This document provides specifications for a federal contract to renew non-skid coating on four areas of Level 01 on the USNS ARCTIC (T-AOE 8). The contractor will be required to remove the existing non-skid coating and apply a new standard non-skid system. The government will provide coating materials including various types and quantities of Amercoat paint. The contractor must prepare surfaces by abrasive blasting or water jetting to the specified standard, apply primer and finish coats in accordance with the manufacturer's instructions, and restore markings. The contractor is responsible for protection of the vessel and equipment, waste disposal, and ensuring all drains and equipment are operational upon completion.
Revised Work Item 0104
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS ARCTIC
(T-AOE 8)
| HULL STRUCTURE | N32205-19-R-6012 | |
| 14 JANUARY 2014 | ||
| ITEM NO. 104 | CATEGORY "A" | N756/CSI/NTR |
RENEW_01 LEVEL NON SKID REV 1
1.0 ABSTRACT
1.1 This item provides for removal of the existing PRC non-skid on four areas of 01 level and application of a new standard non skid system.
2.0 REFERENCES
2.1 SSPC-SP Surface Preparation Standards and Specifications (Contractor provided)
2.2 SSPC-PA Paint application Standards, Guides and Specifications (Contractor provided)
2.3 MSC Drawing, 085-8385180, General Arrangement
3.0 ITEM LOCATION / DESCRIPTION
3.1 01 Level Port Side:
a. Frame 100 to 200 (approximate 2000 sq ft)
b. Frame 500 to 640 (approximate 2800 sq ft)
3.2 01 Level Starboard Side:
a. Frame 100 to 200 (approximate 2000 sq ft)
b. Frame 500 to 640 (approximate 2800 sq ft)
4.0 GOVERNMENT FURNISHED MATERIAL/SERVICES
4.1 Government Furnish Material
4.1.1 The following coating materials will be government furnished:
| Coating Type |
| QTY (Gal) |
| Amercoat 137 Buff |
| 100 |
| Amercoat 137 Dark Grey |
| 100 |
| Amercoat 138G Dark gray |
| 380 |
| Amercoat 240 Dark Grey |
| 40 |
| Amercoat 229T White |
| 4 |
| Amercoat 229T Yellow |
| 4 |
| Amercoat 229T Red 11105 |
| 4 |
| T10 |
| 25 |
4.2 Government Provided Services.
4.2.1 PPG Paint Technical Representative
5.0 NOTES
5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.
5.2 The contractor and all subcontractors regardless of tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.
5.3 Solvents supplied as GFM are for viscosity control only. Solvents required for equipment clean-up are the responsibility of the contractor. The contractor is responsible for all costs associated with monitoring, containment, handling, collection, processing, clean up, recycling and disposing of wash water, rinse water, and dissolved solvents used and generated during work accomplished by this work item, whether on the ship or on the pier adjacent to the ship. All labor and material costs associated with this level of effort, where required or found necessary, shall be included in the bid price of this work item.
5.4 If Contractor uses a grit blast method to accomplish work item requirements, then all labor and material costs associated with the level of effort required in monitoring, containment, handling, clean up, processing, temporary storage, recycling, transportation, and disposal, of the spent blast grit generated; shall be included in the bid price of this work item.
5.5 Disposal of any/all wastes generated by this work item, whether solid or liquid, shall be included in the bid price of this work item.
5.6 Contractor shall monitor, contain, collect, process, filter, clean up, recycle, and dispose of all wash water, rinse water, degreaser rinse fluids, hydro-blasting fluids (or grit blast media) generated by this work item. Dispose as found necessary or required, in accordance with any/all current local, county, state, or federal regulations.
5.7 Specification of Stripe Coating in no way relieves the contractor of the requirement to achieve complete coverage of all surfaces with each of the specified Full Coats. Stripe Coats are additional coats applied to specific areas that represent high corrosion risk. Stripe Coats shall not be used to correct holidays or other application defects in the full coats. Spray application of the Stripe Coats shall not be allowed.
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.
7.0 STATEMENT OF WORK
7.1 In the locations identified in Para 3.0, CHECKPOINT: Prior to the start of any productive work under this item, the Contractor shall witness Ship Force conducting an operational test of deck equipment near all work areas. Contractor shall document performance of test results, noting "as-found" conditions and listing all parties involved in test. Contractor shall submit findings to the MSCREP. All non-working equipment after this report will be the responsibility of the contractor.
7.2 Tag-Out all required systems and equipment. Drain and dispose of any liquid in accordance with all federal, state, and local regulations.
