This document summarizes a federal contract opportunity for the production of hardware in support of the AN/SPQ-15(V) MK 6 MOD 1 Data Distribution System programs. The Naval Sea Systems Command is seeking firm-fixed-price production of data and distribution system hardware, including switchboards, decoders, converters, switches and upgrades. The contract will also include cost-plus-fixed-fee elements for software life-cycle support, engineering and development. The period of performance is five years, with an estimated award date of November 2022. Responses are due by April 5, 2022 or 30 days after the solicitation is posted on March 7, 2022. The requirement is set aside as a small business opportunity, with full and open competition following small business exclusion. Best value continuum procedures will be used to evaluate proposals.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
455287A
SHAPE \* MERGEFORMAT
REVISIONS
| REV |
| DESCRIPTION |
| DATE |
| APPROVED |
| A |
| Incorporated changes per CO # 24-4154 |
| 6/13/2019 |
| PDC |
| ORIGINAL DATE 03 JUNE 2015 |
| DATE APPROVED |
| FRONTIER ELECTRONIC SYS. |
STILLWATER, OKLAHOMA 74074
| ORIGINATOR |
| MIKE HENSON |
| 2015 JUN 09 |
| DOC. COORDINATOR |
| KELLY WHITFIELD |
| 6-9-2015 |
| ACCEPTANCE TEST PROCEDURE |
FOR THE CONVERTER-RECEIVER CONTROL (CRC)
(P/N 456010-2)
| PROJECT ENGINEER |
| EUGENE FRANKLIN |
| 2015 JUN 09 |
| PROGRAM MGR. |
| PAUL CHENAULT |
| 2015 JUN 09 |
| QUALITY |
| DON ZAWISZA |
| 6/9/2015 |
CODE IDENT.
63812 455287A
ACCEPTANCE TEST PROCEDURE
FOR THE CONVERTER-RECEIVER
CONTROL (CRC)
(P/N 456010-2)
TABLE OF CONTENTS
Section Title Page
GENERAL
1.1
SCOPE
1.2
PURPOSE
1.3
TEST OVERVIEW
1.3.1 Script Files 1.4
TEST EQUIPMENT
1.5
LRADDS TEST RACK
1.6
GENERAL REQUIREMENTS
1.6.1 As-Built Documentation 1.6.2 Test Conditions 1.6.3 Failure Reporting 1.6.4 Test Data
FACTORY ACCEPTANCE TEST PROCEDURES
2.1
UNIT SERIAL NUMBER
2.2
CRC POWER CHECK SECTION
2.2.1 AC Power Check 2.3
CRC POWER-UP SECTION
2.3.1 CRC Power-Up 2.3.2 Unloaded Power Supply Check 2.3.3 VME Chassis Power Check Procedure
2.4
TEMPERATURE WARNING SECTION
TABLE OF CONTENTS (Continued) Section Title Page 2.4.1 Temperature Warning CRC Test 2.4.2 Module Installation Procedure
2.4.3 Ethernet Fiber Cable Installation 2.4.4 Power Supply/Indicators Test 2.4.5 Automated Test
APPENDIX A
AS BUILT CONFIGURATION DATA SHEETS
A-1
APPENDIX B
PRODUCTION ROUTERS
B-1
APPENDIX C
NON-CONFORMANCE REPORTS (NCRs) C-1
LIST OF FIGURES
Figure Title Page 1.5-1 Functional Test Setup 2.3.1-1 Backplane Connector Lower J9 Pin-out Locations 2.3.3-1 Extender Pin-out Locations 2.4.2-1 SBC Jumper Settings 2.4.5-1 CRC LRADDS Test Rack Configuration
LIST OF TABLES
Table Title Page 1.3.1-1 Converter-Receiver Control (CRC) (P/N 456010-2) Test Script Files 1.4-1 Test Equipment 2.2.1-1 Fuse Table for the CRC Configuration 2.3.3-1 VME Pin-outs 2.4.2-1 CRC Module Slot Installation 2.4.2-2 IFF Interface Module (IIM) Switch Settings 2.4.2-3 Media Converter Module (MC) Switch Settings 2.4.2-4 Display Interface Module (DIM) (P/N 456063-1) Switch Settings 2.4.2-5 Display Interface Module (DIM) (P/N 456357-1) Switch Settings 2.4.3-1 Ethernet Fiber Cable Assembly Installation Table 2.4.4-1 Power Supply Test Point Voltages 2.4.4-2 Power Supply Test Point Voltages 2.4.5-1 Final-Test Verification Table
SECTION 1
GENERAL
1.1
SCOPE
This document contains the test requirements for the production/acceptance testing of the Converter-Receiver Control (CRC) (P/N 456010-2), referred to herein as the unit. The unit consists of seven IFF Interface Modules (IIMs). This document contains the following sections:
Section 1: General Information
Section 2: Factory Acceptance Test Procedures 1.2
PURPOSE
The purpose of this document is to provide a test procedure to demonstrate that the unit, as manufactured by Frontier Electronics Systems, meets or exceeds all limits and tolerances specified within this document.
