This document outlines a pre-solicitation notice for the AN/SPQ-15 Data Distribution System Production contract. The Navy seeks to award a five-year C-type contract for production of hardware to support the AN/SPQ-15(V) MK 6 MOD 1 Data Distribution System, including switchboards, decoders, converters, switches and upgrades. The contract will include firm-fixed-price CLINs for hardware production, cost-plus-fixed-fee CLINs for software life-cycle support and engineering development, and not separately priced CLINs for deliverables. The solicitation is designated as a small business set-aside, with NAICS code 334118 and PSC codes K012 and 1285. The solicitation number is N0017822R2501 and will be available on March 7, 2022, with proposals due by April 5, 2022. Award is planned for November 2022.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
455279
SHAPE \* MERGEFORMAT
REVISIONS
| REV |
| DESCRIPTION |
| DATE |
| APPROVED |
| ORIGINAL DATE 26 MAY 2015 |
| DATE APPROVED |
| FRONTIER ELECTRONIC SYS. |
STILLWATER, OKLAHOMA 74076-1023
| ORIGINATOR |
| MIKE HENSON |
| 29 MAY 2015 |
| DOC. COORDINATOR |
| KELLY WHITFIELD |
| 1 JUNE 2015 |
| ACCEPTANCE TEST PROCEDURE |
FOR THE DISPLAY INTERFACE
MODULEL (DIM)
(P/N 456357-2)
| PROJECT ENGINEER |
| EUGENE FRANKLIN |
| 1 JUNE 2015 |
| PROGRAM MGR. |
| PAUL CHENAULT |
| 1 JUNE 2015 |
| QUALITY |
| DON ZAWISZA |
| 1 JUNE 2015 |
CODE IDENT.
63812 455279
ACCEPTANCE TEST PROCEDURE
FOR THE DISPLAY INTERFACE
MODULE (DIM)
(P/N 456357-2)
TABLE OF CONTENTS
Section Title Page
GENERAL INFORMATION
1.1
SCOPE
1.2
PURPOSE
1.3
TEST EQUIPMENT
1.4
LRADDS TEST RACK
1.5
GENERAL REQUIREMENTS
1.5.1 Production Routers 1.5.2 Test Conditions 1.5.3 Failure Reporting
1.5.4 Script Files 1.5.5 Test Data
PRE-TEST EVALUATION
2.1
SHORT TEST
2.2
INSTALLATION AND SETUP PROCEDURE
2.2.1 Software and Firmware Installation 2.3
AUTOMATED TEST PROGRAM
BURN-IN
FINAL TEST
4.1
AUTOMATED TEST PROGRAM
APPENDIX A
PRODUCTION ROUTERS
A-1
TABLE OF CONTENTS (Continued)
Section Title Page
APPENDIX B
NON-CONFORMANCE REPORTS (NCRs) B-1
APPENDIX C
BURN-IN LOG
C-1
LIST OF FIGURES
Figure Title Page 1.1-1 Testing Flow
1.4-1 Functional Test Setup 2.2-1 DIU LRADDS Test Rack Configuration
LIST OF TABLES
Table Title Page 1.3-1 Test Equipment
1.5.4-1 Script Files 2.1-1 Short Test Table 2.2-1 DIM Switch Settings for 456357-2 2.2-2 Radar Interface Module (RIM) Switch Settings for the 456005-1 2.2-3 Radar Interface Module (RIM) Switch Settings (456354-1 or 456354-2) 2.3-1 Pre-Test Verification Table 3-1 Burn-in Test Information 4.1-1 Final Test Verification Table
SECTION 1
GENERAL INFORMATION
1.1
SCOPE
This document contains the test requirements for the acceptance testing of the Display Interface Module (DIM) (P/N 456357-2). This document contains the following sections:
Section 1: General Information
Section 2: Pre-Test Evaluation Procedures
Section 3: Burn-In Procedures
Section 4: Final Test Procedures
The figure below illustrates the order of testing.
Figure 1.1-1. Testing Flow
1.2
PURPOSE
The purpose of this document is to demonstrate that the DIM, as manufactured by Frontier Electronic Systems, meets or exceeds all requirements identified within this document.
1.3
TEST EQUIPMENT
Table 1.3-1 lists the equipment required to perform the procedures contained in this document. Enter the serial number and calibration expiration date for each piece of test equipment.
Table 1.3-1. Test Equipment
| DESCRIPTION |
| USE |
| MODEL |
| SERIAL NUMBER |
| MANUFACTURER/ |
SPECIFICATIONS
CALIBRATION
EXP. DATE
| LRADDS Tester |
| Automated Test |
| 456124 |
| 001 |
| FES |
| N/A |
| Oscilloscope |
| Signal Measurement |
| TDS460A |
Tektronix
| Digital Multimeter |
| Voltage Measurement |
Fluke
Note 1: FES maintains calibration of equipment IAW ISO 9001, procedures FES-QSP-7.6-1-1 and FES-QSP-7.6-2.
Note 2: Equivalent or superior equipment may be substituted for the equipment listed above.
1.4 LRADDS Test rack Figure 1.4-1 illustrates the equipment required to perform the procedures contained in this document.
Figure 1.4-1. Functional Test Setup
1.5
GENERAL REQUIREMENTS
1.5.1 Production Routers
Insert the Production Routers for the module into Appendix A.
1.5.2 Test Conditions
Unless otherwise specified herein, testing shall be performed at standard room ambient temperature, 60( to 80(F.
1.5.3 Failure Reporting
Non-Conformance Reports (NCRs) shall be used to document test failures in accordance with FES-QSP-8.3-3 when required. A copy of the NCR shall be included under Appendix B.
1.5.4 Script Files The script files required for testing are shown in the table below. Controlled copies of the DIM script files reside in Document Control under Mstr_software\456271\-01 Rev X\ (where X is the latest revision).
Table 1.5.4-1. Script Files
| Script File Name |
| Test |
| RIM Input |
| DIM Output |
| Estimated Run Time |
| DIM-001 |
| Discrete Azimuth Test |
| ACP/ARP |
| 3 Wire |
| 1 Minute |
| DIM-002 |
| RPM Test |
| ACP/ARP |
| 3 Wire |
| 15 Minutes |
| DIM-003 |
| 3 Wire Pulse Characteristics |
| ACP/ARP |
| 3 Wire |
| 10 Minutes |
| DIM-004 |
| Discrete Azimuth Test |
| ACP/ARP |
| RADDS |
| 1 Minute |
| DIM-005 |
| RPM Test |
| ACP/ARP |
| RADDS |
| 10 Minutes |
| DIM-006 |
| Heading Test |
| ACP/ARP |
| RADDS |
| 15 Minutes |
| DIM-007 |
| RADDS Single Bit Test |
| ACP/ARP |
| RADDS |
| 2 Minutes |
| DIM-008 |
| Discrete Azimuth Test |
| Synchro |
| ACP/ARP |
| 15 Minutes |
| DIM-009 |
| RPM Test |
| Synchro |
| ACP/ARP |
| 15 Minutes |
| DIM-010 |
| Discrete Azimuth Test |
| Synchro |
| Synchro |
| 1 Minute |
| DIM-011 |
| TBI Oscope Test |
| Synchro |
| Synchro |
| 1 Minute |
| DIM-012 |
| Switch and LED Test |
| Synchro |
| None |
| 4 Minutes |
1.5.5 Test Data Successful completion of each test shall be annotated within these procedures. Test data recorded during automated testing shall be maintained on the FES network at \\Fes-dc\data3\Shared Data\Naval Systems\Test Data\part number\serial number.
SECTION 2
PRE-TEST EVALUATION
This section contains the steps for conducting a preliminary test of the DIM before subjecting it to a burn-in cycle.
2.1
SHORT TEST
Using a Digital Multi-Meter (DMM), verify that the power planes are not shorted together or to ground. The DIM Baseboard PWB drawing 456472 may be used to locate measuring points.
1. Verify that there is no short between the following points, where a short is less than 5 Ohms. Measure points for a maximum duration of 5 seconds. Test points TP1 through TP12 are GND. In the following table, enter a check mark as each reading is checked and no short is present.
