This document contains a request for information and responses related to a solicitation for the construction of a National Guard Readiness Center in Barrigada, Guam. Key details include:

  • The solicitation is for the design and construction of a 36,139 square foot National Guard Readiness Center to support training, administrative, and logistical requirements of the Guam Army National Guard. Functional areas include administrative space, arms vaults and cages, classrooms, and unit locks.

  • The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command as an unrestricted procurement requiring technical and past performance proposals as well as price proposals for evaluation. Offerors must submit a bid bond of $3,000,000 or 20 percent of the bid price, whichever is less.

  • The document provides responses to questions from offerors clarifying interior door sound transmission class ratings, acceptable manual roller shades in small areas, fencing material requirements, and confirming road realignment to avoid existing manholes. An extension of one week, to August 5th, was granted for bid submission.

View the file

Other files

File Type Posted
N4019222R2012_Amend0007_Encl(1)_RFI_Notice_7.pdf PDF
N4019222R2012_Amend0007_Attach(1)_Civil_C2toC4_Rev_ 20220727.pdf PDF
N4019222R2012_Amendment_0007.pdf PDF
N4019222R2012_Amend0006_Attach(1)_6_ESR_C10._Rev4.pdf PDF
N4019222R2012_Amendment_0006.pdf PDF
N4019222R2012_Amend0006_Attach(2)_6_ESR_G20_Rev2.pdf PDF
N4019222R2012_Amendment_0005.pdf PDF
N4019222R2012_Amend0005_Attach(1)_6_ESR_C10._Rev3.pdf PDF
N4019222R2012_Amend0005_Encl(1)_RFI_Notice_5.pdf PDF
N4019222R2012_Amend0004_Attach(1)_6_ESR_C10._Rev3.pdf PDF
N4019222R2012_Amend0004_Encl_(1)_RFI_Notice_4.pdf PDF
N4019222R2012_Amend0004_Attach(2)_5_Room_Requirements_Rev3.pdf PDF
N4019222R2012_Amendment_0004.pdf PDF
N4019222R2012_Amendment_0003.pdf PDF
N4019222R2012_Amend0003_Attach(8)_6_ESR_D30_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(6)_5_Room_Requirements_Rev2.pdf PDF
N4019222R2012_Amend0003_Attach(7)_6_ESR_C10._Rev2.pdf PDF
N4019222R2012_Amend0003_Encl (1)_RFI_Notice_3.pdf PDF
N4019222R2012_Amend0003_Attach(3)_6_ESR_G20_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(10)_6_ESR_G20_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(1)_NGRC_C2 Site Layout Plan_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(5)_4_Figure 1_Space Tabulation_Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(9)_6_ESR_E20_Rev2.pdf PDF
N4019222R2012_Amend0003_Attach(2)_6_ESR_C10_doneF._Rev1.pdf PDF
N4019222R2012_Amend0003_Attach(4)_01 50 00.05 20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(7)_6_ESR_D40_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(5)_5_Room_Requirements_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(3)_E1_NGRC_Elect_Site_Plan_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(3)_RFI_Notice_2.pdf PDF
N4019222R2012_Amend0002_Attach(9)_6_ESR_E20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(2)__AS1_Architectural_Site_Plan_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(4)_P1_NGRC_Enlarged_Plumbing_Plan_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(2)_NGRC_CID_20211228_Final.pdf PDF
N4019222R2012_Amend0002_Attach(6)_6_ESR_C30_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(10)_PTS_SECTION_G20_Rev1.pdf PDF
N4019222R2012_Amend0002_Attach(1)_A4_NGRC_Building_Elevations_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(1)_Price Proposal Schedule_REV1.pdf PDF
N4019222R2012_Amend0002_Attach(8)_6_ESR_D50_20220614_Rev1.pdf PDF
N4019222R2012_Amend0002_Encl(4)_1224th_laydown_sketch.pdf PDF
N4019222R2012_Amendment_0002.pdf PDF
Amendment_0001_N4019222R2012.pdf PDF
N4019222R2012_Amendment0001_Encl (1)_RFI_Notice_1.pdf PDF
N4019222R2012_Pre-proposal_Conference_Slides.pdf PDF
N4019222R2012_Site_Visit_Attendance_Sheet.pdf PDF
N4019222R2012_RFP_Part_A_Proposal_Forms_and_Documents.pdf PDF
N4019222R2012_RFP_Part_A_Attachment _1_Request_for_Information_(RFI)_Form.pdf PDF
N4019222R2012_RFP_Part_B_Part_3_Project_Program.pdf PDF
N4019222R2012_RFP_Part_C_Drawings.pdf PDF
N4019222R2012_RFP_Part_B_Part_2_Specification_01_57_19_03_20_SUPP_TEMP_ENVI_CON_JRM_ESS.pdf PDF
N4019222R2012_RFP_Part_B_Prelim-Draft Munitions_Response_ESS_Guam_Construction_AMD7.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING COMMAND MARIANAS