7.3 Accomplish the requirements of SSPC-SP1, Solvent Cleaning, using biodegradable detergent to remove all oil, grease, dirt and soluble salts from the surface of the specified decks. Products such as Chlor Rid (or equal) may be used as an aid in chloride removal provided that the product used leaves no residue that may be detrimental to coating adhesion. Final washdown shall be made with clean, fresh water at 2,500 to 3,000 psi. Upon completion of all water washing chloride testing shall be performed at random locations. If contamination is found, additional tests shall be made as necessary to determine the extent of contamination and to prove the success of remediation. The maximum allowable contamination concentrations shall be less than 10 ug/cm2 of chloride contaminants as determined by field or laboratory analysis using reliable, reproducible test equipment.
7.4 Temporarily remove, store and re-install interferences as required to accomplish the work specified.
7.5 CHECKPOINT: Prove deck drains clear and free flowing to the MSCREP. Plug or suitably blank the drain lines prior to the start of abrasive blasting.
7.6 CHECKPOINT: Prior to initiating surface preparation, the contractor shall ensure that the vessel's equipment is protected from damage caused by water jetting, dirt, blast dust or paint. Measures to be taken include, but are not limited to, the following:
7.6.1 Plug open ends of pipes, vents and ducts.
7.6.2 Grease and wrap all valve stems. Install filters on all air intake vents. Install covers on all fuel tank vents.
7.6.3 In all areas to be blasted and coated, record all ship's markings, including information, size, and color.
7.6.4 Install protective covering of a substantial nature on all portlights, windows, light globes and Landing light lenses to prevent damage to same by inadvertent blasting.
7.6.5 Mask all normally unpainted surfaces such as label plates, instructions, lights, and etcetera.
7.6.6 Protect mooring lines which cannot be stowed or removed for the duration of blasting and painting operations, by suitable means to prevent contamination by blasting abrasive, dust or overspray.
7.6.7 Fixed sprinklers shall be covered with sheet metal disks to prevent damage from abrasive blasting.
7.6.8 Prior to the start of productive work, protective covering shall be inspected and approved by the MSCREP. Deficiencies noted during this inspection shall be corrected and the MSCREP shall be afforded the opportunity to inspect and approve the corrective measures before work commences.
a. Protective covering shall be inspected at the start of each shift. Degraded protective covering shall be repaired prior to the restart of work.
b. Contamination of the vessel and its equipment shall be reported to the MSCREP verbally immediately upon its discovery, followed by a written report within four (4) hours of the verbal notification. The contractor shall be responsible for cleaning the contaminated equipment and showing that the contamination has not caused damage to same. Cost to repair equipment damaged by such contamination shall be borne by the contractor.
7.7 The deck shall be blasted to the intersection of the deck and house on the inboard side and to the bulwark on the outboard side. This includes permanently attached fittings such as tie-downs, gunwale bars, hand holds/grabs, lighting fixtures bulkheads, coamings, and foundations, shall be abrasive blasted to near white metal in accordance with Surface Standard Preparation SSPC-SP10/NACE 2, Near White Metal Blast Cleaning utilizing blasting machines with vacuum recovery. The blast profile achieved shall be angular in nature and within the range set by the manufacturer’s product data sheet for the coating system being applied. Profile shall be determined using a Keane-Tator (or equal) Surface Profile Comparator. Testex (or equal) Replica Tape shall be used at a rate of one (1) reading per 1,000 SF for verification. Replica Tape shall be mounted, identified as to location and included as part of the final paint report.
7.7.1 Prior to the start of abrasive blasting the blast media shall be tested to ensure that it is not contaminated with chlorides, as determined by field or laboratory analysis using reliable, reproducible test equipment.
7.7.2 Small areas inaccessible to the vacuum blast machines and adjacent vertical structures including house bulkheads, gunwale bars, trough, foundations, etcetera, from the deck upward 4 inches, shall be prepared in accordance with Surface Preparation Standard SSPC-SP-11, Power Tool Cleaning to Bare Metal. Surfaces so prepared shall have at least a 1 mil surface profile.
7.8 All areas being abrasive blasted may, with the MSCREP’s approval, be prepared using ultra high pressure water jetting in lieu of abrasive blasting at no additional cost to the Government. If allowed, water jetting shall be performed in accordance with SSPC-SP WJ-2 utilizing equipment with vacuum recovery. Area noted in paragraph 7.6.2 may be prepared using Ultra High Pressure (UHP) hand lances. All water jetted areas shall be prepared to a WJ-2, SC-2 Condition. No more than a light (L) grade flash rust shall be allowed on the steel at the time of coating application. If heavier flash rust is present, the surface shall be pressure washed at 2,500 to 3,000 psi and allowed to air dry in order to restore the surface to an acceptable condition.