Table 2.1-1. Short Test Table
GND
TP1–12
+1.2V
U3 PIN4
+1.8V
U9 PIN5
+2.5V
U5 PIN4
+3.3V
U6 PIN4
+5V
R55 +12V
R56
+1.2V
U3 PIN4
+1.8V
U9 PIN5
+2.5V
U5 PIN4
+3.3
U6 PIN4
+5V
R55
+12V
R56
-12V
P1 A31
VERIFIED: _____________
2.2
INSTALLATION AND SETUP PROCEDURE
The installation and setup procedure verifies the test configuration.
1. Configure the switches on the Display Interface Module (DIM) P/N 456357-2, as shown in Table 2.2-1.
Table 2.2-1. DIM Switch Settings for 456357-2
SWITCH
3 WIRE OUTPUT 8192
| S1-1 |
| Display Select |
| SPA/Q70 |
| ON |
S1-2
Display Type
S1-3
S1-4
Azimuth Rate
S1-5
S1-6
| Primary/Secondary |
| ON |
S1-7
Video SIM
S1-8
AZ True/Relative
| S2-1 |
| Timeout |
| 1 |
| ON |
S2-2
S2-3
S2-4
| S3-1 |
| IP Host Address |
| 1 |
S3-2
| 2 |
| ON |
S3-3
| 4 |
| ON |
S3-4
S3-5
| 16 |
| ON |
S3-6
S3-7
| 64 |
| ON |
S3-8
| 128 |
| ON |
| S4-1 |
| Data |
ON
S4-2
ON
S4-3
ON
S4-4
ON
| S9-1 |
| Power Delay |
S9-2
S9-3
S9-4
S10
SIM
S11
| Local Select |
| ON |
S12
| Video Select |
| 0 |
S13
| Radar Select |
| 1 |
*Blank is OFF (Open). ON = Closed
2. Loosen fasteners and remove the Radar Interface Module (P/N 456005-1, 456354-1 or 456354-2) from the Radar Interface Unit (RIU) Module Test Chassis. Verify the following switch settings and reinstall module securing fasteners.
Table 2.2-2. Radar Interface Module (RIM) Switch Settings for the 456005-1
SWITCH
ACP/ARP INPUT 8192
SWITCH
ACP/ARP INPUT 8192
| S1-1 |
| Radar Select |
| Azimuth Rate |
| S5-1 |
| Power Delay |
| 1 |
S1-2
S5-2
S1-3
Radar Select
S5-3
S1-4
S5-4
S1-5
TBI Use/over ride
S9
| S9 ones; S10 tenths V1 Normalization |
| 0 |
S1-6
AZ True/Relative
S10
S1-7
Not used
S11
SIM
S1-8
Not used
S12
| S12 ones; S13 tenths V2 Normalization |
| 0 |
| S2-1 |
| Input Select |
| TE SPLT |
S13
S2-2
| TE |
| ON |
| S14-43 |
| Radar ID |
| 16 |
| ON |
S2-3
EOS
S14-39
| 8 |
| ON |
S2-4
TM SPLT
S14-40
| 4 |
| ON |
S2-5
| TM |
| ON |
S14-41
| 2 |
| ON |
S2-6
RM
S14-42
| 1 |
| ON |
S2-7
VID 1 SPLT
| S14-6 |
| RIM Number |
| 64 |
| ON |
S2-8
VID 1
S14-5
| 32 |
| ON |
| S3-1 |
| Input Select |
| ARP SPLT |
S14-4
| 16 |
| ON |
S3-2
| ARP |
| ON |
S14-3
| 8 |
| ON |
S3-3
DY
S14-2
| 4 |
| ON |
S3-4
ACP SPLT
S14-1
| 2 |
| ON |
S3-5
| ACP |
| ON |
S14-0
S3-6
DX
| S19-1 |
| Data |
ON
S3-7
VID 2 SPLT
S19-2
ON
S3-8
VID 2
S19-3
ON
| S4-1 |
| IP Host Address |
| 1 |
S19-4
ON
S4-2
| 2 |
| ON |
S4-3
| 4 |
| ON |
S4-4
| 8 |
| ON |
S4-5
| 16 |
| ON |
S4-6
| 32 |
| ON |
S4-7
| 64 |
| ON |
S4-8
| 128 |
| ON |
Table 2.2-3 Radar Interface Module (RIM) Switch Settings (456354-1 or 456354-2)
SWITCH
ACP/ARP INPUT 8192
SWITCH
ACP/ARP INPUT 8192
| S1-1 |
| Radar Select |
| Azimuth Rate |
S9
| S9 ones; S10 tenths V1 Normalization |
| 0 |
S1-2
S10
S1-3
Radar Select
S11
SIM
S1-4
S12
| S12 ones; S13 tenths V2 Normalization |
| 0 |
S1-5
TBI Use/over ride
S13
S1-6
AZ True/Relative
| S14-43 |
| Radar ID |
| 16 |
| ON |
S1-7
Not used
S14-39
| 8 |
| ON |
S1-8
Not used
S14-40
| 4 |
| ON |
| S2-1 |
| Input Select |
| TE SPLT |
S14-41
| 2 |
| ON |
S2-2
| TE |
| ON |
S14-42
| 1 |
| ON |
S2-3
EOS
| S14-6 |
| RIM Number |
| 64 |
| ON |
S2-4
TM SPLT
S14-5
| 32 |
| ON |
S2-5
| TM |
| ON |
S14-4
| 16 |
| ON |
S2-6
RM
S14-3
| 8 |
| ON |
S2-7
VID 1 SPLT
S14-2
| 4 |
| ON |
S2-8
VID 1
S14-1
| 2 |
| ON |
| S3-1 |
| Input Select |
| ARP SPLT |
S14-0
S3-2
| ARP |
| ON |
| S16-1 |
| Timeout |
ON
S3-3
DY
S16-2
S3-4
ACP SPLT
S16-3
S3-5
| ACP |
| ON |
S16-4
S3-6
DX
| S17-1 |
| Data |
ON
S3-7
VID 2 SPLT
S17-2
ON
S3-8
VID 2
S17-3
ON
| S4-1 |
| IP Host Address |
| 1 |
S17-4
ON
S4-2
| 2 |
| ON |
S4-3
| 4 |
| ON |
S4-4
| 8 |
| ON |
S4-5
| 16 |
| ON |
S4-6
| 32 |
| ON |
S4-7
| 64 |
| ON |
S4-8
| 128 |
| ON |
| S5-1 |
| Power Delay |
| 1 |
*Blank is OFF (Open). ON = Closed
S5-2
S5-3
S5-4
3. Connect the DIU LRADDS Test Rack cables as shown in Figure 2.2-1.
Figure 2.2-1. DIU LRADDS Test Rack Configuration 2.2.1 Software and Firmware Installation This step of the procedure details the loading of the Firmware and Software listed on Assembly Number 456357-2 using Software Part Number 456294. These procedures are performed using the LRADDS Test and Scripting Processor.
1. Apply power to the LRADDS Tester and set the DIU Test Chassis’ Power Supply Module switch to the ON position.
2. Log in to the LRADDS test fixture.
3. Start xBash.exe on the Desktop.
4. Type “cd /cygdrive/c/456294/” without the quotes and press Enter.
5. Type “c:/Python26/python 456294X.py –a456357-2” (where “X” is the latest revision number). Press Enter.
6. Follow the onscreen prompts and type “y” when asked. Record below the firmware and software revisions used.
PC Firmware Version 456478 Rev:______________
Interface Firmware Version 456479 Rev:______________
Software Version 456480 Rev:______________
7. Verify that the firmware and software have been loaded without failures.
8. Copy log file from c:\456294\reports\456357-2_SSS_YYYY-MMM-DD_HH-mm-ss-AM.txt to \\Fes-dc\data3\Shared Data\Naval Systems\Test Data\part number\serial number where “SSS” is the serial number “YYYY” is the year “MMM” is the month (i.e., Jan) “DD” is the day “HH” is the hour “mm” is the minute “ss” is the second and “AM” can be AM or PM, depending on the time of day.
Verify that the file has been copied.
