J_-_2_Category_A_Items_ARCTIC.xls
XLS spreadsheet 64 KB Posted
- Attached to
- REGULAR OVERHAUL USNS ARCTIC Federal contract opportunity
- Solicitation number
- N32205-19-R-6012
About this file
This document contains a contractor price breakdown for category A items required for the regular overhaul and dry docking of the USNS ARCTIC (T-AOE 8). The Navy's Military Sealift Command is soliciting bids under solicitation number N32205-19-R-6012.
The price breakdown lists over 50 line items under various categories including general requirements, hull structure, machinery/propulsion, electrical, communications/navigation, auxiliary systems, outfitting/habitability, HVAC, drydocking, and replenishment gear. Specific tasks described include ABS surveys, hull repairs, machinery maintenance/overhauls, electrical system cleaning and component replacement, ventilation system cleaning, drydocking services, and inspection/testing of replenishment equipment. No pricing is included in the breakdown, which appears to be a template for contractors to provide labor and material costs for the listed category A work items required for the regular overhaul of the ARCTIC.
J-2
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | Intent, Scope, General Conditions and Definitions | - 0 | $ - 0 | $0 | ||||||||
| 002 | Technical and Manufacturer's Representative | - 0 | $ - 0 | $0 | ||||||||
| 003 | Approach, Berth, and Mooring Requirements | - 0 | $ - 0 | $0 | ||||||||
| 004 | Testing and Quality Assurance | - 0 | $ - 0 | $0 | ||||||||
| 005 | Electrical Safety Procedure Requirements | - 0 | $ - 0 | $0 | ||||||||
| 006 | Heavy Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 007 | Cold Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 010 | Furnish Office for OMT | - 0 | $ - 0 | $0 | ||||||||
| 011 | Furnish General Services | - 0 | $ - 0 | $0 | ||||||||
| 012 | Telephone Services | - 0 | $ - 0 | $0 | ||||||||
| 013 | Project Planning and Production Status Monitiring Reports | - 0 | $ - 0 | $0 | ||||||||
| 014 | Preparation of Weight and Moment Report | - 0 | $ - 0 | $0 | ||||||||
| 015 | Integrated Logistics and GFM Support Requirements | - 0 | $ - 0 | $0 | ||||||||
| 016 | Fire Protection and Ship's Safety Program | - 0 | $ - 0 | $0 | ||||||||
| 017 | Handling Ships Stores | - 0 | $ - 0 | $0 | ||||||||
| 018 | Delivery and Re-Delivery | - 0 | $ - 0 | $0 | ||||||||
| 019 | Shipboard Access and Security | - 0 | $ - 0 | $0 | ||||||||
| 020 | Gas Free Certificates | - 0 | $ - 0 | $0 | ||||||||
| 021 | Clean and Gas Free Tanks, Voids, Cofferdams and Spaces | - 0 | $ - 0 | $0 | ||||||||
| 022 | Dock Trials and Sea Trial | - 0 | $ - 0 | $0 | ||||||||
| 023 | Hazardous Waste Disposal | - 0 | $ - 0 | $0 | ||||||||
| 024 | Phyiscal Security at Private Contractor's Facility | - 0 | $ - 0 | $0 | ||||||||
| 100 | HULL STRUCTURE | |||||||||||
| 102 | ABS Intermediate Survey Support | - 0 | $ - 0 | $0 | ||||||||
| 103 | ABS Tank Inspection and Testing | - 0 | $ - 0 | $0 | ||||||||
| 104 | Renew 01 Level Non Skid | - 0 | $ - 0 | $0 | ||||||||
| 105 | Replace Sounding Tube Deck Socket Covers | - 0 | $ - 0 | $0 | ||||||||
| 106 | ABS Loadline Correction | - 0 | $ - 0 | $0 | ||||||||
| 107 | Repair and Replace Watertight Doors | - 0 | $ - 0 | $0 | ||||||||
| 108 | Shipwide Exterior Hand Rail Replacement | - 0 | $ - 0 | $0 | ||||||||
| 109 | JP5 Bilge Preservation | - 0 | $ - 0 | $0 | ||||||||
| 110 | Renew Nr 1 SSDG Saltwater Strainer Foundation | - 0 | $ - 0 | $0 | ||||||||
| 111 | FWD and AFT CHT System Piping Repairs | - 0 | $ - 0 | $0 | ||||||||
| 112 | Replace Weather Deck Drain Piping | - 0 | $ - 0 | $0 | ||||||||
| 113 | Fantail Overhead Cleaning and Preservation | - 0 | $ - 0 | $0 | ||||||||
| 114 | Bilgewell Inspection and Preservation | - 0 | $ - 0 | $0 | ||||||||
| 200 | MACHINERY, PROPULSION | |||||||||||
| 202 | Seal Change for Reduction Gear Main Thrust Bearings | - 0 | $ - 0 | $0 | ||||||||
| 203 | Inspect, Set and Test RCC Relief Valves | - 0 | $ - 0 | $0 | ||||||||
| 204 | Inspect, Set and Test RRG Relief Valves | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | Main Switchboard Cleaning(CSI) | - 0 | $ - 0 | $0 | ||||||||
| 304 | Stuffing Tube Repalcement | - 0 | $ - 0 | $0 | ||||||||
| 310 | SSDG top End Overhaul (NR 4 SSDG) | - 0 | $ - 0 | $0 | ||||||||
| 313 | SSDG Woodward Govenor Overhaul | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNICATION AND NAVIGATIONAL AIDS | |||||||||||
| 404 | Navigation Equipment ROH Service | - 0 | $ - 0 | $0 | ||||||||
| 405 | Antenna PM | - 0 | $ - 0 | $0 | ||||||||
| 407 | OE-82 Antenna PM | - 0 | $ - 0 | $0 | ||||||||
