N4019222R2012_Amend0002_Attach(6)_6_ESR_C30_20220614_Rev1.pdf
PDF 32 KB Posted
- Solicitation number
- N4019222R2012
About this file
This solicitation requests proposals for the design and construction of a 36,139 square foot National Guard Readiness Center in Barrigada, Guam. The scope of work includes administrative areas, classrooms, arms vaults, unit locks, and associated site development such as utilities and parking. Offerors must submit technical and price proposals which will be evaluated using source selection procedures. A bid bond of $3 million or 20% of the bid price is required. The project budget is between $25-100 million. The NAICS code is 236220 and the size standard is $39.5 million. A pre-proposal conference will be held on May 4th and questions must be submitted by April 28th. Proposals are due through the System for Award Management website. The point of contact is Juvee Pangelinan of the Naval Facilities Engineering Command.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY22 National Guard Readiness Center WON 1674991 Barrigada, Guam Part 3 Chapter 6 C30 Interior Finishes
Final DB-RFP Submittal
PART 3 - CHAPTER 6 / ESR C30 - Page 1
C30 INTERIOR FINISHES
SYSTEM DESCRIPTION
Interior finishes include wall finishes, floor finishes, wall base finishes, and ceiling finishes.
Provide aesthetically pleasing, functional, durable finishes appropriate to the buildings function.
Acoustic properties of materials, as well as durability and ease of maintenance, shall be considered during material selection. Maximize the use of sustainable materials.
Color selections require the use of wall and floor finish material accents to enhance the color and appearance of the interior design. Provide a wall and floor color design that includes a minimum of two different accents colors throughout the facility. Submit pattern drawings of the accents design with the interior design submittal.
GENERAL SYSTEMS REQUIREMENTS
See "Room Requirements" Conceptual wall and floor finishes tables indicated in Part 6 Notional Drawings for specific requirements on "Interior Finishes."
C30 SSPC QP 1 CERTIFICATION
Not used.
C3010 WALL FINISHES
All interior wall finish materials shall be concrete or glass mat gypsum board with metal stud frames.
All interior wall finish materials shall be concrete or gypsum board. Provide ceramic tile wainscot in all toilet rooms to a height of 4 feet minimum.
The mirror shall be mounted with a minimum of 1/4 inch air space between mirror back and wall.
All interior wall finishes are indicated in the “Room Requirements” portion of this RFP
Primary wall finishes shall consist of painted paperless gypsum wallboard, painted concrete and unpainted concrete walls.
All interior paints must breathe and have the maximum allowable mildewcide additive per the paint manufacturer.
Paperless gypsum board shall be 5/8 inch (16 mm) minimum glass mat (both sides) with no cellulose material. Wall shall have a 1/2-inch (14 mm) gap from the top of the finish flooring to the bottom of the paperless gypsum board to prevent water wicking up into the wallboard. Paperless gypsum board shall be attached to cold-formed galvanized steel furring channels with a minimum coating of Z275 G90 using ceramic-coated screws. Apply sealer over all screw heads. The ceramic screws shall consist of zinc-coated steel screws that are entirely coated (head, shank, and threads) with ceramic. Ceramic screws shall be used at all paperless gypsum furred walls. All paperless gypsum board wall partitions shall be finished to Level 4 in accordance with Gypsum Association GA 214. All interior wall corners and jambs shall receive bullnose finish.
PART 3 - CHAPTER 6 / ESR C30 - Page 2
Restrooms and bathrooms shall receive a minimum 6-foot wainscot. Minimum size of tiles shall be 3-inch square. All tile backer board shall be fiberglass faced gypsum or cementations tile backer board.
All finish materials shall have a smooth surface and shall be moisture and mildew resistant and easily cleaned. Do not use paint with lead or lead-based content or is not permeable. If plaster is used there shall be no visible joints or cracks. Only paperless gypsum board shall be used (fiberglass mat faced gypsum board).
Do not use any coatings containing lead, zinc chromate, strontium chromate, mercury, or asbestos. A standard commercial fungicide shall be added to all paints and finishes during the manufacturing process for the particular paint. The fungicide shall be incorporated into the paint in a quantity so that the paint meets the fungus resistance test specified in Fed. Spec. TT-P-19 or TT-P-29, for exterior and interior paints, respectively.
Conceptual Wall Finish Schedule, refer to Part 6 Notional Drawings.
C3020 FLOOR FINISHES
All floor finishes shall be stable, firm and slip resistant and meet ADA – ABA requirements.
A knowledgeable trained individual(s) and an accredited laboratory specialized in flooring installations shall conduct all the most current ASTM F1869, ASTM F2170, ASTM F2420, ASTM F710 and ASTM D4541 moisture testing. Manufactures requirement of not exceeding 3 pounds per 1000 square feet per 24 hours may be difficult to meet in Guam’s high humidity. The flooring environmental low VOC adhesive mastic can react to the moisture content in the concrete leading to resilient flooring failure. Consideration should be substituting the standard adhesive with the manufacturer’s adhesive for wet environments.
All curing compounds, floor sealers etc. shall be coordinated and verified with the flooring manufacturer for bonding requirements prior to application.
Submit copy of tests reports for moisture and alkalinity content of concrete slab, photographic documentation of floor prep and testing and bond tests stating date of tests, person conducting the tests, lab doing the tests, experience of the testing personnel and floor plan showing where the testing areas.
