This document contains questions and responses related to a solicitation for the design and construction of a National Guard Readiness Center in Barrigada, Guam. The solicitation seeks a contractor to design and construct a 36,139 square foot facility for $25-100 million. Key details include:
-
The project includes administrative areas, arms vaults, classrooms, and unit lockers.
-
A pre-proposal conference will be held on May 4th for interested offerors to ask questions. Proposals are due on June 28th.
-
Offerors must submit a bid bond of $3 million or 20% of the bid price.
-
The Naval Facilities Engineering Command is the contracting agency.
-
The questions and answers provide clarification on requirements for items like site utilities, building systems, and construction specifications.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND MARIANAS
PSC 455, BOX 195
FPO AP 96540-2937
“KNOW SAFETY, NO MISHAPS”
22 June 2022
NOTICE 2
REQUESTS FOR INFORMATION AND RESPONSES
SOLICITATION N4019222R2012 FY22 MILCON PROJECT P-052
NATIONAL GUARD READINESS CENTER, BARRIGADA, GUAM
QUESTION (Q) 4: D503004 paragraph 3 indicates “Provide a CATV system consisting of empty raceways and outlet boxes to enable system installation by the commercial CATV supplier".
However, paragraph 4 indicates "Provide a complete CATV system…" Please confirm that CATV is only provided with empty raceways and outlet boxes or if a complete and usable system (cables, devices, etc.) will be required. Please clarify requirement for CATV system.
Answer (A) 4: Provide a complete CATV system consisting of raceways, cables and outlets back to CATV cabinet. An amendment to D503004 paragraph 3 is forthcoming. Revised RFP Part 3, D503004 to clarify empty raceways. Refer to RFP Amendment 0002.
Q6: D503005 paragraph 6 indicates “Provide an ESS consisting of empty raceways with pull strings, outlet boxes, cover plates, and associated power outlets to enable system installation by the ESS supplier.". Please provide requirements for ESS to be able to properly locate the outlets as well as routing of the empty raceways. Below are some of the information we request for clarification:
1. Which doors require ACS? Room Requirements table indicated high-security mechanical or electronic lock on exterior door at RC02-Lobby, RC03-Hallway 1, RC03a-Hallway 2, RC03b- Hallway 3, TB01-General Purpose Training Bay (GPTB). RFP however does not indicate to provide ACS and/or IDS at these doors. Please advise if these doors require ACS.
2. Please advise which doors require ACS.
3. Please advise which doors require IDS.
4. Please advise where CCTV cameras are required.
A6: See responses below:
1. ACS is required on all exterior doors.
2. ACS is required on all exterior doors.
3. Please see room requirements for doors that require IDS.
4. Please see room requirements where CCTV cameras are required.
Correction: ACS is described as "high security mechanical/electronic locks" in the Room Requirements (RR) tables. ACS is required on all exterior doors, which is supported by language already provided in the RR tables. IDS and CCTV is only required in RC28 and RC29 Arms Vaults. Revised RFP Part 3, D503005 and Room Requirements to ensure ACS/IDS/CCTV locations are described. Refer to RFP Amendment 0002.
Q8: G40 General System Requirements requires a screen wall enclosure for the GPA transformer.
However, drawing E-1 appears to not show a gate for the transformer screen wall enclosure. Please confirm that a gate is not required.
A8: A gate is required. Comply with MDACS. Revised RFP Drawing E-1 to show gate. Refer to RFP Amendment 0002.
Q14: Please advise who will be responsible for the removal or relocation of existing container in front of building 900.
A14: Not in contract for removal.
Q15: Project program Section C30 requires the coating applicator to be SSPC QP 1 certified. This certification is typically held by bridge, industrial, marine and tank coating companies. There are no commercial painters in Guam (especially small business) with this certification and the process of obtaining the certification takes a considerable amount of time and money. Please consider removing this requirement.
A15: Section C30 SSPC QP1 Certification is not applicable on this project. Amendment to remove this certification is forthcoming. Revised RFP Part 3, C30 to remove SSPC QP1 Certification requirement.
Refer to RFP Amendment 0002.
Q26: Are fire alarm devices (notification and signaling) for the generator building connected back to and monitored at the FMCP in the Main Building and transmitted from here? (NOTE: No drawing provided in the RFP).
