0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020.docx

DOCX document 30 KB Posted

Attached to
REGULAR OVERHAUL USNS ARCTIC
Solicitation number
N32205-19-R-6012
Issued by

About this file

This document outlines requirements for tank top repair on the USNS ARCTIC (T-AOE 8) as part of its regular overhaul and dry docking solicited under opportunity number N32205-19-R-6012 issued by the Department of the Navy Military Sealift Command. The scope of work includes cleaning and gas freeing tanks, removing and tagging deck plates, installing caution tape, staging tanks, replacing up to 16 square feet of steel bilge plating and tank top, welding, non-destructive testing, integrity testing, painting disturbed surfaces, removing staging and cleaning/closing the tank. Bidders must comply with applicable general technical requirements and review all other work items to determine effects on this scope.

Work Item 0118 "B" Item

View the file

Other files

File Type Posted
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS REV OCT 2012_ARCTICROH20_REV2.docx DOCX document
0013_A_PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 1-1May18.docx DOCX document
N3220519R6012 Amendment 4.docx DOCX document
0305_A_REPLACE SSDG FORWARD CRANKSHAFT SEAL REV ARCTICROH20.docx DOCX document
Q_and_A__5.docx DOCX document
0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020_Revised.docx DOCX document
6362478_H.zip ZIP file
N3220519R6012_Amendment_2.docx DOCX document
J_-_3_Category_B_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
N3220519R6012_Amendment_3.docx DOCX document
0117_A_7-105-0-JJ_HYDROSTATIC_TESTING_ARCTICROH20.docx DOCX document
Q_and_A__4.docx DOCX document
0912_A_UNDERWATER_HULL_CLEANING_and_PAINTING_REV_1_.docx DOCX document
0107_A_REPLACE_REPAIR_SURVEY_WATERTIGHT_DOORS_ARCTICROH20_REV1.docx DOCX document
0913_A_HULL_FREEBOARD_CLEANING_AND_PAINTING_REV_1_ARCTICROH20.docx DOCX document
0201_A__INSTRUMENT_CALIBRATION_AND_REPAIR_ARCTICROH20.docx DOCX document
0113_A_FANTAIL_OVERHEAD_CLEANING_AND_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Revised_20_SEP_19.xls XLS spreadsheet
N3220519R6012_Amendment_1.docx DOCX document
Q_and_A__3.docx DOCX document
0116_B_BILGE_WELL_STAGING_SUPPORT_REV_1_ARCTICROH20.docx DOCX document
0517_A_INSTALL_OILY_WATER_SEPERATOR_TALT_301_ARCTICROH20_REV1.docx DOCX document
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV2_ARCTICROH20.docx DOCX document
0109_A_JP-5_PUMPROOM_BILGE_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
0104_A_RENEW_01_LEVEL_NON_SKID_REV_1_ARCTICROH20.docx DOCX document
0202_A_SEAL_CHANGE_OUT_FOR_REDUCTION_GEAR_MAIN_THRUST_BEARINGS_ARCTICROH20_REV2.docx DOCX document
Q_AND_A__2.docx DOCX document
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV1_ARCTICROH20_(002).docx DOCX document
J_-_3_Category_B_Items_ARCTIC_Correction.xls XLS spreadsheet
Q_and_A__1.doc DOC document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_and_A_Redacted.docx DOCX document
N3220519R6012.docx DOCX document
USNS_ARCTIC_ROHDD_2020_J_Attachments.zip ZIP file
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SYNOPSIS_N3220519R6012_USNS_ARCTIC.docx DOCX document
SOURCES_SOUGHT_FOR_USNS_ARCTIC_ROH_2020.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

AOE 8

HULL, STRUCTURE N32205-19-R-6012

21 OCTOBER, 2019

ITEM NO. 118 CATEGORY “B” MSC/N756/JEBSK

7-105-0-JJ TANK TOP REPAIR

1.0 ABSTRACT:

1.1 This item describes the requirement to insert four areas of the 7-105-0-JJ tank top.

2.0 REFERENCES:

2.1 ABS Rules for Building and Classing Steel Vessels, Part 7 (Contractor Obtain).

2.2 MSC Drawing No. 085-8385180; Arctic, General Arrangement Plan

2.3 NAVSEA Drawing No. 141-6362169, Assembly 1st Platform

2.4 NAVSEA Drawing No. 501-6359953 – AMR Arrangement

2.5 NAVSEA Drawing No. 801-6360543, Scantling Drawing Fr 35 – Fr 205 01 Lvl and Below

2.6 NAVSEA Drawing No. 180-6362478; FDN Drawing Fr 105 to 165, First Plat

2.7 NAVSEA Drawing No. 500-6361985; Comp Arrg, A2-188, Fr105-165, First Plat, Center

2.8 Arctic ABS Outstanding Repair # 626

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location: AMR (4-105-0-E)

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7.

5.2 The contractor and all subcontractors regardless of tier are advised to review ALL other work items under this contract, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1 Clean and gas free requirements for the 7-105-0-JJ Cargo JP5 tank are covered by Work Item 021, Clean and Gas Free Tanks.

7.2 Mark and tag all deck plates in the AMR lower level (not the AMR Pump Room). Remove all deck plates and store in an area not to interfere with ongoing work. All fasteners shall be bagged and tied to each deck plate. Provide condition report for any damaged fasteners found. The four tank cleaning opening are located forward and aft of each Air Conditioning Plant, therefore minimal deck plates should be removed.

7.3 Install caution/warning tape at bottom of ladder well to notify all personnel that deck plates are missing and care should be taken while transiting space.

7.4 Stage 7-105-0-JJ tank to perform requirements of this work item. Work requirement shall be priced to stage entire tank. Initial examination of AMR bilges by contractor, ABS and MSCREP could determine that staging entire tank is not required. The government will seek a credit if it is determined entire tank staging is not required.

7.5 Accomplish steel bilge plating replacement; also the tank top for 7-105-0-FF, as indicated by readings obtained in Paragraph 7.1 and determined by the MSCREP and attending ABS Surveyor using References 2.3 and 2.7 as guidance

7.5.1 For bidding purposes, the contractor shall estimate that 16 Sqft of steel replacement.(4 sq ft per location)

7.5.2 Provide all labor and material to accomplish work under Paragraph 7.7

a. All steel shall be ABS certified.

b. ABS Surveyor to review material certification prior to steel installation.

c. ABS inspection required of all aspects of installation and materials used. ABS shall witness fit-up prior to root pass and inspect back gouge prior to finish welding section of new plate.

d. Remove piping interferences as required to accomplish bilge plate renewal. Piping sections removed shall be fitted with new gasket material for re-assembly.

e. Perform SSPC-SP-10, Blast to Near White Metal all new steel, minimum surface profile following blast shall be 2-4 mil.

f. Prep, prime, and paint new sections using PPG Marine Coating System. Three full and one stripe coat of epoxy shall be applied. Paint Rep to witness processes.

g. Target, template, fit, weld, and install new sections per References in 2.0 and ABS rules.

h. Back gouge, NDT Dye penetrate test, and re-weld

i. Accomplish integrity test; air or other per the requirements of the attending ABS Surveyor

j. Prep, prime, and paint disturbed areas post hot Work (includes opposite/adjacent sides).

7.6 Small areas of substantial or severe corrosion may be repaired by clad welding upon approval of ABS surveyor. Where an area is approved for clad welding it will be the subject to a change order.

7.7 Paint all disturbed surfaces to match surrounding areas.

7.8 Remove all staging.

7.9 Clean and close requirements for the tank are provided in work item 021.

8.0 GENERAL REQUIREMENTS: None Additional

118 - 1