This document outlines the requirements for cleaning and gas freeing tanks, voids, cofferdams, and spaces aboard the USNS ARCTIC (T-AOE 8) as part of the Regular Overhaul/Dry Docking solicited under solicitation number N32205-19-R-6012 issued by the Department of the Navy Military Sealift Command. The contractor will be responsible for opening, cleaning, gas freeing, and closing over 100 tanks including cargo oil tanks, JP-5 tanks, potable water tanks, sewage tanks, ship fuel oil tanks, and lube oil tanks. The contractor must also clean and gas free voids, trunks, cofferdams, bilge wells and other spaces. Requirements include removing tank contents, ventilating spaces, lighting tanks, removing and reinstalling manhole covers, conducting inspections, and repairing any coating damage from the work. The contractor must submit weekly status reports tracking progress on cleaning, inspections and certifications for each tank and space.

View the file

Other files

File Type Posted
0013_A_PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 1-1May18.docx DOCX document
N3220519R6012 Amendment 4.docx DOCX document
0305_A_REPLACE SSDG FORWARD CRANKSHAFT SEAL REV ARCTICROH20.docx DOCX document
Q_and_A__5.docx DOCX document
0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020_Revised.docx DOCX document
6362478_H.zip ZIP file
N3220519R6012_Amendment_2.docx DOCX document
J_-_3_Category_B_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020.docx DOCX document
N3220519R6012_Amendment_3.docx DOCX document
0117_A_7-105-0-JJ_HYDROSTATIC_TESTING_ARCTICROH20.docx DOCX document
Q_and_A__4.docx DOCX document
0912_A_UNDERWATER_HULL_CLEANING_and_PAINTING_REV_1_.docx DOCX document
0107_A_REPLACE_REPAIR_SURVEY_WATERTIGHT_DOORS_ARCTICROH20_REV1.docx DOCX document
0913_A_HULL_FREEBOARD_CLEANING_AND_PAINTING_REV_1_ARCTICROH20.docx DOCX document
0201_A__INSTRUMENT_CALIBRATION_AND_REPAIR_ARCTICROH20.docx DOCX document
0113_A_FANTAIL_OVERHEAD_CLEANING_AND_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Revised_20_SEP_19.xls XLS spreadsheet
N3220519R6012_Amendment_1.docx DOCX document
Q_and_A__3.docx DOCX document
0116_B_BILGE_WELL_STAGING_SUPPORT_REV_1_ARCTICROH20.docx DOCX document
0517_A_INSTALL_OILY_WATER_SEPERATOR_TALT_301_ARCTICROH20_REV1.docx DOCX document
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV2_ARCTICROH20.docx DOCX document
0109_A_JP-5_PUMPROOM_BILGE_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
0104_A_RENEW_01_LEVEL_NON_SKID_REV_1_ARCTICROH20.docx DOCX document
0202_A_SEAL_CHANGE_OUT_FOR_REDUCTION_GEAR_MAIN_THRUST_BEARINGS_ARCTICROH20_REV2.docx DOCX document
Q_AND_A__2.docx DOCX document
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV1_ARCTICROH20_(002).docx DOCX document
J_-_3_Category_B_Items_ARCTIC_Correction.xls XLS spreadsheet
Q_and_A__1.doc DOC document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_and_A_Redacted.docx DOCX document
N3220519R6012.docx DOCX document
USNS_ARCTIC_ROHDD_2020_J_Attachments.zip ZIP file
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SYNOPSIS_N3220519R6012_USNS_ARCTIC.docx DOCX document
SOURCES_SOUGHT_FOR_USNS_ARCTIC_ROH_2020.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.0 ABSTRACT:

1.1 This work item describes the requirement to open, clean, gas-free, maintain, and close miscellaneous tanks, voids, cofferdams, and spaces. Storage of re-usable fuel and lube oils is also required.

2.0 REFERENCES/ENCLOSURES:

2.1 References:

2.1.1 NAVSEA Drawing 6360562, Capacity Plan

2.1.2 MSC Drawing 7489380, Trim & Stability Booklet

2.2 Enclosures:

2.2.1 USNS ARCTIC (T-AOE 8) List of Applicable Tanks, Voids and Cofferdams

3.0 ITEM LOCATION/DESCRIPTION: See Enclosure 2.2.1.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL: None.

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s, including but not limited to, GTR’s 1 through 7, 22, 23, and 29.

