This document summarizes a federal contract opportunity for the production of hardware and software in support of the AN/SPQ-15(V) MK 6 MOD 1 Data Distribution System programs. The Navy seeks to award a five-year C-type contract with firm-fixed-price CLINs for hardware production, cost-plus-fixed-fee CLINs for software life-cycle support and engineering development, and not separately priced CLINs for deliverables. The solicitation number is N0017822R2501 and will be posted to SAM.gov on or around March 7th, 2022, remaining open for proposals for 30 days. Award is targeted for November 2022 with a period of performance start date also of November 2022. This requirement is designated as a small business set-aside.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
455048J
SHAPE \* MERGEFORMAT
REVISIONS
| REV |
| DESCRIPTION |
| DATE |
| APPROVED |
| A |
| Incorporated changes per CO # 24-2230 |
| 3-25-10 |
| AW |
| B |
| Incorporated changes per CO # 24-2249 |
| 3/30/10 |
| PDC |
| C |
| Incorporated changes per CO # 24-2270 |
| 4/16/10 |
| PDC |
| D |
| Incorporated changes per CO # 24-2358 |
| 6/3/10 |
| PDC |
| E |
| Incorporated changes per CO # 24-2443 |
| 7/22/10 |
| PDC |
| F |
| Incorporated changes per CO # 24-2744 |
| 1/4/11 |
| AW |
| G |
| Incorporated changes per CO # 24-3018 |
| 5/11/2011 |
| PDC |
| H |
| Incorporated changes per CO # 24-3429 |
| 5/01/2012 |
| PDC |
| J |
| Incorporated changes per CO # 24-3638 |
| 4/30/2014 |
| PDC |
| ORIGINAL DATE 29 JANUARY 2009 |
| DATE APPROVED |
| FRONTIER ELECTRONIC SYS. |
STILLWATER, OKLAHOMA 74076-1023
| ORIGINATOR |
| TED NISHIMUTA |
| 3 FEB 2009 |
| DOC. COORDINATOR |
| KELLY WHITFIELD |
| 2-4-09 |
| ACCEPTANCE TEST PROCEDURE |
FOR THE SIGNAL DATA CONVERTER
(P/N 456008-1)
| PROJECT ENGINEER |
| ROCKY SUTTON |
| 3 FEB 2009 |
| PROGRAM MGR. |
| CHRISTOPHER JOBE |
| 4 FEB 2009 |
| QUALITY |
| MICHAEL S. WEBSTER |
| 2/04/09 |
CODE IDENT.
63812 455048J
ACCEPTANCE TEST PROCEDURE
FOR THE SIGNAL DATA CONVERTER
(P/N 456008-1)
TABLE OF CONTENTS
Section Title Page
GENERAL
11.1
SCOPE
11.2
PURPOSE
11.3
TEST OVERVIEW
11.3.1 SDC Unit Level Testing
21.3.2 Script Files
21.4
TEST EQUIPMENT
31.5
LRADDS TEST RACK
31.6
GENERAL REQUIREMENTS
31.6.1 As-Built Documentation
41.6.2 Test Conditions
41.6.3 Failure Reporting
41.6.4 Test Data
FACTORY ACCEPTANCE TEST PROCEDURES
52.1
UNIT SERIAL NUMBER
52.2
SDC POWER CHECK SECTION
52.2.1 AC Power Check
62.3
SDC POWER-UP SECTION
62.3.1 SDC Power-Up
2.3.2 Unloaded Power Supply Check
2.3.3 VME Chassis Power Check Procedure 102.4
TEMPERATURE WARNING SECTION
102.4.1 Temperature Warning SDC Test
122.4.2 Module Installation Procedure
2.4.3 Ethernet Fiber Cable Installation 142.4.4 Power Supply/Indicators Test
TABLE OF CONTENTS (Continued)
Section Title Page 162.4.5 Automated Test
APPENDIX A
AS BUILT CONFIGURATION DATA SHEETS
A-1
APPENDIX B
PRODUCTION ROUTERS
B-1
APPENDIX C
NON-CONFORMANCE REPORTS (NCRs) C-1
LIST OF FIGURES
Figure Title Page 31.5-1 Functional Test Setup
72.3.1-1 Backplane Connector Lower J9 Pin-out Locations
102.3.3-1 Extender Pin-out Locations
172.4.5-1 LRADDS Test Rack Configuration
LIST OF TABLES
Table Title Page 11.3.1-1 SDC Input/Output Script File Summary
