J_-_2_Category_A_Items_ARCTIC_Revised_20_SEP_19.xls
XLS spreadsheet 66 KB Posted
- Attached to
- REGULAR OVERHAUL USNS ARCTIC Federal contract opportunity
- Solicitation number
- N32205-19-R-6012
About this file
This document contains a price breakdown for category A items for the regular overhaul of the USNS ARCTIC (T-AOE 8). The overhaul will be performed for the Military Sealift Command of the Department of the Navy under solicitation number N32205-19-R-6012.
The price breakdown lists over one hundred individual line items across various categories including hull structure, machinery and propulsion, electrical, communications and navigation, auxiliary systems, outfitting and habitability, heating/ventilation/air conditioning, drydocking activities, and UNREP gear. Examples of work include inspection and testing of firefighting equipment, life rafts, and navigation systems; overhauls of pumps, motors, and fans; cleaning and painting of hull areas; and repairs of piping, valves, and winches. Labor hours and material costs are shown for the prime contractor and any subcontractors. The total proposed price will be the sum of costs across all line items.
Revised J-2
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | Intent, Scope, General Conditions and Definitions | - 0 | $ - 0 | $0 | ||||||||
| 002 | Technical and Manufacturer's Representative | - 0 | $ - 0 | $0 | ||||||||
| 003 | Approach, Berth, and Mooring Requirements | - 0 | $ - 0 | $0 | ||||||||
| 004 | Testing and Quality Assurance | - 0 | $ - 0 | $0 | ||||||||
| 005 | Electrical Safety Procedure Requirements | - 0 | $ - 0 | $0 | ||||||||
| 006 | Heavy Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 007 | Cold Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 010 | Furnish Office for OMT | - 0 | $ - 0 | $0 | ||||||||
| 011 | Furnish General Services | - 0 | $ - 0 | $0 | ||||||||
| 012 | Telephone Services | - 0 | $ - 0 | $0 | ||||||||
| 013 | Project Planning and Production Status Monitiring Reports | - 0 | $ - 0 | $0 | ||||||||
| 014 | Preparation of Weight and Moment Report | - 0 | $ - 0 | $0 | ||||||||
| 015 | Integrated Logistics and GFM Support Requirements | - 0 | $ - 0 | $0 | ||||||||
| 016 | Fire Protection and Ship's Safety Program | - 0 | $ - 0 | $0 | ||||||||
| 017 | Handling Ships Stores | - 0 | $ - 0 | $0 | ||||||||
| 018 | Delivery and Re-Delivery | - 0 | $ - 0 | $0 | ||||||||
| 019 | Shipboard Access and Security | - 0 | $ - 0 | $0 | ||||||||
| 020 | Gas Free Certificates | - 0 | $ - 0 | $0 | ||||||||
| 021 | Clean and Gas Free Tanks, Voids, Cofferdams and Spaces | - 0 | $ - 0 | $0 | ||||||||
| 022 | Dock Trials and Sea Trial | - 0 | $ - 0 | $0 | ||||||||
| 023 | Hazardous Waste Disposal | - 0 | $ - 0 | $0 | ||||||||
| 024 | Phyiscal Security at Private Contractor's Facility | - 0 | $ - 0 | $0 | ||||||||
| 100 | HULL STRUCTURE | |||||||||||
| 102 | ABS Intermediate Survey Support | - 0 | $ - 0 | $0 | ||||||||
| 103 | ABS Tank Inspection and Testing | - 0 | $ - 0 | $0 | ||||||||
| 104 | Renew 01 Level Non Skid | - 0 | $ - 0 | $0 | ||||||||
| 105 | Replace Sounding Tube Deck Socket Covers | - 0 | $ - 0 | $0 | ||||||||