Do not begin resilient floor installation until tests results are acceptable in writing from the flooring manufacture, the Contractor and the Government.
Provide floor finish materials to meet the following requirements.
a. Carpet Requirements
CARPET CHARACTERISTIC
MINIMUM CARPET REQUIREMENTS
Carpet shall not be used at areas with exterior doors. Carpet and carpet padding that is specified must be breathable (Permeance Factor: >10 Perms). Carpet and carpet padding shall breathe and not create a second vapor barrier that leads to moisture and mold problems. The exterior building closure shall be completed, pressure tested, certified and HVAC system installed and operational prior to installing carpet and carpet padding. Moisture and pH testing shall also be conducted on concrete floors and certified prior to installation of carpet and carpet padding.
Surface Color: Multi-colored and Patterned
PART 3 - CHAPTER 6 / ESR C30 - Page 3
Surface Texture: Loop
Yarn Weight: 26] oz. Minimum
Density: 6600 oz./cubic yard min.
Dye Method: Solution Dyed
Backing: Industry Standard
Fiber: Branded nylon
b. Concrete Floor Requirements
Finish concrete surface smooth enough to meet the minimum requirements of this RFP or the floor finish manufacturer's smoothness requirements, whichever is the most restrictive. Exposed concrete floors that are not required to have an applied floor finish, shall receive a minimum of 3 coats of the manufacturer's approved sealer. Colored concrete floor shall be colored pigment integral to the concrete mix .
2) Resilient Tile Flooring
Provide resilient solid vinyl tile, in areas as indicated for floors with high durability, low maintenance, requirements. Solid vinyl tile shall be planks or square tiles with protective urethane finish for ease of maintenance a manufacturer's 10-year warranty is required.
Provide resilient static dissipative VCT (SDT) flooring in [areas as indicated] [computer areas or areas with sensitive electronics] for floors with high durability, low maintenance, high slip-resistance requirements to control static in the room. SDT shall be of commercial grade with through pattern and an antistatic additive and shall be installed according to manufacturer's instructions.
Ceramic Tile
Porcelain Tile
Quarry Tile
c. Base
Wall base shall be top set or cove rubber or ceramic
All interior wall finishes are indicated in the "Room Requirements" portion of this RFP
Conceptual Floor Finish Schedule, refer to Part 6 Notional Drawings.
C3030 CEILING FINISHES
Finished surface of ceiling tiles shall be selected to address acoustical, maintenance, moisture, or impact resistance requirements of the room.
PART 3 - CHAPTER 6 / ESR C30 - Page 4
Primary ceiling finish shall be 24-inch x 24 inch by 5/8-inch minimum thickness suspended acoustical panel ceiling system, except provide a suspended paperless gypsum board ceiling restrooms and showers. Acoustical panels shall have a tegular edge. Provide fine fissured panel surface. For projects that require a LEED rating provide environmentally friendly panels.
Acoustical panels shall be sag resistant, moisture resistant and specifically manufactured for high-humidity environments. Panels shall have a factory-applied standard washable painted finish or Type IV with factory-applied plastic membrane-faced vinyl, Form: 2. All grids shall be powder-coated aluminum. All hanger wires shall be 316L stainless steel wire.
Suspended Ceiling finish material shall be paperless gypsum board fiberglass mat faced. Paint paperless gypsum board per manufacturer's recommendation. Paint shall have a fungicide additive.
All ceiling paint shall consist of at least one coat of primer and two coats of the manufacturer's highest premium quality professional paint. It shall be moisture and mildew resistant and easily cleaned. Finish shall be smooth finish with low sheen or semi-gloss paint.
Exposed structural systems shall be painted according to PTS Section C3040 INTERIOR COATINGS
AND SPECIAL FINISHES.
Ceiling finishes shall be as indicated in the “Room Requirements” or Room Finish Schedule portion of this RFP.
C3040 INTERIOR COATINGS AND SPECIAL FINISHES
Paint all interior exposed surfaces.
All exposed metal items, such as interior grilles, registers, diffusers, access panels, and panel boxes shall be prefinished and shall match the adjacent wall or ceiling color unless noted otherwise.
All Structural Steel shall be hot-dipped galvanized except where the size of individual members will not fit in available galvanizing vats or would not be economically feasible. In which case, those individual large members shall be shop-primed with a zinc rich primer. All Structural Steel shall be finish coated with epoxy paint.
All paints shall not contain lead, zinc chromate, strontium chromate, mercury, or asbestos. A standard commercial fungicide shall be added to all paints and finishes during the manufacturing process for the particular paint. The fungicide shall be incorporated into the paint in a quantity so that the paint meets the fungus resistance test specified in Fed. Spec. TT-P-19 or TT-P-29, for exterior and interior paints, respectively.
--End of Section--
| C30 INTERIOR FINISHES |
| C30 SSPC QP 1 CERTIFICATION |
| C3010 WALL FINISHES |
| C3020 FLOOR FINISHES |
| a. Carpet Requirements |
| 2) Resilient Tile Flooring |
| c. Base |
| Conceptual Floor Finish Schedule, refer to Part 6 Notional Drawings. |
| C3030 CEILING FINISHES |
| C3040 INTERIOR COATINGS AND SPECIAL FINISHES |
File details come from the government source that posted it. Updated .