This document outlines a pre-solicitation synopsis for the AN/SPQ-15 Data Distribution System production contract. The Navy seeks to award a C-type contract to produce hardware including switchboards, decoders, converters, and upgrades for existing AN/SPQ-14 and AN/SPQ-15 systems. The contract is set aside as a small business opportunity with a period of performance of five years. Pricing includes firm-fixed-price, cost-plus-fixed-fee, and not-separately-priced contract line items. The solicitation number is N0017822R2501 and is expected to be available on March 7, 2022, with proposals due by April 5, 2022. Award is planned for November 2022 with a period of performance start date of November 2022. The requirement falls under NAICS code 334118 and PSC codes K012 and 1285.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
409030D
SHAPE \* MERGEFORMAT
REVISIONS
| REV |
| DESCRIPTION |
| DATE |
| APPROVED |
| A |
| Incorporated Changes per CO # 24-1291 |
| 5-13-04 |
| AFW |
| B |
| Incorporated Changes per CO # 24-1610 |
| 11/1/05 |
| PDC |
| C |
| Incorporated Changes per CO # 24-1801 |
| 4/11/07 |
| PDC |
| D |
| Incorporated Changes per CO # 24-3481 |
| 7/16/2012 |
| PDC |
| ORIGINAL DATE 25 AUGUST 2003 |
| DATE APPROVED |
| FRONTIER ELECTRONIC SYS. |
STILLWATER, OKLAHOMA 74076-1023
| ORIGINATOR |
| JORY BLAGDEN |
| 08/27/03 |
| DOC. COORDINATOR |
| KELLY WHITFIELD |
| 8-27-03 |
| ACCEPTANCE TEST PROCEDURE |
FOR THE SIGNAL SPLITTER MODULE
(P/N 500034-1)
| PROJECT ENGINEER |
| CHRISTOPHER JOBE |
| 27 AUG 2003 |
| PROGRAM MGR. |
| A.F. WINEMILLER |
| 8-28-03 |
| QUALITY |
| S. ZELESNIKAR |
| 27 AUG 03 |
CODE IDENT.
63812 409030D
ACCEPTANCE TEST PROCEDURE
FOR THE SIGNAL SPLITTER MODULE
(P/N 500034-1)
TABLE OF CONTENTS
Section Title Page
GENERAL INFORMATION
1.1
SCOPE
1.2
PURPOSE
1.3
TEST EQUIPMENT
1.4
GENERAL REQUIREMENTS
1.4.1 Production Routers 1.4.2 Test Conditions 1.4.3 Failure Reporting
1.4.4 Test Data
PRE-TEST EVALUATION
2.1
INSTALLATION AND SETUP PROCEDURE
2.2
AUTOMATED TEST PROGRAM (CONVERTER)
2.3
AUTOMATED TEST PROGRAM (SWITCHBOARD)
BURN-IN
FINAL TEST
4.1
AUTOMATED TEST PROGRAM (CONVERTER)
4.2
AUTOMATED TEST PROGRAM (SWITCHBOARD)
APPENDIX A
PRODUCTION ROUTERS
A-1
TABLE OF CONTENTS (Continued) Section Title Page
APPENDIX B
NON-CONFORMANCE REPORTS
B-1
APPENDIX C
BURN-IN LOG
C-1
LIST OF FIGURES
Figure Title Page 1.1-1 Testing Flow
2.1-1 Converter and Switchboard Test Rack Configurations
LIST OF TABLES
Table Title Page 1.3-1 Test Equipment
2.2-1 Pre-Test Verification Table (Converter) 2.3-1 Pre-Test Verification Table (Switchboard) 3-1 Burn-in Test Information 4.1-1 Final Test Verification Table (Converter) 4.2-1 Final Test Verification Table (Switchboard)
SECTION 1
GENERAL INFORMATION
1.1
SCOPE
This document contains the test requirements for the acceptance testing of the Signal Splitter Module (P/N 500034-1). This document contains the following sections:
Section 1: General Information
Section 2: Pre-Test Evaluation Procedures
Section 3: Burn-In Procedures
Section 4: Final Test Procedures
The figure below illustrates the order of testing.
Figure 1.1-1. Testing Flow
1.2
PURPOSE
The purpose of this document is to demonstrate that the Signal Splitter Module, as manufactured by Frontier Electronic Systems, meets or exceeds all recurring requirements identified within document 409023, PDT Module Validation Plan.
1.3
TEST EQUIPMENT
Table 1.3-1 lists the equipment required to perform the procedures contained in this document. Enter the serial number and calibration expiration date for each piece of test equipment.
Table 1.3-1. Test Equipment
| DESCRIPTION |
| MODEL |
| SERIAL NUMBER |
| MANUFACTURER/ |
SPECIFICATIONS
CALIBRATION
EXP. DATE
| Cruiser Converter Tester |
| 500129-1 |
| 001 |
| FES |
| N/A |
| Switchboard Tester |
| 204306 |
| 001 |
| FES |
| N/A |
1.4
GENERAL REQUIREMENTS
1.4.1 Production Routers
Insert the Production Routers for the module into Appendix A.
1.4.2 Test Conditions
Unless otherwise specified herein, testing shall be performed at standard room ambient temperature, 60( to 80(F.
1.4.3 Failure Reporting
Non-Conformance Reports (NCRs) shall be used to document test failures in accordance with FES-QSP-8.3-3 when required. A copy of each NCR shall be inserted into Appendix B.
1.4.4 Test Data Successful completion of each test shall be annotated within these procedures. Test data recorded during automated testing shall be maintained on the FES network at data3\Shared Data\Naval Systems\Test Data\part number\serial number.
SECTION 2
PRE-TEST EVALUATION
This section contains the steps for conducting a preliminary test of the Signal Splitter Module before subjecting it to a burn-in cycle. Both the Cruiser Converter Tester and Switchboard Tester are required for these tests.
2.1
INSTALLATION AND SETUP PROCEDURE
The Installation and Setup Procedure verifies the test configuration.
1. On the Cruiser Converter Tester, set the Gold Board Converter Chassis’ Power Supply Module switch to the OFF position.
2.
Install the Signal Splitter Module into the Converter Chassis slot designated Signal Splitter in the Cruiser Converter Tester.
3.
Connect the Tester cables as shown in Figure 2.1-1.
Figure 2.1-1. Converter and Switchboard Tester Configurations 2.2
AUTOMATED TEST PROGRAM (CONVERTER)
These procedures are performed using the Cruiser Converter Tester.
1.
Set the Gold Board Converter Chassis’ Power Supply Module switch to the ON position.
2.
Select the Cruiser Converter Tester icon on the initial windows screen and follow the displayed instructions.
3.
The program will display dialog boxes to provide the operator with step-by-step instructions for completing testing. Upon completion of each test, annotate the appropriate entry in Table 2.2-1.
Table 2.2-1. Pre-Test Verification Table (Converter)
| TEST |
| ESTIMATED RUN TIME |
| COMPLETE |
| Oscope-Pulse Characteristics Measurements (Splitter) |
| 5 Minutes |
| LED and Test Point Test (Splitter) |
| 5 Minutes |
2.3
AUTOMATED TEST PROGRAM (SWITCHBOARD)
These procedures are performed using the Switchboard Tester.
1.
Apply power to the Switchboard Tester.
2.
Select the Switchboard Tester Icon on the initial windows screen and following displayed instructions.
3.
The program will display dialog boxes to provide the operator with step-by-step instructions for completing testing. Upon completion of the test, annotate the entry in Table 2.3-1.
Table 2.3-1. Pre-Test Verification Table (Switchboard)
| TEST |
| ESTIMATED RUN TIME |
| COMPLETE |
| Splitter Video Test |
| 15 minutes |
SECTION 3
BURN-IN
This section contains the procedures to accomplish a burn-in cycle on the Signal Splitter Module.
1.
Place the Signal Splitter Module into a test bed capable of providing power to the module per VMEbus standards.
2.
Place the test bed into a thermal chamber.
3.
Complete a 48 hour (minimum) burn-in cycle at 45°C ± 5°C with power applied to the module.
4.
In Table 3-1 record the time and date of the beginning and end of the cycle and the total burn-in time.
Table 3-1. Burn-in Test Information
Date/Time
5.
Insert the temperature burn-in chart into Appendix C.
Completion Verified: ________________
SECTION 4
FINAL TEST
This section details the functional testing of the Signal Splitter Module.
4.1
AUTOMATED TEST PROGRAM (CONVERTER)
These procedures are performed using the Cruiser Converter Tester.
1. Ensure power is OFF on the Cruiser Converter Tester Gold Board Chassis.
2. Install the Signal Splitter Module into the Converter Chassis slot designated “Signal Splitter” in the Cruiser Converter Tester.
3. Connect the Tester Cables as shown in Figure 2.1-1.
4.
Apply power to the Gold Board Chassis.
5.
Select the Cruiser Converter Testers icon on the initial windows screen and follow the displayed instructions.
6.
The program will display dialog boxes to provide the operator with step-by-step instructions for completing testing. Upon completion of each test, annotate the appropriate entry in Table 4.1-1.
Table 4.1-1. Final Test Verification Table (Converter)
| TEST |
| ESTIMATED RUN TIME |
| COMPLETE |
| Oscope-Pulse Characteristics Measurements (Splitter) |
| 5 Minutes |
| LED and Test Point Test (Splitter) |
| 5 Minutes |
4.2
AUTOMATED TEST PROGRAM (SWITCHBOARD)
These procedures are performed using the Switchboard Tester.
1. Apply power to the Switchboard Tester
2. Select the Switchboard Tester icon on the initial windows screen and follow the displayed instructions.
3.
The program will display dialog boxes to provide the operator with step-by-step instructions for completing testing. Upon completion of the test, annotate the entry in Table 4.2-1.
Table 4.2-1. Final Test Verification Table (Switchboard)
| TEST |
| ESTIMATED RUN TIME |
| COMPLETE |
| Splitter Video Test |
| 15 minutes |
4.
Copy test data files to the FES network drive at data3\Shared Data\Naval Systems\Test Data\part number\serial number.
Verified: _______________
Comments:
Validation
This sheet is supplied as a validation of the completion and accuracy of the data contained herein. The Test Technician will sign and date as an indication that all instructions have been followed and that each test step has been successfully completed. Signature by the Quality Engineer is an acknowledgement that the test data has been reviewed for completion and accuracy. Applicable Test/Inspection stamps will be affixed by the signature blocks
Test Technician: ________________________________Date:____________
Quality Engineer: _______________________________Date:____________
APPENDIX A
PRODUCTION ROUTERS
APPENDIX B
NON-CONFORMANCE REPORTS
APPENDIX C
BURN-IN LOG
MODULE TEST
REPAIR
BOARD PER
PARA 1.4.3
Pass�Test?
ACCEPTANCE TEST PROCEDURE
FOR THE SIGNAL SPLITTER MODULE
(P/N 500034-1)
S/N: _________________
13 JULY 2012
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to protecting technical, operational, or operational use information from automatic dissemination under the International Exchange Program or by other means as determined on or after date of task order award. Other requests for this document shall be referred to NAVSEA CDSA Code F31.
WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Prepared By:
FRONTIER ELECTRONIC SYSTEMS CORP.
P.O. BOX 1023
STILLWATER, OKLAHOMA 74076-1023
AUTOMATED
TEST PROGRAM (CONVERTER)
SECTION 4.1
AUTOMATED TEST PROGRAM (SWITCHBOARD) SECTION 2.3
SECTION 2.2
INSTALLATION
AND SETUP
SECTION 2.1
BURN-IN
BOARD
SECTION 3
Pass�Test?
AUTOMATED TEST PROGRAM (CONVERTER) SECTION 2.2
INSTALLATION AND SETUP
SECTION 2.1
START�MODULE �TEST
FINAL TEST
Pre-test �Evaluation
YES
NO
NO
YES
AUTOMATED TEST PROGRAM (SWITCHBOARD) SECTION 4.2
MODULE �TEST COMPLETE