5.2 The contractor and all subcontractors, regardless of tier, are advised to review all other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this Work Item are found in Work Item 001.

5.3 In the event that any tank contents are deemed to be hazardous wastes in accordance with federal, state and local (CONUS) or international (OCONUS) standards, the costs for handling and disposal of those wastes shall be covered under work item 023 of this work package.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 Tank coating system conditions shall be identified and documented by the contractor during tank surveys. ABS surveyor shall receive a copy of contractor’s reports.

7.0 STATEMENT OF WORK REQUIRED:

7.1 It is the contractor’s responsibility to analyze and properly plan tank unloading procedures to ensure that no undue stresses are imposed on the vessel structure. Ship’s force and MSCREP will assist contractor with ship loading documents and software. The contractor shall utilize the services of a Naval Architect or structural engineer to support this planning. The contractor shall provide their tank unloading plan to the MSCREP at least 2 business days prior to starting this work to permit review and approval by MSC Naval Architect.

7.2 Contractor and Ships Force shall take, record, and verify soundings of all tanks listed in enclosure 2.2.1, on arrival at the contractor’s facility.

7.2.1 The Cargo Mate shall review and endorse all soundings taken for Cargo Tanks.

7.2.2 The Chief Engineer shall review and endorse all soundings taken/recorded for ships bunker tanks.

7.2.3 Submit copy of endorsed record to the MSCREP.

7.3 Provide a clean storage facility with a capacity of approximately 1,000,000 gal of cargo fuel oil, 80,000 gallons of JP-5, 450,000 gallons of bunker fuel and 0 tons (0) gal) of lube oil.

7.3.1 Bunker fuel may not be stored in the same tank containment with Cargo DFM.

7.3.2 The contractor shall ensure Contractor designated storage facility shall be inspected by the MSCREP for cleanliness and acceptability prior to any transferring of fuel oil and lube oil.

7.3.3 Prior to off loading of liquids, samples shall be taken by the ship of each of the tanks to be moved to temporary storage. Cargo tank offload samples shall be turned over to the Cargo Mate. Bunker tank offload samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately.

7.3.4 Upon completion of transferring of liquids, the contractor, in conjunction with ship's force, shall validate quantities at the storage facility.

7.3.5 In the event that contamination is suspected, a change order will be issued to the contractor to have a laboratory analysis conducted on the sample.

7.4 Removals: The ship will pump down tanks to low suction, either to other tanks onboard or to shore storage facilities.

7.4.1 In the event that the tank contents are being moved off the ship, the contractor shall provide support to the vessel, including all hoses and manpower on the shore side to accomplish this removal.

7.4.2 Contractor shall be responsible to provide all pumps, hoses, fittings and personnel to safely remove all remaining tank contents as identified in enclosure 2.2.1.

7.4.3 Applicable federal, state, local or international procedures for transferring fuel and lube oils over water shall be followed by the contractor. Contents to be temporarily stored are indicated in the enclosure. All other liquids shall be disposed of in accordance with local, state, federal and/or international regulations.

7.4.4 In some states, the presence of oil in the wash water may deem the mixture to be hazardous waste. When pricing this item, the contractor shall assume that oil is present in the tank wash water. The cost for disposal of the mixture shall be included in the price quote regardless of whether or not, due to the presence of oil, the wash water is deemed hazardous waste or non-hazardous waste. If the mixture is determined to be hazardous waste due to some contaminant other than oil, the procedures outlined in Item 0023 shall be used for the identification, handling and disposal. The costs for removal are still part of this (WI 021) work item. All other costs for offload and disposal shall be captured in this work item.

7.5 When directed by the MSCREP, return all fuel oil and lube oil to the vessel. Prior to returning of liquids, the contractor, together with ship's force, shall take samples of all stored liquids.

7.5.1 Cargo tank offload samples shall be turned over to the Cargo Mate.

7.5.2 Bunker tank offload samples shall be turned over to the Chief Engineer.

7.5.3 Each sample bottle shall be labeled with temporary storage tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately.