| 106 | ABS Loadline Correction | - 0 | $ - 0 | $0 | ||||||||
| 107 | Repair and Replace Watertight Doors | - 0 | $ - 0 | $0 | ||||||||
| 108 | Shipwide Exterior Hand Rail Replacement | - 0 | $ - 0 | $0 | ||||||||
| 109 | JP5 Bilge Preservation | - 0 | $ - 0 | $0 | ||||||||
| 110 | Renew Nr 1 SSDG Saltwater Strainer Foundation | - 0 | $ - 0 | $0 | ||||||||
| 111 | FWD and AFT CHT System Piping Repairs | - 0 | $ - 0 | $0 | ||||||||
| 112 | Replace Weather Deck Drain Piping | - 0 | $ - 0 | $0 | ||||||||
| 113 | Fantail Overhead Cleaning and Preservation | - 0 | $ - 0 | $0 | ||||||||
| 114 | Bilgewell Inspection and Preservation | - 0 | $ - 0 | $0 | ||||||||
| 116 | Bilgewell Stagging Support | - 0 | $ - 0 | $0 | ||||||||
| 200 | MACHINERY, PROPULSION | |||||||||||
| 201 | Instrument Calibration and Repair | - 0 | $ - 0 | $0 | ||||||||
| 202 | Seal Change for Reduction Gear Main Thrust Bearings | - 0 | $ - 0 | $0 | ||||||||
| 203 | Inspect, Set and Test RCC Relief Valves | - 0 | $ - 0 | $0 | ||||||||
| 204 | Inspect, Set and Test RRG Relief Valves | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | Main Switchboard Cleaning(CSI) | - 0 | $ - 0 | $0 | ||||||||
| 304 | Stuffing Tube Repalcement | - 0 | $ - 0 | $0 | ||||||||
| 310 | SSDG top End Overhaul (NR 4 SSDG) | - 0 | $ - 0 | $0 | ||||||||
| 313 | SSDG Woodward Govenor Overhaul | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNICATION AND NAVIGATIONAL AIDS | |||||||||||
| 404 | Navigation Equipment ROH Service | - 0 | $ - 0 | $0 | ||||||||
| 405 | Antenna PM | - 0 | $ - 0 | $0 | ||||||||
| 407 | OE-82 Antenna PM | - 0 | $ - 0 | $0 | ||||||||
| 408 | UHF Transceiver PM | - 0 | $ - 0 | $0 | ||||||||
| 414 | rudder Angle Indiciation Inspection and Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 415 | Gyrocompass and Repeaters GROOM | - 0 | $ - 0 | $0 | ||||||||
| 416 | Steering Control Circuit Card Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 417 | ANURT-23Dv Radio Transmitter System Replacement AOE TALT-210 | - 0 | $ - 0 | $0 | ||||||||
| 500 | MACHINERY, AUXILIARY SYSTEMS | |||||||||||
| 501 | Fire Fighting Systems Equipment Inspection | - 0 | $ - 0 | $0 | ||||||||
| 502 | SCBA Compressor Inspection | - 0 | $ - 0 | $0 | ||||||||
| 503 | SCBA Equipment | - 0 | $ - 0 | $0 | ||||||||
| 504 | RHIB Davit Overhaul and Certification | - 0 | $ - 0 | $0 | ||||||||
| 506 | Auxiliary Boiler Inspection with RFET Survey (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 507 | Overhaul Auxiliary Steam System Reflief Valves | - 0 | $ - 0 | $0 | ||||||||
| 508 | Overhaul Machinery Space Air System Relief Valves | - 0 | $ - 0 | $0 | ||||||||
| 509 | Assist Ships Force | - 0 | $ - 0 | $0 | ||||||||
| 511 | Replace HP Air Union Nut | - 0 | $ - 0 | $0 | ||||||||
| 512 | Overhaul Cargo JP5 System Valves | - 0 | $ - 0 | $0 | ||||||||
| 513 | Replace 100 Feet of Piping | - 0 | $ - 0 | $0 | ||||||||
| 514 | Steam to Electric Water heater Conversion TALT 314 | - 0 | $ - 0 | $0 | ||||||||
| 515 | Overhaul Pumps and Motors | - 0 | $ - 0 | $0 | ||||||||
| 516 | Replace Cargo Diffuser Box Drain Pans | - 0 | $ - 0 | $0 | ||||||||