7.9 Prior to application of any coating, the area to be painted shall be inspected and approved by the MSCREP and the Paint Representative. This includes not only the initial coat of paint, but all subsequent coats as well.
7.9.1 Regardless whether the surfaces are abrasive blasted or UHP Water Jetted, immediately prior to coating the surface shall be re-tested for non-visual surface contaminates at random intervals to ensure that the surface has not been re-contaminated. If contamination is found, additional tests shall be made as necessary to determine the extent of contamination and to prove the success of remediation. Results of this testing shall be presented to the MSCREP at time of inspection for coating application.
7.9.2 The maximum allowable contamination chloride concentrations shall be less than 10 ug/cm2 of chloride contaminants as determined by field or laboratory analysis using reliable, reproducible test equipment.
a. If contamination is found, up to two (2) additional water washes shall be performed. Additional tests shall be made as necessary to determine the extent of contamination and to prove the success of remediation.
7.9.3 If UHP Water Jetting is utilized for surface preparation the limits established by SC-2 shall be met.
7.9.4 Dry Film Thickness (DFT) readings of the prior coat of paint shall be presented to the MSCREP at the time of inspection for coating. Spot readings shall be taken at a rate of five per 1,000 square feet. DFT gages shall be calibrated, spot readings shall be taken and DFT tolerances shall be in accordance with SSPC-PA2, Measurement of Dry Coating Thickness with Magnetic Gages.
7.9.5 Immediately after abrasive blasting/water jetting, the crossbars on each tie-down fitting shall be inspected for damage and deterioration. Prepare a sketch of the deck showing the location of each tie-down fitting and indicating the results of the inspection. Submit three (3) copies of the completed sketch to the MSCREP immediately upon completion of tie-down inspection.
7.10 Upon approval of the surface preparation, all prepared surfaces shall be coated IAW manufactures directions and as follows:
a. One (1) full coat of Amercoat 137 Buff at 5-6 mils DFT
b. One (1) stripe coat of Amercoat 137 Dark Grey at 2-3 mils DFT
c. One (1) full coat of Amercoat 137 Dark Grey at 5-6 mils DFT.
d. One (1) top coat of Amerishield dark gray at 3-4 mils DFT to tie downs and borders
7.10.1 Stripe coats shall be applied to all weldments, crevices, corners, edges, threads, pitted surfaces, tie-downs or other areas not conducive to proper coverage by spray application. Stripe coats shall extend a minimum of 1” from each edge of the area being stripe coated. SSPC-PA1, Paint Application Specification No. 1, shall be used for guidance in stripe coating.
7.10.2 When properly cured the full coat of Amercoat 137 Dark Grey shall be top coated with Amercoat 138G non-skid material at a rate of approximately 30 square feet per gallon. The ridge pattern of the non-skid shall present a uniform appearance and shall not be ”over-rolled” which tends to flatten the ridges and expand the distance between ridges. Non-skid in way of longitudinal weld seams shall be rolled such that the ridges are perpendicular to the weld seam for a distance of three (3) to six (6) inches either side of the weld.
7.10.3 Vertical surfaces shall be top coated to match the surrounding area. Dado lines, where applicable, shall be cut-in straight, level and even.
7.10.4 Restore all markings and color codes as original using Amercoat 229T.
7.11 The following timeframes and actions are critical to the application of non-skid:
7.11.1 Recoat windows and specified by the Paint Rep and Product Spec Sheets shall be adhered to for application of the first and second full coats of Amercoat 137.
7.11.2 Amercoat 138G non-skid shall be applied within 72 hours of application of the second coat of epoxy AC. In the event that 72 hour window is exceeded, the following actions shall be taken:
7.11.3 If application occurs between 36 and 72 hours, the entire area shall first be wiped with the manufacturer’s recommended solvent using clean, lint free rags.
7.11.4 If application occurs after the 72 hour, the entire area shall first be wiped with the manufacturer’s recommended solvent using clean, lint free rags. The surface shall then be lightly abraded, cleaned of the resulting residues, and coated with a 1-2 mil DFT coat of epoxy AC prior to application of non-skid.