A26: Yes. Revised RFP Part 3, D4010 to clarify connection/monitoring requirements for fire alarm notification and signaling from generator building back to FMCP at main building. Refer to RFP Amendment 0002.
Q27: For the General Purpose Training Bay/Unheated Storage building, are the fire alarm devices (notification and signaling) connected back to and monitored at the FMCP in the Main Building and transmitted from here? (NOTE: Drawing does not indicate a standalone FMCP in this building)
A27: Yes. Revised RFP Part 3, D4010 to clarify connection/monitoring requirements for fire alarm notification and signaling from generator building back to FMCP at main building. Refer to RFP Amendment 0002.
Q38: Requesting if the Government can provide the information on the design vehicle for the access road and MEV areas. Please include the weight/load and number of expected passes.
A38: Refer to drawing AS1 for Equipment information for the MEV areas. The access road shall be designed in accordance with standard highway loadings. Refer to RFP Amendment 0002 for revised drawing AS1.
Q41: Please clarify the size of the wash platform and concrete detention tank. There is a discrepancy between the RFP drawing sheets C2 and AS1.
A41: Please follow drawings C2 for sizes of wash platform and concrete detention tank. Amendment drawings are forthcoming. Revised RFP Drawing AS1 to match size of wash platform and concrete detention tank in Drawing C2. Refer to RFP Amendment 0002.
Q49: Chapter 6 RC42 POL Laboratory Room Requirements indicate an undersink neutralizing tank is required. RFP Plumbing Drawings P1 RC42 does not indicate a neutralizing tank. Please confirm if a neutralizing tank is required and provide information for sizing.
A49: Refer to Part 3 ESR for specific room requirements, neutralizing tank shall be provided per applicable code requirements. Tank sizing shall be determined under DB contractor’s responsibility as required. Amendment to drawing is forthcoming. Neutralizing tank is required. Revised RFP Drawing P1 is provided to include tank. Refer to RFP Amendment 0002.
Q54: Please confirm there are no requirements for SmartGrid.
A54: The project does not require SmartGrid.
Q55: Please confirm if there is a J&A for specific brand/model of AMI meter.
A55: No J&A for the AMI meter. The metering system must comply with GPA's requirement.
Q59: RFP Chapter 3 D306001 Direct Digital Controls states that a DDC systems shall be provided.
Please confirm if JCI Metasys must be used to be compatible with the Smartgrid Requirements.
A59: The new DDC system shall interface with the existing "Delta" system brand communicating within the GUARNG Barrigada post. Refer to applicable J&A.
Q60: There is a common wall and foundation between training bay and unheated storage. In the event only one of the two options will be awarded. Please clarify which bid option between #2 and #3 will be awarded first?
A60: Refer to RFP Amendment 0002 for revised Price Proposal Schedule.
Q61: Please confirm that related utilities to training bay and unheated storage shall be included in bid option #2 and bid option #3 respectively.
A61: Confirmed.
Q62: See questions below.
1. Please confirm that bid option 4 will include -asphalt pavement as enclosed within option 4 call out, wash platform, related detention tank and oil/water separator including related sewer line.
2. Please clarify if the water supply line for wash rack as shown in drawing sheet A3 will be part of base bid.
A62: See answers below.
1. Confirmed. Bid Option 4 includes asphalt pavement, detention tank, oil water separator, and associated sewer lines within Option 4 call-out boundary.
2. Water supply line and stub out to wash rack, which is illustrated in Drawing C3, is included in the base bid while the hose bibb is included in Bid Option 4.
Q63: The RFP requires a chain link fence and noted in the drawings for requirement, however the drawings does not specify the height requirement.
1. Please provide the required chain link fence height around MEV parking.
2. Please clarify if barbed wire or razor wire is required?
A63: The intent of the RFP is not to specify all requirements if such requirements are included in design criteria that is already cited in the RFP. Bidders must refer to MDACS G2040.1 to identify height and barbed wire requirements.
Q64: RFP Section 01 50 00.05 20 paragraph 2.3 Fencing states that “To block public view of the construction, enclose the project work area and contractor lay-down area with 8-ft high chain link fence and gates with brown, UV resistant, plastic fabric mesh netting.”
