455047E ATP for the SSSM.doc
DOC document 279 KB Posted
- Attached to
- AN/SPQ-15 Data Distribution System Production Federal contract opportunity
- Solicitation number
- N0017822R2501
About this file
This pre-solicitation notice seeks proposals for the production of hardware in support of the AN/SPQ-15(V) MK 6 MOD 1 Data Distribution System programs. Products and services will include standard data and distribution systems from radar sensors to navigational and tactical displays, as well as durable and reliable state-of-the-art switchboards, decoders, converters, switches, and upgrades for existing AN/SPQ-14(V) Advanced Sensor Distribution System and Data Distribution System installations. The contract will be awarded as a C-Type contract with firm-fixed-price CLINs for hardware production, cost-plus-fixed-fee CLINs for software life-cycle support and software engineering/development efforts, and not separately priced CLINs for deliverables. The solicitation is designated as a small business set-aside with a NAICS code of 334118 and PSC code of K012 and 1285. The period of performance is five years. The solicitation number is N0017822R2501 and will be available on March 7, 2022, open for 30 days, with award planned for November 2022 and a period of performance start date also of November 2022.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
455047E
SHAPE \* MERGEFORMAT
REVISIONS
| REV |
| DESCRIPTION |
| DATE |
| APPROVED |
| A |
| Incorporated changes per CO # 24-2248 |
| 3/26/10 |
| AW |
| B |
| Incorporated changes per CO # 24-2279 |
| 4/16/10 |
| PDC |
| C |
| Incorporated changes per CO # 24-2745 |
| 1/7/11 |
| AW |
| D |
| Incorporated changes per CO # 24-2995 |
| 5/2/2011 |
| PDC |
| E |
| Incorporated changes per CO # 24-3485 |
| 7/16/2012 |
| PDC |
| ORIGINAL DATE 29 JANUARY 2009 |
| DATE APPROVED |
| FRONTIER ELECTRONIC SYS. |
STILLWATER, OKLAHOMA 74076-1023
| ORIGINATOR |
| TED NISHIMUTA |
| 3 FEB 2009 |
| DOC. COORDINATOR |
| KELLY WHITFIELD |
| 2-4-09 |
| ACCEPTANCE TEST PROCEDURE |
FOR THE SPY SIGNAL SPLITTER
MODULE (SSSM)
(P/N 456045-1)
| PROJECT ENGINEER |
| ROCKY SUTTON |
| 03 FEB 2009 |
| PROGRAM MGR. |
| CHRISTOPHER JOBE |
| 4 FEB 2009 |
| QUALITY |
| MICHAEL S. WEBSTER |
| 2/04/09 |
CODE IDENT.
63812 455047E
ACCEPTANCE TEST PROCEDURE
FOR THE SPY SIGNAL SPLITTER
MODULE (SSSM)
(P/N 456045-1)
TABLE OF CONTENTS
Section Title Page
GENERAL INFORMATION
1.1
SCOPE
1.2
PURPOSE
1.3
TEST EQUIPMENT
1.4
LRADDS TEST RACK
1.5
GENERAL REQUIREMENTS
1.5.1 Production Routers 1.5.2 Test Conditions 1.5.3 Failure Reporting 1.5.4 Script Files 1.5.5 Test Data
PRE-TEST EVALUATION
2.1
CONTINUITY TEST
2.2
INSTALLATION AND SETUP PROCEDURE
2.3
AUTOMATED TEST PROGRAM
BURN-IN
FINAL TEST
4.1
AUTOMATED TEST PROGRAM
APPENDIX A
PRODUCTION ROUTERS
A-1
APPENDIX B
NON-CONFORMANCE REPORTS (NCR)
B-1
APPENDIX C
BURN-IN LOG
C-1
TABLE OF CONTENTS (Continued)
LIST OF FIGURES
Figure Title Page 1.1-1 Testing Flow
1.4-1 Functional Test Setup
LIST OF TABLES
Table Title Page 1.3-1 Test Equipment
1.5.4-1 Script Files 2.1-1 Continuity Test 2.2-1 Radar Interface Module (RIM) Switch Settings 2.2-2 Display Interface Module (DIM) Switch Settings (P/N 456063) 2.2-3 Display Interface Module (DIM) Switch Settings (P/N 456357) 2.3-1 Pre-Test Verification Table 3-1 Burn-in Test Information 4.1-1 Final Test Verification Table
SECTION 1
GENERAL INFORMATION
1.1
SCOPE
This document contains the test requirements for the acceptance testing of the Spy Signal Splitter Module (SSSM) (P/N 456045-1). This document contains the following sections:
Section 1: General Information
Section 2: Pre-Test Evaluation Procedures
Section 3: Burn-In Procedures
Section 4: Final Test Procedures
The figure below illustrates the order of testing.
