N4019222R2012_Amend0004_Encl_(1)_RFI_Notice_4.pdf

PDF 155 KB Posted

Attached to
FY22 MILCON P-052 National Guard Readiness Center, Barrigada, Guam
Solicitation number
N4019222R2012
Issued by

About this file

This document contains questions and responses related to a solicitation for the construction of a National Guard Readiness Center in Barrigada, Guam. Key details include that the solicitation seeks design and construction services for a 36,139 square foot facility to support training, administrative, and logistical needs of the Guam Army National Guard. Functional areas for the new building include administrative space, arms vaults and cages, classrooms, and unit lockers. Offerors must submit both technical and price proposals, as well as past performance information, by the revised deadline of July 26, 2022. A bid bond of either $3 million or 20% of the bid price, whichever is less, is also required. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command as an unrestricted procurement for a contract valued between $25-100 million.

View the file

Other files

File Type Posted
N4019222R2012_Amend0007_Encl(1)_RFI_Notice_7.pdf PDF
N4019222R2012_Amend0007_Attach(1)_Civil_C2toC4_Rev_ 20220727.pdf PDF
N4019222R2012_Amendment_0007.pdf PDF
N4019222R2012_Amend0006_Attach(1)_6_ESR_C10._Rev4.pdf PDF
N4019222R2012_Amend0006_Encl(1)_RFI_Notice_6.pdf PDF
N4019222R2012_Amendment_0006.pdf PDF
N4019222R2012_Amend0006_Attach(2)_6_ESR_G20_Rev2.pdf PDF
N4019222R2012_Amendment_0005.pdf PDF
N4019222R2012_Amend0005_Attach(1)_6_ESR_C10._Rev3.pdf PDF
N4019222R2012_Amend0005_Encl(1)_RFI_Notice_5.pdf PDF
N4019222R2012_Amend0004_Attach(1)_6_ESR_C10._Rev3.pdf PDF
N4019222R2012_Amend0004_Attach(2)_5_Room_Requirements_Rev3.pdf PDF
N4019222R2012_Amendment_0004.pdf PDF
N4019222R2012_Amendment_0003.pdf PDF
N4019222R2012_Amend0003_Attach(8)_6_ESR_D30_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(6)_5_Room_Requirements_Rev2.pdf PDF
N4019222R2012_Amend0003_Attach(7)_6_ESR_C10._Rev2.pdf PDF
N4019222R2012_Amend0003_Encl (1)_RFI_Notice_3.pdf PDF
N4019222R2012_Amend0003_Attach(3)_6_ESR_G20_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(10)_6_ESR_G20_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(1)_NGRC_C2 Site Layout Plan_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(5)_4_Figure 1_Space Tabulation_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(9)_6_ESR_E20_Rev2.pdf PDF
N4019222R2012_Amend0003_Attach(2)_6_ESR_C10_doneF._Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(4)_01 50 00.05 20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(7)_6_ESR_D40_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(5)_5_Room_Requirements_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(3)_E1_NGRC_Elect_Site_Plan_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(3)_RFI_Notice_2.pdf PDF
N4019222R2012_Amend0002_Attach(9)_6_ESR_E20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(2)__AS1_Architectural_Site_Plan_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(4)_P1_NGRC_Enlarged_Plumbing_Plan_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(2)_NGRC_CID_20211228_Final.pdf PDF
N4019222R2012_Amend0002_Attach(6)_6_ESR_C30_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(10)_PTS_SECTION_G20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(1)_A4_NGRC_Building_Elevations_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(1)_Price Proposal Schedule_REV1.pdf PDF
N4019222R2012_Amend0002_Attach(8)_6_ESR_D50_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(4)_1224th_laydown_sketch.pdf PDF
N4019222R2012_Amendment_0002.pdf PDF
Amendment_0001_N4019222R2012.pdf PDF
N4019222R2012_Amendment0001_Encl (1)_RFI_Notice_1.pdf PDF
N4019222R2012_Pre-proposal_Conference_Slides.pdf PDF
N4019222R2012_Site_Visit_Attendance_Sheet.pdf PDF
N4019222R2012_RFP_Part_A_Proposal_Forms_and_Documents.pdf PDF
N4019222R2012_RFP_Part_A_Attachment _1_Request_for_Information_(RFI)_Form.pdf PDF
N4019222R2012_RFP_Part_B_Part_3_Project_Program.pdf PDF
N4019222R2012_RFP_Part_C_Drawings.pdf PDF
N4019222R2012_RFP_Part_B_Part_2_Specification_01_57_19_03_20_SUPP_TEMP_ENVI_CON_JRM_ESS.pdf PDF
N4019222R2012_RFP_Part_B_Prelim-Draft Munitions_Response_ESS_Guam_Construction_AMD7.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING COMMAND MARIANAS

PSC 455, BOX 195

FPO AP 96540-2937

“KNOW SAFETY, NO MISHAPS”

8 July 2022

NOTICE 4

REQUESTS FOR INFORMATION AND RESPONSES

SOLICITATION N4019222R2012 FY22 MILCON PROJECT P-052

NATIONAL GUARD READINESS CENTER, BARRIGADA, GUAM

QUESTION (Q) 66: See questions below.

1. In drawing sheet C3, the existing underground transmission line is required to be concrete encased, please provide information as to size and depth of existing underground transmission line required to be concrete encased.