7.6 Accomplish the following for all tanks/spaces listed in enclosure 2.2.1:

7.6.1 Open manholes and erect/maintain safety guards over openings.

7.6.2 Temporarily provide blowers and ventilate tanks and spaces, inclusive of confined areas around manhole covers. Ventilation of the tanks shall be accomplished so as to prevent tank fumes from exhausting in the interior compartments of the ship.

7.6.3 Temporarily provide and maintain, as required, tank lamping/lighting. Lighting shall be explosion proof, safety type lights.

7.6.4 In all cargo tanks, the contractor shall remove all fencing/guards/screens from the tank suction and fill lines. This includes the area commonly referred to as the suction bellmouth. The contractor shall submit a condition report citing any missing/broken studs. Repairs submitted via the condition report process are subject to a change order.

7.6.5 For the V1 and V2 tanks in the MSD spaces, remove all piping interferences to facilitate opening the tank lids for an unobstructed view.

7.7 Clean and Gas Free tanks and spaces listed in enclosure 2.2.1. Cleaning shall completely remove all traces of dirt, sludge, debris and liquids. All tanks and spaces shall be presented in a clean and dry condition and shall be ready to be certified and maintained “Safe for Men/Safe for Hot Work”. The provision of gas free certificates is covered under work item 020 of this work package.

7.7.1 Where a battery of tanks is designated for cleaning and gas freeing, all interior spaces in way of same, such as cofferdams, voids, bilges, bilge wells and other spaces, even if not specifically mentioned, shall be considered as being included as spaces to be cleaned and gas freed.

7.7.2 For all tanks and spaces indicated in enclosure 2.2.1, air vents, sounding tubes, filling and suction lines and other appurtances shall be included for cleaning and gas freeing. Secondary manhole covers for each tank shall also be opened.

7.7.3 Post Original Gas Free Certification at each Tank/Space Location. Certificate shall be mounted directly at the tank/space manhole entrance.

7.7.4 Post copy of Gas Free Certificates at the designated gangway access to the vessel. Certifications posted at gangway shall be in a protective weather/water proof enclosure that is accessible and visible.

7.8 Surveys and testing requirements for these tanks shall be addressed in other work items in this work package.

7.9 At the conclusion of all required work, conduct a final closeout inspection for each tank/space listed in enclosure 2.2.1 with the MSCREP. No tank shall be closed until a final inspection is accomplished with the MSCREP in attendance.

7.9.1 Contractor is responsible for repairing all tank coating damage caused by work in this solicitation work package. During close out inspection, if coatings are found damaged by contractor’s work, contractor shall repair damaged areas prior to final close out of tank/space, at contractor’s expense. Damaged coatings shall be repaired in accordance with MSC paint system and the paint representative’s recommendations.

7.9.2 Tank ventilation and lighting will remain in place during the final tank inspection. Once the tank is approved for closure, remove all blowers, lighting, staging, tools, and miscellaneous equipment.

7.9.3 In cargo tanks, the MSCREP shall inspect the pump suction plenums for cleanliness. Once approved, re-install pump suction fencing/gaurds/screens.

7.9.4 Present Tank in “Final” clean condition. No dirt, dust, debris or liquids shall be allowed. Any tank or space failing the close out inspection, shall be re-cleaned until passing MSCREP inspection (repeated cleanings and inspections will be at contractor expense, and may become subject to issuance of a QDR).

7.10 Upon acceptance of final closeout inspection and by direction of the MSCREP, reinstall manhole covers using new gaskets, grommets, and wicking. Submit a Condition Found Report for any missing or damaged fasteners or hardware.

7.11 The following spaces shall be cleaned and prepared for gas free certification within 14 days of the shipyard availability start:

· Shaft Alley (7-565-1-Q)

· MMR-1 (7-455-0-E)

· MMR-2 (7-510-0-E)

· JP-5 Pump room (7-205-0-E)

· DFM Pump room(7-395-0-E)
· AMR(3-105-0-E)

· AMR Pump Room (6-132-0-E)

· Forward MSD Space (3-183-1-A)

· Forward CHT Space(3-161-1-Q)
· Aft MSD Space(2-667-1-A)
· Aft CHT Space(3-605-0-Q)

· Elevator Trunk Pits No. 1 thru No. 7

· Conveyor Trunk Pits No. 1 thru No. 4

· Also, Any/all sub-bilge level voids, trunks, cofferdams, rose boxes, bilge wells, and other drainage collection pits throughout the vessel.

