0117_A_7-105-0-JJ_HYDROSTATIC_TESTING_ARCTICROH20.docx

DOCX document 34 KB Posted

Attached to
REGULAR OVERHAUL USNS ARCTIC Federal contract opportunity
Solicitation number
N32205-19-R-6012
Issued by
Department of the Navy Military Sealift Command

About this file

This document outlines requirements for hydrostatic testing of the Cargo JP-5 Tank 7-105-0-JJ aboard the USNS ARCTIC as part of the Regular Overhaul/Dry Docking of the vessel. The contractor shall remove deck plate interferences to access four cargo tank cleaning openings, blank off tank and stripping pump bellmouths, and fill the 7-105-0-JJ tank with ballast water to satisfy testing and docking requirements. The contractor must then examine tank boundaries and associated penetrations for structural integrity and submit an as found report. Upon completion of hydrostatic testing, the contractor shall empty and clean the tank. The solicitation was issued by the Department of the Navy Military Sealift Command for the regular overhaul and dry docking of the USNS ARCTIC.

Work Item 0117 "A" Item

View the file

Other files for this federal contract opportunity

Other files attached to REGULAR OVERHAUL USNS ARCTIC, newest first.
File Type Posted
0305_A_REPLACE SSDG FORWARD CRANKSHAFT SEAL REV ARCTICROH20.docx DOCX document
0013_A_PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 1-1May18.docx DOCX document
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS REV OCT 2012_ARCTICROH20_REV2.docx DOCX document
N3220519R6012 Amendment 4.docx DOCX document
0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020_Revised.docx DOCX document
6362478_H.zip ZIP file
Q_and_A__5.docx DOCX document
N3220519R6012_Amendment_2.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
J_-_3_Category_B_Items_ARCTIC_Revised_21_OCT_19.xls XLS spreadsheet
0118_B_7-105-0-JJ_TANK_TOP_REPAIR_ARCTICROH2020.docx DOCX document
N3220519R6012_Amendment_3.docx DOCX document
0912_A_UNDERWATER_HULL_CLEANING_and_PAINTING_REV_1_.docx DOCX document
Q_and_A__4.docx DOCX document
0113_A_FANTAIL_OVERHEAD_CLEANING_AND_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
0116_B_BILGE_WELL_STAGING_SUPPORT_REV_1_ARCTICROH20.docx DOCX document
0109_A_JP-5_PUMPROOM_BILGE_PRESERVATION_ARCTICROH20_REV_1.docx DOCX document
0104_A_RENEW_01_LEVEL_NON_SKID_REV_1_ARCTICROH20.docx DOCX document
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV2_ARCTICROH20.docx DOCX document
0202_A_SEAL_CHANGE_OUT_FOR_REDUCTION_GEAR_MAIN_THRUST_BEARINGS_ARCTICROH20_REV2.docx DOCX document
0107_A_REPLACE_REPAIR_SURVEY_WATERTIGHT_DOORS_ARCTICROH20_REV1.docx DOCX document
0517_A_INSTALL_OILY_WATER_SEPERATOR_TALT_301_ARCTICROH20_REV1.docx DOCX document
Q_and_A__3.docx DOCX document
0913_A_HULL_FREEBOARD_CLEANING_AND_PAINTING_REV_1_ARCTICROH20.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Revised_20_SEP_19.xls XLS spreadsheet
N3220519R6012_Amendment_1.docx DOCX document
0201_A__INSTRUMENT_CALIBRATION_AND_REPAIR_ARCTICROH20.docx DOCX document
J_-_3_Category_B_Items_ARCTIC_Correction.xls XLS spreadsheet
0112_A_REPLACE_WEATHER_DECK__DRAIN_PIPING_REV1_ARCTICROH20_(002).docx DOCX document
Q_AND_A__2.docx DOCX document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
Q_and_A__1.doc DOC document
J_and_A_Redacted.docx DOCX document
USNS_ARCTIC_ROHDD_2020_J_Attachments.zip ZIP file
N3220519R6012.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SYNOPSIS_N3220519R6012_USNS_ARCTIC.docx DOCX document
SOURCES_SOUGHT_FOR_USNS_ARCTIC_ROH_2020.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

