About this file

This document outlines a pre-solicitation notice for the AN/SPQ-15 Data Distribution System Production contract. The Navy seeks to award a five-year C-type contract for production of hardware to support the AN/SPQ-15(V) MK 6 MOD 1 Data Distribution System, including switchboards, decoders, converters, switches and upgrades. The contract will include firm-fixed-price CLINs for hardware production, cost-plus-fixed-fee CLINs for software life-cycle support and engineering development, and not separately priced CLINs for deliverables. The solicitation is designated as a small business set-aside, with NAICS code 334118 and PSC codes K012 and 1285. The solicitation number is N0017822R2501 and will be available on March 7, 2022, with proposals due by April 5, 2022. Award is planned for November 2022.

View the file

Other files for this federal contract opportunity

Other files attached to AN/SPQ-15 Data Distribution System Production, newest first.
File Type Posted
CDRLs_24_August_Draft.pdf PDF
N00178-22-R-2501_24_August_Draft.pdf PDF
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
DMSMS report.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
DRAFT_Exhibit A_CDRLs.pdf PDF
N00178-22-R-2501_DRAFT_6.1.22.docx DOCX document
455105A ATP for the Extender Card.doc DOC document
455049P ATP for the RSDS.doc DOC document
455281A 456060-2 QSDM ATP.doc DOC document
455068B ATP for the RS422_RS232 Converter.doc DOC document
Attachment J.9 - Question Submittal Form.xlsx XLSX spreadsheet
DRAFT J.4 - QASP.pdf PDF
455048J ATP for the SDC.doc DOC document
455047E ATP for the SSSM.doc DOC document
409030D ATP for the SSM.DOC DOC document
Attachment L.1 AN-SPQ 15 Staffing Matrix Format.xlsx XLSX spreadsheet
DRAFT J.5 - Labor Category Qualifications.pdf PDF
DRAFT J.3 - GFP List.xlsx XLSX spreadsheet
DRAFT J.1 - DD 254.pdf PDF
455054D ATP for Spare Power Conditioner.doc DOC document
455287A ATP for the CRC 456010-2.doc DOC document
455278A RIM ATP (PN 456354-2).doc DOC document
455056L ATP for the Spare Processor Assy.doc DOC document
409079C ATP for the Converter PS Module.doc DOC document
DRAFT J.2 - GFI List.pdf PDF
455088F ATP for the Media Converter.doc DOC document
455063H ATP for the SBC.doc DOC document
455280B IIM ATP (PN 456370-2).doc DOC document
455060J ATP for the RVC.doc DOC document
455055B - ATP for the HMI.doc DOC document
DRAFT J.8 - Cost_Summary_Format.xls XLS spreadsheet
DRAFT J.6 - eCRAFT_SCA Crosswalk.xlsx XLSX spreadsheet
N0017822R2501_Unclassified Terms of Use Agreement.pdf PDF
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_2.9.22.docx DOCX document
N00178-22-R-2501 CDRL DRAFT.pdf PDF
N0017822R2501_DRAFT SOL_QA_MATRIX.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

455279

SHAPE \* MERGEFORMAT

REVISIONS

REV
DESCRIPTION
DATE
APPROVED
ORIGINAL DATE 26 MAY 2015
DATE APPROVED
FRONTIER ELECTRONIC SYS.

STILLWATER, OKLAHOMA 74076-1023

ORIGINATOR
MIKE HENSON
29 MAY 2015
DOC. COORDINATOR
KELLY WHITFIELD
1 JUNE 2015
ACCEPTANCE TEST PROCEDURE

FOR THE DISPLAY INTERFACE

MODULEL (DIM)

(P/N 456357-2)

PROJECT ENGINEER
EUGENE FRANKLIN
1 JUNE 2015
PROGRAM MGR.
PAUL CHENAULT
1 JUNE 2015
QUALITY
DON ZAWISZA
1 JUNE 2015

CODE IDENT.