1. Please confirm if the intent of the project is to enclose the entire project site on all direction.
2. Please confirm if the temporary 8-ft high chain link fence with UV resistant plastic fabric is required to enclose the sewer line during construction
3. Please confirm if the ponding basin expansion is to be enclosed with temporary 8-ft high chain link fence with UV resistant plastic fabric during construction
A64: Temporary fencing is not required. Part 3 – Project Program to be revised by a forthcoming amendment.
Q65: Please provide location of contractor laydown area and confirm if the project access is through Route 8 towards Dydasco Reserve Center.
A65: Refer to RFP Amendment 0002.
Q66: See questions below.
1. In drawing sheet C3, the existing underground transmission line is required to be concrete encased, please provide information as to size and depth of existing underground transmission line required to be concrete encased.
2. In drawing sheet C3, the existing “covers” requires to be adjusted to match access road elevation. Can the government provide information as to size, section and existing elevation of electrical manhole covers that needs to be adjusted to match access road elevation?
3. Please confirm that redesigning of the existing manhole is not required to meet traffic rating requirement.
A66: Deferred.
Q67: Based on the amount of pending RFI’s and the limited information in the drawings we are respectfully requesting a four-week extension of bid date from June 7, 2022 to July 5, 2022, to provide ample time for the designer and estimator to come up with design and material takeoff for pricing.
A67: Refer to RFP Amendment 0002.
Q68: Please clarify if the information requested in Factor 4 – Small Business Utilization to be submitted is not applicable to small business offerors.
A68: Not applicable.
Q69: Please confirm if ceramic tiles in showers should be full height.
A69: Wall tile at shower shall be full height.
Q70: Room requirements do not specify wall base for any of the rooms called out to have exposed concrete with hardener and sealer. Will these rooms receive rubber base as well?
A70: Refer to Drawing A11 Room Finish Schedule for Wall Base designation. Unless otherwise noted in A11, F4 flooring does not have matching wall base.
Q71: For Design Build projects, more time is needed for coordination between designers and subcontractors/suppliers. As our designers reviewed the RFP during development of our Conceptual Drawings, several RFI's were generated and submitted to the government. Responses to these RFI's are necessary to be incorporated into our Conceptual Drawings and distributed to subcontractors/suppliers to provide best value pricing. We humbly request for an extension of four (4) weeks time extension to the current submission date of June 7th, 2022 CHST.
A71: Refer to RFP Amendment 0002.
Q72: Several Rooms are missing ideal plan dimensions; for example, RC37-ALSE and RC38-NVG office. Please provide missing ideal plan dimension for the rooms missing this information.
A72: The general intent is for these rooms to be similar in scale to how these rooms are illustrated in the notional floor plan, provided that the overall building area requirement is not exceeded. Specifically for the RC37-ALSE and RC38-NVG spaces, the Functional Program Area table in RFP Part 3 describes a total combined area of 986 GSF for both rooms.
Q73: Part 3, Chapter 6, para C101001-Fixed Partitions indicates a minimum STC rated of 42 for fixed partitions. However, room requirements are missing Acoustics information. Please advise on which rooms are desired to have STC rated walls and STC rated doors.
A73: Provide minimum STC rated of 42 to all interior fixed partitions and doors except for utility rooms, storage, vaults and cages.
Q74: Currently Guam Energy Code does not apply to Unconditions Warehouse Space. Please confirm no Insulation and Vapor-Barrier are required at Exterior Wall of unconditioned warehouse spaces for the Training Bay and Unheated Storage.
A74: Confirmed, no insulation is required at the exterior wall of the unconditioned spaces for Training Bay and Unheated Storage.
Q75: Room requirement tables are missing other/special requirement information. Please confirm it is the RFP intention to leave this section blank for all rooms. Otherwise, please provide any special requirements contractors should incorporate into design.
A75: If there is nothing listed in the other/special requirements, it is not applicable.
Q76: Part 3 - Chapter 5- Room requirements seem to be missing C102007-Interior Door Hardware.
Please advise and also indicate which rooms require special door hardware such as combination locks card key system.
A76: Provide card key system to all exterior entrances, vaults, electrical and telecom rooms. Refer to C102007 for requirements. Part 3 – Project Program to be revised by a forthcoming amendment.
