutoCAD SHX Text

UNCLASSIFIED/FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED/FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED/FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED/FOR OFFICIAL USE ONLY

AutoCAD SHX Text

AS NOTED

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .