This document provides a notice and responses to questions regarding Solicitation N4019222R2012 for the FY22 MILCON P-052 National Guard Readiness Center in Barrigada, Guam. The solicitation is for a construction contract to design and build a 36,139 square foot readiness center for $25-100 million. The Navy is the contracting agency. One question asked if the road alignment could be redesigned to avoid existing manholes. The answer stated the road would be realigned with conduit concrete encasement still required. Revised drawings were provided in Amendment 0007 extending the bid time to August 5, 2022. Another question regarding power outage details was marked N/A. Interested offerors can view the solicitation at SAM.gov and attend an in-person site visit on May 4, 2022 after registering with the point of contact by April 28.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27 July 2022
NOTICE 7
REQUESTS FOR INFORMATION AND RESPONSES
SOLICITATION N4019222R2012 FY22 MILCON PROJECT P-052
NATIONAL GUARD READINESS CENTER, BARRIGADA, GUAM
QUESTION (Q) 144: Based on 19 July 2022 at 2:00pm site visit, both the manhole in question seems to be non-traffic rated. To comply with traffic rated requirement the manhole cover or the entire manhole may need to be replaced and/or re-designed. In addition, no existing elevation (manhole elevation) was provided for bidding reference to determine if it needs to be lowered or raised to match the road design elevation.
1. To avoid the manhole adjustment, will the government allow redesigning of the road alignment to avoid the manholes in question?
2. If avoiding the manhole by road realignment is not acceptable, will the government allow a long outage of power and communication? Will the government provide more information as to the rating of power including cable size and comm line quantity?
3. We are requesting an additional one week of bid time extension from 29 July 2022 to 05 August 2022, to consider the changes in design.
ANSWER (A) 144: See answers below.
1. Road realignment will occur to avoid the existing manhole. Conduit concrete encasement is still required. Amended drawings will be provided on Wednesday, 27 July 2022. Revised drawings provided. Refer to Amendment 0007.
2. N/A.
3. Refer to Amendment 0006.