Figure 1.1-1. Testing Flow
1.2
PURPOSE
The purpose of this document is to demonstrate that the Spy Signal Splitter Module (SSSM), as manufactured by Frontier Electronic Systems, meets or exceeds all requirements identified within this document.
1.3
TEST EQUIPMENT
Table 1.3-1 lists the equipment required to perform the procedures contained in this document. Enter the serial number and calibration expiration date for each piece of test equipment.
Table 1.3-1. Test Equipment
| DESCRIPTION |
| USE |
| MODEL |
| SERIAL NUMBER |
| MANUFACTURER/ |
SPECIFICATIONS
CALIBRATION
EXP. DATE
| LRADDS Tester |
| Automated Test |
| 456124 |
| 001 |
| FES |
| N/A |
| Oscilloscope |
| Signal Measurement |
| TDS460A |
Tektronix
| Digital Multimeter |
| Voltage Measurement |
Fluke
Note 1: FES maintains calibration of equipment IAW ISO 9001, procedures FES-QSP-7.6-1-1 and FES-QSP-7.6-2.
Note 2: Equivalent or superior equipment may be substituted for the equipment listed above.
1.4 LRADDS Test rack Figure 1.4-1 illustrates the equipment required to perform the procedures contained in this document.
Figure 1.4-1. Functional Test Setup
1.5
GENERAL REQUIREMENTS
1.5.1 Production Routers
Insert the Production Routers for the module into Appendix A.
1.5.2 Test Conditions
Unless otherwise specified herein, testing shall be performed at standard room ambient temperature, 60( to 80(F.
1.5.3 Failure Reporting
Non-Conformance Reports (NCRs) shall be used to document test failures in accordance with FES-QSP-8.3-3 when required. A copy of the NCR shall be included under Appendix B.
1.5.4 Script Files
The script files required for testing are shown in the table below. Controlled copies of the SSSM script files reside in Document Control under Mstr_software\456271\ -01 Rev X\ (where X is the latest revision).
Table 1.5.4-1. Script Files
| SCRIPT FILE NAME |
| PURPOSE |
| SSSM-001 |
| Discrete Azimuth Test (PPI 6-Wire) |
| SSSM-002 |
| Discrete Azimuth Test (RHI 6-Wire) |
| SSSM-003 |
| 6-Wire Pulse Characteristics Test |
| SSSM-004 |
| Switch and LED Test |
1.5.5 Test Data Successful completion of each test shall be annotated within these procedures. Test data recorded during automated testing shall be maintained on the FES network at data3\Shared Data\Naval Systems\Test Data\part number\serial number.
SECTION 2
PRE-TEST EVALUATION
This section contains the steps for conducting a preliminary test of the Spy Signal Splitter Module (SSSM) before subjecting it to a burn-in cycle.
2.1
CONTINUITY TEST
Using a Digital Multi-Meter (DMM), verify that the power planes are not shorted together or to ground by verifying no continuity at the following points. Refer to schematic and PWB 456043 and 456044 for measuring points. Readings are to be greater than 100 Ω.
Table 2.1-1. Continuity Test
GND
TP1-TP10
+2.0V
U61 PIN 6
+2.5V
U43 PIN 3
+3.3V
U62 PIN 6
+5V
U62 PIN 3
+15V
U44 PIN 4
+2.0V
U61 PIN 6
+2.5V
U43 PIN 3
+3.3V
U62 PIN 6
+5V
U62 PIN 3
+15V
U44 PIN 4
-24V
U63 PIN 5
Verified:________________ 2.2
INSTALLATION AND SETUP PROCEDURE
The Installation and Setup Procedure verifies the test configuration.
