455287A ATP for the CRC 456010-2.doc

DOC document 921 KB Posted

Attached to
AN/SPQ-15 Data Distribution System Production Federal contract opportunity
Solicitation number
N0017822R2501
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document summarizes a federal contract opportunity for the production of hardware in support of the AN/SPQ-15(V) MK 6 MOD 1 Data Distribution System programs. The Naval Sea Systems Command is seeking firm-fixed-price production of data and distribution system hardware, including switchboards, decoders, converters, switches and upgrades. The contract will also include cost-plus-fixed-fee elements for software life-cycle support, engineering and development. The period of performance is five years, with an estimated award date of November 2022. Responses are due by April 5, 2022 or 30 days after the solicitation is posted on March 7, 2022. The requirement is set aside as a small business opportunity, with full and open competition following small business exclusion. Best value continuum procedures will be used to evaluate proposals.

View the file

Other files for this federal contract opportunity

Other files attached to AN/SPQ-15 Data Distribution System Production, newest first.
File Type Posted
N00178-22-R-2501_24_August_Draft.pdf PDF
CDRLs_24_August_Draft.pdf PDF
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
DMSMS report.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
N00178-22-R-2501_DRAFT_6.1.22.docx DOCX document
DRAFT_Exhibit A_CDRLs.pdf PDF
455088F ATP for the Media Converter.doc DOC document
455063H ATP for the SBC.doc DOC document
455280B IIM ATP (PN 456370-2).doc DOC document
455060J ATP for the RVC.doc DOC document
455055B - ATP for the HMI.doc DOC document
DRAFT J.8 - Cost_Summary_Format.xls XLS spreadsheet
DRAFT J.6 - eCRAFT_SCA Crosswalk.xlsx XLSX spreadsheet
455105A ATP for the Extender Card.doc DOC document
455049P ATP for the RSDS.doc DOC document
455279 456357-2 DIM ATP.doc DOC document
455281A 456060-2 QSDM ATP.doc DOC document
455068B ATP for the RS422_RS232 Converter.doc DOC document
Attachment J.9 - Question Submittal Form.xlsx XLSX spreadsheet
DRAFT J.4 - QASP.pdf PDF
455048J ATP for the SDC.doc DOC document
455047E ATP for the SSSM.doc DOC document
409030D ATP for the SSM.DOC DOC document
Attachment L.1 AN-SPQ 15 Staffing Matrix Format.xlsx XLSX spreadsheet
DRAFT J.5 - Labor Category Qualifications.pdf PDF
DRAFT J.3 - GFP List.xlsx XLSX spreadsheet
DRAFT J.1 - DD 254.pdf PDF
455054D ATP for Spare Power Conditioner.doc DOC document
455278A RIM ATP (PN 456354-2).doc DOC document
455056L ATP for the Spare Processor Assy.doc DOC document
409079C ATP for the Converter PS Module.doc DOC document
DRAFT J.2 - GFI List.pdf PDF
N0017822R2501_Unclassified Terms of Use Agreement.pdf PDF
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_QA_Responses.xlsx XLSX spreadsheet
N0017822R2501_DRAFT_2.9.22.docx DOCX document
N00178-22-R-2501 CDRL DRAFT.pdf PDF
N0017822R2501_DRAFT SOL_QA_MATRIX.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

455287A

SHAPE \* MERGEFORMAT

REVISIONS

REV
DESCRIPTION
DATE
APPROVED
A
Incorporated changes per CO # 24-4154
6/13/2019
PDC
ORIGINAL DATE 03 JUNE 2015
DATE APPROVED
FRONTIER ELECTRONIC SYS.

STILLWATER, OKLAHOMA 74074

ORIGINATOR
MIKE HENSON
2015 JUN 09
DOC. COORDINATOR
KELLY WHITFIELD
6-9-2015
ACCEPTANCE TEST PROCEDURE

FOR THE CONVERTER-RECEIVER CONTROL (CRC)

(P/N 456010-2)

PROJECT ENGINEER
EUGENE FRANKLIN
2015 JUN 09
PROGRAM MGR.
PAUL CHENAULT
2015 JUN 09
QUALITY
DON ZAWISZA
6/9/2015

CODE IDENT.

63812 455287A

ACCEPTANCE TEST PROCEDURE

FOR THE CONVERTER-RECEIVER

CONTROL (CRC)

(P/N 456010-2)

TABLE OF CONTENTS

Section Title Page

GENERAL

1.1

SCOPE

1.2

PURPOSE

1.3

TEST OVERVIEW

1.3.1 Script Files 1.4

TEST EQUIPMENT

1.5

LRADDS TEST RACK

1.6

GENERAL REQUIREMENTS

1.6.1 As-Built Documentation 1.6.2 Test Conditions 1.6.3 Failure Reporting 1.6.4 Test Data

FACTORY ACCEPTANCE TEST PROCEDURES

2.1

UNIT SERIAL NUMBER

2.2

CRC POWER CHECK SECTION

2.2.1 AC Power Check 2.3

CRC POWER-UP SECTION

2.3.1 CRC Power-Up 2.3.2 Unloaded Power Supply Check 2.3.3 VME Chassis Power Check Procedure

2.4

TEMPERATURE WARNING SECTION

TABLE OF CONTENTS (Continued) Section Title Page 2.4.1 Temperature Warning CRC Test 2.4.2 Module Installation Procedure

2.4.3 Ethernet Fiber Cable Installation 2.4.4 Power Supply/Indicators Test 2.4.5 Automated Test

APPENDIX A

AS BUILT CONFIGURATION DATA SHEETS

A-1

APPENDIX B

PRODUCTION ROUTERS

B-1

APPENDIX C

NON-CONFORMANCE REPORTS (NCRs) C-1

LIST OF FIGURES

Figure Title Page 1.5-1 Functional Test Setup 2.3.1-1 Backplane Connector Lower J9 Pin-out Locations 2.3.3-1 Extender Pin-out Locations 2.4.2-1 SBC Jumper Settings 2.4.5-1 CRC LRADDS Test Rack Configuration

LIST OF TABLES

Table Title Page 1.3.1-1 Converter-Receiver Control (CRC) (P/N 456010-2) Test Script Files 1.4-1 Test Equipment 2.2.1-1 Fuse Table for the CRC Configuration 2.3.3-1 VME Pin-outs 2.4.2-1 CRC Module Slot Installation 2.4.2-2 IFF Interface Module (IIM) Switch Settings 2.4.2-3 Media Converter Module (MC) Switch Settings 2.4.2-4 Display Interface Module (DIM) (P/N 456063-1) Switch Settings 2.4.2-5 Display Interface Module (DIM) (P/N 456357-1) Switch Settings 2.4.3-1 Ethernet Fiber Cable Assembly Installation Table 2.4.4-1 Power Supply Test Point Voltages 2.4.4-2 Power Supply Test Point Voltages 2.4.5-1 Final-Test Verification Table

SECTION 1

GENERAL

1.1

SCOPE

This document contains the test requirements for the production/acceptance testing of the Converter-Receiver Control (CRC) (P/N 456010-2), referred to herein as the unit. The unit consists of seven IFF Interface Modules (IIMs). This document contains the following sections:

Section 1: General Information

Section 2: Factory Acceptance Test Procedures 1.2

PURPOSE

The purpose of this document is to provide a test procedure to demonstrate that the unit, as manufactured by Frontier Electronics Systems, meets or exceeds all limits and tolerances specified within this document.

1.3

TEST OVERVIEW

1.3.1 Script Files

The script files required for testing are shown in the table below. Controlled copies of the CRC script files reside in Document Control under Mstr_software\456271\-01 Rev X\ (where X is the current revision).

Table 1.3.1-1. Converter-Receiver Control (CRC) (P/N 456010-2) Test Script Files

SCRIPT FILE NAME
DESCRIPTION
CRC-001
Discrete Azimuth, Communications, Video Test (Synchro)
CRC-002
Discrete Azimuth, Communications, Video Test (Synchro)
CRC-003
Discrete Azimuth, Communications, Video Test (Synchro)
CRC-004
Discrete Azimuth, Communications, Video Test (Synchro)
CRC-005
Discrete Azimuth, Communications, Video Test (Synchro)
CRC-006
Discrete Azimuth, Communications, Video Test (Synchro)
CRC-007
Discrete Azimuth, Communications, Video Test (Synchro)

1.4

TEST EQUIPMENT

Table 1.4-1 lists the equipment required to perform the procedures contained in this document. Enter the serial number and calibration expiration date for each piece of test equipment listed in the table.

Table 1.4-1. Test Equipment

DESCRIPTION
USE
MODEL
SERIAL NUMBER
MANUFACTURER/

SPECIFICATIONS

CALIBRATION

EXP. DATE

LRADDS Tester
Automated Test
456124
001
FES
N/A
Oscilloscope
Signal Measurement
TDS460A

Tektronix

Digital Multimeter
Voltage Measurement

Fluke

Power Supply Load Tester
Voltage Measurement
456407-1
001
FES
N/A

Note 1: FES maintains calibration of equipment IAW ISO 9001, procedures FES-QSP-7.6-1-1 and FES-QSP-7.6-2.

Note 2: Equivalent or superior equipment may be substituted for the equipment listed above.

1.5 LRADDS Test rack Figure 1.5-1 illustrates the equipment required to perform the procedures contained in this document.

Figure 1.5-1. Functional Test Setup

1.6

GENERAL REQUIREMENTS

1.6.1 As-Built Documentation As-Built Configuration Tracking Sheets for the unit are inserted into Appendix A. Insert the routers for all assemblies of the unit into Appendix B.

1.6.2 Test Conditions

Unless otherwise specified herein, testing shall be performed at standard room ambient temperature, 60 to 80F.

1.6.3 Failure Reporting

Non-Conformance Reports (NCRs) shall be used to document test failures in accordance with FES-QSP-8.3-3 when required. Copies of each NCRs shall be inserted into Appendix C.

1.6.4 Test Data Successful completion of each test shall be annotated within these procedures. Test data recorded during automated testing shall be maintained on the FES network at \\fes-dc\data3\Shared Data\Naval Systems\Test Data\part number\serial number.

SECTION 2

FACTORY ACCEPTANCE TEST PROCEDURES

2.1

UNIT SERIAL NUMBER

Enter the Serial Number of the Converter-Receiver Control (CRC) (P/N 456010-2) on the front of test procedure.

2.2

CRC POWER CHECK SECTION

2.2.1 AC Power Check The AC power check verifies correct wiring of the AC input and the two Power Supply Modules.

1.

Ensure the CRC chassis has no modules installed.

2. Before attaching AC power entry cable to J33 on CRC unit, place the MAIN POWER switch to the OFF position.

3. Place the TEMPERATURE WARNING switch to the DISABLE position.

4. Remove all fuses from the CRC and verify the part numbers and amp rating of fuses F1 thru F4 per Table 2.2.1-1.

Table 2.2.1-1. Fuse Table for the CRC Configuration

ASSY
F1
F2
F3
F4
456010-2
313005
313005
313005
313005

Amp

Rating 5 Amp

Slo-Blo 5 Amp

Slo-Blo 5 Amp

Slo-Blo 5 Amp

Slo-Blo

Verified:___________

5. Check connector J33 (AC power connector) on unit with a multimeter set for Ohms measurements, to ensure that there is no short between pins A (B, C (B, and A (C and that Pin B is connected to ground (chassis).

6. Check connectors J15, J16, J17, J18 (Synchro AZ connectors) on the unit with a multimeter set for ohms measurements to ensure that there is no short between pins A→B, A→C, A→D, A→E, B→C, B→D, B→E, C→D, C→E, D→E.

2.3 CRC power-up SECTION

2.3.1 CRC Power-Up The CRC power-up procedure verifies the functioning of the cooling fans and power indicators. Attach the power cable to the CRC.

1.

Ensure the CRC Chassis has no modules installed.

2. Apply AC power to J33 of the CRC unit.

3. Install the Power Supply Load Tester into Power Supply 2 slot.

4. On the CRC, set the MAIN POWER switch to the ON position.

5. Ensure that the DS1 Power ON indicator is illuminated and that the three (3) cooling fans are rotating and exhausting air upwards.

WARNING

J9 and J16 connector pins carry 115 VAC. Avoid touching or shorting between contacts.

6. Using a multimeter set for AC voltage measurements, verify the following voltages between the lower J9 connector pins on the backplane of the CRC Chassis Power Supply. See Figure 2.3.1-1 for J9 pin layout.

a) 115 VRMS (+10/-5 VRMS) pin 30 (Line) to pin 32 (Ground)

b) 115 VRMS (+10/-5 VRMS) pin 30 (Line) to pin 28 (Neutral)

c) Less than 5 VRMS pin 28 (Neutral) to pin 32 (Ground)

Figure 2.3.1-1. Backplane Connector Lower J9 Pin-out Locations

7. Turn on the Power Supply Load Tester.

8. Using a multimeter set for AC voltage measurements, verify the following voltages between test points on the Power Supply Load Tester.

a) 115 VRMS (+10/-5 VRMS) TP1 (Line) to TP3 (Ground) b) 115 VRMS (+10/-5 VRMS) TP1 (Line to TP2 (Neutral) c) Less than 5 VRMS TP2 (Neutral) to TP3 (Ground)

Verified:___________

9. On the CRC, set the MAIN POWER switch to the OFF position.

10. Remove the Power Supply Load Tester from the CRC chassis.

2.3.2 Unloaded Power Supply Check The Power Supply check verifies the presence of correct DC Power Supply voltages in an unloaded condition with no modules installed.

1. On the CRC, set the MAIN POWER switch to the OFF position.

2.

Install Converter Power Supply (Part Number 500190-2) into the POWER SUPPLY 1 slot of the CRC Chassis.

3.

On the CRC, set the MAIN POWER switch to the ON position and set POWER SUPPLY 1 switch in the upper CRC Chassis to the ON position.

4.

Verify that the three voltage indicators and PWR switch are illuminated.

5.

Set POWER SUPPLY 1 switch to the OFF position.

6.

On the CRC, set the MAIN POWER switch to the OFF position.

7.

Install the second Power Supply Module (500190-2) into the POWER SUPPLY 2 slot of the CRC Chassis.

8.

Repeat steps 1 through 5 for POWER SUPPLY 2.

9.

On the CRC, set the MAIN POWER switch to the OFF position.

10.

Set POWER SUPPLY 1 and POWER SUPPLY 2 switches to the ON position.

11.

On the CRC, set the MAIN POWER switch to the ON position. Verify that the DC indicators on POWER SUPPLY 2 light up approximately one (1) second after the DC indicators on POWER SUPPLY 1 light up.

Verified:___________

12.

On the CRC, set the MAIN POWER switch and the POWER SUIPPLY switches to the OFF position.

2.3.3 VME Chassis Power Check Procedure The VME Chassis Power Check procedure verifies correct wiring and that the voltage is applied to the backplane connectors.

1.

Install an Extender Card (P/N 456104-1) into IIM 1 Chassis slot.

2. On both CRC Power Supply Modules, set the POWER switch to the ON position.

3. Using a multimeter set for DC voltage measurements, verify the following voltages are within the specified range using the GND pin as a common reference for each voltage listed in Table 2.3.3-1. See Figure 2.3.3-1 for VME pin layout.

WARNING

P1 and P2 connector pins have the potential of sourcing high current. Avoid touching or shorting between contacts.

Table 2.3.3-1. VME Pin-outs

DC Voltage
VME PIN NUMBER
Range
+5V
P1-B32

+5.35 max.

+4.875 min.

+12V
P1-C31
+12.60 max.

+11.64 min.

-12V
P1-A31
-12.60 max.

-11.64 min.

GND Reference
P2-B31
N/A

Figure 2.3.3-1. Extender Pin-out Locations

4. Measure Backplane voltages located in IIM 1 slot. Verify voltages are in accordance with Table 2.3.3-1.

2.4

TEMPERATURE WARNING SECTION

2.4.1 Temperature Warning CRC Test This procedure includes testing instructions that verify the CRC Temperature Warning Components are functioning and cabled correctly.

1.

Ensure all modules are removed from the CRC Chassis to gain access to both Thermostats located above the VME Chassis and under the fan assembly.

2.

On the CRC, set the MAIN POWER switch to the ON position and ensure that the DS1 Power On indicator is lit and the cooling fans are operating.

3.

On both Power Supply Modules, set the POWER switch to the ON position and ensure their DC voltage indicators and switches are illuminated.

Set the TEMPERATURE WARNING switch to DISABLE and verify DS2 is OFF and no alarm is sounding.

5.

Set the TEMPERATURE WARNING switch to ENABLE and verify DS2 is OFF and no alarm is sounding.

WARNING

Keep Heat Gun approximately 4 to 6 inches away from Thermostats to prevent excessive heating. Use a directional nozzle if available to focus heat exclusively on the Thermostats.

6.

Use a heat gun to apply heat to Thermostat RT1 located on the left side, closest to connector J1 until the CRC’s TEMPERATURE WARNING lamp DS2 illuminates.

7.

Verify the Warning Horn LS1 is sounding then set the CRC’s TEMPERATURE WARNING switch to DISABLE and observe Audible Alarm sounding has ceased.

8.

Allow the Thermostat Assembly to cool and TEMPERATURE WARNING lamp to go OFF.

Verified:___________

9.

Set the TEMPERATURE WARNING switch to ENABLE and verify DS2 is OFF and no alarm is sounding.

10.

Use a heat gun to apply heat to Thermostat RT2 located on the right side until the CRC’s TEMPERATURE WARNING lamp DS2 illuminates.

11.

Verify the Warning Horn LS1 is sounding, then set the CRC’s TEMPERATURE WARNING switch to DISABLE and observe Audible Alarm sounding has ceased.

12.

Allow the Thermostat Assembly to cool and TEMPERATURE WARNING lamp to go OFF.

Verified:___________

2.4.2 Module Installation Procedure The module installation procedure verifies the default system level module configuration and all visual indicators.

1.

On both Power Supply Modules, set the POWER switch to the OFF position.

2.

On the CRC, set the MAIN POWER switch to the OFF position.

NOTE

Do not secure modules to the chassis during installation. Modules shall be removed for dip switch selection at a later step.

3.

Install the following modules into the CRC Chassis using the ID panel as an installation guide for correct placement.

Table 2.4.2-1. CRC Module Slot Installation

MODULE
SLOT ID
PART NUMBER
Extender
EXTENDER
P/N 456104
IIM 1
IIM 1
P/N 456370-2
IIM 2
IIM 2
P/N 456370-2
IIM 3
IIM 3
P/N 456370-2
IIM 4
IIM 4
P/N 456370-2
IIM 5
IIM 5
P/N 456370-2
IIM 6
IIM 6
P/N 456370-2
IIM 7
IIM 7
P/N 456370-2
QSDM
QSDM
P/N 456060-2
MEDIA CONV.
MC
P/N 456170
SBC
SBC
P/N 456105
SBC
SBC
P/N 456570

Note: SBC P/N 456105 is used in AEGIS systems.

SBC P/N 456570 is used in SSDS systems.

4.

Set the following switch settings then sequentially install IIM 1 thru IIM 7 Modules (P/N 456370-2) into the CRC Chassis.

NOTE

Use the ID panel as a guide for selecting the module from a designated slot.

Table 2.4.2-2. IFF Interface Module (IIM) Switch Settings

SWITCH

IIM 1 - 7

S1-1
IP Host Address
1

S1-2

2
ON

S1-3

4
ON

S1-4

8
ON

S1-5

16
ON

S1-6

S1-7

64
ON

S1-8

128
ON
S2-1
Data

ON

S2-2

ON

S2-3

ON

S2-4

ON

S3-1
Power Delay
1

S3-2

S3-3

S3-4

S6-1
Timeout

ON

S6-2

S6-3

S6-4

*Blank is OFF (Open). ON = Closed

5. Loosen fasteners and remove Single Board Computer Module (SBC) (P/N 456105 or 456570) from the Converter-Receiver Control (CRC) Module Test Chassis. Verify the following jumpers as shown in Figure 2.4.2-1 then reinstall module securing fasteners.

Figure 2.4.2-1. SBC Jumper Settings

6. Loosen fasteners and remove Media Converter Module (MC) (P/N 456170) from the Converter-Receiver Control (CRC) Chassis. Verify the following switch settings and jumpers then reinstall module securing fasteners.

Table 2.4.2-3. Media Converter Module (MC) Switch Settings

SWITCH
MC

SETTING

S1-1 thru S1-3
Open
S1-4 thru S1-6
Closed
S1-7 thru S1-8
Open
S2-1
Open
S2-2
Closed
S2-3 thru S2-4
Open
S3-1 thru S3-3
Open
S3-4 thru S3-6
Closed
S3-7 thru S3-8
Open
S4-1
Open
S4-2
Closed
S4-3 thru S2-4
Open

7. Install Quad Synchro Decoder Module (QSDM) (P/N 456060-2) into the Converter-Receiver Control (CRC) Chassis.

8. Loosen fasteners and remove Display Interface Module (DIM 1) (P/N 456063) from the Radar Video Converter (RVC) Module Test Chassis. Verify the following switch settings and reinstall module securing fasteners.

Table 2.4.2-4. Display Interface Module (DIM) (P/N 456063-1) Switch Settings

SWITCH

3 WIRE OUTPUT 8192

S1-1
Display Select
SPA/Q70

S1-2

Display Type

S1-3

S1-4

Azimuth Rate

S1-5

S1-6

Primary/Secondary
ON

S1-7

Video SIM

S1-8

AZ True/Relative

S4-1
IP Host Address
1

S4-2

2
ON

S4-3

4
ON

S4-4

S4-5

16
ON

S4-6

S4-7

64
ON

S4-8

128
ON
S5-1
Power Delay

S5-2

S5-3

S5-4

S11

SIM

S16

Local Select
ON

S17

Video Select
0

S18

Radar Select
1
S19-1
Data

ON

S19-2

ON

S19-3

S19-4

*Closed = ON; Open = OFF

9. For the Display Interface Module (DIM) (P/N 456357-1 or 456357-2) use the following switch settings.

Table 2.4.2-5. Display Interface Module (DIM) (P/N 456357-1 or 456357-2) Switch Settings

SWITCH

3 WIRE OUTPUT 8192

S1-1
Display Select
SPA/Q70

S1-2

Display Type

S1-3

S1-4

Azimuth Rate

S1-5

S1-6

Primary/Secondary
ON

S1-7

Video SIM

S1-8

AZ True/Relative

S2-1
Timeout
1
ON

S2-2

S2-3

S2-4

S3-1
IP Host Address
1

S3-2

2
ON

S3-3

4
ON

S3-4

S3-5

16
ON

S3-6

S3-7

64
ON

S3-8

128
ON
S4-1
Data

ON

S4-2

ON

S4-3

S4-4

S9-1
Power Delay

S9-2

S9-3

S9-4

S10

SIM

S11

Local Select
ON

S12

Video Select
0

S13

Radar Select
1

*Closed = ON; Open = OFF

2.4.3 Ethernet Fiber Cable Installation This section describes where to attach the external Ethernet Fiber Cable Assemblies.

1. Install the following cable assemblies according to Table 2.4.3-1.

Table 2.4.3-1. Ethernet Fiber Cable Assembly Installation Table Ethernet Cable

Assembly

IIM

Connector

CRC

Connector

456115-1
IIM 1 (CH 1)
J34 (Ethernet CH 1)
456115-1
IIM 2 (CH 2)
J35 (Ethernet CH 2)
456115-1
IIM 3 (CH 3)
J36 (Ethernet CH 3)
456115-1
IIM 4 (CH 4)
J37 (Ethernet CH 4)
456115-1
IIM 5 (CH 5)
J38 (Ethernet CH 5)
456115-1
IIM 6 (CH 6)
J39 (Ethernet CH 6)
456115-1
IIM 7 (CH 7)
J40 (Ethernet CH 7)
456171-1
SBC A0 (CH 1)
MC (Copper CH 1)
456171-2
SBC A1 (CH 2)
MC (Copper CH 2)
456115-1
MC (CH 1)
J41 (Ethernet CH 1)
456115-1
MC (CH 2)
J42 (Ethernet CH 2)

2.4.4 Power Supply/Indicators Test The Power Supply/Indicators test verifies correct wiring and function of the Power Supplies and module indicators.

1. On the CRC, set the MAIN POWER switch to the ON position.

2. Ensure that the DS1 Power On indicator is lit and the cooling fans are operating.

3. Set POWER SUPPLY 1 Module switch to the ON position.

4. Verify +5V, +12V, -12V LEDs and POWER Switch are lit on POWER SUPPLY 1 Module.

5. Using a multimeter set for DC voltage measurements, check POWER SUPPLY 1 test point voltages and record the findings in Table 2.4.4-1. Set POWER SUPPLY 1 Module to the OFF position.

Table 2.4.4-1. Power Supply Test Point Voltages

BASELINE VOLTAGE
MEASURED READING: POWER SUPPLY 1
MEASURED READING: POWER SUPPLY 2
ACCEPTANCE CRITERIA

+5.00

+5.35 max.

+4.875 min.

+12.00

+12.60 max.

+11.64 min.

-12.00

-12.60 max.

-11.64 min.

6. Set POWER SUPPLY 2 Module switch to the ON position.

7. Verify +5V, +12V, and -12V LEDs and POWER Switch are lit on POWER SUPPLY 2 Module.

Verified:___________

8. Using a multimeter set for DC voltage measurements, check POWER SUPPLY 2 test point voltages and record the findings in Table 2.4.4-1. Set POWER SUPPLY 1 Module to the ON position.

9. Verify that all measurements are within acceptable limits.

10. With both Power Supplies ON, verify that all measurements are within acceptable limits and record the findings in Table 2.4.4-2.

Table 2.4.4-2. Power Supply Test Point Voltages

BASELINE VOLTAGE
ACTUAL READING: POWER SUPPLY 1
ACTUAL READING: POWER SUPPLY 2
ACCEPTANCE CRITERIA

+5.00

+5.35 max.

+4.875 min.

+12.00

+12.60 max.

+11.64 min.

-12.00

-12.60 max.

-11.64 min.

11. Place IIM 1 thru IIM 7 switches in SIM Mode by using the switch located on the front panel.

12. Verify the status of the following displays on the CRC modules. Link will be lit if GiGE is present. TX & RX will be blinking if Ethernet is present. COMM will be lit if CPS1273 Emulator is present.

(ID Panel Description)

MODULE

DISPLAY

STATUS

IIM 1

LINK (GREEN LED)

ON

TX (GREEN LED)

BLINKING

RX (GREEN LED)

SIM (GREEN LED)

CH1 RO/VID (GREEN LED)

CH1 COMM (GREEN LED)

OFF

CH1 AZ (GREEN LED)

CH2 RO/VID (GREEN LED)

CH2 COMM (GREEN LED)

CH2 AZ (GREEN LED)

IIM 2

(ID Panel Description)

MODULE

DISPLAY

STATUS

IIM 3

IIM 4

IIM 5

IIM 6

(ID Panel Description)

MODULE

DISPLAY

STATUS

IIM 7

SINGLE BOARD COMPUTER

SYS STATUS

LED 1 (RED LED)

LED 2 (AMBER LED)

LED 3 (YELLOW LED)

LED 4 (GREEN LED)

A0 (GREEN LED)

MEDIA CONVERTER

CH 1 FIBER (GREEN LED)

CH 1 LINK (GREEN LED)

CH 2 FIBER (GREEN LED)

CH 2 LINK (GREEN LED)

QUAD SYNCHRO DECODER

ACTIVITY

CH 1 (GREEN LED)

CH 2 (GREEN LED)

CH 3 (GREEN LED)

CH 4 (GREEN LED)

13.

Set the SIM Mode switch to OFF on IIM 1 thru IIM 7.

2.4.5 Automated Test This section contains the procedures for running an automated test on the CRC Unit section of the unit.

1.

Configure the Converter-Receiver Control (CRC) (P/N 456010-2) and Test Equipment as shown in Figure 2.4.5-1.

2.

Turn ON the power to all equipment associated with the CRC Unit Testing.

3.

Connect the LRADDS Test Rack cables as shown in Figure 2.4.5-1.

Figure 2.4.5-1. CRC LRADDS Test Rack Configuration

Select the LRADDS Tester ICON on the initial windows screen and follow the displayed prompts.

5.

A dialog box “Interface Configuration” appears showing the expected Comm Port Assignments and GPIB Addresses.

Verify that the Communication Ports and GPIB Addresses are set as they appear in the display. Select OK when complete.

6. From the displayed Main Screen Menu, select the “Test Info” option.

7. A dialog box prompting for “Tester Identification” will now be displayed. Enter the test operator’s name and press enter.

8. A dialog box prompting for Serial Number will be displayed. Enter the Converter-Receiver Control (CRC) Serial Number and press Enter.

9. Select test type “Unit Level Testing” and then “Final”.

10. At the unit level selection screen, select “Converter-Receiver Control (CRC)”.

11. From the Main Menu Screen, select the “Load Test” option. A dialog box is shown with the names of tests that can be run.

12. Select all script files in Table 2.4.5-1.

13.

The Main Screen will be displayed showing the entered information. From this display, select the BEGIN TEST option. The program will now display dialog boxes to provide the operator with step-by-step instructions for completing the test. Upon completion of each test, annotate the appropriate entry in Table 2.4.5-1.

Table 2.4.5-1. Final-Test Verification Table

Script File Name
Test
Source
Estimated Run Time
Complete
CRC-001
Discrete Azimuth, Communications, Video Test for IIM 1
Synchro 1
10 Minutes
CRC-002
Discrete Azimuth communications, Video Test for IIM 2
Synchro 1
10 Minutes
CRC-003
Discrete Azimuth communications, Video Test for IIM 3
Synchro 1
10 Minutes
CRC-004
Discrete Azimuth communications, Video Test for IIM 4
Synchro 1
10 Minutes
CRC-005
Discrete Azimuth communications, Video Test for IIM 5
Synchro 1
10 Minutes
CRC-006
Discrete Azimuth communications, Video Test for IIM 6
Synchro 1
10 Minutes
CRC-007
Discrete Azimuth communications, Video Test for IIM 7
Synchro 1
10 Minutes

14.

Copy data files to the network drive \\Fes-dc\data3\Shared Data\Naval Systems\Test Data\part number\serial number

15.

Ensure J41 and J42 on the UUT are connected to the LRADDS Test Rack per Figure 2.4.5-1.

16.

On the LRADDS Test Rack, login and open a terminal window by “right-clicking” on the Desktop and select “Open Terminal.”

17.

In the terminal window type: LNST-026 and follow the provided prompts.

18. Verify that all IP Addresses are listed as passed.

Comments:

VALIDATION

Signatures below serve as a validation of the successful completion and accuracy of the data contained herein. The Test Technician shall sign and date as an indication that all instructions have been followed and that each test step has been successfully completed. The Quality Engineer shall sign and date as an acknowledgement that the test data has been reviewed for completion and accuracy. Appropriate stamps shall be affixed by the signature blocks.

Test Technician: ____________________________________ Date:________________ Quality Assurance: __________________________________ Date:________________

APPENDIX A

AS BUILT Configuration Data Sheets

APPENDIX B

PRODUCTION ROUTERS

APPENDIX C

NON-CONFORMANCE REPORTS (NCRs)

ACCEPTANCE TEST PROCEDURE

FOR THE CONVERTER-RECEIVER CONTROL (CRC)

(P/N 456010-2)

S/N: ________________

11 JUNE 2019

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to protecting technical, operational, or operational use information from automatic dissemination under the International Exchange Program or by other means as determined on or after date of task order award. Other requests for this document shall be referred to NAVSEA CDSA Code F31.

WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Prepared By:

FRONTIER ELECTRONIC SYSTEMS CORP.

4500 W. 6TH AVENUE

STILLWATER, OKLAHOMA 74074

_1349681886.vsd text

Interface Panel CRC

Backplane

Power Supply

IIM (Slot 1)

IIM (Slot 2)

IIM (Slot 3)

IIM (Slot 4)

IIM (Slot 5)

IIM (Slot 6)

IIM (Slot 7)

SBC

QSDM

Interface Panel SDC

LRADDS Test Fixture

SPY 6 Wire HRI

Sin/Cos

Synchro(4)

ACP/ARP

SPY 6-Wire PPI

Azimuth Radar Data

NW Sw (up to 4)

NW Sw (up to 4)

Protocol Analyzer H/W and SW (LEDA Plus)

3-Wire

RIM (Golden)

RADDS

ACP/ARP

Synchro

RIM (Slot 2)

RIM (Slot 3)

RIM (Slot 4)

Interface Panel RVC

DIM (Golden)

DIM (Slot 2)

DIM (Slot 3)

DIM (Slot 4)

SpySSM

SSM

Interface Panel CRC

IIM (Golden)

IIM (Slot 2)

IIM (Slot 3)

IIM (Slot 4)

RIM Test Chassis (RIU)

DIM Test Chassis (DIU)

IIM Test Chassis (IIU)

IIM (Slot 5)

IIM (Slot 6)

IIM (Slot 7)

SBC

QSDM

LRADDS Test Rack

NW Sw

NW Sw (up to 14)

CP-1273 Emulator

Video(2)

Big Iron 24 port Network Switch

Dual Scan Cvtr Computer

Dual Scan Cvtr Computer

HMI Computer w/RS422 conv

Power Conditioner

2 -T

To SDC Lx (up to 4)

To RVC Lx (up to 4)

To CRC Lx (up to 14)

To CDS Lx (up to 13)

CDS Emulator

Lx (1)

Test Computer (Supermicro X7DBN Motherboard w/ 3 ea Intel EXPI9404PTL Quad Port NIC)

To Port Under test

Serial Data (2)

NAV Data (RS-422)

Test System Configured For CRC Test

IFF Vid (2)

Fans, Controls and Indcators

120VAC

CRC (UUT)

_1495348237.vsd