| 408 | UHF Transceiver PM | - 0 | $ - 0 | $0 | ||||||||
| 414 | rudder Angle Indiciation Inspection and Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 415 | Gyrocompass and Repeaters GROOM | - 0 | $ - 0 | $0 | ||||||||
| 416 | Steering Control Circuit Card Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 417 | ANURT-23Dv Radio Transmitter System Replacement AOE TALT-210 | - 0 | $ - 0 | $0 | ||||||||
| 500 | MACHINERY, AUXILIARY SYSTEMS | |||||||||||
| 501 | Fire Fighting Systems Equipment Inspection | - 0 | $ - 0 | $0 | ||||||||
| 502 | SCBA Compressor Inspection | - 0 | $ - 0 | $0 | ||||||||
| 503 | SCBA Equipment | - 0 | $ - 0 | $0 | ||||||||
| 504 | RHIB Davit Overhaul and Certification | - 0 | $ - 0 | $0 | ||||||||
| 506 | Auxiliary Boiler Inspection with RFET Survey (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 507 | Overhaul Auxiliary Steam System Reflief Valves | - 0 | $ - 0 | $0 | ||||||||
| 508 | Overhaul Machinery Space Air System Relief Valves | - 0 | $ - 0 | $0 | ||||||||
| 509 | Assist Ships Force | - 0 | $ - 0 | $0 | ||||||||
| 511 | Replace HP Air Union Nut | - 0 | $ - 0 | $0 | ||||||||
| 512 | Overhaul Cargo JP5 System Valves | - 0 | $ - 0 | $0 | ||||||||
| 513 | Replace 100 Feet of Piping | - 0 | $ - 0 | $0 | ||||||||
| 514 | Steam to Electric Water heater Conversion TALT 314 | - 0 | $ - 0 | $0 | ||||||||
| 515 | Overhaul Pumps and Motors | - 0 | $ - 0 | $0 | ||||||||
| 516 | Replace Cargo Diffuser Box Drain Pans | - 0 | $ - 0 | $0 | ||||||||
| 517 | Oily Water Separator Replacement (TALT-301) | - 0 | $ - 0 | $0 | ||||||||
| 518 | CHT and Soil Drain Piping System Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 600 | OUTFIT, FURNISHINGS AND HABITABILITY | |||||||||||
| 601 | Galley and Scullery Equipment Inspection and Service | - 0 | $ - 0 | $0 | ||||||||
| 602 | Life Raft Certification | - 0 | $ - 0 | $0 | ||||||||
| 603 | Accomadation Ladder Inspection and Weight Test | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | Habitability Spaces Vent Systems Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 803 | Overhaul Vane Axial Fan and Motor | - 0 | $ - 0 | $0 | ||||||||
| 804 | Repair /Replace Exterior Ventilation Intake/Exhaust Ducts | - 0 | $ - 0 | $0 | ||||||||
| 806 | Repair Exterior House Air Intake Housings (VR08-003) | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | Dry Docking and Undocking (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 902 | Sea Suction and Discharge Waster Piping (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 904 | Hull Valve Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 905 | Rudders and Stern Frame Examination (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 906 | Bilge Keel Examination (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 908 | Cathelco Protection Syste, Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 909 | Propeller Clean and repair (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 910 | Renew Zincs | - 0 | $ - 0 | $0 | ||||||||
| 911 | Ultrasonic tetsing (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 912 | Underwater Hull Cleaning and Painting | - 0 | $ - 0 | $0 | ||||||||
| 913 | Freeboard Cleaning and Painting | - 0 | $ - 0 | $0 | ||||||||
| 914 | Anchor Chain and Locker Painting and Markings | - 0 | $ - 0 | $0 | ||||||||
| 921 | Replace Rudder Seals | - 0 | $ - 0 | $0 | ||||||||
| 924 | Propeller and Rudder Stock Clearances | - 0 | $ - 0 | $0 | ||||||||
| 925 | Cathodic Protection System Repairs | - 0 | $ - 0 | $0 | ||||||||
| 1000 | UNREP GEAR | |||||||||||
| 1001 | Inspect and Test UNREP HP Air Relief Valves | - 0 | $ - 0 | $0 | ||||||||
| 1002 | Replace UNREP Winch Control Booth Windows | - 0 | $ - 0 | $0 | ||||||||
| 1005 | Cargo Boom Quadrennial Inspection and Weight Test | - 0 | $ - 0 | $0 | ||||||||
| 1007 | Refurbish Saddle Winch Motor Foundations | - 0 | $ - 0 | $0 | ||||||||
| 1008 | Overhaul Spanwire Winch Main Electric Motors | - 0 | $ - 0 | $0 | ||||||||
| 1011 | Overhaul Hauling Winch Electric Motor(S) | - 0 | $ - 0 | $0 | ||||||||
| 1012 | Ram Tensioner Crossover Pipe Inpspection/Repair and Preservation | - 0 | $ - 0 | $0 | ||||||||
| 1013 | Replace RAM Tensioner Crossover Pipe | - 0 | $ - 0 | $0 | ||||||||
| 1014 | Replace Sliding Block Transfer Head Bumpers | - 0 | $ - 0 | $0 | ||||||||
| 1018 | Refurbish highline/spanwire Winch Band Brakes | - 0 | $ - 0 | $0 | ||||||||
| 1019 | Lead Angle Compensator Shaft Repairs | - 0 | $ - 0 | $0 |
&LUSNS ARCTIC (T-AOE 8)&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-19-R-6012
&CATTACHMENT J-2
File details come from the government source that posted it. Updated .