7.12 Required Deliverable Report: Contractor shall create, maintain, update, and submit weekly during the progress meeting, a tank/space work matrix. This matrix shall contain the following information:

A.
Tank/Space Name
B.
Tank/Space Location Designation
C.
Date Tank/Space Opened
D.
Date Gas Free Cleaning Started
E.
Date Gas Free Cleaning Completed
F.
Date Gas Free Cert. Received
G.
Date ABS Initial Structural Survey Complete
H.
Date Air Test/Hydro Test Completed
I.
Date Final Tank/Space Cleaning Started
J.
Date Final Tank/Space Cleaning Completed
K.
Date Tank/Space Final Close
L.
Tank/Space Related Repair Status: List major job sequence within a tank/space followed by date start & date completed (such as below):

* Access Cuts -> Date Removed/Date Installed

* Blasting -> date start/date complete

* Painting -> date start/date complete

* Related work items internal repairs (pipe, valve, structure, etc)

* Related work items external repairs (welding, UT’s, zincs, other structural related; etc.)

* Fluids added/removed from tank/space (pot water chlorination; Undocking Stability; fuels/oils; etc.)

M.
Other

7.13 Paint all disturbed surfaces to match surroundings.

7.14 Preparation of Drawings: None.

7.15 Manufacturer's Rep: None.

8.0 GENERAL REQUIREMENTS: None additional.

USNS ARCTIC

T-AOE 8

GENERAL REQUIREMENTSN32205-19-R-6012
25 FEBRUARY 2014
ITEM NO. 021CATEGORY "A"MSC/PO1B/REV FEB 14

CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACE REV 2

021-1

ENCLOSURE 2.2.1 – USNS ARCTIC

(T-AOE-8)

TANKS, VOIDS, AND COFFERDAMS

NOTE: Tank Arrival Conditions are estimates only.

Cargo Oil (DFM) Tanks

Description
Tank Location
95% Capacity

(gals)

Work Item Req Opening
Open Required
Estimated

Contents Upon Arrival (Gallons)

(7-65-0-FF)
65-105
319390
103
YES
742
(7-245-0-FF)
245-265
202668
103
YES
1423
(7-395-1-FF)
395-425(S)
267938
103
YES
631
(7-395-2-FF)
395-425(P)
267941
(7-425-1-FF)
425-455(S)
215080
(7-425-2-FF)
425-455(P)
215084
(7-565-0-FF)
565-605
353433
103/105
YES
478
(7-430-0-FF) CONTAM CLT
430-455
23520

Cargo JP-5 Tanks

Description
Tank Location
95% Capacity

(gals)

Work Item Req Opening
Open Required
(7-045-0-JJ)
45-65
102947
103
YES
402
(7-105-0-JJ)
105-150
367017
103
YES
1254
(7-205-1-JJ)
205-265(S)
290466
115
YES
271
(7-205-2-JJ)
205-265(P)
323726
103
YES
271
(7-265-1-JJ)
265-297(S)
217472
103
YES
610
(7-265-2-JJ)
265-297(P)
217475
102
YES
610
(7-297-1-JJ)
297-330(P)
269169
(7-297-2-JJ)
297-330(S)
269173
103
YES
1384
(7-362-1-JJ)
362-395(S)
298282
(7-362-2-JJ)
362-395(P)
298284
(7-205-0-JJ/CONTAM CLTG
205-210
17607

Convertible Tanks

Description
Location
95% Capacity

(gals)

Work Item Req Opening
Open Required
(7-150-0-FF/JJ)
150-205
752167
103
YES
2316
(7-265-0-FF/JJ)
265-330
422940
102/103
YES
1500
(7-330-0-FF/JJ)
330-395
422940
103
YES
1200
(7-330-1-FF/JJ)
330-362(S)
284673
106
YES
990
(7-330-2-FF/JJ)
330-362(P)
284673
106
YES
990

WATER TANKS

Description
Location
100% Capacity

(gals)