1.3
TEST OVERVIEW
1.3.1 Script Files
The script files required for testing are shown in the table below. Controlled copies of the CRC script files reside in Document Control under Mstr_software\456271\-01 Rev X\ (where X is the current revision).
Table 1.3.1-1. Converter-Receiver Control (CRC) (P/N 456010-2) Test Script Files
| SCRIPT FILE NAME |
| DESCRIPTION |
| CRC-001 |
| Discrete Azimuth, Communications, Video Test (Synchro) |
| CRC-002 |
| Discrete Azimuth, Communications, Video Test (Synchro) |
| CRC-003 |
| Discrete Azimuth, Communications, Video Test (Synchro) |
| CRC-004 |
| Discrete Azimuth, Communications, Video Test (Synchro) |
| CRC-005 |
| Discrete Azimuth, Communications, Video Test (Synchro) |
| CRC-006 |
| Discrete Azimuth, Communications, Video Test (Synchro) |
| CRC-007 |
| Discrete Azimuth, Communications, Video Test (Synchro) |
1.4
TEST EQUIPMENT
Table 1.4-1 lists the equipment required to perform the procedures contained in this document. Enter the serial number and calibration expiration date for each piece of test equipment listed in the table.
Table 1.4-1. Test Equipment
| DESCRIPTION |
| USE |
| MODEL |
| SERIAL NUMBER |
| MANUFACTURER/ |
SPECIFICATIONS
CALIBRATION
EXP. DATE
| LRADDS Tester |
| Automated Test |
| 456124 |
| 001 |
| FES |
| N/A |
| Oscilloscope |
| Signal Measurement |
| TDS460A |
Tektronix
| Digital Multimeter |
| Voltage Measurement |
Fluke
| Power Supply Load Tester |
| Voltage Measurement |
| 456407-1 |
| 001 |
| FES |
| N/A |
Note 1: FES maintains calibration of equipment IAW ISO 9001, procedures FES-QSP-7.6-1-1 and FES-QSP-7.6-2.
Note 2: Equivalent or superior equipment may be substituted for the equipment listed above.
1.5 LRADDS Test rack Figure 1.5-1 illustrates the equipment required to perform the procedures contained in this document.
Figure 1.5-1. Functional Test Setup
1.6
GENERAL REQUIREMENTS
1.6.1 As-Built Documentation As-Built Configuration Tracking Sheets for the unit are inserted into Appendix A. Insert the routers for all assemblies of the unit into Appendix B.
1.6.2 Test Conditions
Unless otherwise specified herein, testing shall be performed at standard room ambient temperature, 60 to 80F.
1.6.3 Failure Reporting
Non-Conformance Reports (NCRs) shall be used to document test failures in accordance with FES-QSP-8.3-3 when required. Copies of each NCRs shall be inserted into Appendix C.
1.6.4 Test Data Successful completion of each test shall be annotated within these procedures. Test data recorded during automated testing shall be maintained on the FES network at \\fes-dc\data3\Shared Data\Naval Systems\Test Data\part number\serial number.
SECTION 2
FACTORY ACCEPTANCE TEST PROCEDURES
2.1
UNIT SERIAL NUMBER
Enter the Serial Number of the Converter-Receiver Control (CRC) (P/N 456010-2) on the front of test procedure.
2.2
CRC POWER CHECK SECTION
2.2.1 AC Power Check The AC power check verifies correct wiring of the AC input and the two Power Supply Modules.
1.
Ensure the CRC chassis has no modules installed.