Q77: Drawing sheet A1 indicates Pass-Thru Lockers in RC35-Aviation Unit Open Office. However, Part 5 - Room Requirements is missing information regarding these lockers. Please advise.
A77: The requirement for the 7 Pass-Thru lockers indicated for RC36-Briefing Room is for the adjacent RC35-Aviation Unit Open Office. Part 3 – Project Program to be revised by a forthcoming amendment.
Q78: Drawing A1 seems to indicate benches in the men's and women's shower areas (Rooms RC14a and RC16a). However, room requirement tables are missing information regarding these benches. Please advise.
A78: Benches are required as shown in A11 for RC14a and RC16. Project Program to be revised by a forthcoming amendment.
Q79: Part 3 - Chapter 6 - Para E20 - Furnishings, Systems requirement states the estimated FF&E amount is $501,809.00. However, the proposal schedule in Part A of the RFP provides FF&E amount at $1,645,000.00. Please advise.
A79: Part 3 - Chapter 6 total FF&E Amount is based on the CID - FF&E Summary and Budget List.
Refer to Amendment 0002 for CID package to show FF&E estimate details and revised Price Proposal Schedule.
Q80: Part 3 - Chapter 6 - Para E20 - Furnishings, Systems requirement indicates the Audio Visual Equipment is estimated at an amount of $5,160.00 and will be identified as a separate line item, priced separately from the FF&E, and funded as an option. However, the proposal schedule in Part A of the RFP is missing this line item. Please advise.
A80: Refer to RFP Amendment 0002.
Q81: RFP Part 3 Chapter 6 D30 System description indicates ventilation to be provided in accordance with Army National Guard DG 415-1 & 3, which indicates 10 CFM/Person for classrooms, and ASHRAE 62.1, which indicates 7.5 CFM/Person and 0.6 CFM/SF for Lecture Classrooms. Confirm which ventilation rate is to be provided.
A81: Refer to GUARNG design guidelines for specific criteria. The more stringent requirement shall supersede other standard design criteria.
Q82: Part 3 - Chapter 6 - Para E20 - Furnishings, Systems requirement mentions that the FF&E and A/V Summary/Budget List of the Comprehensive Interior Design Package. Please provide this list.
A82: Refer to RFP Amendment 0002 for CID package.
Q83: Is there a possibility that Bid Item No. 0003 or Bid Item No. 0004 will be awarded without the other? If so, is there an order of precedence for awarding bid item 0003 and bid item 0004? There is a common wall shared between the Training Bay and the Unheated Storage Building per RFP drawings.
Please advise if price for this common wall should be carried in both bid items. If not, please advise which bid item should carry price for this common wall.
A83: Refer to RFP Amendment 0002 for revised Price Proposal Schedule.
Q84: Room requirement for RC38- NVG Office does not list a requirement for a fume hood. A fume hood and exhaust duct is shown on drawing sheet M2 and M3. It is unusual for a fume hood to be located in an office. Please clarify the requirement for the fume hood.
A84: Refer to Part 3 ESR D309090 for the requirements of fume hood.
Q85: Project program room requirement for RC42 POL Laboratory section D209002 Acid Waste System says “Provide acid neutralizing tank under sink in POL LAB.” Please confirm if the intent of the RFP is to provide a “point of use acid neutralization tank” to be used under a laboratory sink.
A85: Refer to Part 3 ESR for specific room and D209002 requirements neutralizing tank shall be provided per applicable code requirements.
Q86: The discipline / scope matrix under “Model and Facility Data matrix” provided under Part 6 - Attachments, seems to indicate that landscape is not part of the scope. The 5th column from the left indicates if the work section is in scope or not. Please clarify.
A86: No landscaping, only top soil and grass on the affected areas. No shrub and trees will be provided.
Q87: The RFP project program or drawings does not specifically state a requirement for any tree protection or transplanting requirement. Please confirm that tree protection and/or transplanting is not required in this RFP?
A87: Deferred.
Q88: Under the project program Section G205005 Plantings states “Not Used” while in Part 4 Section G205005 1.4 Planting says to provide trees and shrubs. Following the RFP, “The Contract and Order of precedence” section 01 33 10.05 20 paragraph 3.3.2 b, Part 3 project program requirements will govern over Part 4. Please confirm that tree and shrub planting is not required by the RFP.