21.3.2-1 Signal Data Converter (SDC) (P/N 456008-1) Test Script Files
21.4-1 Test Equipment
52.2.1-1 Fuse Table for the SDC Configuration
92.3.3-1 VME Pin-outs
122.4.2-1 SDC Module Slot Installation
132.4.2-2 Radar Interface Module (RIM) Switch Settings
142.4.3-1 Ethernet Fiber Cable Assembly Installation Table
152.4.4-1 Power Supply Test Point Voltages
2.4.5-1 Test Table
SECTION 1
GENERAL
1.1 SCOPE
This document contains the test requirements for the production/acceptance testing of the Signal Data Converter (SDC) (P/N 456008-1), referred to herein as the unit. The unit consists of four Radar Interface Modules (RIM) and a SPY Signal Splitter Module (SSSM). This document contains the following sections:
Section 1: General Information
Section 2: Factory Acceptance Test
1.2 PURPOSE
The purpose of this document is to provide a test procedure to demonstrate that the unit, as manufactured by Frontier Electronics Systems (FES), meets or exceeds all limits and tolerances specified within this document.
1.3 TEST OVERVIEW
1.3.1 SDC Unit Level Testing
Table 1.3.1-1 is a list of input/output tests that shall be used to validate the SDC.
Table 1.3.1-1. SDC Input/Output Script File Summary
| SIGNAL |
| REQUIREMENT * |
| APPLICABLE SCRIPT FILES |
| SIN/COS |
| Section 3.1.1.3.1 |
| SDC-003 |
| Synchro |
| Section 3.1.1.3.2 |
| SDC-004 |
| ACP/ARP |
| Section 3.1.1.3.3 |
| SDC-001 |
| 6-Wire SPY-1 |
| Section 3.1.1.3.4 |
| SDC-005 |
| 6-Wire SPY-1 Oscope |
| Section 3.1.1.3.4 |
| SDC-007 |
* Frontier Document Number 455005A
1.3.2 Script Files
The script files required for testing are shown in the table below. Controlled copies of the SDC script files reside in Document Control under Mstr_software\456271\ -01 Rev X\ (where X is the latest revision).
NOTE
Table 1.3.2-1. Signal Data Converter (SDC) (P/N 456008-1) Test Script Files
| SCRIPT FILE NAME |
| DESCRIPTION |
| SDC-001 |
| Discrete Azimuth - Azimuth Test (ACP/ARP) |
| SDC-002 |
| Splitter Test |
| SDC-003 |
| Discrete Azimuth - Azimuth Test (Sin/Cos) |
| SDC-004 |
| Discrete Azimuth - Azimuth Test (Synchro) |
| SDC-005 |
| Discrete Azimuth - Azimuth Test (PPI 6-Wire) |
| SDC-006 |
| Discrete Azimuth – Azimuth Test (RHI 6-Wire) |
| SDC-007 |
| 6-Wire and Pulse Characteristic Test |
1.4 TEST EQUIPMENT
Table 1.4-1 lists the equipment required to perform the procedures contained in this document. Enter the serial number and calibration expiration date for each piece of test equipment listed in the table.
Table 1.4-1. Test Equipment
| DESCRIPTION |
| USE |
| MODEL |
| SERIAL NUMBER |
| MANUFACTURER/ |
SPECIFICATIONS
CALIBRATION
EXP. DATE
| LRADDS Tester |
| Automated Test |
| 456124 |
| 001 |
| FES |
| N/A |
| Oscilloscope |
| Signal Measurement |
| TDS460A |
Tektronix
| Digital Multimeter |
| Voltage Measurement |
Fluke
| Power Supply Load Tester |
| Voltage Measurement |
| 456407-1 |
| 001 |
| FES |
| N/A |
Note 1: FES maintains calibration of equipment IAW ISO 9001, procedures FES-QSP-7.6-1-1 and FES-QSP-7.6-2.
Note 2: Equivalent or superior equipment may be substituted for the equipment listed above.
1.5 LRADDS TEST RACK
Figure 1.5-1 illustrates the equipment required to perform the procedures contained in this document.
Figure 1.5-1. Functional Test Setup
1.6 GENERAL REQUIREMENTS
1.6.1 As-Built Documentation
As-Built Configuration Tracking Sheets for the unit are inserted into Appendix A. Insert the routers for all assemblies of the unit into Appendix B.
1.6.2 Test Conditions
Unless otherwise specified herein, testing shall be performed at standard room ambient temperature, 60 to 80F.
1.6.3 Failure Reporting
Non-Conformance Reports (NCRs) shall be used to document test failures in accordance with FES-QSP-8.3-3 when required. Copies of each NCRs shall be inserted into Appendix C.
1.6.4 Test Data
Successful completion of each test shall be annotated within these procedures. Test data recorded during automated testing shall be maintained on the FES network at data3\Shared Data\Naval Systems\Test Data\part number\serial number.
SECTION 2
FACTORY ACCEPTANCE TEST PROCEDURES
2.1
UNIT SERIAL NUMBER
Enter the Serial Number of the Signal Data Converter (SDC) (P/N 456008-1)) on the front of test procedure.
2.2
SDC POWER CHECK SECTION
2.2.1 AC Power Check The AC power check verifies correct wiring of the AC input and the two Power Supply Modules.
1.
Ensure the SDC chassis has no modules installed.
2. Before attaching AC power entry cable to J43 on SDC unit, place the MAIN POWER switch to the OFF position.
3. Place the TEMPERATURE WARNING switch to the DISABLE position.
4. Remove all fuses from the SDC and verify the part numbers and amp rating of fuses F1 thru F4 as per Table 2.2.1-1.
Table 2.2.1-1. Fuse Table for the SDC Configuration
| ASSY |
| F1 |
| F2 |
| F3 |
| F4 |
| 456008-1 |
| 313005 |
| 313005 |
| 313005 |
| 313005 |
Amp
Rating 5 Amp
Slo-Blo 5 Amp
Slo-Blo 5 Amp
Slo-Blo 5 Amp
Slo-Blo
Verified:___________
5. Check connector J43 (AC power connector) on unit with a multimeter set for ohms measurements, to ensure that there is no short between pins A (B, C (B, and A (C and that Pin B is connected to ground (chassis).
6. Check connectors J33, J34, J41, J42 (Synchro AZ connectors) on the unit with a multimeter set for ohms measurements to ensure that there is no short between pins A→B, A→C, A→D, A→E, B→C, B→D, B→E, C→D, C→E, D→E.
2.3
SDC POWER-UP SECTION
2.3.1 SDC Power-Up The SDC power-up procedure verifies the functioning of the cooling fans and power indicators.
1.
Ensure the SDC Chassis has no modules installed.
2. Apply AC power to J43 of the SDC unit.
3. Install the Power Supply Load Tester into Power Supply 2 slot.
4. On the SDC, set the MAIN POWER switch to the ON position.
5. Ensure that the DS1 Power ON indicator is illuminated and that the three (3) cooling fans are rotating and exhausting air upwards.
Verified:___________
WARNING
J9 and J16 connector pins carry 115 VAC. Avoid touching or shorting between contacts.
6. Using a multimeter set for AC voltage measurements, verify the following voltages between the lower J9 connector pins on the backplane of the SDC Chassis Power Supply. See Figure 2.3.1-1 for J9 pin layout.
a) 115 VRMS (+10/-5 VRMS) pin 30 (Line) to pin 32 (Ground)
b) 115 VRMS (+10/-5 VRMS) pin 30 (Line) to pin 28 (Neutral)
c) Less than 5 VRMS pin 28 (Neutral) to pin 32 (Ground)
Verified:___________
Figure 2.3.1-1. Backplane Connector Lower J9 Pin-out Locations
7. Turn on the Power Supply Load Tester.
8. Using a multimeter set for AC voltage measurements, verify the following voltages between test points on the Power Supply Load Tester.
a) 115 VRMS (+10/-5 VRMS) TP1 (Line) to TP3 (Ground)
b) 115 VRMS (+10/-5 VRMS) TP1 (Line) to TP2 (Neutral)
c) Less than 5 VRMS TP2 (Neutral) to TP3 (Ground)
Verified:___________
9. On the SDC, set the MAIN POWER switch to the OFF position.
10. Remove the Power Supply Load Tester from the SDC chassis.
2.3.2 Unloaded Power Supply Check
The Power Supply check verifies the presence of correct DC Power Supply voltages in an unloaded condition with no modules installed.