63812 455279

ACCEPTANCE TEST PROCEDURE

FOR THE DISPLAY INTERFACE

MODULE (DIM)

(P/N 456357-2)

TABLE OF CONTENTS

Section Title Page

GENERAL INFORMATION

1.1

SCOPE

1.2

PURPOSE

1.3

TEST EQUIPMENT

1.4

LRADDS TEST RACK

1.5

GENERAL REQUIREMENTS

1.5.1 Production Routers 1.5.2 Test Conditions 1.5.3 Failure Reporting

1.5.4 Script Files 1.5.5 Test Data

PRE-TEST EVALUATION

2.1

SHORT TEST

2.2

INSTALLATION AND SETUP PROCEDURE

2.2.1 Software and Firmware Installation 2.3

AUTOMATED TEST PROGRAM

BURN-IN

FINAL TEST

4.1

AUTOMATED TEST PROGRAM

APPENDIX A

PRODUCTION ROUTERS

A-1

TABLE OF CONTENTS (Continued)

Section Title Page

APPENDIX B

NON-CONFORMANCE REPORTS (NCRs) B-1

APPENDIX C

BURN-IN LOG

C-1

LIST OF FIGURES

Figure Title Page 1.1-1 Testing Flow

1.4-1 Functional Test Setup 2.2-1 DIU LRADDS Test Rack Configuration

LIST OF TABLES

Table Title Page 1.3-1 Test Equipment

1.5.4-1 Script Files 2.1-1 Short Test Table 2.2-1 DIM Switch Settings for 456357-2 2.2-2 Radar Interface Module (RIM) Switch Settings for the 456005-1 2.2-3 Radar Interface Module (RIM) Switch Settings (456354-1 or 456354-2) 2.3-1 Pre-Test Verification Table 3-1 Burn-in Test Information 4.1-1 Final Test Verification Table

SECTION 1

GENERAL INFORMATION

1.1

SCOPE

This document contains the test requirements for the acceptance testing of the Display Interface Module (DIM) (P/N 456357-2). This document contains the following sections:

Section 1: General Information

Section 2: Pre-Test Evaluation Procedures

Section 3: Burn-In Procedures

Section 4: Final Test Procedures

The figure below illustrates the order of testing.

Figure 1.1-1. Testing Flow

1.2

PURPOSE

The purpose of this document is to demonstrate that the DIM, as manufactured by Frontier Electronic Systems, meets or exceeds all requirements identified within this document.

1.3

TEST EQUIPMENT

Table 1.3-1 lists the equipment required to perform the procedures contained in this document. Enter the serial number and calibration expiration date for each piece of test equipment.

Table 1.3-1. Test Equipment

DESCRIPTION
USE
MODEL
SERIAL NUMBER
MANUFACTURER/

SPECIFICATIONS

CALIBRATION

EXP. DATE

LRADDS Tester
Automated Test
456124
001
FES
N/A
Oscilloscope
Signal Measurement
TDS460A

Tektronix

Digital Multimeter
Voltage Measurement

Fluke

Note 1: FES maintains calibration of equipment IAW ISO 9001, procedures FES-QSP-7.6-1-1 and FES-QSP-7.6-2.

Note 2: Equivalent or superior equipment may be substituted for the equipment listed above.

1.4 LRADDS Test rack Figure 1.4-1 illustrates the equipment required to perform the procedures contained in this document.

Figure 1.4-1. Functional Test Setup

1.5

GENERAL REQUIREMENTS

1.5.1 Production Routers

Insert the Production Routers for the module into Appendix A.

1.5.2 Test Conditions

Unless otherwise specified herein, testing shall be performed at standard room ambient temperature, 60( to 80(F.

1.5.3 Failure Reporting

Non-Conformance Reports (NCRs) shall be used to document test failures in accordance with FES-QSP-8.3-3 when required. A copy of the NCR shall be included under Appendix B.

1.5.4 Script Files The script files required for testing are shown in the table below. Controlled copies of the DIM script files reside in Document Control under Mstr_software\456271\-01 Rev X\ (where X is the latest revision).

