N3220519R6012 Amendment 4.docx

DOCX document 39 KB Posted

Attached to
REGULAR OVERHAUL USNS ARCTIC Federal contract opportunity
Solicitation number
N32205-19-R-6012
Issued by
Department of the Navy Military Sealift Command

About this file

This document is an amendment to a solicitation for the regular overhaul and dry docking of the USNS ARCTIC (T-AOE 8).

The amendment modifies pricing terms by requesting unit pricing for various work items and services under CLIN 0001, and establishes rates for additional man-hours and other direct costs under CLIN 0002 to be used for negotiating changes. It also lists optional Category B work items under CLINs 0003 through 0015 that can be exercised at the contracting officer's discretion. The standard work items included in the solicitation are provided.

The ship is to arrive at the contractor's yard on or about March 16, 2020, with all work to be completed within 75 calendar days from the actual start date designated by the Navy. The solicitation was issued by the Department of the Navy Military Sealift Command for the regular overhaul and dry docking of the USNS ARCTIC to support its mission.

View the file

Other files for this federal contract opportunity

Other files attached to REGULAR OVERHAUL USNS ARCTIC, newest first.
File Type Posted
0305_A_REPLACE SSDG FORWARD CRANKSHAFT SEAL REV ARCTICROH20.docx DOCX document
0013_A_PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 1-1May18.docx DOCX document
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS REV OCT 2012_ARCTICROH20_REV2.docx DOCX document
0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020_Revised.docx DOCX document
Q_and_A__5.docx DOCX document
6362478_H.zip ZIP file
N3220519R6012_Amendment_2.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
J_-_3_Category_B_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020.docx DOCX document
N3220519R6012_Amendment_3.docx DOCX document
0117_A_7-105-0-JJ_HYDROSTATIC_TESTING_ARCTICROH20.docx DOCX document
0912_A_UNDERWATER_HULL_CLEANING_and_PAINTING_REV_1_.docx DOCX document
Q_and_A__4.docx DOCX document
0113_A_FANTAIL_OVERHEAD_CLEANING_AND_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
0116_B_BILGE_WELL_STAGING_SUPPORT_REV_1_ARCTICROH20.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Revised_20_SEP_19.xls XLS spreadsheet
N3220519R6012_Amendment_1.docx DOCX document
0201_A__INSTRUMENT_CALIBRATION_AND_REPAIR_ARCTICROH20.docx DOCX document
0517_A_INSTALL_OILY_WATER_SEPERATOR_TALT_301_ARCTICROH20_REV1.docx DOCX document
Q_and_A__3.docx DOCX document
0913_A_HULL_FREEBOARD_CLEANING_AND_PAINTING_REV_1_ARCTICROH20.docx DOCX document
0109_A_JP-5_PUMPROOM_BILGE_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
0104_A_RENEW_01_LEVEL_NON_SKID_REV_1_ARCTICROH20.docx DOCX document
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV2_ARCTICROH20.docx DOCX document
0202_A_SEAL_CHANGE_OUT_FOR_REDUCTION_GEAR_MAIN_THRUST_BEARINGS_ARCTICROH20_REV2.docx DOCX document
0107_A_REPLACE_REPAIR_SURVEY_WATERTIGHT_DOORS_ARCTICROH20_REV1.docx DOCX document
Q_AND_A__2.docx DOCX document
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV1_ARCTICROH20_(002).docx DOCX document
J_-_3_Category_B_Items_ARCTIC_Correction.xls XLS spreadsheet
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
Q_and_A__1.doc DOC document
J_and_A_Redacted.docx DOCX document
USNS_ARCTIC_ROHDD_2020_J_Attachments.zip ZIP file
N3220519R6012.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SYNOPSIS_N3220519R6012_USNS_ARCTIC.docx DOCX document
SOURCES_SOUGHT_FOR_USNS_ARCTIC_ROH_2020.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220519R6012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "A" Work Items (WIs)

FFP

Prepare for and accomplish the ROH/DD of the USNS ARCTIC (T-AOE 8) Total Category "A" WIs $_____________

Proposed unit price per KWh $_____ in accordance with (IAW) WI 011, 7.1.1.4

Proposed unit price per gallon of potable water $______ IAW WI 011, 7.1.3.2

Proposed unit price per gallon of distilled water $______ IAW WI 011, 7.1.4.2

Proposed unit price per gallon of bilge water removal $______ IAW WI 011, 7.1.19.3

Proposed unit price per crane usage $______ IAW WI 11, 7.9.1

Proposed Hazardous Waste handling fee rate IAW WI 023, 7.4.3 ______%

FOB: Destination

NET AMT
TEM NOSUPPLIES/SERVICESQUANTITYUNITUNIT PRICEAMOUNT

AGR and ODC

FFP

AGR

(18,000) man-hours @ $________ per man-hour = $_____________

ODC

Base $1,000,000.00

Proposed G&A Rate _______________% Subtotal: $_____________

Proposed Profit Rate _______________% Subtotal: $_____________

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0025

FFP

WI 0025 - Physical Security at Private Contractor's Facility in FPCON Bravo - Delta

