This document contains a technical survey report and recommendation for repairs to a naval vessel's fuel tank and related federal contract opportunity. The survey report details leaks discovered in the 7-105-0-FF JP5 cargo tank located underneath an auxiliary machinery room during pressure testing. Temporary lap plate repairs were made at four locations around tank cleaning openings at frames 115 and 145. The recommendation is to crop and renew the deck plating around the temporary repairs to the satisfaction of the attending surveyor. The related federal contract opportunity is a solicitation for the regular overhaul and dry docking of the USNS ARCTIC (T-AOE 8) issued by the Department of the Navy Military Sealift Command. The solicitation number is N32205-19-R-6012 and is listed as a pre-solicitation opportunity.

Work item 0118 Revised

View the file

Other files

File Type Posted
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS REV OCT 2012_ARCTICROH20_REV2.docx DOCX document
0013_A_PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 1-1May18.docx DOCX document
N3220519R6012 Amendment 4.docx DOCX document
0305_A_REPLACE SSDG FORWARD CRANKSHAFT SEAL REV ARCTICROH20.docx DOCX document
Q_and_A__5.docx DOCX document
6362478_H.zip ZIP file
N3220519R6012_Amendment_2.docx DOCX document
J_-_3_Category_B_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020.docx DOCX document
N3220519R6012_Amendment_3.docx DOCX document
0117_A_7-105-0-JJ_HYDROSTATIC_TESTING_ARCTICROH20.docx DOCX document
Q_and_A__4.docx DOCX document
0912_A_UNDERWATER_HULL_CLEANING_and_PAINTING_REV_1_.docx DOCX document
0107_A_REPLACE_REPAIR_SURVEY_WATERTIGHT_DOORS_ARCTICROH20_REV1.docx DOCX document
0913_A_HULL_FREEBOARD_CLEANING_AND_PAINTING_REV_1_ARCTICROH20.docx DOCX document
0201_A__INSTRUMENT_CALIBRATION_AND_REPAIR_ARCTICROH20.docx DOCX document
0113_A_FANTAIL_OVERHEAD_CLEANING_AND_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Revised_20_SEP_19.xls XLS spreadsheet
N3220519R6012_Amendment_1.docx DOCX document
Q_and_A__3.docx DOCX document
0116_B_BILGE_WELL_STAGING_SUPPORT_REV_1_ARCTICROH20.docx DOCX document
0517_A_INSTALL_OILY_WATER_SEPERATOR_TALT_301_ARCTICROH20_REV1.docx DOCX document
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV2_ARCTICROH20.docx DOCX document
0109_A_JP-5_PUMPROOM_BILGE_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
0104_A_RENEW_01_LEVEL_NON_SKID_REV_1_ARCTICROH20.docx DOCX document
0202_A_SEAL_CHANGE_OUT_FOR_REDUCTION_GEAR_MAIN_THRUST_BEARINGS_ARCTICROH20_REV2.docx DOCX document
Q_AND_A__2.docx DOCX document
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV1_ARCTICROH20_(002).docx DOCX document
J_-_3_Category_B_Items_ARCTIC_Correction.xls XLS spreadsheet
Q_and_A__1.doc DOC document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_and_A_Redacted.docx DOCX document
N3220519R6012.docx DOCX document
USNS_ARCTIC_ROHDD_2020_J_Attachments.zip ZIP file
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SYNOPSIS_N3220519R6012_USNS_ARCTIC.docx DOCX document
SOURCES_SOUGHT_FOR_USNS_ARCTIC_ROH_2020.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CS3591177 - Special Continuous Survey - Hull 601-Feb-2019Charleston, SC
Due By31 Jan 2020Recommendation
Item NameAux Mchy Rm, 3-105-0-E
Found

After completion of deck plating repairs/renewal on the the Auxiliary Machinery Room (3-105-0-E), during tank pressure testing of the 7-105-0-FF JP5 Cargo Tank, the subject tank being located underneath the Auxiliary Machinery Room (3-105-0-E) with common deck plating, leaks were discovered in way of four (4) 18 inch OD tank cleaning openings (butterworth covers) around the edges and bolt holes. The tank cleaning openings in question are located at Frames 115 and 145 and between longtidunals L4 and L5 on both the port and starboard sides.

As a temporary repair, owner elected to weld a 24 inch OD by 3/8 inch lap plate over each of the leaking tank cleaning openings in the Auxiliary Machinery Room. A total of four (4) lap plates were installed at the following locations:

1. Frame 115 forward of the No. 1 AC Plant starboard side between between longitudinals L4 and L5.

2. Frame 115 forward of the No. 2 AC Plant port side between between longitudinals L4 and L5, underneath the stairway into the Auxiliary Machinery Room.

3. Frame 145 aft of the No. 2 AC Plant port side between between longitudinals L4 and L5.

4. Frame 145 forward of the escape trunk starboard side between at longitudinal L4.

The welded lap plates were examined, welds tested for tightness and confirmed to have no leaks.

Recommendation Crop and renew the deck plating in way of the temporary lap plate repairs to the satisfaction of the attending surveyor.