NOTE: USB port parameters: COM Port: 3 (Windows), Baud Rate: 115200, Data bits: 8, Parity: None, Stop bits:1, Flow Control: None. Verify software has been loaded.
9. Using the following procedure, record the MAC Address, Firmware and Software versions on the module.
a. Perform a board reset and plug a USB cable into the unit.
b. From the desktop, run LRADDS.ht.
c. On the DIM, press the CPU Reset button.
d. From the LRADDS.ht window, record the following values:
MAC Address:_________________________________________
e. Press “v” inside the Hyperterminal window and record the versions displayed.
PC Firmware Version (456478):______________
Interface Firmware Version (456479):______________
Software Version (456480):______________
10. Verify the Mac Address displayed in the LRADDS.ht window matches the MAC address in the spreadsheet “IM MAC Address Log” located at \\Fes-dc\data3\Document Control\Mstr_software\NAVAL_MacAddress
11. Create and apply the label for Part Numbers flashed per Assembly Drawing 456357-2. Verify below.
2.3
AUTOMATED TEST PROGRAM
These procedures are performed using the LRADDS Test and Scripting Processor.
1.
Set the DIU and RIU Module Test Chassis’ Power Supply Module switch to the ON position. Also turn ON LRADDS tester power.
2. Select the LRADDS Tester icon on the initial windows screen and follow the displayed instructions.
3.
A dialog box “Interface Configurations” appears showing the expected Comm Port Assignments.
a.
Verify that the Communication Ports and GPIB Address are set as they appear in the display.
b.
Select OK when complete.
4.
Select Test Info.
5.
A dialog box prompting for “Tester Identification” will now be displayed. Enter the Tester Information and press Enter.
6.
A dialog box appears requesting a Serial Number. Enter the DIM Serial Number and press Enter.
7.
Select test type “Module Level Testing” and then “Preliminary”.
8.
At the Module Selection screen, select “Display Interface Module (DIM) (456357-2)”.
9.
From the displayed Main Screen Menu, select the LOAD TEST option. A dialog box with the names of the tests that can be run will be displayed.
10.
Select the Display Interface Module (DIM) test and then select all scripts in Table 2.3-1.
11.
The Main Screen will be displayed showing the entered information. From this display, select the BEGIN TEST option. The program will now display dialog boxes to provide the operator with step-by-step instructions for completing the test. Upon completion of each test, annotate the appropriate entry in Table 2.3-1.
Table 2.3-1. Pre-Test Verification Table
| Script File Name |
| Test |
| RIM Input |
| DIM Output |
| Estimated Run Time |
| Complete |
| DIM-001 |
| Discrete Azimuth Test |
| ACP/ARP |
| 3 Wire |
| 1 Minute |
| DIM-002 |
| RPM Test |
| ACP/ARP |
| 3 Wire |
| 15 Minutes |
| DIM-003 |
| 3 Wire Pulse Characteristics |
| ACP/ARP |
| 3 Wire |
| 10 Minutes |
| DIM-004 |
| Discrete Azimuth Test |
| ACP/ARP |
| RADDS |
| 1 Minute |
| DIM-005 |
| RPM Test |
| ACP/ARP |
| RADDS |
| 10 Minutes |
| DIM-006 |
| Heading Test |
| ACP/ARP |
| RADDS |
| 15 Minutes |
| DIM-007 |
| RADDS Single Bit Test |
| ACP/ARP |
| RADDS |
| 2 Minutes |
| DIM-008 |
| Discrete Azimuth Test |
| Synchro |
| ACP/ARP |
| 15 Minutes |
| DIM-009 |
| RPM Test |
| Synchro |
| ACP/ARP |
| 15 Minutes |
| DIM-010 |
| Discrete Azimuth Test |
| Synchro |
| Synchro |
| 1 Minute |
| DIM-011 |
| TBI Oscope Test |
| Synchro |
| Synchro |
| 1 Minute |
| DIM-012 |
| Switch and LED Test |
| Synchro |
| None |
| 4 Minutes |
NOTES
To re-run any test, execute steps 5 through 7.