A88: Deferred.
Q89: Part 4 Section G2050 1.1 Design -The document requires attendance by the Landscape Architect (LA) for inspections and site meetings. This requires meetings prior to design, a kickoff partnering meeting, twice during construction, pre and post establishment, and quarterly during establishment. Is this the intent of the RFP to require these meetings if only soil and seeding are required? Please clarify the anticipated number and extent of meetings (on-site and virtual) for the Landscape Architect.
A89: Since the landscaping requirement is minimal, it is not the intent to require the attendance of a licensed landscape architect at these meetings.
Q90: As per RFP Part 3 Chapter 2.4 Appropriate Design, the building design shall comply with MDACS. In other Guam Military projects, compliance to MDACS will require an airwell system for the Generator Building. Based on RFP drawing sheet E3, the Facility will require a minimum rating of 600KW generator. The generator building, for a 600KW generator, with an airwell system will require approx. 621 GSF space. However, RFP Part 3 Chapter 4.1 Space Tabulation indicates a 375 GSF for the Generator Building. Our understanding is that the 375 GSF Generator building does not have an airwell system. Please confirm an airwell system for the generator building is not required.
A90: Deferred.
Q91: The room requirement for TB02-Support Office provided an Ideal Plan Dimension of 810 NSF.
However, drawing sheet A6 shows this room's dimensions to be 19'-6" x 14'-6" (roughly 286 SF). Please advise.
A91: The dimension of 810 NSF is for Training Bay Support Spaces to include Support Office, Unisex Restroom, POL Room, Mech Room and Circulation. Drawing A6 to be revised by a forthcoming amendment.
Q92: Tailpipe exhaust ventilation is based upon engine horsepower. Confirm the type of vehicle/motors to be worked on within the General Purpose Training Bay.
A92: Refer to Part 3 ESR D304090, vehicle tailpipe exhaust system shall be provided in accordance with ARNG design guidelines. These are standard military equipment vehicle that requires exhaust ventilation.
Refer to applicable DoD design criteria per UFC 3-410-01 and ARNG design guidelines.
Q93: Confirm if tailpipe exhaust hoses and exhaust hose reels are required within the General Purpose Training Bay.
A93: Refer to Part 3 ESR D304090, vehicle tailpipe exhaust system shall be provided in accordance with ARNG design guidelines. These are standard military equipment vehicle that requires exhaust ventilation.
Refer to applicable DoD design criteria per UFC 3-410-01 and ARNG design guidelines.
Q94: RFP Document Part 3 Chapter Five RC37 ALSE and RC42 POL LAB Indicate that a fume hood is required. The fume hood ventilation requirements is based on the cross sectional opening of the fume hood. Provide the required fume hood dimensions and hood type required.
A94: Refer to D30, fume hood shall be provided in accordance with the applicable code and standards.
Nominal sizes are reference in the CID list on the respective FF&E that needs to be provided with hood, final design details and sizing shall be the design build contractor’s responsibility.
Q95: RFP Drawings indicate a Wash Platform is being provided. Confirm if pressure washing equipment or a domestic water connection is required. If required, confirm the required pressures and flow rate for wash equipment.
A95: Pressure washing equipment is not required. Provide one (1) hose bibb as domestic water connection is required.
Q96: RFP Drawings M4 indicate OA for TB02-Support office to be 1.0 CFM/SF. RFP Part 3 Chapter 6 D30 System description indicates ventilation to be provided in accordance with Army National Guard DG 415-1 & 3, which indicates 10 CFM/Person for Office Spaces, and ASHRAE 62.1, which indicates 5 CFM/Person and 0.6 CFM/SF for office spaces. Confirm which ventilation rate is to be provided.
A96: Deferred.
Q97: RFP Part 3 Chapter 6 D30 System description indicates ventilation to be provided in accordance with Army National Guard DG 415-1 & 3, which indicates 10 CFM/Person for Offices, and ASHRAE 62.1, which indicates 5 CFM/Person and 0.6 CFM/SF for Offices. Confirm which ventilation rate is to be provided.
A97: Deferred.