Table 1.5.4-1. Script Files

Script File Name
Test
RIM Input
DIM Output
Estimated Run Time
DIM-001
Discrete Azimuth Test
ACP/ARP
3 Wire
1 Minute
DIM-002
RPM Test
ACP/ARP
3 Wire
15 Minutes
DIM-003
3 Wire Pulse Characteristics
ACP/ARP
3 Wire
10 Minutes
DIM-004
Discrete Azimuth Test
ACP/ARP
RADDS
1 Minute
DIM-005
RPM Test
ACP/ARP
RADDS
10 Minutes
DIM-006
Heading Test
ACP/ARP
RADDS
15 Minutes
DIM-007
RADDS Single Bit Test
ACP/ARP
RADDS
2 Minutes
DIM-008
Discrete Azimuth Test
Synchro
ACP/ARP
15 Minutes
DIM-009
RPM Test
Synchro
ACP/ARP
15 Minutes
DIM-010
Discrete Azimuth Test
Synchro
Synchro
1 Minute
DIM-011
TBI Oscope Test
Synchro
Synchro
1 Minute
DIM-012
Switch and LED Test
Synchro
None
4 Minutes

1.5.5 Test Data Successful completion of each test shall be annotated within these procedures. Test data recorded during automated testing shall be maintained on the FES network at \\Fes-dc\data3\Shared Data\Naval Systems\Test Data\part number\serial number.

SECTION 2

PRE-TEST EVALUATION

This section contains the steps for conducting a preliminary test of the DIM before subjecting it to a burn-in cycle.

2.1

SHORT TEST

Using a Digital Multi-Meter (DMM), verify that the power planes are not shorted together or to ground. The DIM Baseboard PWB drawing 456472 may be used to locate measuring points.

1. Verify that there is no short between the following points, where a short is less than 5 Ohms. Measure points for a maximum duration of 5 seconds. Test points TP1 through TP12 are GND. In the following table, enter a check mark as each reading is checked and no short is present.

Table 2.1-1. Short Test Table

GND

TP1–12

+1.2V

U3 PIN4

+1.8V

U9 PIN5

+2.5V

U5 PIN4

+3.3V

U6 PIN4

+5V

R55 +12V

R56

+1.2V

U3 PIN4

+1.8V

U9 PIN5

+2.5V

U5 PIN4

+3.3

U6 PIN4

+5V

R55

+12V

R56

-12V

P1 A31

VERIFIED: _____________

2.2

INSTALLATION AND SETUP PROCEDURE

The installation and setup procedure verifies the test configuration.

1. Configure the switches on the Display Interface Module (DIM) P/N 456357-2, as shown in Table 2.2-1.

Table 2.2-1. DIM Switch Settings for 456357-2

SWITCH

3 WIRE OUTPUT 8192

S1-1
Display Select
SPA/Q70
ON

S1-2

Display Type

S1-3

S1-4

Azimuth Rate

S1-5

S1-6

Primary/Secondary
ON

S1-7

Video SIM

S1-8

AZ True/Relative

S2-1
Timeout
1
ON

S2-2

S2-3

S2-4

S3-1
IP Host Address
1

S3-2

2
ON

S3-3

4
ON

S3-4

S3-5

16
ON

S3-6

S3-7

64
ON

S3-8

128
ON
S4-1
Data

ON

S4-2

ON

S4-3

ON

S4-4

ON

S9-1
Power Delay

S9-2

S9-3

S9-4

S10

SIM

S11

Local Select
ON

S12

Video Select
0

S13

Radar Select
1

*Blank is OFF (Open). ON = Closed

2. Loosen fasteners and remove the Radar Interface Module (P/N 456005-1, 456354-1 or 456354-2) from the Radar Interface Unit (RIU) Module Test Chassis. Verify the following switch settings and reinstall module securing fasteners.