Work Item Req Opening
Open Required
(7-488-1-W) POTABLE
488-499(S)
19545
103
YES
(7-488-2-W) POTABLE
488-499(P)
19545
103
YES
(7-499-1-W) POTABLE
499-510(S)
16426
103
YES
(7-477-2-W) POTABLE
477-488(P)
22655
103
YES
(4-477-2-W) FEED RESERVE
477-488(P)
1659
103
YES
(4-510-1-W) FEED RESERVE
510-521(S)
1622
103
YES

FEED AND DRAIN TANK MMR 1

370
506
YES

FEED AND DRAIN TANK MMR 2

370
506
YES
Description
Location
100% Capacity

(gals)

Work Item Req Opening
Open Required
(7-16-0-W) Fore Peak Tank
FE-35
209957
102/103
YES

SEWAGE

Description
Location
100% Capacity

(gals)

Work Item Req Opening
Open Required
Fwd CHT Tank
3-161-1-Q
2025
111
YES
Aft CHT Tank
3-605-0-Q
8610
111
YES
Fwd MSD V1Tank
3-183-1-E
1200
Fwd MSD V2 Tank
3-183-1-E
1200
Aft MSD V1 Tank #1
2-667-1-A
1200
111
YES
Aft MSD V1 Tank #2
2-667-1-A
1200
111
YES
Aft MSD V2 Tank #1
2-667-1-A
1200
111
YES
Aft MSD V2 Tank #2
2-667-1-A
1200
111
YES

SHIP FUEL OIL TANKS

Description
Location
95% Capacity

(gals)

Work Item Req Opening
Open Required
(2-141-1-F) SSDG SERVICE
141-150
1952
(2-141-2-F) SSDG SERVICE
141-150
1952
(3-565-1-F) AUXILIARY
565-580(S)
5171
(3-565-4-F) AUXILIARY
565-580(P)
5171
(3-445-3-F) CONTAM STLG
445-455
10342
103
YES
100
(2-435-1-F)
435-445(S)
5171
(2-435-2-F)
435-445(P)
5171
(7-445-1-F) SERVICE
445-455(S)
26979
(7-445-2-F) SERVICE
445-455(P)
26979
103
YES
70
(5-565-1-F) SERVICE
565-580(S)
38779
(5-565-2-F) SERVICE
565-580(P)
38780
(5-580-1-F)
580-605(S)
57242
105
YES
70
(5-580-2-F)
580-605(P)
57243
105
YES
70
(4-605-1-F)
605-625(S)
39864
(4-605-2-F)
605-625(P)
39865
(4-625-1-F)
625-685(S)
104573
(4-625-2-F)
625-685(P)
104574
105
YES
70
(6-625-0-F)
625-685(C)
404519
(6-605-0-F)
605-625(C)
183135
(4-685-0-F)
685-AE(C)
132678
921
YES
70
(3-685-1-F)
685-AE(P)
26861
921
YES
70
(3-685-2-F)
685-AE(S)
26862
105
YES
70

Lube Oil Tanks

Description
Tank Location
95% Capacity

(gals)

Work Item Req Opening
Open Required
(2-114-2-F) AUX STOR
114-123(P)
1066
(3-502-1-F) RDCN GR STOR
502-510(S)
821
(3-502-3-F) RDCN GR STOR
502-510(S)
821
(3-502-5-F) RDCN GR STOR
502-510(S)
964
(3-502-7-F) RDCN GR STOR
502-510(S)
964
(3-502-9-F) RDCN GR STOR
502-510(S)
964
(3-502-11-F)RDCN GR STOR
502-510(S)
964
(3-510-2-F) RDCN GR STOR
510-518(P)
821
(3-510-4-F) RDCN GR STOR
510-518(P)
821
(3-510-6-F) RDCN GR STOR
510-518(P)
964
103
YES
(3-510-8-F) RDCN GR STOR
510-518(P)
964
(3-510-10-F)RDCN GR STOR
510-518(P)
964
(3-510-12-F)RDCN GR STOR
510-518(P)
964
(4-502-1-F) SSDG STOR
502-510(S)
964
(4-502-3-F) SSDG STOR
502-510(S)
964
(4-502-5-F) RDCN GR STLG
502-510(S)
997
(4-502-7-F) RDCN GR STLG
502-510(S)
997
(4-502-9-F) RDCN GR STLG
502-510(S)
997
(4-502-11-F)RDCN GR STLG
502-510(S)
997
(4-502-13-F)RDCN GR STLG
502-510(S)
997
(4-510-2-F)SSDG STOR
510-518(P)
964
(4-510-4-F)SSDG STOR
510-518(P)
964
(4-510-6-F)RDCN GR STLG
510-518(P)
997
(4-510-8-F)RDCN GR STLG
510-518(P)
997
(4-510-10-F)RDCN GR STLG
510-518(P)
997
(4-510-12-F)RDCN GR STLG
510-518(P)
997
(4-510-14-F)RDCN GR STLG
510-518(P)
997
LO SUMP MMR1
496-499
6032
103
YES
LO SUMP MMR2
518-521
6133
103
YES