7.11.5 If more than seven (7) days elapses, the surface shall first be taken down to bare metal and the coating system reapplied in accordance with paragraphs 6 through 12 above prior to the application of non-skid. In the event that this becomes necessary, the contractor shall be responsible for all labor and material necessary to effect removal and replacement of the epoxy AC at no additional cost to the government.
7.11.6 The contractor shall follow in accordance with the manufactures product data sheets for all coating applications with the above paints.
7.12 During the course of all surface preparation and coating operations, the area involved shall be roped off or otherwise barricaded to prevent entry by persons other than those directly involved in the work underway or those inspecting same. Those persons who are allowed in the work area shall wear disposable booties over their shoes to prevent contamination of the surface. New booties shall be put on each time a person enters the area. Such cordoning or barricading shall remain in place until the non-skid and color markings are properly cured.
7.13 Paint material shall be stored within the Paint Manufacturer's recommended temperature range. When paint material is being applied, ensure that the material's temperature is within the Manufacturer's recommended range, but in any case, not less than 70o F.
7.14 Ensure the following conditions are met prior to painting:
7.14.1 Surfaces shall be clean, dry and free of oil, grease or residue from abrasive blasting.
7.14.2 Surface appearance meets the definition of SSPC-SP10, near white metal blast cleaning or SSPC-SP WJ-2 Surface Preparation of Steel and Other Hard Materials by High- and Ultra-High Pressure Water Jetting Prior to Recoating, WJ-2 Condition, as applicable.
7.14.3 Air and substrate temperatures shall be within the range published by the paint manufacturer.
7.14.4 The ambient air and substrate temperatures register at least 5o F. above the dew point temperature.
7.14.5 The relative humidity is within the range set by the manufacturer. In the event that there is no range established by the manufacturer, the relative humidity shall be no higher than 85 percent.
7.14.6 No coating shall be applied at temperatures below 35o F. without prior written approval of the MSCREP.
7.14.7 No coating shall be applied between the hours of sunset and 0800 without prior written approval of the MSCREP.
7.14.8 The surface profile is angular in nature and of a depth that meets the manufacturer’s requirements for the coating being applied.
7.14.9 Material Safety Data Sheets for the product(s) being applied are on the job site and have been reviewed by the personnel involved.
7.15 Prior to application of any coating, the area to be painted shall be inspected and approved by the MSCREP and the Paint Representative. Inspection shall include surface preparation including cleanliness and surface profile as determined by Keane-Tator Comparator (or equal) examination and/or replica tape, DFT readings of prior coats, etcetera, as applicable depending upon the current stage of coating application. This includes not only the initial coat of paint, but all subsequent coats as well.
7.16 The contractor shall prepare a paint report and submit same to the MSCREP within three (3) days of completing the coating application. The report shall include the following data:
7.16.1 The location, date and time of each coating application.
7.16.2 The air and substrate temperatures, relative humidity and dew point temperature at the time of each coating application.
7.16.3 DFT readings at a rate of five (5) spot readings per 1,000 sq. ft. of surface for each coat of paint. DFT gages shall be calibrated and spot readings shall be taken in accordance with SSPC-PA2, Measurement of Dry Coating Thickness with Magnetic Gages.
7.16.4 Manufacturer, Product Identification Number, color and Batch Numbers for each coat of paint applied.
7.16.5 Surface profile measurements of the metal substrate.
7.16.6 Results of testing for non-visible surface contaminants (soluble salts).
7.17 Remove all protective covering and replace all interferences removed in the performance of this item. Upon completion the vessel shall be cleaned of all residues resulting from the surface preparation and painting operations. All debris generated in the performance of this item, whether solid or liquid shall be disposed of in accordance with applicable Federal, State and Local regulations.
7.18 CHECKPOINT: Upon the completion of all work, remove the blanks and /or plugs and again prove the drains to be clear and free flowing.
7.19 CHECKPOINT: Upon completion of work, ship force shall conduct final operation testing of electronic and electrical gear, lighting, and deck machinery. "Post Work" performance test results to the "as-found" conditions previously recorded in para 7.1.
7.19.1 Contractor shall be responsible for correcting any discrepancies resulting from work in this work item, at contractor's expense.
7.19.2 All repaired items shall be demonstrated operational to ship force and MSCREP.
7.20 Preparation of Drawings: None
7.21 Technical Representative:
7.21.1 A Government Paint technical representative will be in attendance, on the government’s account, to observe the surface preparation and coating application on the government’s behalf and to advise the MSCREP as to the quality, and appropriateness of the contractor’s efforts.
8.0 GENERAL REQUIREMENTS: None Additional.
104 - 1