N4019222R2012_Amend0006_Encl(1)_RFI_Notice_6.pdf
PDF 181 KB Posted
- Solicitation number
- N4019222R2012
About this file
This document contains a request for information and responses related to a solicitation for the construction of a National Guard Readiness Center in Barrigada, Guam. Key details include:
-
The solicitation is for the design and construction of a 36,139 square foot National Guard Readiness Center to support training, administrative, and logistical requirements of the Guam Army National Guard. Functional areas include administrative space, arms vaults and cages, classrooms, and unit locks.
-
The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command as an unrestricted procurement requiring technical and past performance proposals as well as price proposals for evaluation. Offerors must submit a bid bond of $3,000,000 or 20 percent of the bid price, whichever is less.
-
The document provides responses to questions from offerors clarifying interior door sound transmission class ratings, acceptable manual roller shades in small areas, fencing material requirements, and confirming road realignment to avoid existing manholes. An extension of one week, to August 5th, was granted for bid submission.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND MARIANAS
PSC 455, BOX 195
FPO AP 96540-2937
“KNOW SAFETY, NO MISHAPS”
26 July 2022
NOTICE 6
REQUESTS FOR INFORMATION AND RESPONSES
SOLICITATION N4019222R2012 FY22 MILCON PROJECT P-052
NATIONAL GUARD READINESS CENTER, BARRIGADA, GUAM
QUESTION (Q) 140: In amendment 4, section C101001 which is for Fixed Partitions was revised to provide minimum STC rating of 42 and included “doors except for utility rooms” while the specification C1020 for Interior Doors including the room requirements remain unchanged with no STC rating required. Please confirm the intent of the RFP is to have all interior doors except the utility rooms to be STC rated.
A140: Concur. Part 3 – Project Program, ESR C10, has been revised to add interior door STC requirements on C1020. Refer to Amendment 0006.
Q141: Section E201002 Window Treatments states that “All windows and other glazed openings to the exterior building shall be provided with manually or electrically operated double-roller sunscreen”. Since the roller shade in this project occur in smaller offices and storage rooms. Please confirm if manual operated roller shades are acceptable to use in these small areas.
A141: Concur, manual operated roller shades are acceptable to use in small areas.
Q142: Section G204001 Fencing & Gates states to “Provide aluminized (aluminum coated steel) fencing component, including fence fabric in accordance with ASTM A-491, post, rails, braces, and gates in accordance with ASTM B211-03 polyvinyl chloride (PVC) coated over aluminized steel fencing components for the fencing system. PVC coating shall be in color and a minimum thickness of 2mm (0.10 inches)”. However, aluminized mesh cannot be coated with vinyl coating since it won’t adhere to the core wire properly and when fabricated into fence fabric the bending, twisting, knuckling will cause tears.
A. In Chapter 5 Room Requirements, Cage 1 to 5 required to have a painted chain-link with metal frame. Please confirm if these are made from aluminized wire in accordance with ASTM A491 or vinyl coating over steel wire.
B. Please confirm if the chain link fences for site development should be aluminized wire in accordance with ASTM A491 or vinyl coating over steel wire.
A142: See answers below.
A. Confirmed. Aluminized chain link in accordance with ASTM A-491 for cages 1 to 5.
B. Confirmed. Aluminized chain link fence in accordance with ASTM A-491 for site development.
ESR G20, Section G204001 has been revised. Refer to Amendment 0006.
Q143: In amendment 4 notice 4, Q&A#127 calls out that “Unit logo artwork is either located in the unit HQ entrance wall or located in an interior wall facing the main entrance in existing Readiness Center facility a Barrigada GUARNG complex. However, final placement of the artwork will be determined during post-award design phase for this project.” Please confirm:
1. Is the unit logo artwork going to be a part of the government furnished government installed package?
A143: Unit logo artwork is not part of the government furnished government installed package and should be included in the total price of the primary building price.
Q144: Based on 19 July 2022 at 2:00pm site visit, both the manhole in question seems to be non-traffic rated. To comply with traffic rated requirement the manhole cover or the entire manhole may need to be replaced and/or re-designed. In addition, no existing elevation (manhole elevation) was provided for bidding reference to determine if it needs to be lowered or raised to match the road design elevation.
1. To avoid the manhole adjustment, will the government allow redesigning of the road alignment to avoid the manholes in question?
2. If avoiding the manhole by road realignment is not acceptable, will the government allow a long outage of power and communication? Will the government provide more information as to the rating of power including cable size and comm line quantity?
3. We are requesting an additional one week of bid time extension from 29 July 2022 to 05 August 2022, to consider the changes in design.
A144: See answers below.
1. Road realignment will occur to avoid the existing manhole. Conduit concrete encasement is still required. Amended drawings will be provided on Wednesday, 27 July 2022.
2. N/A.
3. Refer to Amendment 0006.