DRAFT J.8 - Cost_Summary_Format.xls

XLS spreadsheet 45 KB Posted

Attached to
AN/SPQ-15 Data Distribution System Production Federal contract opportunity
Solicitation number
N0017822R2501
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document provides details for a federal contract opportunity to procure AN/SPQ-15 Data Distribution System hardware and software support. The Navy seeks to award a five-year C-type contract, with firm-fixed-price CLINs for hardware production and cost-plus-fixed-fee CLINs for software life cycle support and development. Deliverables will include standard data and distribution systems, switchboards, decoders, converters, and switches to support existing radar, navigational and tactical display systems. The solicitation number will be N0017822R2501, with a response deadline of April 5, 2022 and anticipated award in November 2022. This is a small business set-aside requiring computer terminal and peripheral equipment manufacturing. The period of performance will begin in November 2022.

View the file

Other files for this federal contract opportunity

Other files attached to AN/SPQ-15 Data Distribution System Production, newest first.
File Type Posted
CDRLs_24_August_Draft.pdf PDF
N00178-22-R-2501_24_August_Draft.pdf PDF
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
DMSMS report.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
DRAFT_Exhibit A_CDRLs.pdf PDF
N00178-22-R-2501_DRAFT_6.1.22.docx DOCX document
455054D ATP for Spare Power Conditioner.doc DOC document
455287A ATP for the CRC 456010-2.doc DOC document
455278A RIM ATP (PN 456354-2).doc DOC document
455056L ATP for the Spare Processor Assy.doc DOC document
409079C ATP for the Converter PS Module.doc DOC document
DRAFT J.2 - GFI List.pdf PDF
455105A ATP for the Extender Card.doc DOC document
455049P ATP for the RSDS.doc DOC document
455279 456357-2 DIM ATP.doc DOC document
455281A 456060-2 QSDM ATP.doc DOC document
455068B ATP for the RS422_RS232 Converter.doc DOC document
Attachment J.9 - Question Submittal Form.xlsx XLSX spreadsheet
DRAFT J.4 - QASP.pdf PDF
455048J ATP for the SDC.doc DOC document
455047E ATP for the SSSM.doc DOC document
409030D ATP for the SSM.DOC DOC document
Attachment L.1 AN-SPQ 15 Staffing Matrix Format.xlsx XLSX spreadsheet
DRAFT J.5 - Labor Category Qualifications.pdf PDF
DRAFT J.3 - GFP List.xlsx XLSX spreadsheet
DRAFT J.1 - DD 254.pdf PDF
455088F ATP for the Media Converter.doc DOC document
455063H ATP for the SBC.doc DOC document
455280B IIM ATP (PN 456370-2).doc DOC document
455060J ATP for the RVC.doc DOC document
455055B - ATP for the HMI.doc DOC document
DRAFT J.6 - eCRAFT_SCA Crosswalk.xlsx XLSX spreadsheet
N0017822R2501_Unclassified Terms of Use Agreement.pdf PDF
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
N00178-22-R-2501 CDRL DRAFT.pdf PDF
N0017822R2501_DRAFT SOL_QA_MATRIX.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_2.9.22.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Summary Format-CPFF

ATTACHMENT J.8
SOLICITATION NO. N0017822R2501
COST SUMMARY FORMAT
Prime Offeror Name:
Subcontractor Name (if applicable):
DCAA Point of Contact Information:
DCMA Point of Contact Information:Total for All YearsBase PeriodOption Year 1Option Year 2Option Year 3Option Year 4
Cost ElementsContract Labor CategoryHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Employee Name 1
Employee Name 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Prime Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Labor Cost including pass through
Total Labor Cost (Prime and Subcontractor Labor)
Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)
Total Labor Cost Plus Fixed Fee (CPFF)
Other Direct Costs CLINS
Prime Contractor ODCs
Travel
Other Direct Costs (ODCs)
Prime Burdens on Prime ODCs
Material Handling
G&A
Other (specify each separately)
Subtotal Burden on Prime ODCs
Subcontractor ODCs
Travel
Subcontractor 1
Subcontractor 2
Etc.
Subtotal Subcontractor Travel
Other Direct Costs
Subcontractor 1
Subcontractor 2
Etc.
Subtotal Subcontractor Other Direct Costs
Total Subcontractor Travel and Other Direct Costs
Prime Burdens on Subcontractor ODCs
Total Other Direct Cost CLINs
Total CPFF all CLINs (Labor and ODCs)
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor *
Total Pass Through Amount (including fee)0%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime Contractor0%
* When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B.

Supporting Cost Data

SUPPORTING COST DATA
Direct Labor:Actual Current Labor RateEffective Date of Current RateProposed Base Period Labor RateReason for difference between actual current labor rate and proposed labor rates. Reason for difference between proposed rates and DCAA recommended rates, if known.
Employee Name$$
Employee Name$$
Employee Name$$
Indirect Rates:Current RateProposed Base RateSubject to FPRA? (Yes/No) Reason for difference between current rates and proposed rates. Reason for difference between proposed rates and DCAA recommended rates, if known.
Fringe
Overhead
G&A
Other (list)

&RAttachment J.8 &RAttachment J.8