2. Before attaching AC power entry cable to J33 on CRC unit, place the MAIN POWER switch to the OFF position.
3. Place the TEMPERATURE WARNING switch to the DISABLE position.
4. Remove all fuses from the CRC and verify the part numbers and amp rating of fuses F1 thru F4 per Table 2.2.1-1.
Table 2.2.1-1. Fuse Table for the CRC Configuration
| ASSY |
| F1 |
| F2 |
| F3 |
| F4 |
| 456010-2 |
| 313005 |
| 313005 |
| 313005 |
| 313005 |
Amp
Rating 5 Amp
Slo-Blo 5 Amp
Slo-Blo 5 Amp
Slo-Blo 5 Amp
Slo-Blo
Verified:___________
5. Check connector J33 (AC power connector) on unit with a multimeter set for Ohms measurements, to ensure that there is no short between pins A (B, C (B, and A (C and that Pin B is connected to ground (chassis).
6. Check connectors J15, J16, J17, J18 (Synchro AZ connectors) on the unit with a multimeter set for ohms measurements to ensure that there is no short between pins A→B, A→C, A→D, A→E, B→C, B→D, B→E, C→D, C→E, D→E.
2.3 CRC power-up SECTION
2.3.1 CRC Power-Up The CRC power-up procedure verifies the functioning of the cooling fans and power indicators. Attach the power cable to the CRC.
1.
Ensure the CRC Chassis has no modules installed.
2. Apply AC power to J33 of the CRC unit.
3. Install the Power Supply Load Tester into Power Supply 2 slot.
4. On the CRC, set the MAIN POWER switch to the ON position.
5. Ensure that the DS1 Power ON indicator is illuminated and that the three (3) cooling fans are rotating and exhausting air upwards.
WARNING
J9 and J16 connector pins carry 115 VAC. Avoid touching or shorting between contacts.
6. Using a multimeter set for AC voltage measurements, verify the following voltages between the lower J9 connector pins on the backplane of the CRC Chassis Power Supply. See Figure 2.3.1-1 for J9 pin layout.
a) 115 VRMS (+10/-5 VRMS) pin 30 (Line) to pin 32 (Ground)
b) 115 VRMS (+10/-5 VRMS) pin 30 (Line) to pin 28 (Neutral)
c) Less than 5 VRMS pin 28 (Neutral) to pin 32 (Ground)
Figure 2.3.1-1. Backplane Connector Lower J9 Pin-out Locations
7. Turn on the Power Supply Load Tester.
8. Using a multimeter set for AC voltage measurements, verify the following voltages between test points on the Power Supply Load Tester.
a) 115 VRMS (+10/-5 VRMS) TP1 (Line) to TP3 (Ground) b) 115 VRMS (+10/-5 VRMS) TP1 (Line to TP2 (Neutral) c) Less than 5 VRMS TP2 (Neutral) to TP3 (Ground)
Verified:___________
9. On the CRC, set the MAIN POWER switch to the OFF position.
10. Remove the Power Supply Load Tester from the CRC chassis.
2.3.2 Unloaded Power Supply Check The Power Supply check verifies the presence of correct DC Power Supply voltages in an unloaded condition with no modules installed.
1. On the CRC, set the MAIN POWER switch to the OFF position.
2.
Install Converter Power Supply (Part Number 500190-2) into the POWER SUPPLY 1 slot of the CRC Chassis.
3.
On the CRC, set the MAIN POWER switch to the ON position and set POWER SUPPLY 1 switch in the upper CRC Chassis to the ON position.
4.
Verify that the three voltage indicators and PWR switch are illuminated.
5.
Set POWER SUPPLY 1 switch to the OFF position.
6.
On the CRC, set the MAIN POWER switch to the OFF position.
7.
Install the second Power Supply Module (500190-2) into the POWER SUPPLY 2 slot of the CRC Chassis.
8.
Repeat steps 1 through 5 for POWER SUPPLY 2.
9.
On the CRC, set the MAIN POWER switch to the OFF position.
10.
Set POWER SUPPLY 1 and POWER SUPPLY 2 switches to the ON position.
11.
On the CRC, set the MAIN POWER switch to the ON position. Verify that the DC indicators on POWER SUPPLY 2 light up approximately one (1) second after the DC indicators on POWER SUPPLY 1 light up.
Verified:___________
12.