1. On the SDC, set the MAIN POWER switch to the OFF position.
2.
Install Converter Power Supply (Part Number 500190-2) into the POWER SUPPLY 1 slot of the SDC Chassis.
3.
On the SDC, set the MAIN POWER switch to the ON position and set POWER SUPPLY 1 switch in the upper SDC Chassis to the ON position.
4.
Verify that the three voltage indicators and PWR switch are illuminated.
Verified:___________ 5.
Set POWER SUPPLY 1 switch to the OFF position.
6.
On the SDC, set the MAIN POWER switch to the OFF position.
7.
Install the second Power Supply Module (500190-2) into the POWER SUPPLY 2 slot of the SDC Chassis.
8.
Repeat steps 3 through 6 for POWER SUPPLY 2.
Verified:___________ 9.
On the SDC, set the MAIN POWER switch to the OFF position.
10.
Set POWER SUPPLY1 and POWER SUPPLY 2 switches to the ON position.
11.
On the SDC, set the MAIN POWER switch to the ON position. Verify that the DC indicators on POWER SUPPLY 2 light up approximately one (1) second after the DC indicators on POWER SUPPLY 1 light up.
Verified:___________
12.
On the SDC, set the MAIN POWER switch and the POWER SUIPPLY switches to the OFF position.
2.3.3 VME Chassis Power Check Procedure The VME Chassis Power Check procedure verifies correct wiring and that the voltage is applied to the backplane connectors.
1.
Install an Extender Module (P/N 456104-1) into RIM 1 Chassis slot.
2. On both SDC Power Supply Modules, set the POWER switch to the ON position.
3. Using a multimeter set for DC voltage measurements, verify the following voltages in the RIM 1 slot are within the specified range, using the GND pin as a common reference for each voltage listed in Table 2.3.3-1. See Figure 2.3.3-1 for VME pin layout.
WARNING
P1 and P2 connector pins have the potential of sourcing high current. Avoid touching or shorting between contacts.
Table 2.3.3-1. VME Pin-outs
| DC Voltage |
| VME PIN NUMBER |
| Range |
| +5V |
| P1-B32 |
+5.35 max.
+4.875 min.
| +12V |
| P1-C31 |
| +12.60 max. |
+11.64 min.
| -12V |
| P1-A31 |
| -12.60 min. |
-11.64 max.
| GND Reference |
| P2-B31 |
| N/A |
Figure 2.3.3-1. Extender Pin-out Locations
2.4
TEMPERATURE WARNING SECTION
2.4.1 Temperature Warning SDC Test
This procedure includes testing instructions that verify the SDC Temperature Warning Components are functioning and cabled correctly.
1.
On the SDC, set the MAIN POWER switch to the ON position and ensure that the DS1 Power On indicator is lit and the cooling fans are operating.
2.
On both Power Supply Modules, set the POWER switch to the ON position and ensure their DC voltage indicators and switches are illuminated.
3.
Set the TEMPERATURE WARNING switch to DISABLE and verify DS2 is OFF and no alarm is sounding.
Verified:___________ 4.
Set the TEMPERATURE WARNING switch to ENABLE and verify DS2 is OFF and no alarm is sounding.
Verified:___________
WARNING
Keep Heat Gun approximately 4 to 6 inches away from Thermostats to prevent excessive heating. Use a directional nozzle if available to focus heat exclusively on the Thermostats.
5.
Use a heat gun to apply heat to Thermostat RT1 located on the left side, closest to connector J1 until the SDC’s TEMPERATURE WARNING lamp DS2 illuminates.
6.
Verify the Warning Horn LS1 is sounding, then set the SDC’s TEMPERATURE WARNING switch to DISABLE and observe Audible Alarm sounding has ceased.
Verified:___________
7.
Allow the Thermostat Assembly to cool and TEMPERATURE WARNING lamp to go OFF.
Verified:___________ 8.
Set the TEMPERATURE WARNING switch to ENABLE and verify DS2 is OFF and no alarm is sounding.
Verified:___________
9.
Use a heat gun to apply heat to Thermostat RT2 located on the right side until the SDC’s TEMPERATURE WARNING lamp DS2 illuminates.