Table 2.2-2. Radar Interface Module (RIM) Switch Settings for the 456005-1

SWITCH

ACP/ARP INPUT 8192

SWITCH

ACP/ARP INPUT 8192

S1-1
Radar Select
Azimuth Rate
S5-1
Power Delay
1

S1-2

S5-2

S1-3

Radar Select

S5-3

S1-4

S5-4

S1-5

TBI Use/over ride

S9

S9 ones; S10 tenths V1 Normalization
0

S1-6

AZ True/Relative

S10

S1-7

Not used

S11

SIM

S1-8

Not used

S12

S12 ones; S13 tenths V2 Normalization
0
S2-1
Input Select
TE SPLT

S13

S2-2

TE
ON
S14-43
Radar ID
16
ON

S2-3

EOS

S14-39

8
ON

S2-4

TM SPLT

S14-40

4
ON

S2-5

TM
ON

S14-41

2
ON

S2-6

RM

S14-42

1
ON

S2-7

VID 1 SPLT

S14-6
RIM Number
64
ON

S2-8

VID 1

S14-5

32
ON
S3-1
Input Select
ARP SPLT

S14-4

16
ON

S3-2

ARP
ON

S14-3

8
ON

S3-3

DY

S14-2

4
ON

S3-4

ACP SPLT

S14-1

2
ON

S3-5

ACP
ON

S14-0

S3-6

DX

S19-1
Data

ON

S3-7

VID 2 SPLT

S19-2

ON

S3-8

VID 2

S19-3

ON

S4-1
IP Host Address
1

S19-4

ON

S4-2

2
ON

S4-3

4
ON

S4-4

8
ON

S4-5

16
ON

S4-6

32
ON

S4-7

64
ON

S4-8

128
ON

Table 2.2-3 Radar Interface Module (RIM) Switch Settings (456354-1 or 456354-2)

SWITCH

ACP/ARP INPUT 8192

SWITCH

ACP/ARP INPUT 8192

S1-1
Radar Select
Azimuth Rate

S9

S9 ones; S10 tenths V1 Normalization
0

S1-2

S10

S1-3

Radar Select

S11

SIM

S1-4

S12

S12 ones; S13 tenths V2 Normalization
0

S1-5

TBI Use/over ride

S13

S1-6

AZ True/Relative

S14-43
Radar ID
16
ON

S1-7

Not used

S14-39

8
ON

S1-8

Not used

S14-40

4
ON
S2-1
Input Select
TE SPLT

S14-41

2
ON

S2-2

TE
ON

S14-42

1
ON

S2-3

EOS

S14-6
RIM Number
64
ON

S2-4

TM SPLT

S14-5

32
ON

S2-5

TM
ON

S14-4

16
ON

S2-6

RM

S14-3

8
ON

S2-7

VID 1 SPLT

S14-2

4
ON

S2-8

VID 1

S14-1

2
ON
S3-1
Input Select
ARP SPLT

S14-0

S3-2

ARP
ON
S16-1
Timeout

ON

S3-3

DY

S16-2

S3-4

ACP SPLT

S16-3

S3-5

ACP
ON

S16-4

S3-6

DX

S17-1
Data

ON

S3-7

VID 2 SPLT

S17-2

ON

S3-8

VID 2

S17-3

ON

S4-1
IP Host Address
1

S17-4

ON

S4-2

2
ON

S4-3

4
ON

S4-4

8
ON

S4-5

16
ON

S4-6

32
ON

S4-7

64
ON

S4-8

128
ON
S5-1
Power Delay
1

*Blank is OFF (Open). ON = Closed

S5-2

S5-3

S5-4

3. Connect the DIU LRADDS Test Rack cables as shown in Figure 2.2-1.

Figure 2.2-1. DIU LRADDS Test Rack Configuration 2.2.1 Software and Firmware Installation This step of the procedure details the loading of the Firmware and Software listed on Assembly Number 456357-2 using Software Part Number 456294. These procedures are performed using the LRADDS Test and Scripting Processor.