On the CRC, set the MAIN POWER switch and the POWER SUIPPLY switches to the OFF position.
2.3.3 VME Chassis Power Check Procedure The VME Chassis Power Check procedure verifies correct wiring and that the voltage is applied to the backplane connectors.
1.
Install an Extender Card (P/N 456104-1) into IIM 1 Chassis slot.
2. On both CRC Power Supply Modules, set the POWER switch to the ON position.
3. Using a multimeter set for DC voltage measurements, verify the following voltages are within the specified range using the GND pin as a common reference for each voltage listed in Table 2.3.3-1. See Figure 2.3.3-1 for VME pin layout.
WARNING
P1 and P2 connector pins have the potential of sourcing high current. Avoid touching or shorting between contacts.
Table 2.3.3-1. VME Pin-outs
| DC Voltage |
| VME PIN NUMBER |
| Range |
| +5V |
| P1-B32 |
+5.35 max.
+4.875 min.
| +12V |
| P1-C31 |
| +12.60 max. |
+11.64 min.
| -12V |
| P1-A31 |
| -12.60 max. |
-11.64 min.
| GND Reference |
| P2-B31 |
| N/A |
Figure 2.3.3-1. Extender Pin-out Locations
4. Measure Backplane voltages located in IIM 1 slot. Verify voltages are in accordance with Table 2.3.3-1.
2.4
TEMPERATURE WARNING SECTION
2.4.1 Temperature Warning CRC Test This procedure includes testing instructions that verify the CRC Temperature Warning Components are functioning and cabled correctly.
1.
Ensure all modules are removed from the CRC Chassis to gain access to both Thermostats located above the VME Chassis and under the fan assembly.
2.
On the CRC, set the MAIN POWER switch to the ON position and ensure that the DS1 Power On indicator is lit and the cooling fans are operating.
3.
On both Power Supply Modules, set the POWER switch to the ON position and ensure their DC voltage indicators and switches are illuminated.
Set the TEMPERATURE WARNING switch to DISABLE and verify DS2 is OFF and no alarm is sounding.
5.
Set the TEMPERATURE WARNING switch to ENABLE and verify DS2 is OFF and no alarm is sounding.
WARNING
Keep Heat Gun approximately 4 to 6 inches away from Thermostats to prevent excessive heating. Use a directional nozzle if available to focus heat exclusively on the Thermostats.
6.
Use a heat gun to apply heat to Thermostat RT1 located on the left side, closest to connector J1 until the CRC’s TEMPERATURE WARNING lamp DS2 illuminates.
7.
Verify the Warning Horn LS1 is sounding then set the CRC’s TEMPERATURE WARNING switch to DISABLE and observe Audible Alarm sounding has ceased.
8.
Allow the Thermostat Assembly to cool and TEMPERATURE WARNING lamp to go OFF.
Verified:___________
9.
Set the TEMPERATURE WARNING switch to ENABLE and verify DS2 is OFF and no alarm is sounding.
10.
Use a heat gun to apply heat to Thermostat RT2 located on the right side until the CRC’s TEMPERATURE WARNING lamp DS2 illuminates.
11.
Verify the Warning Horn LS1 is sounding, then set the CRC’s TEMPERATURE WARNING switch to DISABLE and observe Audible Alarm sounding has ceased.
12.
Allow the Thermostat Assembly to cool and TEMPERATURE WARNING lamp to go OFF.
Verified:___________
2.4.2 Module Installation Procedure The module installation procedure verifies the default system level module configuration and all visual indicators.
1.
On both Power Supply Modules, set the POWER switch to the OFF position.
2.
On the CRC, set the MAIN POWER switch to the OFF position.
NOTE
Do not secure modules to the chassis during installation. Modules shall be removed for dip switch selection at a later step.
3.
Install the following modules into the CRC Chassis using the ID panel as an installation guide for correct placement.
Table 2.4.2-1. CRC Module Slot Installation
| MODULE |
| SLOT ID |
| PART NUMBER |
| Extender |
| EXTENDER |
| P/N 456104 |
| IIM 1 |
| IIM 1 |
| P/N 456370-2 |
| IIM 2 |
| IIM 2 |
| P/N 456370-2 |
| IIM 3 |
| IIM 3 |
| P/N 456370-2 |
| IIM 4 |
| IIM 4 |
| P/N 456370-2 |
| IIM 5 |
| IIM 5 |
| P/N 456370-2 |
| IIM 6 |
| IIM 6 |
| P/N 456370-2 |
| IIM 7 |
| IIM 7 |
| P/N 456370-2 |
| QSDM |
| QSDM |
| P/N 456060-2 |
| MEDIA CONV. |
| MC |
| P/N 456170 |
| SBC |
| SBC |
| P/N 456105 |
| SBC |
| SBC |
| P/N 456570 |
Note: SBC P/N 456105 is used in AEGIS systems.