Q98: Bid Item 002-Option 1 on proposal schedule is for a Photovoltaic System. Part 3-Chapter 6 paragraph D50 Electrical, also mentions a PV system. However, the RFP does not provide enough information to price this line item. Please confirm if the PV system will serve only the Readiness Center and not the Training Bay/Heater Storage Building. Is the PV System allowed to be installed on the roof?
If not, please provide location on the ground where the system should be located.
A98: See RFP drawing E3 to reference the recommended PV system’s point of connection and see response to Q3 for PV system installation location.
Q99: Room Requirements for Classrooms 1, 2, 3 & 4 call for STC 42 rated Retractable Partitions.
Acoustics requirements are not provided for the classrooms. If perimeter walls of these classrooms need to be STC rated, please provide the STC rating.
A99: Deferred.
Q100: Room Requirements Table for RC27-Hallway 5 is missing exterior doors, but drawing sheet A1 shows a double exterior door. Please advise.
A100: Revised Part 3 Room Requirements to include exterior doors. Refer to RFP Amendment 0002.
Q101: Please advise if doors for RC28- Arms Vault (AVIATION) and RC29-Arms Vault (ESC) need to be Vault Doors. If so, please provide Part 3 Specification for Vault Doors.
A101: Deferred.
Q102: Room Requirement Tables for Rooms RC28 and RC29 are missing door hardware requirements.
Please advise.
A102: RC28 and RC29 are arms vaults, which will require special card key access devices. Refer to RFP Part 3 Chapter 6, C102007 for additional hardware details. Bidders will be required to make reasonable assumptions on specific hardware design requirements not explicitly provided since this Design-Build RFP represents 15% level of design.
Q103: Room Requirement Table is missing design requirement and count for Lockers in room RC35- Aviation Open Office. However, Drawing Sheet A1 indicates Pass Thru-Lockers are to be provided in this room. Please advise.
A103: See response to Q77.
Q104: Room Requirement Table for RC44-Operations room lists C1010-Partitions but Specific Requirements are left blank. Please advise.
A104: Deferred.
Q105: Reference drawing sheet A1, please confirm if it is the design intent to have a partial height wall in RC44-Operations room by the L-shaped desk/counter where the two chairs are located.
A105: It is a partial height wall with a swinging gate. Please refer to CID Package Appendix C for Aviation Operations Office.
Q106: There is an exterior double door on the east side of the Readiness Center building, located between Gridlines C&D (between rooms RC26 and RC31). Room requirement table for RC03-Hallway 1 calls for this door to be storefront type with exterior glazing. However, elevation detail C1/A4 does not show this door to be storefront type. Please advise.
A106: Revised Drawing A4 to illustrate intended door type. Refer to RFP Amendment 0002.
Q107: Room requirements for TB03-Unisex Restroom calls for an interior flush door with vision panels.
Please confirm if it is correct that this restroom door will receive vision panel.
A107: Revised RFP Room Requirements for TB03 - Unisex Restroom to remove vision panel. Refer to RFP Amendment 0002.
Q108: Chapter 6 paragraph C101002 Demountable Partitions indicate demountable partitions shall be funded as part of FF&E. Please provide location and dimensions of demountable partition for contractors to design and price structural support for this item.
A108: This Design-Build RFP represents 15% level of design and is generally not intended to provide prescriptive sizes of doors or similar products. Bidders will be required to use the RFP drawings as a basis to make determinations on overall widths and heights needed for movable partitions. Refer to classroom layouts in Drawing A1 for partition locations/widths and building sections on Drawing A5 for partition height.
Q109: Please advise if Lockers in RC13-Unit Lockers are required to be installed on concrete bases.
A109: Lockers shall be provided with concrete bases. Refer to CID Appendix A.
Q110: CLIN 0005-Option 4 is for a Wash Platform. Please provide Part 3-Chapter 6 performance requirements for this wash platform to include specialty equipment if required for the wash platform.
A110: Deferred.
Q111: Part 3- Chapter 6 paragraph C103090 Other Interior Specialties states to provide ceiling mounted motorized projection screen as approved by client. However, Chapter 5- Room requirements is missing projections screens. Please indicate which rooms will receive projection screens and provide size of projection screens.
A111: Projection screen requirements are identified in Part 3 Room Requirements for Classrooms 1-4.
Refer to RFP Amendment 0002 for the CID Package for additional information.