1. Apply power to the LRADDS Tester and set the DIU Test Chassis’ Power Supply Module switch to the ON position.

2. Log in to the LRADDS test fixture.

3. Start xBash.exe on the Desktop.

4. Type “cd /cygdrive/c/456294/” without the quotes and press Enter.

5. Type “c:/Python26/python 456294X.py –a456357-2” (where “X” is the latest revision number). Press Enter.

6. Follow the onscreen prompts and type “y” when asked. Record below the firmware and software revisions used.

PC Firmware Version 456478 Rev:______________

Interface Firmware Version 456479 Rev:______________

Software Version 456480 Rev:______________

7. Verify that the firmware and software have been loaded without failures.

8. Copy log file from c:\456294\reports\456357-2_SSS_YYYY-MMM-DD_HH-mm-ss-AM.txt to \\Fes-dc\data3\Shared Data\Naval Systems\Test Data\part number\serial number where “SSS” is the serial number “YYYY” is the year “MMM” is the month (i.e., Jan) “DD” is the day “HH” is the hour “mm” is the minute “ss” is the second and “AM” can be AM or PM, depending on the time of day.

Verify that the file has been copied.

NOTE: USB port parameters: COM Port: 3 (Windows), Baud Rate: 115200, Data bits: 8, Parity: None, Stop bits:1, Flow Control: None. Verify software has been loaded.

9. Using the following procedure, record the MAC Address, Firmware and Software versions on the module.

a. Perform a board reset and plug a USB cable into the unit.

b. From the desktop, run LRADDS.ht.

c. On the DIM, press the CPU Reset button.

d. From the LRADDS.ht window, record the following values:

MAC Address:_________________________________________

e. Press “v” inside the Hyperterminal window and record the versions displayed.

PC Firmware Version (456478):______________

Interface Firmware Version (456479):______________

Software Version (456480):______________

10. Verify the Mac Address displayed in the LRADDS.ht window matches the MAC address in the spreadsheet “IM MAC Address Log” located at \\Fes-dc\data3\Document Control\Mstr_software\NAVAL_MacAddress

11. Create and apply the label for Part Numbers flashed per Assembly Drawing 456357-2. Verify below.

2.3

AUTOMATED TEST PROGRAM

These procedures are performed using the LRADDS Test and Scripting Processor.

1.

Set the DIU and RIU Module Test Chassis’ Power Supply Module switch to the ON position. Also turn ON LRADDS tester power.

2. Select the LRADDS Tester icon on the initial windows screen and follow the displayed instructions.

3.

A dialog box “Interface Configurations” appears showing the expected Comm Port Assignments.

a.

Verify that the Communication Ports and GPIB Address are set as they appear in the display.

b.

Select OK when complete.

4.

Select Test Info.

5.

A dialog box prompting for “Tester Identification” will now be displayed. Enter the Tester Information and press Enter.

6.

A dialog box appears requesting a Serial Number. Enter the DIM Serial Number and press Enter.

7.

Select test type “Module Level Testing” and then “Preliminary”.

8.

At the Module Selection screen, select “Display Interface Module (DIM) (456357-2)”.

9.

From the displayed Main Screen Menu, select the LOAD TEST option. A dialog box with the names of the tests that can be run will be displayed.

10.

Select the Display Interface Module (DIM) test and then select all scripts in Table 2.3-1.

11.

The Main Screen will be displayed showing the entered information. From this display, select the BEGIN TEST option. The program will now display dialog boxes to provide the operator with step-by-step instructions for completing the test. Upon completion of each test, annotate the appropriate entry in Table 2.3-1.

Table 2.3-1. Pre-Test Verification Table

Script File Name
Test
RIM Input
DIM Output
Estimated Run Time
Complete
DIM-001
Discrete Azimuth Test
ACP/ARP
3 Wire
1 Minute
DIM-002
RPM Test
ACP/ARP
3 Wire
15 Minutes
DIM-003
3 Wire Pulse Characteristics
ACP/ARP
3 Wire
10 Minutes
DIM-004
Discrete Azimuth Test
ACP/ARP
RADDS
1 Minute
DIM-005
RPM Test
ACP/ARP
RADDS
10 Minutes
DIM-006
Heading Test
ACP/ARP
RADDS
15 Minutes
DIM-007
RADDS Single Bit Test
ACP/ARP
RADDS
2 Minutes
DIM-008
Discrete Azimuth Test
Synchro
ACP/ARP
15 Minutes
DIM-009
RPM Test
Synchro
ACP/ARP
15 Minutes
DIM-010
Discrete Azimuth Test
Synchro
Synchro
1 Minute
DIM-011
TBI Oscope Test
Synchro
Synchro
1 Minute
DIM-012
Switch and LED Test
Synchro
None
4 Minutes

NOTES

To re-run any test, execute steps 5 through 7.