SBC P/N 456570 is used in SSDS systems.
4.
Set the following switch settings then sequentially install IIM 1 thru IIM 7 Modules (P/N 456370-2) into the CRC Chassis.
NOTE
Use the ID panel as a guide for selecting the module from a designated slot.
Table 2.4.2-2. IFF Interface Module (IIM) Switch Settings
SWITCH
IIM 1 - 7
| S1-1 |
| IP Host Address |
| 1 |
S1-2
| 2 |
| ON |
S1-3
| 4 |
| ON |
S1-4
| 8 |
| ON |
S1-5
| 16 |
| ON |
S1-6
S1-7
| 64 |
| ON |
S1-8
| 128 |
| ON |
| S2-1 |
| Data |
ON
S2-2
ON
S2-3
ON
S2-4
ON
| S3-1 |
| Power Delay |
| 1 |
S3-2
S3-3
S3-4
| S6-1 |
| Timeout |
ON
S6-2
S6-3
S6-4
*Blank is OFF (Open). ON = Closed
5. Loosen fasteners and remove Single Board Computer Module (SBC) (P/N 456105 or 456570) from the Converter-Receiver Control (CRC) Module Test Chassis. Verify the following jumpers as shown in Figure 2.4.2-1 then reinstall module securing fasteners.
Figure 2.4.2-1. SBC Jumper Settings
6. Loosen fasteners and remove Media Converter Module (MC) (P/N 456170) from the Converter-Receiver Control (CRC) Chassis. Verify the following switch settings and jumpers then reinstall module securing fasteners.
Table 2.4.2-3. Media Converter Module (MC) Switch Settings
| SWITCH |
| MC |
SETTING
| S1-1 thru S1-3 |
| Open |
| S1-4 thru S1-6 |
| Closed |
| S1-7 thru S1-8 |
| Open |
| S2-1 |
| Open |
| S2-2 |
| Closed |
| S2-3 thru S2-4 |
| Open |
| S3-1 thru S3-3 |
| Open |
| S3-4 thru S3-6 |
| Closed |
| S3-7 thru S3-8 |
| Open |
| S4-1 |
| Open |
| S4-2 |
| Closed |
| S4-3 thru S2-4 |
| Open |
7. Install Quad Synchro Decoder Module (QSDM) (P/N 456060-2) into the Converter-Receiver Control (CRC) Chassis.
8. Loosen fasteners and remove Display Interface Module (DIM 1) (P/N 456063) from the Radar Video Converter (RVC) Module Test Chassis. Verify the following switch settings and reinstall module securing fasteners.
