455054D ATP for Spare Power Conditioner.doc
DOC document 1 MB Posted
- Attached to
- AN/SPQ-15 Data Distribution System Production Federal contract opportunity
- Solicitation number
- N0017822R2501
About this file
This pre-solicitation synopsis outlines requirements for a contract to produce hardware in support of the AN/SPQ-15(V) MK 6 MOD 1 Data Distribution System. The contract will be for five years and include production of standard data and distribution systems, switchboards, decoders, converters, switches and upgrades for existing AN/SPQ-14(V) and DDS installations. The contract type will be cost-plus-fixed-fee and firm-fixed-price, with NAICS code 334118 and PSC codes K012 and 1285. The solicitation number will be N0017822R2501 and is estimated to be available on March 7, 2022, with proposals due by April 5, 2022. Award is planned for November 2022. The requirement is set aside for small businesses initially. The Department of the Navy Naval Sea Systems Command will serve as the agency.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
455054D
REVISIONS
| REV |
| DESCRIPTION |
| DATE |
| APPROVED |
| A |
| Incorporated changes per CO # 24-2204 |
| 2/18/10 |
| PDC |
| B |
| Incorporated changes per CO # 24-2399 |
| 7/6/2010 |
| PDC |
| C |
| Incorporated changes per CO # 24-3381 |
| 3/16/2012 |
| CCJ |
| D |
| Incorporated changes per CO # 24-3555 |
| 2/27/2013 |
| PDC |
| ORIGINAL DATE 29 JANUARY 2009 |
| DATE APPROVED |
| FRONTIER ELECTRONIC SYS. |
STILLWATER, OKLAHOMA 74076-1023
| ORIGINATOR |
| ROCKY SUTTON |
| 03 FEB 2009 |
| DOC. COORDINATOR |
| KELLY WHITFIELD |
| 2-4-09 |
| ACCEPTANCE TEST PROCEDURE |
FOR THE SPARE POWER CONDITIONER ASSEMBLY (P/N 456037-1)
| PROJECT ENGINEER |
| ROCKY SUTTON |
| 03 FEB 2009 |
| PROGRAM MGR. |
| CHRISTOPHER JOBE |
| 4 FEB 2009 |
| QUALITY |
| MICHAEL S. WEBSTER |
| 2/04/09 |
CODE IDENT.
63812 455054D
CONTRACT NO.
ACCEPTANCE TEST PROCEDURE
FOR THE POWER CONDITIONER
ASSEMBLY (P/N 456037-1)
TABLE OF CONTENTS
Section Title Page
1GENERAL INFORMATION
11.1
SCOPE
11.2
PURPOSE
11.3
TEST EQUIPMENT
11.4
GENERAL REQUIREMENTS
11.4.1 Production Routers
11.4.2 Test Conditions
11.4.3 Failure Reporting
11.4.4 Document References
11.4.5 Script Files and Firmware
11.4.6 Test Data
11.4.7 Vendor Specifications
1TEST PROCEDURES
12.1 Setup
12.2 TEST Power CONDITIONER CONTROLS AND OUTPUT
12.3 UShA CARD CONFIGURATION
12.4 Load Test
1Addendum A Input Power Verification
1Addendum B Setting up a Linux tftp Server
1APPENDIX A
PRODUCTION ROUTERS
A-
1APPENDIX B
NON-CONFORMANCE REPORTS (NCRs) B-
LIST OF FIGURES
Figure Title Page 1.1-1 Testing Flow 2.1-1 Power Conditioner Assembly Test Configuration 2.2-1 Power Conditioner Front Panel 2.2-2 Output Connector AC-1 through AC-4 Signal and Contact Locations 2.3-1 USHA Configuration Utility Main Menu 2.3-2 USHA Configuration Menu 2.3-3 System Group Configuration Menu 2.3-4 Parameter Group Configuration Menu 2.3-5 IPv4 Configuration Menu 2.3-6 Date and Time Menu 2.3-7 Control Group Configuration Menu 2.4-1 USHA Configuration Utility Main Menu 2.4-2 USHA Configuration Menu 2.4-3 System Group Configuration Menu 2.4-4 IPv4 Configuration Menu Add A-1 AC Power Cable Signal and Contact Locations
LIST OF TABLES
Table Title Page 1.3-1 Test Equipment 1.4.5-1 Script Files and Firmware
SECTION 1
GENERAL INFORMATION
1.1 SCOPE
This document contains the test requirements for the acceptance testing of the Power Conditioner Assembly (P/N 456037-1). This document contains the following sections:
Section 1: General Information
Section 2: Test Procedures The figure below illustrates the order of testing.