12. After the test is complete, select Close File from the menu to save the test data.
13. Copy and verify data files have been copied to:
\\Fes-dc\data3\Shared Data\Naval Systems\Test Data\ part number\serial number.
14. Remove test stand fibers from the DIM and RIM.
15. Place short copper Ethernet cable connected directly between the DIM and the dumb switch in the Test Fixture.
16. Set DIM switch S2-1 to Closed (ON) and the rest of S2 to Open (OFF).
17. Cycle power to the DIM and verify that the DIM resets after 60 to 90 seconds (LEDs will go out and come back on).
SECTION 3
BURN-IN
This section contains the procedures to be followed to accomplish a burn-in cycle on the DIM.
1.
Place the DIM into a test bed capable of providing power to the module per VMEbus standards.
2.
Place the test bed into a thermal chamber.
3.
Complete a 48 hour (minimum) burn-in cycle at 45°C ± 5°C with power applied to the module.
4.
In Table 3-1 record the time and date of the beginning and end of the cycle and the total burn-in time.
Table 3-1. Burn-in Test Information
Date/Time
5.
Insert the temperature burn-in chart into Appendix C.
Completion Verified: ________________
SECTION 4
FINAL TEST
This section details the functional testing of the DIM.
4.1
AUTOMATED TEST PROGRAM
These procedures are performed using the LRADDS Test Rack and the Scripting Processor.
1. Perform Section 2.2, Installation and Setup Procedure.
2.
Set the DIU and RIU Module Test Chassis’ Power Supply Module switch to the ON position. Also turn ON LRADDS tester power.
3.
Select the LRADDS Tester icon on the initial windows screen and follow the displayed instructions.
4.
A dialog box “Interface Configurations” appears showing the expected Comm Port Assignments.
a.
Verify that the Communication Ports and GPIB Address are set as they appear in the display.
b.
Select OK when complete.
5.
Select Test Info.
6.
A dialog box prompting for “Tester Identification” will now be displayed. Enter the Tester Information and press Enter.
7.
A dialog box appears requesting a Serial Number. Enter the DIM Serial Number and press Enter.
8.
Select test type “Module Level Testing” and then “Final”.
9.
At the Module Selection, select “Display Interface Module (DIM) (456357-2)”.
10.
From the displayed Main Screen Menu, select the LOAD TEST option. A dialog box with the names of the tests that can be run will be displayed.
11.
Select the Display Interface Module (DIM) test and then select all scripts in Table 4.1-1.
12.
The Main Screen will be displayed showing the entered information. From this display, select the BEGIN TEST option. The program will now display dialog boxes to provide the operator with step-by-step instructions for completing the test. Upon completion of each test, annotate the appropriate entry in Table 4.1-1.
Table 4.1-1. Final Test Verification Table
| Script File Name |
| Test |
| RIM Input |
| DIM Output |
| Estimated Run Time |
| Complete |
| DIM-001 |
| Discrete Azimuth Test |
| ACP/ARP |
| 3 Wire |
| 1 Minute |
| DIM-002 |
| RPM Test |
| ACP/ARP |
| 3 Wire |
| 15 Minutes |
| DIM-003 |
| 3 Wire Pulse Characteristics |
| ACP/ARP |
| 3 Wire |
| 10 Minutes |
| DIM-004 |
| Discrete Azimuth Test |
| ACP/ARP |
| RADDS |
| 1 Minute |
| DIM-005 |
| RPM Test |
| ACP/ARP |
| RADDS |
| 10 Minutes |
| DIM-006 |
| Heading Test |
| ACP/ARP |
| RADDS |
| 15 Minutes |
| DIM-007 |
| RADDS Single Bit Test |
| ACP/ARP |
| RADDS |
| 2 Minutes |
| DIM-008 |
| Discrete Azimuth Test |
| Synchro |
| ACP/ARP |
| 15 Minutes |
| DIM-009 |
| RPM Test |
| Synchro |
| ACP/ARP |
| 15 Minutes |
| DIM-010 |
| Discrete Azimuth Test |
| Synchro |
| Synchro |
| 1 Minute |
| DIM-011 |
| TBI Oscope Test |
| Synchro |
| Synchro |
| 1 Minute |
| DIM-012 |
| Switch and LED Test |
| Synchro |
| None |
| 4 Minutes |
NOTES
To re-run any test, execute steps 10 through 12.