1. Set the Gold Board Radar Interface Unit (RIU) Test Chassis’ Power Supply Module switch to the OFF position.
2.
Remove the Spy Signal Splitter Module (SSSM) Gold Board from the RIU Test Chassis and install the SSSM being tested into the Gold Board slot.
3.
Remove the RIM Gold Board and set its switches as shown in Table 2.2-1.
Table 2.2-1. Radar Interface Module (RIM) Switch Settings
| SWITCH |
| SETTING |
| S1-1 thru S1-8 |
| Closed |
| S2-1 |
| Open |
| S2-2 |
| Closed |
| S2-3 and S2-4 |
| Open |
| S2-5 |
| Closed |
| S2-6 and S2-7 |
| Open |
| S2-8 |
| Closed |
| S3-1 |
| Open |
| S3-2 |
| Closed |
| S3-3 and S3-4 |
| Open |
| S3-5 |
| Closed |
| S3-6 and S3-7 |
| Open |
| S3-8 |
| Closed |
| S4-1 |
| Open |
| S4-2 thru S4-8 |
| Closed |
| S5-1 thru S5-4 |
| Open |
| S9 |
| 0 |
| S10 |
| 0 |
| S11 |
| OFF |
| S12 |
| 0 |
| S13 |
| 0 |
| S14-1 thru S14-11 |
| Closed |
| S14-12 |
| Open |
| S17-1 thru S17-4 |
| N/A for 456005-1 |
Closed for 456354-1
| S19-1 thru S19-4 |
| Closed for 456005-1 |
N/A for 456354-1
4.
Install the Radar Interface Module (RIM) Gold Board into slot 1 of the RIU Test Chassis.
5.
On SIGNAL SPLITTER Module (P/N 500034-1) located in the Gold Board RIU Test Chassis, set all Front Panel switches to the OFF position.
6.
Remove power to the Display Interface Unit (DIU) Test Chassis.
7.
Remove the Display Interface Module (DIM) Gold Board and set its switches in accordance with Table 2.2-2.
Table 2.2-2. Display Interface Module (DIM) Switch Settings (P/N 456063)
| SWITCH |
| DIM 1 |
SETTING
DIM 2
SETTING
| S1-1 |
| Closed |
| Closed |
| S1-2 |
| Closed |
| Open |
| S1-3 |
| Closed |
| Open |
| S1-4 thru S1-8 |
| Open |
| Open |
| S4-1 |
| Open |
| Open |
| S4-2 |
| Open |
| Closed |
| S4-3 |
| Closed |
| Open |
| S4-4 thru S4-8 |
| Closed |
| Closed |
| S5-1 thru S5-4 |
| Open |
| Open |
| S11 |
| OFF |
| OFF |
| S16 |
| Local |
| Local |
| S17 |
| 0 |
| 0 |
| S18 |
| 1 |
| 1 |
| S19-1 thru S19-4 |
| Closed |
| Closed |
Table 2.2-3. Display Interface Module (DIM) Switch Settings (P/N 456357)
| SWITCH |
| DIM 1 |
SETTING
DIM 2
SETTING
| S1-1 |
| Closed |
| Closed |
| S1-2 |
| Closed |
| Open |
| S1-3 |
| Closed |
| Open |
| S1-4 thru S1-8 |
| Open |
| Open |
| S2-1 and S2-2 |
| Open |
| Open |
| S2-3 |
| Closed |
| Closed |
| S2-4 |
| Open |
| Open |
| S3-1 |
| Open |
| Open |
| S3-2 |
| Open |
| Closed |
| S3-3 |
| Closed |
| Open |
| S3-4 thru S3-8 |
| Closed |
| Closed |
| S4-1 thru S4-4 |
| Closed |
| Closed |
| S9-1 thru S9-4 |
| Closed |
| Closed |
| S10 |
| OFF |
| OFF |
| S11 |
| Local |
| Local |
| S12 |
| 0 |
| 0 |
| S13 |
| 1 |
| 1 |
2.3
AUTOMATED TEST PROGRAM
These procedures are performed using the LRADDS Tester and the Scripting Processor.
1.
If not already ON, apply power to the LRADDS Tester and set the RIU Test Chassis’ Power Supply Module switch to the ON position.