Q112: Part 3, Chapter 6 paragraph E20-Furnishings mentions drying cages, weapon racks, and security cameras are part of the construction contract as fixed furnishings. However, Part 3, Chapter 5 and Chapter 6 are missing requirements for these items. Please advise.
A112: Revised RFP Part 3 E20 to ensure fixed furnishing items are correctly identified. Refer to the following: CID package for weapons storage shelves information and. Part 3 Room Requirements for security camera information. Refer to RFP Amendment 0002.
Q113: Part 3, Chapter 6 paragraph E2010 Fixed Furnishings indicates contractor to provide equipment racks. However, Part 3 Chapter 5- Room Requirements is missing location of the racks and Chapter 6 is missing performance requirements. Please advise.
A113: Deferred.
Q114: Chapter 5 - Room Requirements tables are missing B2020 Exterior Windows. Please provide required size of windows.
A114: This Design-Build RFP represents 15% level of design and is generally not intended to provide prescriptive sizes for windows or similar products. Bidders will be required to use the RFP drawings as a basis to make determinations on overall window sizes. Refer to floor plans and exterior elevations provided.
Q115: Chapter 5 - Room Requirements tables are missing B203008-Exterior Door Hardware and C102007 Interior Door Hardware for several rooms. Please advise.
A115: This Design-Build RFP represents 15% level of design and is generally not intended to provide prescriptive sizes for windows or similar products. Bidders will be required to use the RFP drawings as a basis to make determinations on overall window sizes. Refer to floor plans and exterior elevations provided.
Q116: See question below:
1. Factor 4 requires the submittal of a Small Business Participation and Commitment Strategy, following the format of RFP Exhibit D, which relates to an Offeror's final proposed price, as well as the determination of proposed subcontractors and suppliers. Kindly note that an Offeror's final pricing and subcontractor selection is normally not determined until bid day and, most times in order to provide the government with the best competitive number, right before bid time; this is made even more difficult being a design-build project. Therefore, as such has been understood and allowed on other NAVFAC submittals, we kindly ask that you consider allowing the submittal of Non-Price Proposal Factor 4 and electronic copies of the proposal at least one (1) business day after the submittal of the RFP Part A Documents, Price Proposal, and Non-Price Proposal Factors 1, 2, 3, & 5.
2. The last sentence of subparagrah (3) at the top of RFP page 29 of 61 states "The small business participation and commitment strategy must be in agreement with any required small business subcontracting plan and will be made a part of the contract upon award." However, we do not note the submission of the subcontracting plan described in Section 00 22 16 for large business offerors, nor listed as part of the proposal submission parts under RFP Section 00 21 16, Para. 3.2.
Kindly clarify if a subcontracting plan is required as part of the proposal submission, and if so, specify the submission requirement. If such is indeed required, we kindly ask that you consider allowing the submittal of subcontracting plan as part of the Non-Price Proposal Factor 4 and electronic copies submission and at least one (1) business day after the submittal of the RFP Part A Documents, Price Proposal, and Non-Price Proposal Factors 1, 2, 3, & 5, as described above.
A116: No. Factor 4 – Small Business Utilization is due on the date and time indicated in RFP Amendment 0002. After receipt of proposals, Offerors will be contacted and provided with the Small Business Subcontracting Plan template and instructions on submitting the plan.
Q117: Response A18 of Notice 1 refers to Response A16, which states to "Provide prices for all in CLINS in Sec 00 10 00 and Representations & Certifications and the price proposal." As Response A16 did not clearly address what we understand Question A18 to be inquiring, we are requesting further clarification by submittal of this question.
Please understand that from review of the RFP documents, we note that CLINs 0001 thru 0007 on SF1442/Sec 00 10 00 (unnumbered pages 3-7) are nearly the exact same CLINs and information noted on RFP page 8 of 61 (noted as "Price Proposal Schedule").