13. Copy and verify data files have been copied to \\Fes-dc\data3\Shared Data\Naval Systems\Test Data\ part number\serial number.
14. Remove test stand fibers from the DIM and RIM.
15. Place short copper Ethernet cable connected directly between the DIM and the dumb switch in the Test Fixture.
16. Set DIM switch S2-1 to Closed (ON) and the rest of S2 to Open (OFF).
17. Cycle power to the DIM and verify that the DIM resets after 60 to 90 seconds (LEDs will go out and come back on).
Comments:
Validation
This sheet is supplied as a validation of the completion and accuracy of the data contained herein. The Test Technician will sign and date as an indication that all instructions have been followed and that each test step has been successfully completed. Signature by the Quality Engineer is an acknowledgement that the test data has been reviewed for completion and accuracy. Applicable inspection or test stamps will be affixed by the signature blocks
Test Technician: ________________________________Date:____________
Quality Engineer: _______________________________Date:____________
APPENDIX A
PRODUCTION ROUTERS
APPENDIX B
NON-CONFORMANCE REPORTS (NCRs)
APPENDIX C
BURN-IN LOG
MODULE TEST
REPAIR
BOARD PER
PARA 1.5.3
Module Test complete
Pass�Test?
ACCEPTANCE TEST PROCEDURE
FOR THE DISPLAY INTERFACE
MODULE (DIM)
(P/N 456357-2)
S/N: _________________
26 MAY 2015
Prepared By:
FRONTIER ELECTRONIC SYSTEMS CORP.
P.O. BOX 1023
STILLWATER, OKLAHOMA 74076-1023
AUTOMATED
TEST PROGRAM
SECTION 4.1
SHORT TEST
SECTION 2.1
INSTALLATION
AND SETUP
SECTION 2.2
BURN-IN
BOARD
SECTION 3
Pass�Test?
AUTOMATED TEST PROGRAM SECTION 2.3
INSTALLATION AND SETUP
SECTION 2.2
START�MODULE �TEST
FINAL TEST
Pre-test Evaluation
YES
NO
NO
YES
_1349681712.vsd text
Interface Panel RIU
LRADDS Test Fixture
Sin/Cos
Azimuth Radar Data
NW Sw (up to 4)
NW Sw (up to 4)
Protocol Analyzer H/W and SW (LEDA Plus)
3-Wire
Backplane
Power Supply
RIM (Golden)
RADDS
ACP/ARP
Synchro
RIM (Slot 2)
RIM (Slot 3)
RIM (Slot 4)
Interface Panel DIU
DIM (UUT)
DIM (Slot 2)
DIM (Slot 3)
DIM (Slot 4)
SpySSM
SSM
Interface Panel IIU
IIM (Slot 1)
IIM (Slot 2)
IIM (Slot 3)
IIM (Slot 4)
RIM Test Chassis (RIU)
DIM Test Chassis (DIU)
IIM Test Chassis (IIU)
IIM (Slot 5)
IIM (Slot 6)
IIM (Slot 7)
SBC
QSDM
LRADDS Test Rack
NW Sw
NW Sw (up to 14)
CP-1273 Emulator
Video
Iron Box 24 port Network Switch
Dual Scan Cvtr Computer
Dual Scan Cvtr Computer
HMI Computer w/RS422 conv
Power Conditioner
2 -T
To RIU Lx (up to 4)
To DIU Lx (up to 4)
To IIU Lx (up to 14)
To CDS Lx (up to 13)
CDS Emulator
Lx (1)
Test Computer (Supermicro X7DBN Motherboard w/ 3 ea Intel EXPI9404PTL Quad Port NIC)
To Port Under test
RADDS to 6W
NAV Data (RS-422)
6 Wire Out
Test System Configured for DIM Test
(Heavy Weight Lines Indicate Paths Used In This Test)
RADDDS to SPA-25 G/H
SPA-25 G/H Display
_1333367820.vsd