PSC 455, BOX 195

FPO AP 96540-2937

“KNOW SAFETY, NO MISHAPS”

26 July 2022

NOTICE 6

REQUESTS FOR INFORMATION AND RESPONSES

SOLICITATION N4019222R2012 FY22 MILCON PROJECT P-052

NATIONAL GUARD READINESS CENTER, BARRIGADA, GUAM

QUESTION (Q) 140: In amendment 4, section C101001 which is for Fixed Partitions was revised to provide minimum STC rating of 42 and included “doors except for utility rooms” while the specification C1020 for Interior Doors including the room requirements remain unchanged with no STC rating required. Please confirm the intent of the RFP is to have all interior doors except the utility rooms to be STC rated.

A140: Concur. Part 3 – Project Program, ESR C10, has been revised to add interior door STC requirements on C1020. Refer to Amendment 0006.

Q141: Section E201002 Window Treatments states that “All windows and other glazed openings to the exterior building shall be provided with manually or electrically operated double-roller sunscreen”. Since the roller shade in this project occur in smaller offices and storage rooms. Please confirm if manual operated roller shades are acceptable to use in these small areas.

A141: Concur, manual operated roller shades are acceptable to use in small areas.

Q142: Section G204001 Fencing & Gates states to “Provide aluminized (aluminum coated steel) fencing component, including fence fabric in accordance with ASTM A-491, post, rails, braces, and gates in accordance with ASTM B211-03 polyvinyl chloride (PVC) coated over aluminized steel fencing components for the fencing system. PVC coating shall be in color and a minimum thickness of 2mm (0.10 inches)”. However, aluminized mesh cannot be coated with vinyl coating since it won’t adhere to the core wire properly and when fabricated into fence fabric the bending, twisting, knuckling will cause tears.

A. In Chapter 5 Room Requirements, Cage 1 to 5 required to have a painted chain-link with metal frame. Please confirm if these are made from aluminized wire in accordance with ASTM A491 or vinyl coating over steel wire.

B. Please confirm if the chain link fences for site development should be aluminized wire in accordance with ASTM A491 or vinyl coating over steel wire.

A142: See answers below.

A. Confirmed. Aluminized chain link in accordance with ASTM A-491 for cages 1 to 5.

B. Confirmed. Aluminized chain link fence in accordance with ASTM A-491 for site development.

ESR G20, Section G204001 has been revised. Refer to Amendment 0006.

Q143: In amendment 4 notice 4, Q&A#127 calls out that “Unit logo artwork is either located in the unit HQ entrance wall or located in an interior wall facing the main entrance in existing Readiness Center facility a Barrigada GUARNG complex. However, final placement of the artwork will be determined during post-award design phase for this project.” Please confirm:

1. Is the unit logo artwork going to be a part of the government furnished government installed package?

A143: Unit logo artwork is not part of the government furnished government installed package and should be included in the total price of the primary building price.

Q144: Based on 19 July 2022 at 2:00pm site visit, both the manhole in question seems to be non-traffic rated. To comply with traffic rated requirement the manhole cover or the entire manhole may need to be replaced and/or re-designed. In addition, no existing elevation (manhole elevation) was provided for bidding reference to determine if it needs to be lowered or raised to match the road design elevation.

1. To avoid the manhole adjustment, will the government allow redesigning of the road alignment to avoid the manholes in question?

2. If avoiding the manhole by road realignment is not acceptable, will the government allow a long outage of power and communication? Will the government provide more information as to the rating of power including cable size and comm line quantity?

3. We are requesting an additional one week of bid time extension from 29 July 2022 to 05 August 2022, to consider the changes in design.

A144: See answers below.

1. Road realignment will occur to avoid the existing manhole. Conduit concrete encasement is still required. Amended drawings will be provided on Wednesday, 27 July 2022.

2. N/A.

3. Refer to Amendment 0006.