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0030

FFP

WI 0030 - Continuation of Services

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0116

FFP

WI 0116 - Staging to Support work Item 0114

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0118

FFP

WI 0118 - 7-105-0-JJ Tank Top Repair

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0330

FFP

WI 0330 - Stuffing Tube Replacment

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0510

FFP

WI 0510 - Lagging and Insulation Repair

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0530

FFP

WI 0510 - Assit Ships Force (Staging)

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0927

FFP

WI 0927 - Dry Docking and Undocking

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0928

FFP

WI 0928 - Shell Plate and Welding repair

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0929

FFP

WI 0929 - Steel Renewal

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0932

FFP

WI 0932 - Ultrasonic Testing

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0933

FFP

WI 0933 - Replace Port and Starboard rudder Stock Bearings

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Category "B" WI 0934

FFP

WI 0934 - Replace One Rudder Stock Bearing

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

TOTAL PROPOSED PRICE

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0015 $______________

The contractor shall enter the total proposed price of all CLINs.

CLAUSES INCORPORATED BY FULL TEXT

PART I - THE SCHEDULE

Section B, Price Schedule, detailed information

CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.

CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blastingTank cleaning
WeldingMachinists (inside and outside)
BurningBrazing
CarpentryElectrical work
Electronic workShipfitting
LaggingPainting
BoilermakingPipefitting
Sheetmetal workEngineering
RiggingStaging/scaffolding
General laborFire Watch

Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:

TestingQuality Assurance
PlanningCleaning (except tank cleaning)
Material handling & warehousingSecurity
SurveyingAdministration
TransportationPurchasing staff
LoftingOther indirect support
Supervision

Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's FBLR and not separately priced.

The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.

The base cost, stated in this CLIN does not include the profit or G&A rates.

NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.

CLINs 0003 through 0015 –Attachment J-3 – Category “B” WIs provides a WI breakdown of CLIN 0003 through 0013 pricing.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

C – 2 List of Standard WIs included for this solicitation:

001
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
002
TECHNICAL AND MANUFACTURER’S REPRESENTATIVES
003
APPROACH, BERTH AND MOORING REQUIREMENTS
004
TESTING AND QUALITY ASSURANCE
005
ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
006
HEAVY WEATHER PLAN
007
COLD WEATHER PLAN
010
FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT)
011
FURNISH GENERAL SERVICES
012
TELEPHONE SERVICES
013
PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS
014
PREPARATION OF WEIGHT AND MOMENT REPORT
015
INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS
016
FIRE PROTECTION AND SHIP’S SAFETY PROGRAM
017
HANDLING SHIPS STORES
018
DELIVERY AND REDELIVERY OF THE VESSEL
019
SHIPBOARD ACCESS AND SECURITY
020
GAS FREE CERTIFICATES
021
CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES
022
DOCK TRIALS AND SEA TRIALS
023
HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR’S FACILITY
024
PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY
025
PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY IN F/P BRAVO - DELTA
030
CONTINUATION OF SERVICES

SECTION 100 – HULL STRUCTURE

102
ABS INTERMEDIATE SURVEY SUPPORT
103
ABS TANK INSPECTION AND TESTING
104
RENEW 01 LEVEL NON SKID
105
REPLACE SOUNDING TUBE DECK SOCKET COVERS
106
ABS LOADLINE CORRECTION
107
REPLACE AND REPAIR WATERTIGHT DOORS
108
SHIPWIDE EXTERIOR HAND RAIL REPLACEMENT
109
JP5 PUMPROOM BILGES PRESERVATION
110
RENEW NR 1 SSDG SALTWATER STRAINER FOUNDATION
111
FWD AND AFT CHT SYSTEM PIPING REPAIRS
112
REPLACE WEATHER DECK DRAIN PIPING
113
FANTAIL OVERHEAD CLEANING AND PRESERVATION
114
BILGEWELL INSPECTION AND PRESERVATION

REMOVED

116
STAGING TO SUPPORT WORK ITEM 114

SECTION 200 – MACHINERY, PROPULSION

201
TBD
202
SEAL CHANGE FOR REDUCTION GEAR MAIN THRUST BEARING(S)
203
INSPECT, SET AND TEST RCC RELIEF VALVES
204
INSPECT, SET AND TEST RRG RELIEF VALVES

SECTION 300 – ELECTRICAL

301
MAIN SWITCHBOARD CLEANING
304
STUFFING TUBE REPLACEMENT
305
REPLACE SSDG FORWARD CRANKSHAFT SEAL REV.
310
SSDG TOP END OVERHAUL (NR 4 SSDG)
313
SSDG WOODWARD GOVERNOR OVERHAUL
330
STUFFING TUBE REPLACEMENT