| 517 | Oily Water Separator Replacement (TALT-301) | - 0 | $ - 0 | $0 | ||||||||
| 518 | CHT and Soil Drain Piping System Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 600 | OUTFIT, FURNISHINGS AND HABITABILITY | |||||||||||
| 601 | Galley and Scullery Equipment Inspection and Service | - 0 | $ - 0 | $0 | ||||||||
| 602 | Life Raft Certification | - 0 | $ - 0 | $0 | ||||||||
| 603 | Accomadation Ladder Inspection and Weight Test | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | Habitability Spaces Vent Systems Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 803 | Overhaul Vane Axial Fan and Motor | - 0 | $ - 0 | $0 | ||||||||
| 804 | Repair /Replace Exterior Ventilation Intake/Exhaust Ducts | - 0 | $ - 0 | $0 | ||||||||
| 806 | Repair Exterior House Air Intake Housings (VR08-003) | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | Dry Docking and Undocking (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 902 | Sea Suction and Discharge Waster Piping (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 904 | Hull Valve Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 905 | Rudders and Stern Frame Examination (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 906 | Bilge Keel Examination (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 908 | Cathelco Protection Syste, Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 909 | Propeller Clean and repair (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 910 | Renew Zincs | - 0 | $ - 0 | $0 | ||||||||
| 911 | Ultrasonic tetsing (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 912 | Underwater Hull Cleaning and Painting | - 0 | $ - 0 | $0 | ||||||||
| 913 | Freeboard Cleaning and Painting | - 0 | $ - 0 | $0 | ||||||||
| 914 | Anchor Chain and Locker Painting and Markings | - 0 | $ - 0 | $0 | ||||||||
| 921 | Replace Rudder Seals | - 0 | $ - 0 | $0 | ||||||||
| 924 | Propeller and Rudder Stock Clearances | - 0 | $ - 0 | $0 | ||||||||
| 925 | Cathodic Protection System Repairs | - 0 | $ - 0 | $0 | ||||||||
| 1000 | UNREP GEAR | |||||||||||
| 1001 | Inspect and Test UNREP HP Air Relief Valves | - 0 | $ - 0 | $0 | ||||||||
| 1002 | Replace UNREP Winch Control Booth Windows | - 0 | $ - 0 | $0 | ||||||||
| 1005 | Cargo Boom Quadrennial Inspection and Weight Test | - 0 | $ - 0 | $0 | ||||||||
| 1007 | Refurbish Saddle Winch Motor Foundations | - 0 | $ - 0 | $0 | ||||||||
| 1008 | Overhaul Spanwire Winch Main Electric Motors | - 0 | $ - 0 | $0 | ||||||||
| 1011 | Overhaul Hauling Winch Electric Motor(S) | - 0 | $ - 0 | $0 | ||||||||
| 1012 | Ram Tensioner Crossover Pipe Inpspection/Repair and Preservation | - 0 | $ - 0 | $0 | ||||||||
| 1013 | Replace RAM Tensioner Crossover Pipe | - 0 | $ - 0 | $0 | ||||||||
| 1014 | Replace Sliding Block Transfer Head Bumpers | - 0 | $ - 0 | $0 | ||||||||
| 1018 | Refurbish highline/spanwire Winch Band Brakes | - 0 | $ - 0 | $0 | ||||||||
| 1019 | Lead Angle Compensator Shaft Repairs | - 0 | $ - 0 | $0 |
&LUSNS ARCTIC (T-AOE 8)&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-19-R-6012
&CATTACHMENT J-2
File details come from the government source that posted it. Updated .