Figure 1.1-1. Testing Flow
1.2 PURPOSE
The purpose of this document is to demonstrate that the Power Conditioner Assembly as manufactured by Frontier Electronic Systems meets or exceeds all requirements identified within this document.
1.3 TEST EQUIPMENT
Table 1.3-1 lists the equipment required to perform the procedures contained in this document. Enter the serial number and calibration expiration date for each piece of test equipment.
Table 1.3-1. Test Equipment
| DESCRIPTION |
| USE |
| MODEL |
| SERIAL NUMBER |
| MANUFACTURER/ |
SPECIFICATIONS
CALIBRATION
EXP. DATE
| LRADDS Tester |
| Linux Test Computer |
| 456124 |
| 001 |
| FES |
| N/A |
| Digital Multimeter |
| Voltage Measurement |
| 87 |
Fluke
| 500W Flood Lamps (2) |
| Load Test |
| N/A |
| N/A |
| N/A |
| N/A |
| DB9S to RJ45 |
| USHA Prog. |
| N/A |
| N/A |
| Supplied w/ Pwr. Cond. |
| N/A |
| Output Test Power Strip |
| Load Test |
| N/A |
| N/A |
N/A
Note 1: FES maintains calibration of equipment IAW ISO 9001, procedures FES-QSP-7.6-1-1 and FES-QSP-7.6-2.
Note 2: Equivalent or superior equipment may be substituted for the equipment listed above.
1.4 GENERAL REQUIREMENTS
This section lists the general requirements for this document.
1.4.1 Production Routers
Insert the Production Routers for the module into Appendix A.
1.4.2 Test Conditions
Unless otherwise specified herein, testing shall be performed at standard room ambient temperature, 60( to 80(F.
1.4.3 Failure Reporting
Non-Conformance Reports (NCRs) shall be used to document test failures in accordance with FES-QSP-8.3-3 when required. A copy of the NCR shall be included under Appendix B.
1.4.4 Document References
These documents are referenced in the body of this document:
455045 Network Requirements for the AN/SPQ-15(V) Data Distribution System (DDS)
1.4.5 Script Files and Firmware
Table 1.4.5-1 lists the script files and firmware required to perform the procedures listed in this document.
Table 1.4.5-1. Script Files and Firmware
| DESCRIPTION |
| FILENAME |
| PART NUMBER |
| RedHat Binary |
| net-snmp-5.3.1-24.el5_2.1.i386.rpm |
| 456127 |
| RedHat Binary |
| net-snmp-utils-5.3.1-24.el5_2.1.i386.rpm |
| 456127 |
| RedHat Binary |
| tftp-0.42-3.1.i386.rpm |
| 456127 |
| RedHat Binary |
| tftp-server-0.43-1.i386.rpm |
| 456127 |
| SNMP Test |
| /usr/share/FES/bin/LNST-001 |
| 456376 |
1.4.6 Test Data
Successful completion of each test shall be annotated within these procedures. Test data recorded during automated testing shall be maintained on the FES network at data3\Shared Data\Naval Systems\Test Data\part number\serial number.
1.4.7 Vendor Specifications
Vendor part number:
UPR1-4.0K-1G-SRNDTI-JS2E
Vender Series:
4Kva SRNDTI
Vender Reference:
008-4Kvasrndtiupsj.pdf
Output Tolerance:
120VAC ± 3%
SECTION 2
TEST PROCEDURES
This section contains the steps for conducting the test of the Power Conditioner Assembly before shipment as a spare unit or installation into the next higher assembly.
2.1 Setup
If a new power cord is made or an assembly needs to be checked, refer to Addendum A – Input Power Verification. If not, then connect the Power Conditioner Assembly and test equipment per Figure 2.1-1.
Figure 2.1-1. Power Conditioner Assembly Test Configuration
2.2 TEST Power CONDITIONER CONTROLS AND OUTPUT
This section verifies the Power Conditioner front panel controls function correctly and output voltages are within specification. Refer to Figure 2.2-1 for the following steps.