Verified:___________ 10.
Verify the Warning Horn LS1 is sounding, then set the SDC’s TEMPERATURE WARNING switch to DISABLE and observe Audible Alarm sounding has ceased.
Verified:___________ 11.
Allow the Thermostat Assembly to cool and TEMPERATURE WARNING lamp to go OFF.
Verified:___________
2.4.2 Module Installation Procedure
The module installation procedure verifies the default system level module configuration and all visual indicators.
1.
On both Power Supply Modules, set the POWER switch to the OFF position.
2.
On the SDC, set the MAIN POWER switch to the OFF position.
NOTE
Do not secure modules to the chassis during installation. Modules shall be removed for DIP switch selection at a later step.
3. Table 2.4.2-1 illustrates the position of each module to be installed in the SDC chassis.
Table 2.4.2-1. SDC Module Slot Installation
| MODULE |
| SLOT ID |
| PART NUMBER |
| Extender |
| EXTENDER |
| P/N 456104 |
| Signal Splitter |
| SIGNAL SPLITTER |
| P/N 500034 |
| RIM 1 |
| RIM 1 |
| P/N 456354 |
| RIM 2 |
| RIM 2 |
| P/N 456354 |
| RIM 3 |
| RIM 3 |
| P/N 456354 |
| RIM 4 |
| RIM 4 |
| P/N 456354 |
| SPY Splitter |
| SPY SPLITTER |
| P/N 456045 |
4.
Set all Front Panel switches to the OFF position On Signal Splitter Module (P/N 500034-1), then install into the SDC Chassis.
SWITCH
SIGNAL SPLITTER
S1-1 thru S1-8
OFF
5.
Set the following switch settings then sequentially install RIM 1 thru RIM 4 Modules (P/N 456354-1) into the SDC Chassis.
NOTE
Use the ID panel as a guide for selecting the module from a designated slot.
Table 2.4.2-2. Radar Interface Module (RIM) Switch Settings
| SWITCH |
| RIM 1 |
SETTING
RIM 2
SETTING
RIM 3
SETTING
RIM 4
SETTING
| S1-1 thru S1-8 |
| Open |
| Open |
| Open |
| Open |
| S2-1 |
| Open |
| Open |
| Open |
| Open |
| S2-2 |
| Closed |
| Closed |
| Closed |
| Closed |
| S2-3 and S2-4 |
| Open |
| Open |
| Open |
| Open |
| S2-5 |
| Closed |
| Closed |
| Closed |
| Closed |
| S2-6 and S2-7 |
| Open |
| Open |
| Open |
| Open |
| S2-8 |
| Closed |
| Closed |
| Closed |
| Closed |
| S3-1 |
| Open |
| Open |
| Open |
| Open |
| S3-2 |
| Closed |
| Closed |
| Closed |
| Closed |
| S3-3 and S3-4 |
| Open |
| Open |
| Open |
| Open |
| S3-5 |
| Closed |
| Closed |
| Closed |
| Closed |
| S3-6 and S3-7 |
| Open |
| Open |
| Open |
| Open |
| S3-8 |
| Closed |
| Closed |
| Closed |
| Closed |
| S4-1 |
| Open |
| Open |
| Open |
| Open |
| S4-2 thru S4-8 |
| Closed |
| Closed |
| Closed |
| Closed |
| S5-1 thru S5-4 |
| Open |
| Open |
| Open |
| Open |
| S9 |
| 0 |
| 0 |
| 0 |
| 0 |
| S10 |
| 0 |
| 0 |
| 0 |
| 0 |
| S11 |
| OFF |
| OFF |
| OFF |
| OFF |
| S12 |
| 0 |
| 0 |
| 0 |
| 0 |
| S13 |
| 0 |
| 0 |
| 0 |
| 0 |
| S14-1 thru S14-11 |
| Closed |
| Closed |
| Closed |
| Closed |
| S14-12 |
| Open |
| Open |
| Open |
| Open |
| S16-1, S16-2, S16-4 |
| Open |
| Open |
| Open |
| Open |
| S16-3 |
| Closed |
| Closed |
| Closed |
| Closed |
| S17-1 thru S17-4 |
| Closed |
| Closed |
| Closed |
| Closed |
6.