2. In drawing sheet C3, the existing “covers” requires to be adjusted to match access road elevation. Can the government provide information as to size, section and existing elevation of electrical manhole covers that needs to be adjusted to match access road elevation?

3. Please confirm that redesigning of the existing manhole is not required to meet traffic rating requirement.

A66: Deferred.

Q119: Reference to Bid Option #2 General Purpose Training Bay and Bid Option #3 Unheated Storage Building, if one or both options are not awarded, should the area (building footprint) be asphalt paved under the Basic bid? Otherwise please clarify.

A119: If the options are not exercised for one or both buildings, the area should just have asphalt paving similar in the design to the adjacent MEV parking.

Q120: Reference to Bid Option #2 General Purpose Training Bay and Bid Option #3 Unheated Storage Building, should we consider the underground utilities like power and water supporting these buildings be part of respective options?

A120: Any branch conduits coming off main power, water, and sewer lines that support these buildings in Bid Options would only be part of the associated bid option. Therefore, if the bid options for one or both buildings are not exercised, any branch conduits for the associated building would not be provided in the Base Bid."

Q127: The Project Program states that “to provide wall mosaic, painted mural, graphics and/or logo of activity in appropriate locations”. Please provide location.

A127: ESR E201001 Fixed Artwork states: "As required, provide wall mosaic…" is a placeholder for Final Design Phase. As noted in the CID Package Basis of Design, "Artwork requirements have not been determined at this time and will be coordinated with the end user to confirm direction during the Final Design Phase." DB Contractor to coordinate this effort with End user at the Final Design Phase.

Correction: Unit logo artwork is either located in the Unit’s HQ entrance wall or located in an interior wall facing the main entrance in existing Readiness Center facilities at Barrigada GUARNG complex.

However, final placement of the artwork will be determined during post-award design phase for this project.

Q130: Telecom plan shows that a new underground duct line with conduit & cables and spare conduits, please confirm if the scope of work will be connected to the existing telecom room inside the building

800. If yes, please provide as-built plans building 800.

A130: Yes, confirmed that the new telecom underground duct line will be connected to the existing telecom room inside Building 800. As-built plans for building 800 will be provided by the government and is to be provided in forthcoming amendment.

Correction: Due to the sensitivity of telecommunications information, telecommunications as-built drawings for B800 cannot be released to bidders. Bidders shall use information provided in RFP and are required to make reasonable assumptions for connecting telecommunication lines at existing B800 TeleCom Room. GUARNG will only provide the information to the successful bidder after contract award.

Q132: Based on the amount of pending RFI’s and the limited information in the drawings we are respectfully requesting a four-week extension of bid date from June 28, 2022, to July 26, 2022, to provide ample time for the designer and estimator to come up with the design and material takeoff for pricing.

A132: Refer to RFP Amendment 0004.

Q133: Part 3 Chapter 6 sub section C101001 states that “Sound rated partition assemblies shall have a minimum Sound Transmission Coefficient (STC) of 42…”, but does not specify or mention “all” fixed partitions to be STC 42 or as implied in question #73.

1. Please clarify the Q73 response of the government to “Provide minimum STC rated of 42 to all interior fixed partitions and doors except for utility rooms, storage, vaults and cages”.

2. If all fixed partitions are intended to be STC rated regardless of room requirements, kindly amend the project program spec section C101001.

3. Please confirm that Part 3 Chapter 5 Room Requirements will govern with regards to room STC requirement unless otherwise amended.

A133: See answers below and refer to RFP Amendment 0004.

1. Please see attached revised ESR C10_Rev3, paragraph C101001

2. Please see attached revised ESR C10_Rev3, paragraph C101001

3. Added C101001 in Chapter 5 Room Requirements on rooms that require STC rated of 42, please see attached revised Chapter 5 Room Requirements_Rev2.

Q134: Notice 2 Question 74 and Answer 74 states that no insulation is required at the exterior wall of unconditioned spaces for Training Bay and Unheated Storage building. Please confirm if:

1. Would air barrier also be needed in unconditioned spaces for Training Bay and Unheated Storage building?

A134: Air barrier is not required in the unconditioned spaces for Training bay and Unheated storage building.

Q135: Notice 2 Question 74 and Answer 74 states that no insulation is required at the exterior wall of unconditioned spaces for Training Bay and Unheated Storage building. Please confirm if:

1. Would closed cell sprayed insulation air barrier also be needed in unconditioned spaces for Training Bay and Unheated Storage building?

A135: Closed cell sprayed insulation air barrier is not required in unconditioned spaces for Training bay and Unheated storage building.

Q136: Amendment 2 NGRC CID page 46 calls out base cabinet at full length of the counter. Please confirm if:

1. Which counter will have the cabinets at full length? Is it the counter along the concrete wall or the L-shaped counter along interior gypsum wall?

2. Both counters will have base cabinets at full length?

A136: See answers below:

1. Per A1, base cabinet at full length will be along the concrete wall.

2. The sketches provided by End Users are samples, further development needed during design phase to include adequate knee space where shown.

Q137: Please confirm if a continuous air barrier is needed for the Generator Building.

A137: Continuous air barrier is not required for Generator building.

Q138: Part 3 Chapter 6 sub section E201003 states that “Materials such as wood and steel shall not be used”. However, CID– Section 4 – Appendix A (page 33 of 51) shows sample locker benches with wood top. Please confirm if we could use hardwood top for locker benches.

A138: Follow E201003 that states "materials such as wood and steel shall not be used."