This document provides information on a federal solicitation for construction services. The Naval Facilities Engineering Command Marianas is seeking offers for a construction contract to design and build a 36,139 square foot National Guard Readiness Center in Barrigada, Guam to support training, administrative, and logistical needs of the Guam Army National Guard. The project budget is between $25-100 million. Offerors must submit a technical proposal, past performance, and price proposal by the response deadline and include a bid bond of at least $3 million or 20% of the bid price, whichever is less. A pre-proposal conference will be held on May 4th with a mandatory site visit directly after to allow potential offerors to view the project location and ask questions. The point of contact listed can provide the solicitation documents and respond to any queries. No prior contract exists for this work.

View the file

Other files

File Type Posted
N4019222R2012_Amend0007_Encl(1)_RFI_Notice_7.pdf PDF
N4019222R2012_Amend0007_Attach(1)_Civil_C2toC4_Rev_ 20220727.pdf PDF
N4019222R2012_Amendment_0007.pdf PDF
N4019222R2012_Amend0006_Attach(1)_6_ESR_C10._Rev4.pdf PDF
N4019222R2012_Amend0006_Encl(1)_RFI_Notice_6.pdf PDF
N4019222R2012_Amendment_0006.pdf PDF
N4019222R2012_Amend0006_Attach(2)_6_ESR_G20_Rev2.pdf PDF
N4019222R2012_Amendment_0005.pdf PDF
N4019222R2012_Amend0005_Attach(1)_6_ESR_C10._Rev3.pdf PDF
N4019222R2012_Amend0004_Attach(1)_6_ESR_C10._Rev3.pdf PDF
N4019222R2012_Amend0004_Encl_(1)_RFI_Notice_4.pdf PDF
N4019222R2012_Amend0004_Attach(2)_5_Room_Requirements_Rev3.pdf PDF
N4019222R2012_Amendment_0004.pdf PDF
N4019222R2012_Amendment_0003.pdf PDF
N4019222R2012_Amend0003_Attach(8)_6_ESR_D30_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(6)_5_Room_Requirements_Rev2.pdf PDF
N4019222R2012_Amend0003_Attach(7)_6_ESR_C10._Rev2.pdf PDF
N4019222R2012_Amend0003_Encl (1)_RFI_Notice_3.pdf PDF
N4019222R2012_Amend0003_Attach(3)_6_ESR_G20_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(10)_6_ESR_G20_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(1)_NGRC_C2 Site Layout Plan_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(5)_4_Figure 1_Space Tabulation_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(9)_6_ESR_E20_Rev2.pdf PDF
N4019222R2012_Amend0003_Attach(2)_6_ESR_C10_doneF._Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(4)_01 50 00.05 20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(7)_6_ESR_D40_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(5)_5_Room_Requirements_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(3)_E1_NGRC_Elect_Site_Plan_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(3)_RFI_Notice_2.pdf PDF
N4019222R2012_Amend0002_Attach(9)_6_ESR_E20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(2)__AS1_Architectural_Site_Plan_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(4)_P1_NGRC_Enlarged_Plumbing_Plan_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(2)_NGRC_CID_20211228_Final.pdf PDF
N4019222R2012_Amend0002_Attach(6)_6_ESR_C30_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(10)_PTS_SECTION_G20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(1)_A4_NGRC_Building_Elevations_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(1)_Price Proposal Schedule_REV1.pdf PDF
N4019222R2012_Amend0002_Attach(8)_6_ESR_D50_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(4)_1224th_laydown_sketch.pdf PDF
N4019222R2012_Amendment_0002.pdf PDF
Amendment_0001_N4019222R2012.pdf PDF
N4019222R2012_Amendment0001_Encl (1)_RFI_Notice_1.pdf PDF
N4019222R2012_Pre-proposal_Conference_Slides.pdf PDF
N4019222R2012_Site_Visit_Attendance_Sheet.pdf PDF
N4019222R2012_RFP_Part_A_Proposal_Forms_and_Documents.pdf PDF
N4019222R2012_RFP_Part_A_Attachment _1_Request_for_Information_(RFI)_Form.pdf PDF
N4019222R2012_RFP_Part_B_Part_3_Project_Program.pdf PDF
N4019222R2012_RFP_Part_C_Drawings.pdf PDF
N4019222R2012_RFP_Part_B_Part_2_Specification_01_57_19_03_20_SUPP_TEMP_ENVI_CON_JRM_ESS.pdf PDF
N4019222R2012_RFP_Part_B_Prelim-Draft Munitions_Response_ESS_Guam_Construction_AMD7.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING COMMAND MARIANAS

PSC 455, BOX 195

FPO AP 96540-2937

“KNOW SAFETY, NO MISHAPS”

13 July 2022

NOTICE 5

REQUESTS FOR INFORMATION AND RESPONSES

SOLICITATION N4019222R2012 FY22 MILCON PROJECT P-052

NATIONAL GUARD READINESS CENTER, BARRIGADA, GUAM

QUESTION (Q) 66: See questions below.

1. In drawing sheet C3, the existing underground transmission line is required to be concrete encased, please provide information as to size and depth of existing underground transmission line required to be concrete encased.

2. In drawing sheet C3, the existing “covers” requires to be adjusted to match access road elevation. Can the government provide information as to size, section and existing elevation of electrical manhole covers that needs to be adjusted to match access road elevation?

3. Please confirm that redesigning of the existing manhole is not required to meet traffic rating requirement.

A66: If the information is not available, bidders are to verify actual condition and make assumptions.

The covers must be traffic rated since they are located along the access road and will depend on the final road elevation. Bidders will be responsible for measurement and assumptions of existing manhole and hand hole. A second site visit is scheduled for Tuesday, 19 July 22 at 2:00pm, Guam time.

Q128: This section states that the finishes shall be coordinated with section C30 Interior Finishes.

However, in section C30 Interior Finishes there is no given finish specifically for Demountable Partition.

Please provide finish for demountable partitions.

A128: The demountable partitions shall be fabric finish with STC 42. Part 3 – Project Program to be revised by a forthcoming amendment. Refer to Amendment 0005 for revised Part 3 – Project Program.

Q139: With the recent situation, we would like to request a 30-day time extension for the bid proposal submission. Getting quotations from local and off-island suppliers and prospective subcontractors is a challenge. Thank you.

A139: Refer to Amendment 0005.