This document contains answers to questions from potential offerors regarding solicitation N32205-19-R-6012 for the regular overhaul of the USNS ARCTIC. The answers clarify specifications for various work items including replacing 80 linear feet of weather deck drain piping, overhauling two RHIB davits manufactured by Willard Marine, pricing an assist to ship's force staging work item, specifying that capastic material for cathodic protection system maintenance is contractor furnished, and clarifying the amount of material needed to replace bumpers. The document also provides the technical manual referenced in a work item to refurbish a highline/spanwire winch band brake.

View the file

Other files for this federal contract opportunity

Other files attached to REGULAR OVERHAUL USNS ARCTIC, newest first.
File Type Posted
0305_A_REPLACE SSDG FORWARD CRANKSHAFT SEAL REV ARCTICROH20.docx DOCX document
0013_A_PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 1-1May18.docx DOCX document
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS REV OCT 2012_ARCTICROH20_REV2.docx DOCX document
N3220519R6012 Amendment 4.docx DOCX document
0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020_Revised.docx DOCX document
6362478_H.zip ZIP file
Q_and_A__5.docx DOCX document
N3220519R6012_Amendment_2.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
0117_A_7-105-0-JJ_HYDROSTATIC_TESTING_ARCTICROH20.docx DOCX document
J_-_3_Category_B_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020.docx DOCX document
N3220519R6012_Amendment_3.docx DOCX document
0912_A_UNDERWATER_HULL_CLEANING_and_PAINTING_REV_1_.docx DOCX document
Q_and_A__4.docx DOCX document
0113_A_FANTAIL_OVERHEAD_CLEANING_AND_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
0116_B_BILGE_WELL_STAGING_SUPPORT_REV_1_ARCTICROH20.docx DOCX document
0109_A_JP-5_PUMPROOM_BILGE_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
0104_A_RENEW_01_LEVEL_NON_SKID_REV_1_ARCTICROH20.docx DOCX document
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV2_ARCTICROH20.docx DOCX document
0202_A_SEAL_CHANGE_OUT_FOR_REDUCTION_GEAR_MAIN_THRUST_BEARINGS_ARCTICROH20_REV2.docx DOCX document
0107_A_REPLACE_REPAIR_SURVEY_WATERTIGHT_DOORS_ARCTICROH20_REV1.docx DOCX document
0517_A_INSTALL_OILY_WATER_SEPERATOR_TALT_301_ARCTICROH20_REV1.docx DOCX document
Q_and_A__3.docx DOCX document
0913_A_HULL_FREEBOARD_CLEANING_AND_PAINTING_REV_1_ARCTICROH20.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Revised_20_SEP_19.xls XLS spreadsheet
N3220519R6012_Amendment_1.docx DOCX document
0201_A__INSTRUMENT_CALIBRATION_AND_REPAIR_ARCTICROH20.docx DOCX document
J_-_3_Category_B_Items_ARCTIC_Correction.xls XLS spreadsheet
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV1_ARCTICROH20_(002).docx DOCX document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
Q_and_A__1.doc DOC document
J_and_A_Redacted.docx DOCX document
USNS_ARCTIC_ROHDD_2020_J_Attachments.zip ZIP file
N3220519R6012.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SYNOPSIS_N3220519R6012_USNS_ARCTIC.docx DOCX document
SOURCES_SOUGHT_FOR_USNS_ARCTIC_ROH_2020.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-19-R-6012

QUESTIONS AND ANSWERS #2

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

QUESTION #1:

SPECIFICATION ITEM NO.: 112, PARAGRAPH / SECTION NO: 3.3 & 7.3.2, TITLE: Renew Weather Deck Drain Piping, Paragraph 3.3 and 7.3.2 state 80 linear feet of piping is needed but 7.3.1 states 40 linear feet, please clarify.

ANSWER: Paragraph 3.3 and 7.3.2 both state 80 linear feet. WI 112 Renew Weather Deck Drain Piping Rev 1 has been issued.

QUESTION #2:

SPECIFICATION ITEM NO.: 504, PARAGRAPH / SECTION NO: TITLE: RHIB Davit 5-year Overhaul and Weight Test, Please confirm the manufacturer of the two RHIBS is Willard Marine.

ANSWER: Willard Marine is the OEM of the RHIB(s).

QUESTION #3:

SPECIFICATION ITEM NO.: 530; PARAGRAPH / SECTION NO: TITLE: Assist Ships Force-Staging. Work Item is in the specification but not in the revised J-3, please confirm it is to be priced.

ANSWER: The J-3 has been modified to reflect the addition of B item 530 Assist Ship’s Force Staging work item.

QUESTION #4

SPECIFICATION ITEM NO.: 925, PARAGRAPH / SECTION NO: TITLE: Cathodic Protection System Maintenance. Please clarify if new capastic material is government furnished or contractor furnished.

ANSWER: Capastic Material shall be contractor furnished.

QUESTION #5

SPECIFICATION ITEM NO.: 1014, PARAGRAPH / SECTION NO:3.1.2, TITLE: Replace Sliding Block Transfer Head Bumpers. Paragraph 3.1.2 states to replace 6 bumpers but 4.2 includes 16 total pieces, please clarify.

ANSWER: The GFM listed in Para 3.1.2 is the adequate amount of material to change out the bumpers listed in the work item.

QUESTION #6

SPECIFICATION ITEM NO.: 1018, PARAGRAPH / SECTION NO: TITLE: Refurbish Highline/Spanwire Winch Band Brake. Reference 2.1 is “NAVSEA Technical Manual SG813-AX-MMA-020 Winch, Electric Hydraulic, Double Drum MK3 Mods 15 and 16” but the manual provided is “NAVSEA Technical Manual SG813-AX-MMA-010 Winch, Electric Hydraulic, Double Drum MK 3 Mods 1 - 8, 11 - 14, and 17.” Please provide the manual referenced in the item.

ANSWER: Will provide NAVSEA Technical Manual SG813-AX-MMA-020 Winch, Electric Hydraulic, Double Drum MK3 Mods 15 and 16.

File details come from the government source that posted it. Updated .