Table 2.4.2-4. Display Interface Module (DIM) (P/N 456063-1) Switch Settings
SWITCH
3 WIRE OUTPUT 8192
| S1-1 |
| Display Select |
| SPA/Q70 |
S1-2
Display Type
S1-3
S1-4
Azimuth Rate
S1-5
S1-6
| Primary/Secondary |
| ON |
S1-7
Video SIM
S1-8
AZ True/Relative
| S4-1 |
| IP Host Address |
| 1 |
S4-2
| 2 |
| ON |
S4-3
| 4 |
| ON |
S4-4
S4-5
| 16 |
| ON |
S4-6
S4-7
| 64 |
| ON |
S4-8
| 128 |
| ON |
| S5-1 |
| Power Delay |
S5-2
S5-3
S5-4
S11
SIM
S16
| Local Select |
| ON |
S17
| Video Select |
| 0 |
S18
| Radar Select |
| 1 |
| S19-1 |
| Data |
ON
S19-2
ON
S19-3
S19-4
*Closed = ON; Open = OFF
9. For the Display Interface Module (DIM) (P/N 456357-1 or 456357-2) use the following switch settings.
Table 2.4.2-5. Display Interface Module (DIM) (P/N 456357-1 or 456357-2) Switch Settings
SWITCH
3 WIRE OUTPUT 8192
| S1-1 |
| Display Select |
| SPA/Q70 |
S1-2
Display Type
S1-3
S1-4
Azimuth Rate
S1-5
S1-6
| Primary/Secondary |
| ON |
S1-7
Video SIM
S1-8
AZ True/Relative
| S2-1 |
| Timeout |
| 1 |
| ON |
S2-2
S2-3
S2-4
| S3-1 |
| IP Host Address |
| 1 |
S3-2
| 2 |
| ON |
S3-3
| 4 |
| ON |
S3-4
S3-5
| 16 |
| ON |
S3-6
S3-7
| 64 |
| ON |
S3-8
| 128 |
| ON |
| S4-1 |
| Data |
ON
S4-2
ON
S4-3
S4-4
| S9-1 |
| Power Delay |
S9-2
S9-3
S9-4
S10
SIM
S11
| Local Select |
| ON |
S12
| Video Select |
| 0 |
S13
| Radar Select |
| 1 |
*Closed = ON; Open = OFF
2.4.3 Ethernet Fiber Cable Installation This section describes where to attach the external Ethernet Fiber Cable Assemblies.
1. Install the following cable assemblies according to Table 2.4.3-1.
Table 2.4.3-1. Ethernet Fiber Cable Assembly Installation Table Ethernet Cable
Assembly
IIM
Connector
CRC
Connector
| 456115-1 |
| IIM 1 (CH 1) |
| J34 (Ethernet CH 1) |
| 456115-1 |
| IIM 2 (CH 2) |
| J35 (Ethernet CH 2) |
| 456115-1 |
| IIM 3 (CH 3) |
| J36 (Ethernet CH 3) |
| 456115-1 |
| IIM 4 (CH 4) |
| J37 (Ethernet CH 4) |
| 456115-1 |
| IIM 5 (CH 5) |
| J38 (Ethernet CH 5) |
| 456115-1 |
| IIM 6 (CH 6) |
| J39 (Ethernet CH 6) |
| 456115-1 |
| IIM 7 (CH 7) |
| J40 (Ethernet CH 7) |
| 456171-1 |
| SBC A0 (CH 1) |
| MC (Copper CH 1) |
| 456171-2 |
| SBC A1 (CH 2) |
| MC (Copper CH 2) |
| 456115-1 |
| MC (CH 1) |
| J41 (Ethernet CH 1) |
| 456115-1 |
| MC (CH 2) |
| J42 (Ethernet CH 2) |
2.4.4 Power Supply/Indicators Test The Power Supply/Indicators test verifies correct wiring and function of the Power Supplies and module indicators.
1. On the CRC, set the MAIN POWER switch to the ON position.
2. Ensure that the DS1 Power On indicator is lit and the cooling fans are operating.
3. Set POWER SUPPLY 1 Module switch to the ON position.
4. Verify +5V, +12V, -12V LEDs and POWER Switch are lit on POWER SUPPLY 1 Module.
5. Using a multimeter set for DC voltage measurements, check POWER SUPPLY 1 test point voltages and record the findings in Table 2.4.4-1. Set POWER SUPPLY 1 Module to the OFF position.
Table 2.4.4-1. Power Supply Test Point Voltages
| BASELINE VOLTAGE |
| MEASURED READING: POWER SUPPLY 1 |
| MEASURED READING: POWER SUPPLY 2 |
| ACCEPTANCE CRITERIA |
+5.00
+5.35 max.
+4.875 min.
+12.00
+12.60 max.
+11.64 min.
-12.00
-12.60 max.
-11.64 min.
6. Set POWER SUPPLY 2 Module switch to the ON position.
7. Verify +5V, +12V, and -12V LEDs and POWER Switch are lit on POWER SUPPLY 2 Module.
Verified:___________
8. Using a multimeter set for DC voltage measurements, check POWER SUPPLY 2 test point voltages and record the findings in Table 2.4.4-1. Set POWER SUPPLY 1 Module to the ON position.
9. Verify that all measurements are within acceptable limits.
10. With both Power Supplies ON, verify that all measurements are within acceptable limits and record the findings in Table 2.4.4-2.