Figure 2.2-1. Power Conditioner Front Panel
1. On the Power Conditioner, set the INPUT POWER switch and SYSTEM ON/OFF switch to OFF.
2. Apply power to the Power Conditioner.
3. On the Power Conditioner, set the INPUT POWER switch to ON.
4. On the Power Conditioner, set the SYSTEM ON/OFF switch to ON.
5. Upon power ON, the Power Conditioner completes a self-diagnostic routine that will cause some of the front panel indicators to flash several times. Allow a few moments for its indicators to settle before proceeding.
6. On the Power Conditioner front panel, under the STATUS heading, verify the AC IN OK indicator is ON.
Verified:___________
7. On the Power Conditioner front panel, under the STATUS heading, verify the INV indicator is ON.
8. On the Power Conditioner front panel, under the LOAD heading, verify that all indicators are OFF.
9. On the Power Conditioner front panel, verify the AC INPUT indicator is ON.
10. Verify the Power Conditioner’s fan is operating by verifying the air is being exhausted out the back of the unit.
11. Use a multimeter set for AC voltage measurements to verify the following voltages between the contacts of the Power Conditioner output connectors AC-1 through AC-4, located at the rear on the unit. See Figure 2.2-2 for contact locations.
WARNING
AC-1 through AC-4 connector contacts carry 120 VAC. Avoid touching or shorting between contacts or chassis.
Figure 2.2-2. Output Connector AC-1 through AC-4 Signal and Contact Locations
(Orientation: Looking at the pins of the connector)
a) 120 VRMS (+5/-5 VRMS) contact 1 (Line) to contact 3 (GND)
b) Less than 5 VRMS contact 3 (GND) to chassis
2.3 UShA CARD CONFIGURATION
This section configures the Power Conditioner.
1. Using the LRADDS Linux Test Computer, login to root using the user name: root and password: admin12.
2. Open a Terminal Window by right-button clicking on the desktop and selecting “Open Terminal” with a left-button click.
3. At the prompt of the Terminal, type “chkconfig --list tftp” and press “Enter“. Observe that the response is “tftp on”. If it is not, then follow the procedure in Addendum B to enable tftp.
4. At the prompt of the Terminal, access the Power Conditioner via Minicom by typing “minicom” in the Terminal and press “Enter“.
5. Sign in to the Power Conditioner by entering “admin12” for the password and press “Enter.” This will bring up the USHA Configuration Utility Main Menu which can be seen in Figure 2.3-1.
Figure 2.3-1. USHA Configuration Utility Main Menu
6. At the “=>” prompt, enter ‘1’ and press “Enter” for the USHA Configuration. This will bring up the USHA Configuration Menu which can be seen in Figure 2.3-2.
Figure 2.3-2. USHA Configuration Menu
7. At the “=>” prompt, enter ‘1’ and press “Enter” for System Group. Refer to Figure 2.3-3, System Group Configuration Menu, and verify that the USHA card firmware version is v6.01 or above.
Figure 2.3-3. System Group Configuration Menu
8. At the “=>” prompt, enter ‘0’ and press “Enter” to return to the USHA Configuration Menu which can be seen in Figure 2.3-2.
9. At the “=>” prompt, enter ‘3’ and press “Enter” for Parameter Group. This will bring up the Parameter Group Configuration Menu which can be seen in Figure 2.3-4.
Figure 2.3-4. Parameter Group Configuration Menu
10. At the “=>” prompt, enter ‘6’ and press “Enter” to configure the Default Language.
11. Enter ‘2’ to set the Default Language as English.
12. At the “=>” prompt, enter ‘0’ and press “Enter” to return to the USHA Configuration Menu which can be seen in Figure 2.3-2.
13. At the “=>” prompt, enter ‘1’ and press “Enter” for System Group. This will bring up the System Group Configuration Menu which can be seen in Figure 2.3-3.
14. At the “=>” prompt, enter ‘1’ and press “Enter” to configure the IP Address. This will bring up the IPv4 Configuration Menu which can be seen in Figure 2.3-5.