Ship JP-5 Tanks

Description
Tank Location
95% Capacity

(gals)

Work Item Req Opening
Open Required
(3-445-2-J) SERVICE
445-455(P)
5171
(3-445-4-J) SERVICE
445-455(P)
5171

Miscellaneous Tanks

Description
Tank Location
95% Capacity

(gals)

Work Item Req Opening
Open Required
(4-132-2-F) USED OIL
132-141(P)
1273
103
YES
(6-035-0-W) CHN LKR SUMP
35-45 (C)
4335
(7-477-0-W) W WTR CLTG
477-488(C)
1954
(7-483-1-F) SSDG CLTG
483-488(S)
960
103
YES
(7-483-2-F) GTRB W CLTG
483-488(P)
1013
103
YES
(7-521-1-F) OILY W CLTG
521-527(S)
497
103
YES
(7-527-1-F) GTRB W CLTG
527-532(S)
510
103
YES
(7-532-2-F) USED OIL CLTG
532-538(P)
999
103
YES
(7-538-2-W) W WTR CLTG
538-543(P)
500
103
YES
(7-488-0-F) WASTE HLDG
488-499
18523
103
YES
(7-499-0-F) WASTE OIL
499-510
20036
103
YES
OWDC TK FOR CARGO OIL PUMP RM
417-420
189
OWDC TK FOR CARGO JP-5 RM
221-225
182
EMER GAS TURB FUEL TANK MMR 1
496-499
289
EMER GAS TURB FUEL TANK MMR 2
518-521
301

Misc. Spaces

Description
Location

Area (sqft)

MMR #1 Bilge

MMR #2 Bilge

Shaft Alley

JP-5 Pump Room Bilge

DFM Pump Room Bilge

AMR Bilge
3-105-0-E
AMR Pump Room Bilge
6-132-0-E
Elevator Trunk Pit #1
Bottom 4-225-0-T
Elevator Trunk Pit #2
Bottom 4-249-0-T
Elevator Trunk Pit #3
Bottom 5-265-0-T
Elevator Trunk Pit #4
Bottom 5-302-0-T
Elevator Trunk Pit #5
Bottom 5-330-0-T
Elevator Trunk Pit #6
Bottom 5-367-0-T
Elevator Trunk Pit #7
Bottom 5-545-0-T
Package Conveyor Pit #1 (SD STRM NO 1)
2-100-2-T
Package Conveyor Pit #2
2-455-3-T
Package Conveyor Pit #3
3-577-2-T
Pallet Conveyor Pit
4-395-0-AA
DSN-450 Doppler Speed Log Xdcr Trunk
7-145-1-Q
AN/UQN-4 Xdcr & Underwater Log Trunk
7-210-1-Q
Chain Locker
5-35-0-Q
Forward CHT Space
3-161-1-Q
Aft CHT Space
3-605-0-Q
Forward MSD Space
3-183-1-E
Aft MSD Space
2-667-1-A

Voids

Description
Location
Open Required
Void
7-35-0-V
Void (Elevator 7)
7-430-01-V
Void (MMR1)
7-455-0-V
Void (MMR2)
7-510-0-V
YES
Void (Kingpost)
1-425-1-KPV
Void (Kingpost)
1-391-2-KPV
Void (Kingpost)
1-326-2-KPV
Void (Kingpost)
1-326-1-KPV
Void (Kingpost)
1-506-2-KPV
Void (Kingpost)
1-492-1-KPV
Void (Kingpost)
1-262-1-KPV
Void (Kingpost)
1-207-2-KPV
Void (Kingpost)
1-206-1-KPV
Void (Kingpost)
1-258-2-KPV