Table 2.4.4-2. Power Supply Test Point Voltages
| BASELINE VOLTAGE |
| ACTUAL READING: POWER SUPPLY 1 |
| ACTUAL READING: POWER SUPPLY 2 |
| ACCEPTANCE CRITERIA |
+5.00
+5.35 max.
+4.875 min.
+12.00
+12.60 max.
+11.64 min.
-12.00
-12.60 max.
-11.64 min.
11. Place IIM 1 thru IIM 7 switches in SIM Mode by using the switch located on the front panel.
12. Verify the status of the following displays on the CRC modules. Link will be lit if GiGE is present. TX & RX will be blinking if Ethernet is present. COMM will be lit if CPS1273 Emulator is present.
(ID Panel Description)
MODULE
DISPLAY
STATUS
IIM 1
LINK (GREEN LED)
ON
TX (GREEN LED)
BLINKING
RX (GREEN LED)
SIM (GREEN LED)
CH1 RO/VID (GREEN LED)
CH1 COMM (GREEN LED)
OFF
CH1 AZ (GREEN LED)
CH2 RO/VID (GREEN LED)
CH2 COMM (GREEN LED)
CH2 AZ (GREEN LED)
IIM 2
(ID Panel Description)
MODULE
DISPLAY
STATUS
IIM 3
IIM 4
IIM 5
IIM 6
(ID Panel Description)
MODULE
DISPLAY
STATUS
IIM 7
SINGLE BOARD COMPUTER
SYS STATUS
LED 1 (RED LED)
LED 2 (AMBER LED)
LED 3 (YELLOW LED)
LED 4 (GREEN LED)
A0 (GREEN LED)
MEDIA CONVERTER
CH 1 FIBER (GREEN LED)
CH 1 LINK (GREEN LED)
CH 2 FIBER (GREEN LED)
CH 2 LINK (GREEN LED)
QUAD SYNCHRO DECODER
ACTIVITY
CH 1 (GREEN LED)
CH 2 (GREEN LED)
CH 3 (GREEN LED)
CH 4 (GREEN LED)
13.
Set the SIM Mode switch to OFF on IIM 1 thru IIM 7.
2.4.5 Automated Test This section contains the procedures for running an automated test on the CRC Unit section of the unit.
1.
Configure the Converter-Receiver Control (CRC) (P/N 456010-2) and Test Equipment as shown in Figure 2.4.5-1.
2.
Turn ON the power to all equipment associated with the CRC Unit Testing.
3.
Connect the LRADDS Test Rack cables as shown in Figure 2.4.5-1.
Figure 2.4.5-1. CRC LRADDS Test Rack Configuration
Select the LRADDS Tester ICON on the initial windows screen and follow the displayed prompts.
5.
A dialog box “Interface Configuration” appears showing the expected Comm Port Assignments and GPIB Addresses.
Verify that the Communication Ports and GPIB Addresses are set as they appear in the display. Select OK when complete.
6. From the displayed Main Screen Menu, select the “Test Info” option.
7. A dialog box prompting for “Tester Identification” will now be displayed. Enter the test operator’s name and press enter.
8. A dialog box prompting for Serial Number will be displayed. Enter the Converter-Receiver Control (CRC) Serial Number and press Enter.
9. Select test type “Unit Level Testing” and then “Final”.
10. At the unit level selection screen, select “Converter-Receiver Control (CRC)”.
11. From the Main Menu Screen, select the “Load Test” option. A dialog box is shown with the names of tests that can be run.
12. Select all script files in Table 2.4.5-1.
13.
The Main Screen will be displayed showing the entered information. From this display, select the BEGIN TEST option. The program will now display dialog boxes to provide the operator with step-by-step instructions for completing the test. Upon completion of each test, annotate the appropriate entry in Table 2.4.5-1.
Table 2.4.5-1. Final-Test Verification Table
| Script File Name |
| Test |
| Source |
| Estimated Run Time |
| Complete |
| CRC-001 |
| Discrete Azimuth, Communications, Video Test for IIM 1 |
| Synchro 1 |
| 10 Minutes |
| CRC-002 |
| Discrete Azimuth communications, Video Test for IIM 2 |
| Synchro 1 |
| 10 Minutes |
| CRC-003 |
| Discrete Azimuth communications, Video Test for IIM 3 |
| Synchro 1 |
| 10 Minutes |
| CRC-004 |
| Discrete Azimuth communications, Video Test for IIM 4 |
| Synchro 1 |
| 10 Minutes |
| CRC-005 |
| Discrete Azimuth communications, Video Test for IIM 5 |
| Synchro 1 |
| 10 Minutes |
| CRC-006 |
| Discrete Azimuth communications, Video Test for IIM 6 |
| Synchro 1 |
| 10 Minutes |
| CRC-007 |
| Discrete Azimuth communications, Video Test for IIM 7 |
| Synchro 1 |
| 10 Minutes |
14.