2.
Select the LRADDS Tester icon on the initial windows screen and follow the displayed instructions.
3.
A dialog box “Interface Configurations” appears showing the expected Comm Port Assignments.
a.
Verify that the Communication Ports and GPIB Address are set as they appear in the display.
b.
Select OK when complete.
4.
Click on the “Test Info” button.
5.
A dialog box prompting for “Tester Identification” will now be displayed. Enter the tester information and press ENTER from the key module.
6.
A dialog box appears requesting a Serial Number. Enter the serial number of the Spy Signal Splitter Module (SSSM) being tested and press ENTER.
7.
Select test type “Preliminary”.
8.
At the Module Selection screen, select “Spy Signal Splitter Module”.
9.
From the displayed Main Screen Menu, select the LOAD TEST option. A dialog box with the names of the tests that can be run will be displayed.
10.
Click on the “Select All” button.
11.
The Main Screen will be displayed showing the entered information. From this display, select the BEGIN TEST option. The program will now display dialog boxes to provide the operator with step-by-step instructions for completing the test. Upon completion of each test, annotate the appropriate entry in Table 2.3-1.
Table 2.3-1. Pre-Test Verification Table
| TEST |
| ESTIMATED RUN TIME |
| COMPLETE |
| Discrete Azimuth Test (PPI 6-Wire) – SSSM-001 |
| 5 Minutes |
| Discrete Azimuth Test (RHI 6-Wire) – SSSM-002 |
| 5 Minute |
| 6-Wire Pulse Characteristics Test – SSSM-003 |
| 10 Minutes |
| Switch and LED Test – SSSM-004 |
| 5 Minutes |
12.
After the test is complete, select Close File from the menu to save the test data.
SECTION 3
BURN-IN
This section contains the procedures to be followed to accomplish a burn-in cycle on the Spy Signal Splitter Module (SSSM).
1.
Place the Spy Signal Splitter Module (SSSM) into a test bed capable of providing power to the module per VMEbus standards.
2.
Place the test bed into a thermal chamber.
3.
Complete a 48 hour (minimum) burn-in cycle at 45°C ± 5°C with power applied to the module.
4.
In Table 3-1 record the time and date of the beginning and end of the cycle and the total burn-in time.
Table 3-1. Burn-in Test Information
Date/Time
5.
Insert the temperature burn-in chart into Appendix C.
Verified:________________
SECTION 4
FINAL TEST
This section details the functional testing of the Spy Signal Splitter Module (SSSM).
4.1
AUTOMATED TEST PROGRAM
These procedures are preformed using the LRADDS Test Rack and the Scripting Processor.
1. Perform Section 2.2, Installation and Setup Procedure.
2.
If not already ON, apply power to the LRADDS Tester and set the Gold Board RIU Test Chassis’ Power Supply Module switch to the ON position.
3.
Select the LRADDS Tester icon on the initial windows screen and follow the displayed instructions.
4.
A dialog box “Interface Configurations” appears showing the expected Comm Port Assignments.
a.
Verify that the Communication Ports and GBIP Address are set as they appear in the display.
b.
Select OK when complete.
5.
Click on the “Test Info” button.
6.
A dialog box prompting for “Tester Identification” will now be displayed. Enter the tester information and press ENTER from the key module.
7.
A dialog box appears requesting a Serial Number. Enter the serial number of the Spy Signal Splitter Module (SSSM) being tested and press ENTER.
8.
Select test type “Final”.
9.
At the Module Selection screen, select “Spy Signal Splitter Module”.
10.
From the displayed Main Screen Menu, select the LOAD TEST option. A dialog box with the names of the tests that can be run will be displayed.
11.
Click on the “Select All” button.
12.
The Main Screen will be displayed showing the entered information. From this display, select the BEGIN TEST option. The program will now display dialog boxes to provide the operator with step-by-step instructions for completing the test. Upon completion of each test, annotate the appropriate entry in Table 4.1-1.