Therefore:
a.Kindly confirm that RFP page 8 of 61 titled "Price Proposal Schedule" is considered to part of the "CLINS in Sec 0010 00".
b. If so, please understand that an Offeror is already under an extreme time crunch to provide a competitive number and complete proposal on bid day, and more so if the Factor 4 - SB Participation information is required on the same bid day, though we've also requested your consideration to have this due the next business day. Therefore, in consideration of those factors and to avoid having an offeror submit redundant pricing information, we kindly request the government's consideration to only have an Offeror complete page 8 of 61 titled "Price Proposal Schedule", and not both CLINs 0001 thru 0007 on SF1442/Sec 00 10 00 (unnumbered pages 3-7) and RFP page 8 of 61 titled "Price Proposal Schedule".
A117: See responses below:
a. Confirmed.
b. Complete price proposal schedule only. Refer to RFP Amendment 0002.
Q118: Part 3 Chapter 5 Room Requirements call for 169 EA, TA 50 Lockers. Please provide minimum required size of TA 50 Lockers.
A118: Minimum dimensions of TA50 Lockers (Single Tier) are 36" wide x 24" deep x 72" high.
Q119: Reference to Bid Option #2 General Purpose Training Bay and Bid Option #3 Unheated Storage Building, if one or both options are not awarded, should the area (building footprint) be asphalt paved under the Basic bid? Otherwise please clarify.
A119: Deferred.
Q120: Reference to Bid Option #2 General Purpose Training Bay and Bid Option #3 Unheated Storage Building, should we consider the underground utilities like power and water supporting these buildings be part of respective options?
A120: Deferred.
Q121: For both within the Gov Guam property and US Gov property, project program does not specifically state the requirement for Prime Coat & Tack Coat. Please confirm if we can use Emulsified Asphalt “CSS-1h” which is a standard material in Guam.
A121: Deferred.
Q122: For both within the Gov Guam property and US Gov property, project program states that asphalt binder should be AR 8000. However, the standard for Gov Guam Projects, are both AR8000 and AR16000. Please consider if we can also use AR16000 as asphalt binder.
A122: Deferred.
Q123: Project program para 1.a states that paved surfaces shall be in compliance with FHWA, while para 1.e states that it should be compliance with OICC Marianas 123C which are conflicting specifications.
The standard for Gov Guam property only follows FHWA Specifications. Please consider that we should only comply with FHWA specifications and not with OICC MARIANAS 123C Specs.
A123: Deferred.
Q124: Project program para 2.a states that paved surfaces shall be in compliance with the OICC Marianas 123C. Please consider if we can also use the UFGS Standards, reference UFGS 32 12 15.13, using Gradation 1.
A124: Deferred.
Q125: Project Program para. 2b states that Top Friction Course shall be Gradation 11 for US Gov Property. However, the friction course standard in Guam is using the FHWA Specifications, which does not include gradation 11. Please clarify which will govern Gradation 11 or FHWA specifications.
A125: Deferred.
Q126: The RFP project program does not specifically state a requirement for Pavement Thickness. Please confirm if we can use 3” thick- Binder Course, 2” thick- Wearing Course, and 1” thick-Basalt for Friction properties.
A126: Deferred.
Q127: The Project Program states that “to provide wall mosaic, painted mural, graphics and/or logo of activity in appropriate locations”. Please provide location.
A127: Deferred.
Q128: This section states that the finishes shall be coordinated with section C30 Interior Finishes.
However, in section C30 Interior Finishes there is no given finish specifically for Demountable Partition.
Please provide finish for demountable partitions.
A128: Deferred.
Q129: As per drawing S2 along Gridline 1/(G-H) it refers that the section details can be shown on C1/S9, on which a concrete canopy can be shown. However, upon checking on the rendered drawings on Project Program Part 6- Attachments, no canopy was shown. Please confirm that concrete canopy is not required along Gridline 1.
A129: Deferred.
Q130: Telecom plan shows that a new underground duct line with conduit & cables and spare conduits, please confirm if the scope of work will be connected to the existing telecom room inside the building
800. If yes, please provide as-built plans building 800.
A130: Deferred.
Q131: On Site Layout Plan (Sheet 10 - C2) shows a detention tank with dimensions of 11’-4” x 33’-0”.
Please provide the required volume for this detention tank.
A131: Deferred.
Q132: Based on the amount of pending RFI’s and the limited information in the drawings we are respectfully requesting a four-week extension of bid date from June 28, 2022, to July 26, 2022, to provide ample time for the designer and estimator to come up with the design and material takeoff for pricing.
A132: Refer to RFP Amendment 0002.