Install Spy Signal Splitter Module (P/N 456045-1) into the SDC Chassis.
7.
Install the Extender Card (P/N 456104-1) into the SDC Chassis.
2.4.3 Ethernet Fiber Cable Installation This section describes where to attach the external Ethernet Fiber Cable Assemblies.
1. Install the following cable assemblies according to Table 2.4.3-1.
Table 2.4.3-1. Ethernet Fiber Cable Assembly Installation Table
Ethernet Cable
Assembly
RIM
Connector
SDC
Connector
| 456115-1 |
| RIM 1 (CH 1) |
| J44 (Ethernet CH 1) |
| 456115-1 |
| RIM 2 (CH 2) |
| J45 (Ethernet CH 2) |
| 456115-1 |
| RIM 3 (CH 3) |
| J46 (Ethernet CH 3) |
| 456115-1 |
| RIM 4 (CH 4) |
| J47 (Ethernet CH 4) |
2.4.4 Power Supply/Indicators Test The Power Supply/Indicators test verifies correct wiring and function of the Power Supplies and module indicators.
1. On the SDC, set the MAIN POWER switch to the ON position.
2. Ensure that the DS1 Power On indicator is lit and the cooling fans are operating.
3. Set POWER SUPPLY 1 Module switch to the ON position.
4. Verify +5V, +12V, -12V LEDs and POWER Switch are lit on POWER SUPPLY 1 Module.
Verified:___________
5. Using a multimeter set for DC voltage measurements, check POWER SUPPLY 1 test point voltages and record the findings in Table 2.4.4-1. Set POWER SUPPLY 1 Module to the OFF position.
Table 2.4.4-1. Power Supply Test Point Voltages
| BASELINE VOLTAGE |
| ACTUAL READING: POWER SUPPLY 1 |
| ACTUAL READING: POWER SUPPLY 2 |
| ACCEPTANCE CRITERIA |
+5.00
+5.35 max.
+4.875 min.
+12.00
+12.60 max.
+11.64 min.
-12.00
-12.60 min.
-11.64 max.
6. Set POWER SUPPLY 2 Module switch to the ON position.
7. Verify +5V, +12V, and -12V LEDs and POWER Switch are lit on POWER SUPPLY 2 Module.
Verified:___________
8. Using a multimeter set for DC voltage measurements, check POWER SUPPLY 2 test point voltages and record the findings in Table 2.4.4-1. Set POWER SUPPLY 1 Module to the ON position.
9. Verify that all measurements are within acceptable limits.
Verified:___________
10. Verify the status of the following displays on the SDC modules.
MODULE
DISPLAY
STATUS
SIGNAL SPLTR
ACTIVITY
ACP (GREEN LED)
OFF
ARP (GREEN LED)
TM (GREEN LED)
TE (GREEN LED)
V1
GP 1 (GREEN LED)
GP 2 (GREEN LED)
GP 3 (GREEN LED)
GP 4 (GREEN LED)
V2
GP 1 (GREEN LED)
GP 2 (GREEN LED)
GP 3 (GREEN LED)
GP 4 (GREEN LED)
RIM 1
LINK (GREEN LED)
TX (GREEN LED)
RX (GREEN LED)
SIM (GREEN LED)
AZ (GREEN LED)
RIM 2
RIM 3
RIM 4
SPY SIGNAL SPLITTER
NORMAL (GREEN LED)
ON
BYPASS (RED LED)
2.4.5 Automated Test This section contains the procedures for running an automated test on the SDC Unit section of the unit.
1.
Configure the Signal Data Converter (SDC) (P/N 456008-1) and Test Equipment as shown in Figure 2.4.5-1.
2.
Turn ON the power to all equipment associated with the SDC Unit Testing.
3.
Connect the LRADDS Test Rack cables to the DIU as shown in Figure 2.4.5-1.
Figure 2.4.5-1. LRADDS Test Rack Configuration 4.
Select the LRADDS Tester ICON on the initial windows screen and follow the displayed prompts.
5.
From the displayed Main Screen Menu, select the “Load Test” option. A dialog box with the names of the tests that can be run will be displayed.
6.
Select Unit Level Testing followed by Signal Data Converter and then select all tests listed in Table 2.4.5-1.
7.