12. After the test is complete, select Close File from the menu to save the test data.

13. Copy and verify data files have been copied to:

\\Fes-dc\data3\Shared Data\Naval Systems\Test Data\ part number\serial number.

14. Remove test stand fibers from the DIM and RIM.

15. Place short copper Ethernet cable connected directly between the DIM and the dumb switch in the Test Fixture.

16. Set DIM switch S2-1 to Closed (ON) and the rest of S2 to Open (OFF).

17. Cycle power to the DIM and verify that the DIM resets after 60 to 90 seconds (LEDs will go out and come back on).

SECTION 3

BURN-IN

This section contains the procedures to be followed to accomplish a burn-in cycle on the DIM.

1.

Place the DIM into a test bed capable of providing power to the module per VMEbus standards.

2.

Place the test bed into a thermal chamber.

3.

Complete a 48 hour (minimum) burn-in cycle at 45°C ± 5°C with power applied to the module.

4.

In Table 3-1 record the time and date of the beginning and end of the cycle and the total burn-in time.

Table 3-1. Burn-in Test Information

Date/Time

5.

Insert the temperature burn-in chart into Appendix C.

Completion Verified: ________________

SECTION 4

FINAL TEST

This section details the functional testing of the DIM.

4.1

AUTOMATED TEST PROGRAM

These procedures are performed using the LRADDS Test Rack and the Scripting Processor.

1. Perform Section 2.2, Installation and Setup Procedure.

2.

Set the DIU and RIU Module Test Chassis’ Power Supply Module switch to the ON position. Also turn ON LRADDS tester power.

3.

Select the LRADDS Tester icon on the initial windows screen and follow the displayed instructions.

4.

A dialog box “Interface Configurations” appears showing the expected Comm Port Assignments.

a.

Verify that the Communication Ports and GPIB Address are set as they appear in the display.

b.

Select OK when complete.

5.

Select Test Info.

6.

A dialog box prompting for “Tester Identification” will now be displayed. Enter the Tester Information and press Enter.

7.

A dialog box appears requesting a Serial Number. Enter the DIM Serial Number and press Enter.

8.

Select test type “Module Level Testing” and then “Final”.

9.

At the Module Selection, select “Display Interface Module (DIM) (456357-2)”.

10.

From the displayed Main Screen Menu, select the LOAD TEST option. A dialog box with the names of the tests that can be run will be displayed.

11.

Select the Display Interface Module (DIM) test and then select all scripts in Table 4.1-1.

12.

The Main Screen will be displayed showing the entered information. From this display, select the BEGIN TEST option. The program will now display dialog boxes to provide the operator with step-by-step instructions for completing the test. Upon completion of each test, annotate the appropriate entry in Table 4.1-1.

Table 4.1-1. Final Test Verification Table

Script File Name
Test
RIM Input
DIM Output
Estimated Run Time
Complete
DIM-001
Discrete Azimuth Test
ACP/ARP
3 Wire
1 Minute
DIM-002
RPM Test
ACP/ARP
3 Wire
15 Minutes
DIM-003
3 Wire Pulse Characteristics
ACP/ARP
3 Wire
10 Minutes
DIM-004
Discrete Azimuth Test
ACP/ARP
RADDS
1 Minute
DIM-005
RPM Test
ACP/ARP
RADDS
10 Minutes
DIM-006
Heading Test
ACP/ARP
RADDS
15 Minutes
DIM-007
RADDS Single Bit Test
ACP/ARP
RADDS
2 Minutes
DIM-008
Discrete Azimuth Test
Synchro
ACP/ARP
15 Minutes
DIM-009
RPM Test
Synchro
ACP/ARP
15 Minutes
DIM-010
Discrete Azimuth Test
Synchro
Synchro
1 Minute
DIM-011
TBI Oscope Test
Synchro
Synchro
1 Minute
DIM-012
Switch and LED Test
Synchro
None
4 Minutes

NOTES

To re-run any test, execute steps 10 through 12.