(T-AOE 8)

HULL STRUCTURERFP NO. N32205-19-R-6012
21 OCTOBER 2019
ITEM NO. 117CATEGORY "A"N756/JBSK

7-105-0-JJ HYDROSTATIC TESTING

1.0 ABSTRACT:

1.1. This item describes hydrostatic testing of the Cargo JP-5 Tank 7-105-0-JJ.

2.0 REFERENCES/ENCLOSURES:

2.1. REFERENCES:

2.1.1 ABS Rules for Building and Classing Steel Vessels, Part 7 (Contractor Obtain)

2.1.2 MSC Drawing 085-8385180 Rev -, General Arrangement.

2.1.3 NAVSEA Drawing 167-6362019 Rev J, List of Tank Cleaning Openings

2.1.4 NAVSEA Drawing 544-6360562 Rev K, Cargo JP-5 System Diagram

2.1.5 ABS Outstanding Repair Comment 626

3.0 ITEM LOCATION/DESCRIPTION:

3.1. Location: Cargo JP5 Tank 7-105-0-JJ.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1. The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements (GTR) to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s.

5.2. The contractor and all subcontractors, regardless of tier, are advised to review other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3. Tank testing requirements identified in Paragraph 7 may be accomplished in any order or concurrently provided that all boundaries of all spaces are tested. Contractor shall not be compensated for multiple fill and discharge of individual tanks unless subject tanks had failed first tank boundary inspection due to a material condition.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1. Accomplish tank internal inspections prior to the boundary testing of each individual tank.

7.0 STATEMENT OF WORK REQUIRED:

7.1. Provide all labor, material, special tools to perform the work described in this work item.

7.2. Ship’s force and contractor representative shall jointly tag out/safety lock out all equipment associated with the operation of pumps and valves for the 7-105-0-JJ Cargo JP5 tank.

7.3. Clean and Gas Free of the 7-150-0, 7-105-0 and 7-65-0 tanks are covered under Work Item 021.

7.4. All work is to be completed in conjunction with ballasting the 7-105-0-JJ tank for entering drydock.

7.5. Contractor shall remove deck plate interferences to access four cargo tank cleaning openings that have plates welded on top. See Reference 2.1.5 for exact locations of plates.

7.5.1 Remove welded covers on tank cleaning openings. It is preferred to remove the covers by grinding vice welding; it is ultimately the contractors decision on the method of the welded cover plates. Removal is of the welded covers only, not the bolted cover that is underneath the welded plate.

7.5.2 Blank off tank and stripping pump bellmouths. Blanks shall be catalogued on the Tank Test Matrix. Once testing is completed, remove all blanks from pump suctions. It will be required to remove fencing around cargo tank suction wells therefore this labor is to be included in the work item pricing. Should the contractor choose to not blank the pump suctions, the government shall not be held responsible for system valve leakage resulting in the tank resulting to hold pressure.

7.5.3 The 7-150-0-FF/JJ and 7-65-0-FF Cargo tanks shall only be required to be cleaned safe for men only FOR THIS EVOLUTION. This is to allow the ABS Surveyor to examine tank boundaries, if required. Once this work item is completed, the standards set forth in work item 021 for the 7-150-0-FF/JJ and 7-65-0-FF apply.

7.6. Fill the 7-105-0-JJ tank with ballast water, to an amount is in agreement between the dockmaster, MSC Naval Architect and ABS to satisfy the requirements for hydrostatic testing and docking the vessel.

7.6.1. When agreed upon level has been attained, xxamine all boundaries and associated penetrations, all platforms, ladders, and handrails along with their corresponding securements for structural integrity.

7.6.2. Submit an as found report for any discrepancies; if none are discovered, the QA check point sheet shall act as the record of completion.

7.6.3. When hydrostatic testing requirements are complete on the 7-105-0-JJ tank, contractor shall empty and clean the tank in accordance with WI 021.

8.0 GENERAL REQUIREMENTS: None.

117-1