SECTION 400 – COMMUNICATION & NAVIGATION AIDS

404
NAVIGATION EQUIPMENT ROH SERVICE
405
ANTENNA PM
407
OE-82 ANTENNA PM
408
UHF TRANSCEIVER PM
414
RUDDER ANGLE INDICATION INSPECTION AND MAINTENANCE
415
GYROCOMPASS AND REPEATERS GROOM.
416
STEERING CONTROL CIRCUIT CARD MAINTENANCE
417
ANURT-23Dv RADIO TRANSMITTER SYSTEM REPLACEMENT AOE TALT-210

SECTION 500 – MACHINERY, AUXILIARY

501
FIRE FIGHTING SYSTEMS EQUIPMENT INSPECTION
502
SCBA COMPRESSOR INSPECTION
503
SCBA EQUIPMENT
504
RHIB DAVIT 5 YEAR OVERHAUL AND WEIGHT TEST
506
AUXILIARY BOILER INSPECTION WITH RFET SURVEY(ABS)
507
OVERHAUL AUXILIARY STEAM SYSTEM RELIEF VALVES
508
OVERHAUL MACHINERY SPACE AIR SYSTEM RELIEF VALVES
509
ASSIST SHIPS FORCE
510
LAGGING AND INSULATION REPAIR
511
REPLACE HP AIR UNION NUT
512
OVERHAUL CARGO JP5 SYSTEM VALVES
513
REPLACE 100 FEET OF PIPING
514
STEAM TO ELECTRIC WATER HEATER CONVERSION TALT 314
515
OVERHAUL PUMPS AND MOTORS
516
REPLACE CARGO DIFFUSER BOX DRAIN PANS
517
OILY WATER SEPARATOR REPLACEMENT (TALT-301)
518
CHT AND SOIL DRAIN PIPING SYSTEM CLEANING
530
ASSIST SHIPS FORCE (STAGING)

SECTION 600 – OUTFIT, FURNISHING & HABITABILITY

601
GALLEY AND SCULLERY EQUIPMENT INSPECTION AND SERVICE
602
LIFE RAFT CERTIFICATION
603
ACCOMODATION LADDER INSPECTION AND WEIGHT TEST

SECTION 800 – HEATING, VENTILATION & AIR CONDITIONING

801
HABITABILITY SPACES VENT SYSTEMS CLEANING
803
OVERHAUL VANE AXIAL FAN AND MOTOR
804
REPAIR/REPLACE EXTERIOR VENTILATION INTAKE/EXHAUST DUCTS
806
REPAIR EXTERIOR HOUSE AIR INTAKE HOUSINGS (VR08-003)

SECTION 900 – DRYDOCKING AND UNDOCKING

901
DRY DOCKING AND UNDOCKING (ABS)
902
SEA SUCTION AND DISCHARGE WASTER PIPING (ABS)
904
HULL VALVE MAINTENANCE
905
RUDDERS AND STERN FRAME EXAMINATION (ABS)
906
BILGE KEEL EXAMINATION (ABS)
908
CATHELCO PROTECTION SYSTEM MAINTENANCE
909
PROPELLER CLEAN AND REPAIR (ABS)
910
RENEW ZINCS
911
ULTRASONIC TESTING (ABS)
912
UNDERWATER HULL CLEANING AND PAINTING
913
FREEBOARD CLEANING AND PAINTING
914
ANCHOR CHAIN AND LOCKER PAINTING AND MARKINGS
921
REPLACE RUDDER SEALS
924
PROPELLER AND RUDDER STOCK CLEARANCES
925
CATHODIC PROTECTION SYSTEM REPAIRS
927
DRY DOCKING AND UNDOCKING
928
SHELL PLATE AND WELDING REPAIR
929
STEEL RENEWAL
932
ULTRASONIC TESTING
933
REPLACE PORT AND STARBOARD RUDDER STOCK BEARINGS
934
REPLACE ONE RUDDER STOCK BEARING

SECTION 1000 – UNREP GEAR

1001
INSPECT AND TEST UNREP HP AIR RELIEF VALVES
1002
REPLACE UNREP WINCH CONTROL BOOTH WINDOWS
1005
CARGO BOOM QUADRENNIAL INSPECTION AND WEIGHT TEST
1007
REFURBISH SADDLE WINCH MOTOR FOUNDATIONS
1008
OVERHAUL SPANWIRE WINCH MAIN ELECTRIC MOTORS
1011
OVERHAUL HAULING WINCH ELECTRIC MOTOR(S)
1012
RAM TENSIONER CROSSOVER PIPE INSPECTION/REPAIR AND PRESERVATION
1013
REPLACE RAM TENSIONER CROSSOVER PIPE
1014
REPLACE SLIDING BLOCK TRANSFER HEAD BUMPERS
1018
REFURBISH HIGHLINE/SPANWIRE WINCH BAND BRAKES
1019
LEAD ANGLE COMPENSATOR SHAFT REPAIR

SECTION F - DELIVERY AND PERFORMANCE

F-1 SHIP AVAILABILITY PERIOD

It is anticipated the ship will arrive at contractor’s yard on or about 16 March 2020. All work shall be completed in no more than 75 calendar days from actual start date designated by the Government at time of contract award.

(End of Summary of Changes) image1.wmf