Table 4.1-1. Final Test Verification Table
| TEST |
| ESTIMATED RUN TIME |
| COMPLETE |
| Discrete Azimuth Test (PPI 6-Wire) – SSSM-001 |
| 5 Minutes |
| Discrete Azimuth Test (RHI 6-Wire) – SSSM-002 |
| 5 Minute |
| 6-Wire Pulse Characteristics Test – SSSM-003 |
| 10 Minutes |
| Switch and LED Test – SSSM-004 |
| 5 Minutes |
13.
Copy test data files to the network drive data3\Shared Data\Naval Systems\Test Data\part number\serial number.
Verified:________________
Comments:
Validation
This sheet is supplied as a validation of the completion and accuracy of the data contained herein. The Test Technician will sign and date as an indication that all instructions have been followed and that each test step has been successfully completed. Signature by the Quality Engineer is an acknowledgement that the test data has been reviewed for completion and accuracy. Appropriate Test/Inspection stamps will be affixed by the signature blocks
Test Technician: ________________________________Date:____________
Quality Engineer: _______________________________Date:____________
APPENDIX A
PRODUCTION ROUTERS
APPENDIX B
NON-CONFORMANCE REPORTS (NCR)
APPENDIX C
BURN-IN LOG
MODULE TEST
REPAIR
BOARD PER
PARA 1.5.3
Module Test complete
Pass�Test?
ACCEPTANCE TEST PROCEDURE
FOR THE SPY SIGNAL SPLITTER MODULE (SSSM)
(P/N 456045-1)
S/N: _________________
Prepared For:
Combat Direction Systems Activity Dam Neck
Dahlgren Division, Code F31
1922 Regulus Avenue
Virginia Beach, VA 23461-2067
13 JULY 2012
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to protecting technical, operational, or operational use information from automatic dissemination under the International Exchange Program or by other means as determined on or after date of task order award. Other requests for this document shall be referred to NAVSEA CDSA Code F31.
WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Prepared By:
FRONTIER ELECTRONIC SYSTEMS CORP.
P.O. BOX 1023
STILLWATER, OKLAHOMA 74076-1023
AUTOMATED
TEST PROGRAM
SECTION 4.1
CONTINUITY TEST
SECTION 2.1
INSTALLATION
AND SETUP
SECTION 2.2
BURN-IN
BOARD
SECTION 3
Pass�Test?
AUTOMATED TEST PROGRAM SECTION 2.3
INSTALLATION AND SETUP
START�MODULE �TEST
FINAL TEST
Pre-test Evaluation
YES
NO
NO
YES
_1349681561.vsd text
Interface Panel RIU
LRADDS Test Fixture
SPY 6 Wire RHI
Sin/Cos
Synchro
ACP/ARP
SPY 6-Wire PPI
Azimuth Radar Data
NW Sw (up to 4)
NW Sw (up to 4)
Protocol Analyzer H/W and SW (LEDA Plus)
Test System Configured for RIM Test
(Heavy Weight Lines Indicate Paths used in this test)
Backplane
Power Supply
RIM (UUT)
RADDS
ACP/ARP
RIM (Slot 2)
RIM (Slot 3)
RIM (Slot 4)
Interface Panel DIU
DIM (Golden)
DIM (Slot 2)
DIM (Slot 3)
DIM (Slot 4)
SpySSM
SSM
Interface Panel IIU
IIM (Slot 1)
IIM (Slot 2)
IIM (Slot 3)
IIM (Slot 4)
RIM Test Chassis (RIU)
DIM Test Chassis (DIU)
IIM Test Chassis (IIU)
IIM (Slot 5)
IIM (Slot 6)
IIM (Slot 7)
SBC
QSC
LRADDS Test Rack
NW Sw
NW Sw (up to 14)
NAWCAD SIM
Video
Iron Box 24 port Network Switch
Dual Scan Cvtr Comupter
Dual Scan Cvtr Comptuer
HMI Computer w/RS422 conv
Power Conditioner
2 -T
To RIU Lx (up to 4)
To DIU Lx (up to 4)
To IIU Lx (up to 14)
To CDS Lx (up to 13)
CDS Emulator
Lx (1)
Test Computer (Supermicro X7DBN Motherboard w/ 3 ea Intel EXPI9404PTL Quad Port NIC)
To Port Under test
RADDS to 6W
NAV Data (RS-422)
6 Wire Out
3 Wire
File details come from the government source that posted it. Updated .