The Main Screen will be displayed showing the entered information. From this display, select the BEGIN TEST option. The program will now display dialog boxes to provide the operator with step-by-step instructions for completing each test. Upon completion of each test, annotate the appropriate entry in Table 2.4.5-1.
Table 2.4.5-1. Test Table
| Script File Name |
| Test |
| Estimated Run Time |
| Complete |
| SDC-001 |
| Discrete Azimuth Test (ACP/ARP) |
| 5 Minutes |
| SDC-002 |
| Splitter Test |
| 5 Minutes |
| SDC-003 |
| Discrete Azimuth Test (Sin/Cos) |
| 15 Minutes |
| SDC-004 |
| Discrete Azimuth Test (Synchro) |
| 5 Minutes |
| SDC-005 |
| Discrete Azimuth Test (PPI 6-Wire) |
| 15 Minutes |
| SDC-006 |
| Discrete Azimuth Test (RHI 6-Wire) |
| 15 Minutes |
| SDC-007 |
| 6-Wire Pulse Characteristics Test |
| 30 Minutes |
8. Upon completion of all testing, copy the test data files(s) to the network drive data3\Shared Data\Naval Systems\Test Data\part number\serial number.
Verified: ______________
Comments:
VALIDATION
Signatures below serve as a validation of the successful completion and accuracy of the data contained herein. The Test Technician shall sign and date as an indication that all instructions have been followed and that each test step has been successfully completed. The Quality Engineer shall sign and date as an acknowledgement that the test data has been reviewed for completion and accuracy. Appropriate stamps shall be affixed by the signature blocks.
Test Technician: ____________________________________ Date:________________ Quality Assurance: __________________________________ Date:________________
APPENDIX A
AS BUILT Configuration Data Sheets
APPENDIX B
PRODUCTION ROUTERS
APPENDIX C
NON-CONFORMANCE REPORTS (NCRs)
ACCEPTANCE TEST PROCEDURE
FOR THE SIGNAL DATA CONVERTER (P/N 456008-1)
S/N: ________________
24 APRIL 2014
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to protecting technical, operational, or operational use information from automatic dissemination under the International Exchange Program or by other means as determined on or after date of task order award. Other requests for this document shall be referred to NAVSEA CDSA Code F31.
WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Prepared By:
FRONTIER ELECTRONIC SYSTEMS CORP.
P.O. BOX 1023
STILLWATER, OKLAHOMA 74076-1023
_1349681653.vsd text
Interface Panel RIU
LRADDS Test Fixture
SPY 6 Wire RHI
Sin/Cos
Synchro
ACP/ARP
SPY 6-Wire PPI
Azimuth Radar Data
NW Sw (up to 4)
NW Sw (up to 4)
Protocol Analyzer H/W and SW (LEDA Plus)
Test System Configured for RIM Test
(Heavy Weight Lines Indicate Paths used in this test)
Backplane
Power Supply
RIM (UUT)
RADDS
ACP/ARP
RIM (Slot 2)
RIM (Slot 3)
RIM (Slot 4)
Interface Panel DIU
DIM (Golden)
DIM (Slot 2)
DIM (Slot 3)
DIM (Slot 4)
SpySSM
SSM
Interface Panel IIU
IIM (Slot 1)
IIM (Slot 2)
IIM (Slot 3)
IIM (Slot 4)
RIM Test Chassis (RIU)
DIM Test Chassis (DIU)
IIM Test Chassis (IIU)
IIM (Slot 5)
IIM (Slot 6)
IIM (Slot 7)
SBC
QSC
LRADDS Test Rack
NW Sw
NW Sw (up to 14)
NAWCAD SIM
Video
Iron Box 24 port Network Switch
Dual Scan Cvtr Comupter
Dual Scan Cvtr Comptuer
HMI Computer w/RS422 conv
Power Conditioner
2 -T
To RIU Lx (up to 4)
To DIU Lx (up to 4)
To IIU Lx (up to 14)
To CDS Lx (up to 13)
CDS Emulator
Lx (1)
Test Computer (Supermicro X7DBN Motherboard w/ 3 ea Intel EXPI9404PTL Quad Port NIC)
To Port Under test
RADDS to 6W
NAV Data (RS-422)
6 Wire Out
3 Wire
_1366544673.vsd
File details come from the government source that posted it. Updated .