Figure 2.3-5. IPv4 Configuration Menu
15. At the “=>” prompt, enter ‘1’ and press “Enter” to set the IP Address.
16. Enter 172.16.0.53 and press “Enter” to set the new IP Address.
17. At the “=>” prompt, enter ‘3’ and press “Enter” to set the Network Mask.
18. Enter 255.255.254.0 and press “Enter” to set the new Network Mask.
19. At the “=>” prompt, enter ‘0’ and press “Enter” to return to the System Group Configuration Menu which can be seen in Figure 2.3-3.
20. At the “=>” prompt, enter ‘3’ and press “Enter” for Date and Time. This will bring up the Date and Time Menu which can be seen in Figure 2.3-6.
Figure 2.3-6. Date and Time Menu
21. At the “=>” prompt, enter ‘1’ and press “Enter” to set the System Date. Set to the current date (dd/mm/yyyy) and press “Enter.”
22. At the “=>” prompt, enter ‘2’ and press “Enter” to set the System Time. Set to the current time (hh:mm:ss) and press “Enter.”
23. At the “=>” prompt, enter ‘0’ and press “Enter” to return to the System Group Configuration Menu which can be seen in Figure 2.3-3.
24. At the “=>” prompt, enter ‘0’ and press “Enter” to return to the USHA Configuration Menu which can be seen in Figure 2.3-2.
25. At the “=>” prompt, enter ‘2’ and press “Enter” for Control Group. This will bring up the Control Group Configuration Menu which can be seen in Figure 2.3-7.
Figure 2.3-7. Control Group Configuration Menu
26. At the “=>” prompt, enter ‘2’ and press “Enter” to change the Read-Only Community String.
27. Enter “dfltRO_AN-SPQ-15V-C” and press “Enter” to set the New Community Name.
28. At the “=>” prompt, enter ‘4’ and press “Enter” for BOOT/DHCP Control.
29. At the “=>” prompt, enter ‘2’ and press “Enter” to Disable.
30. At the “=>” prompt, enter ‘5’ and press “Enter” for TFTP/HTTP Upgrade Control.
31. At the “=>” prompt, enter ‘2’ and press “Enter” to Disable.
32. At the “=>” prompt, enter ‘0’ and press “Enter” to return to the USHA Configuration Menu which can be seen in Figure 2.3-2.
33. At the “=>” prompt, enter ‘0’ and press “Enter” to return to the USHA Configuration Utility Main Menu which can be seen in Figure 2.3-1.
34. At the “=>” prompt, enter ‘0’ and press “Enter” to exit the USHA Configuration.
35. At the “Ready” prompt, press “Ctrl-a” to access the Minicom menu.
36. Press ‘x’ and press “Enter” to leave the Minicom session.
37. At the prompt, type “exit” and press “Enter” to close the Terminal window.
2.4 Load Test
This section tests that the Power Conditioner USHA Card responds to a change in the load.
1. On the Test Computer, open the Terminal by right-clicking on the desktop and selecting “Open Terminal.”
2. At the Terminal Prompt, enter “LNST-001” and press “Enter” to run the load test script.
3. Follow the directions on the screen to complete the load test. When it asks for the Power Conditioner to be loaded down, plug in the AC OUT power strip into the back of the Power Conditioner, plug in two (2) Flood Lamps, and turn them on. When finished with the test script, turn them off. Verify the test indicates the Power Conditioner has no problems or irregularities.
Verified:___________
4. Open a Terminal Window by right-button clicking on the desktop and selecting “Open Terminal” with a left-button click.
5. At the prompt of the Terminal, access the Power Conditioner via Minicom by typing “minicom” in the Terminal and press “Enter“.
6. Sign in to the Power Conditioner by entering “admin12” for the password and press “Enter.” This will bring up the USHA Configuration Utility Main Menu which can be seen in Figure 2.4-1.
Figure 2.4-1. USHA Configuration Utility Main Menu
7. At the “=>” prompt, enter ‘1’ and press “Enter” for the USHA Configuration. This will bring up the USHA Configuration Menu which can be seen in Figure 2.4-2.
Figure 2.4-2. USHA Configuration Menu
8. At the “=>” prompt, enter ‘1’ and press “Enter” for System Group. This will bring up the System Group Configuration Menu which can be seen in Figure 2.4-3.
Figure 2.4-3. System Group Configuration Menu
9. At the “=>” prompt, enter ‘1’ and press “Enter” to configure the IP Address. This will bring up the IPv4 Configuration Menu which can be seen in Figure 2.4.4.
