0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020_Revised.docx
DOCX document 12 KB Posted
- Attached to
- REGULAR OVERHAUL USNS ARCTIC
- Solicitation number
- N32205-19-R-6012
About this file
This document contains a technical survey report and recommendation for repairs to a naval vessel's fuel tank and related federal contract opportunity. The survey report details leaks discovered in the 7-105-0-FF JP5 cargo tank located underneath an auxiliary machinery room during pressure testing. Temporary lap plate repairs were made at four locations around tank cleaning openings at frames 115 and 145. The recommendation is to crop and renew the deck plating around the temporary repairs to the satisfaction of the attending surveyor. The related federal contract opportunity is a solicitation for the regular overhaul and dry docking of the USNS ARCTIC (T-AOE 8) issued by the Department of the Navy Military Sealift Command. The solicitation number is N32205-19-R-6012 and is listed as a pre-solicitation opportunity.
Work item 0118 Revised
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| CS3591177 - Special Continuous Survey - Hull 6 | 01-Feb-2019 | Charleston, SC | ||
| Due By | 31 Jan 2020 | Recommendation | ||
| Item Name | Aux Mchy Rm, 3-105-0-E | |||
| Found |
After completion of deck plating repairs/renewal on the the Auxiliary Machinery Room (3-105-0-E), during tank pressure testing of the 7-105-0-FF JP5 Cargo Tank, the subject tank being located underneath the Auxiliary Machinery Room (3-105-0-E) with common deck plating, leaks were discovered in way of four (4) 18 inch OD tank cleaning openings (butterworth covers) around the edges and bolt holes. The tank cleaning openings in question are located at Frames 115 and 145 and between longtidunals L4 and L5 on both the port and starboard sides.
As a temporary repair, owner elected to weld a 24 inch OD by 3/8 inch lap plate over each of the leaking tank cleaning openings in the Auxiliary Machinery Room. A total of four (4) lap plates were installed at the following locations:
1. Frame 115 forward of the No. 1 AC Plant starboard side between between longitudinals L4 and L5.
2. Frame 115 forward of the No. 2 AC Plant port side between between longitudinals L4 and L5, underneath the stairway into the Auxiliary Machinery Room.
3. Frame 145 aft of the No. 2 AC Plant port side between between longitudinals L4 and L5.
4. Frame 145 forward of the escape trunk starboard side between at longitudinal L4.
The welded lap plates were examined, welds tested for tightness and confirmed to have no leaks.
Recommendation Crop and renew the deck plating in way of the temporary lap plate repairs to the satisfaction of the attending surveyor.