13. Copy and verify data files have been copied to \\Fes-dc\data3\Shared Data\Naval Systems\Test Data\ part number\serial number.

14. Remove test stand fibers from the DIM and RIM.

15. Place short copper Ethernet cable connected directly between the DIM and the dumb switch in the Test Fixture.

16. Set DIM switch S2-1 to Closed (ON) and the rest of S2 to Open (OFF).

17. Cycle power to the DIM and verify that the DIM resets after 60 to 90 seconds (LEDs will go out and come back on).

Comments:

Validation

This sheet is supplied as a validation of the completion and accuracy of the data contained herein. The Test Technician will sign and date as an indication that all instructions have been followed and that each test step has been successfully completed. Signature by the Quality Engineer is an acknowledgement that the test data has been reviewed for completion and accuracy. Applicable inspection or test stamps will be affixed by the signature blocks

Test Technician: ________________________________Date:____________

Quality Engineer: _______________________________Date:____________

APPENDIX A

PRODUCTION ROUTERS

APPENDIX B

NON-CONFORMANCE REPORTS (NCRs)

APPENDIX C

BURN-IN LOG

MODULE TEST

REPAIR

BOARD PER

PARA 1.5.3

Module Test complete

Pass�Test?

ACCEPTANCE TEST PROCEDURE

FOR THE DISPLAY INTERFACE

MODULE (DIM)

(P/N 456357-2)

S/N: _________________

26 MAY 2015

Prepared By:

FRONTIER ELECTRONIC SYSTEMS CORP.

P.O. BOX 1023

STILLWATER, OKLAHOMA 74076-1023

AUTOMATED

TEST PROGRAM

SECTION 4.1

SHORT TEST

SECTION 2.1

INSTALLATION

AND SETUP

SECTION 2.2

BURN-IN

BOARD

SECTION 3

Pass�Test?

AUTOMATED TEST PROGRAM SECTION 2.3

INSTALLATION AND SETUP

SECTION 2.2

START�MODULE �TEST

FINAL TEST

Pre-test Evaluation

YES

NO

NO

YES

_1349681712.vsd text

Interface Panel RIU

LRADDS Test Fixture

Sin/Cos

Azimuth Radar Data

NW Sw (up to 4)

NW Sw (up to 4)

Protocol Analyzer H/W and SW (LEDA Plus)

3-Wire

Backplane

Power Supply

RIM (Golden)

RADDS

ACP/ARP

Synchro

RIM (Slot 2)

RIM (Slot 3)

RIM (Slot 4)

Interface Panel DIU

DIM (UUT)

DIM (Slot 2)

DIM (Slot 3)

DIM (Slot 4)

SpySSM

SSM

Interface Panel IIU

IIM (Slot 1)

IIM (Slot 2)

IIM (Slot 3)

IIM (Slot 4)

RIM Test Chassis (RIU)

DIM Test Chassis (DIU)

IIM Test Chassis (IIU)

IIM (Slot 5)

IIM (Slot 6)

IIM (Slot 7)

SBC

QSDM

LRADDS Test Rack

NW Sw

NW Sw (up to 14)

CP-1273 Emulator

Video

Iron Box 24 port Network Switch

Dual Scan Cvtr Computer

Dual Scan Cvtr Computer

HMI Computer w/RS422 conv

Power Conditioner

2 -T

To RIU Lx (up to 4)

To DIU Lx (up to 4)

To IIU Lx (up to 14)

To CDS Lx (up to 13)

CDS Emulator

Lx (1)

Test Computer (Supermicro X7DBN Motherboard w/ 3 ea Intel EXPI9404PTL Quad Port NIC)

To Port Under test

RADDS to 6W

NAV Data (RS-422)

6 Wire Out

Test System Configured for DIM Test

(Heavy Weight Lines Indicate Paths Used In This Test)

RADDDS to SPA-25 G/H

SPA-25 G/H Display

_1333367820.vsd

File details come from the government source that posted it. Updated .