Figure 2.4-4. IPv4 Configuration Menu
10. At the “=>” prompt, enter ‘1’ and press “Enter” to set the IP Address.
11. Enter 172.16.0.250 and press “Enter” to set the new IP Address. This is the spare power conditioner IP Address.
12. At the “=>” prompt, enter ‘0’ and press “Enter” to return to the System Group Configuration Menu which can be seen in Figure 2.3-3.
13. At the “=>” prompt, enter ‘0’ and press “Enter” to return to the USHA Configuration Menu which can be seen in Figure 2.4-2.
14. At the “=>” prompt, enter ‘0’ and press “Enter” to return to the USHA Configuration Utility Main Menu which can be seen in Figure 2.4-1.
15. At the “=>” prompt, enter ‘0’ and press “Enter” to exit the USHA Configuration.
16. At the “Ready” prompt, press “Ctrl-a” to access the Minicom menu.
17. Press ‘x’ and press “Enter” to leave the Minicom session.
18. At the prompt, type “exit” and press “Enter” to close the Terminal window.
19. On the Power Conditioner, set the SYSTEM ON/OFF switch to OFF.
20. On the Power Conditioner, set the INPUT POWER switch to OFF.
21. Remove power from the Power Conditioner.
22. Copy all data files to the network drive data3\Shared Data\Naval Systems\Test Data\part number\serial number.
Verified:___________
Addendum A Input Power Verification This section verifies the AC power input for the Power Conditioner Assembly is correct.
1. Using a multimeter set for AC voltage measurements, ensure 115 VAC voltage between Line and Return contacts of the AC input cable. Refer to Figure Add A-1 for contact locations.
WARNING
Power cable connector contacts carry 115 VAC. Avoid touching or shorting between contacts.
Figure Add A-1. AC Power Cable Signal and Contact Locations
(Orientation: Looking at the pins of the connector)
a) 115 VRMS (+10/-5 VRMS) contact 1 (Line) to contact 3 (Ground)
b) 115 VRMS (+10/-5 VRMS) contact 1 (Line) to contact 2 (Return)
c) Less than 5 VRMS contact 2 ( Return ) to contact 3 (Ground)
2. Remove AC power to the power input cable.
Addendum B Setting up a Linux tftp Server
This sections describes the process of setting up a Linux tftp server on the Tester.
1. Edit the file /etc/xinetd.d/tftp by changing into the file location by typing “cd /etc/xinetd.d/”.
2. Edit the file /etc/xinetd.d/tftp to match the following by typing “vi tftp” in the Terminal window.
3. Set the line numbering by typing “:set nu”. Note the line number for “disable = yes”.
4. Change the word yes to no by typing “:[noted line number]s/yes/no/g”, for example: “:14/s/yes/no/g”. The file should look similar to the following:
service tftp socket_type = dgram protocol = udp wait = yes user = root server = /usr/sbin/in.tftpd server_args = -s /tftpboot disable = no
5. To save and quit vi editor, type “:wq”.
6. To turn the tftp service on, type “chkconfig tftp on”.
7. Restart the tftpd daemon by typing “service xinetd reload”.
8. To check if the tftpboot directory is available, type “ls –d /tftpboot”. It will return /tftpboot if the directory exists.
9. To create a tftp folder if it does not exist, type “mkdir /tftpboot” followed by “chmod 777 /tftpboot”.
Comments:
VALIDATION
This sheet is supplied as a validation of the completion and accuracy of the data contained herein. The Test Technician will sign and date as an indication that all instructions have been followed and that each test step has been successfully completed. Signature by the Quality Engineer is an acknowledgement that the test data has been reviewed for completion and accuracy. The applicable test / inspection stamp will be affixed by the signature blocks.
Test Technician: ________________________________Date:____________
Quality Engineer: _______________________________Date:____________
APPENDIX A
PRODUCTION ROUTERS
APPENDIX B
NON-CONFORMANCE REPORTS (NCRs)
ACCEPTANCE TEST PROCEDURE
FOR SPARE POWER CONDITIONER ASSEMBLY (P/N 456037-1)
MFG. S/N: _________________
S/N: _________________
8 FEBRUARY 2013
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to protecting technical, operational, or operational use information from automatic dissemination under the International Exchange Program or by other means as determined on or after date of task order award. Other requests for this document shall be referred to NAVSEA CDSA Code F31.
WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Prepared By:
FRONTIER ELECTRONIC SYSTEMS CORP.
P.O. BOX 1023
STILLWATER, OKLAHOMA 74076-1023
| [ USHA Configuration Utility Main Menu ] |
1. USHA Configuration
2. UPS Parameters
3. Access Control Table
4. Domain User Table
5. Trap Receiver Table
6. SNMPv3 USM Table
7. Reset Configuration To Default
8. Restart USHA
9. UPS Pass-Through
0. Exit
| [ USHA Configuration Menu ] |
1. System Group
2. Control Group
3. Parameter Group
4. Email Group
5. Web Authentication Group
6. Ping Group
0. Return to previous menu
| [ System Group Configuration Menu ] |
USHA Version : USHA Pro II Mini Card v6.01 (SN 1121001919086)
Ethernet address : 00 E0 D8 13 74 D9
1. IPv4 Configuration
2. IPv6 Configuration
3. Date and Time
4. DNS IP Address : 192.168.7.3
| [ Parameter Group Configuration Menu ] |
1. sysContact : Technical Support Team
2. sysName : USHA
3. System Location :
4. EMD Configuration : Disabled
5. Temperature Unit : Celsius
6. Default Language : Auto
| [ IPv4 Configuration Menu ] |
1. IPv4 Address : 192.168.18.54
2. IPv4 Gateway Address : 192.168.18.254
3. IPv4 Network Mask : 255.255.254.0
| [ Date and Time Menu ] |
1. System Date (dd/mm/yyyy) : 02/07/2009
2. System Time (hh:mm:ss) : 21:32:47
3. NTP Server :
4. NTP Time Zone : 00:00
5. Daylight Saving Time Control : Disabled
6. NTP Control : Disabled
| [ Control Group Configuration Menu ] |
1. HTTP Login Username : USHA
2. Community Read-Only : public
3. Community Read/Write : *
4. BOOTP/DHCP Control : Enabled
5. TFTP/HTTP Upgrade Control : Enabled
6. PING Echo Control : Enabled
7. Telnet Control
8. HTTP Control
9. SNMP Control
A. SMTP Port : 25
B. SSH Control
| [ USHA Configuration Utility Main Menu ] |
1. USHA Configuration
2. UPS Parameters
3. Access Control Table
4. Domain User Table
5. Trap Receiver Table
6. SNMPv3 USM Table
7. Reset Configuration To Default
8. Restart USHA
9. UPS Pass-Through
0. Exit
| [ USHA Configuration Menu ] |
1. System Group
2. Control Group
3. Parameter Group
4. Email Group
5. Web Authentication Group
6. Ping Group
| [ System Group Configuration Menu ] |
USHA Version : USHA Pro II Mini Card v6.01 (SN 1121001919086)
Ethernet address : 00 E0 D8 13 74 D9
1. IPv4 Configuration
2. IPv6 Configuration
3. Date and Time
4. DNS IP Address : 192.168.7.3
| [ IPv4 Configuration Menu ] |
1. IPv4 Address : 192.168.18.54
2. IPv4 Gateway Address : 192.168.18.254
3. IPv4 Network Mask : 255.255.254.0
_1421819355.vsd
SILENCE
_1421819358.vsd
_1423049949.vsd
120 VAC
Conditioned Power (1-Line, 2-Rtn, 3-Gnd)
LRADDS TESTER
P/N 456124 (Linux Test Computer)
RS232
115 VAC
Input Power
Copper Ethernet (CAT5)
Ethernet
Vendor Supplied RS-232 to RJ45 Serial Cable
LRADDS TESTER
RX-4 NETWORK
SWITCH
Output Test Power Strip
POWER
CONDITIONER ASSEMBLY
P/N 456037-1
Port 12
COM 2
_1421819356.vsd
_1421819352.vsd
MODULE TEST
Start Test
Test Complete
Input Power Verification and Setup
USHA Card Configuration
Test Power Conditioner Controls and Output
Load Test
Pass Tests?
Yes
Yes
USHA Card Firmware Upgrade
Firmware Version at least V6.01?
No
Correct Fault Para 1.4.3
No