Copy data files to the network drive \\Fes-dc\data3\Shared Data\Naval Systems\Test Data\part number\serial number
15.
Ensure J41 and J42 on the UUT are connected to the LRADDS Test Rack per Figure 2.4.5-1.
16.
On the LRADDS Test Rack, login and open a terminal window by “right-clicking” on the Desktop and select “Open Terminal.”
17.
In the terminal window type: LNST-026 and follow the provided prompts.
18. Verify that all IP Addresses are listed as passed.
Comments:
VALIDATION
Signatures below serve as a validation of the successful completion and accuracy of the data contained herein. The Test Technician shall sign and date as an indication that all instructions have been followed and that each test step has been successfully completed. The Quality Engineer shall sign and date as an acknowledgement that the test data has been reviewed for completion and accuracy. Appropriate stamps shall be affixed by the signature blocks.
Test Technician: ____________________________________ Date:________________ Quality Assurance: __________________________________ Date:________________
APPENDIX A
AS BUILT Configuration Data Sheets
APPENDIX B
PRODUCTION ROUTERS
APPENDIX C
NON-CONFORMANCE REPORTS (NCRs)
ACCEPTANCE TEST PROCEDURE
FOR THE CONVERTER-RECEIVER CONTROL (CRC)
(P/N 456010-2)
S/N: ________________
11 JUNE 2019
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to protecting technical, operational, or operational use information from automatic dissemination under the International Exchange Program or by other means as determined on or after date of task order award. Other requests for this document shall be referred to NAVSEA CDSA Code F31.
WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Prepared By:
FRONTIER ELECTRONIC SYSTEMS CORP.
4500 W. 6TH AVENUE
STILLWATER, OKLAHOMA 74074
_1349681886.vsd text
Interface Panel CRC
Backplane
Power Supply
IIM (Slot 1)
IIM (Slot 2)
IIM (Slot 3)
IIM (Slot 4)
IIM (Slot 5)
IIM (Slot 6)
IIM (Slot 7)
SBC
QSDM
Interface Panel SDC
LRADDS Test Fixture
SPY 6 Wire HRI
Sin/Cos
Synchro(4)
ACP/ARP
SPY 6-Wire PPI
Azimuth Radar Data
NW Sw (up to 4)
NW Sw (up to 4)
Protocol Analyzer H/W and SW (LEDA Plus)
3-Wire
RIM (Golden)
RADDS
ACP/ARP
Synchro
RIM (Slot 2)
RIM (Slot 3)
RIM (Slot 4)
Interface Panel RVC
DIM (Golden)
DIM (Slot 2)
DIM (Slot 3)
DIM (Slot 4)
SpySSM
SSM
Interface Panel CRC
IIM (Golden)
IIM (Slot 2)
IIM (Slot 3)
IIM (Slot 4)
RIM Test Chassis (RIU)
DIM Test Chassis (DIU)
IIM Test Chassis (IIU)
IIM (Slot 5)
IIM (Slot 6)
IIM (Slot 7)
SBC
QSDM
LRADDS Test Rack
NW Sw
NW Sw (up to 14)
CP-1273 Emulator
Video(2)
Big Iron 24 port Network Switch
Dual Scan Cvtr Computer
Dual Scan Cvtr Computer
HMI Computer w/RS422 conv
Power Conditioner
2 -T
To SDC Lx (up to 4)
To RVC Lx (up to 4)
To CRC Lx (up to 14)
To CDS Lx (up to 13)
CDS Emulator
Lx (1)
Test Computer (Supermicro X7DBN Motherboard w/ 3 ea Intel EXPI9404PTL Quad Port NIC)
To Port Under test
Serial Data (2)
NAV Data (RS-422)
Test System Configured For CRC Test
IFF Vid (2)
Fans, Controls and Indcators
120VAC
CRC (UUT)
_1495348237.vsd