Att_J-8_-_DD_2794_-_SD_PSA_113_115_120_121.xls

DoD Form XLS spreadsheet 71 KB Posted

Attached to
San Diego DDG 51 Post-Shakedown Availability Execution
Solicitation number
N00024-16-R-2310
Issued by

About this file

Attachment J-8 - DD 2794

View the file

Other versions and copies of DD Form 2794

File Revision Posted Attached to
9. DD2794_Cost and Software Reporting Plan_AF-24-M-C1_20240510.xls May 10, 2024 Space Development Agency (SDA) Advanced Fire Control Ground Infrastructure (AFCGI)
Attachment_21_DD2794 Avionics CSDR Plan_21 Nov 2022.xlsx Nov 21, 2022 T-6A Avionics Replacement Program
Attachment 0005 DD2794 Sustainment CSDR Standard Plan 23-R-0075 PRID 2022H018.xlsx 2022 Fuel Tank Combo-Pack for the Apache AH-64
Attachment 9 - RMWT LEO GEPs DD2794 CSDR Plan.xlsx Revision not stated Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs)
DHMS Deployment DD2794 CSDR Plan.xlsx Revision not stated Program Executive Office (PEO) Defense Healthcare Management Systems (DHMS) Deployment Solutions
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf Revision not stated KC-135 Center Console Refresh (CCR) Revision 2
Attachment 0004 - DD2794 CSDR.xls Revision not stated Head, Rotary Wing for the Apache AH-64
Attachment 0005 - DD2794 Sustainment CSDR Standard Plan 23-B-0037.cplan.XML_Finalized.pdf Revision not stated Head, Rotary Wing for the Apache AH-64
ATTACHMENT 8 DD 2794 IDIQ CSDR Plan v2.xlsx Revision not stated RFP - Space Test Experiments Platform (STEP) 2. 0
J-16 DD 2794 CSDR Plan for BVY-1 ISIS TI-26-28-30 (2023-08-04) FINALIZED MEMO.pdf Revision not stated BVY-1 ISIS TI-26 TI-28 TI-30 Solicitation
DRAFT CSDR Plan F100 RDN DD Form 2794.xls Revision not stated Regional Depot Network (RDN) Re-manufacture of F100-PW-220/-220E/-229/-229EEP Series Engine Modules
DD2794 COST AND SOFTWARE DATA REPORTING PLAN.xls Revision not stated KC-135 Center Console Refresh (CCR)
TMIP-J Attachment 7 DD2794 CSDR Standard Plan.xls Revision not stated Theater Medical Information Program Joint (TMIP-J) Sustainment
Attachment 15 - DD2794 MK41 VLS Launcher.xls Revision not stated FY 22-27 MK 41 Vertical Launching System (VLS) Production
Attachment_0001_DD2794_CSDR_Plan.xls Revision not stated F-16 Brake Control System Redesign (BCSR)
Exhibit A1 A004 DD Form 2794 DISC_CSDR_Plan.xls Revision not stated Directorate for Test Resources (DTR) Instrumentation Support Contract (DISC) Draft RFP
N0010419RK082 Attach 1 - CSDR Co-Plan, DD Form 2794.pdf Revision not stated JSF C/P Cartridges IDIQ
APPENDIX_C_CSDR__DD2794_Attachment.xlsx Revision not stated KC-135 Aero-I SATCOM Replacement
Attachment_J-5_DD_2794_Co-Plan_for_MMM-_Procurement.xlsx Revision not stated Multifunction Modular Mast
Attachment_J-6_-_DD_2794_Co-Plan_for_MMM-_Development.xlsx Revision not stated Multifunction Modular Mast
Show all 20

Who attaches DD Form 2794

Other files

File Type Posted
Bidders_Questions_1-23_-_For_Release_-_15-Sep-16.pdf PDF
16-R-2310_-_Amend_0004_-_Released_-_13-Sep-16.docx DOCX document
Bidders_Questions_1-22_-_For_Release_-_13-Sep-16.pdf PDF
Att_S-2_-_Cost_Exhibits_(Rev_6-Sep-16_-_via_Amend_0003).xls XLS spreadsheet
16-R-2310_-_Amend_0003_-_Released_-_13-Sep-16.docx DOCX document
Bidders_Questions_1-20_-_For_Release_-_9-Sep-16.pdf PDF
593-21-001_-_Ref_2.2_-_EPA_Form_8700-22A.pdf PDF
Bidders_Questions_1-11-_For_Release_-_8-Sep-16.pdf PDF
593-21-001_-_Ref_2.3_-_10_U.S.C._7311.pdf PDF
593-21-001_-_Ref_2.1_-_Resource_Conservation_ _Recovery_Act_(RCRA).pdf PDF
593-21-001_-_Ref_2.2_-_EPA_Form_8700-22.pdf PDF
16-R-2310_-_Amend_0002_-_Released_-_30-Aug-16.docx DOCX document
Att_J-1_-_SD_PSA_Execution_CDRLs_-_26-Aug-16.pdf PDF
Att_J-1_-_SD_PSA_Execution_CDRLs_-_22-AUG-16.pdf PDF
16-R-2310_-_Amend_0001_-_Released_-_22-Aug-16.docx DOCX document
Att_J-6_-_DD254_-_Signed.pdf PDF
Att_S-2_-_Cost_Exhibits.xls XLS spreadsheet
Att_S-5_-_Contractor_Award_Announcement_Information.docx DOCX document
Att_J-1_-_SD_PSA_Execution_CDRLs_-_29-JUL-16.pdf PDF
N00024-16-R-2310_-_SD_PSA_Execution_-_Released.docx DOCX document
Att_S-3_-_Craft-Trade_Hours.xlsx XLSX spreadsheet
Att_S-4_-_Compliance_Checklist.docx DOCX document
Att_S-1_-_Bidders_Questions_Form.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1

COST AND SOFTWARE DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. MAJOR PROGRAMa. NAME:PSA for DDGs 113, 115, 120 and 121
b. PHASE/MILESTONEc. PRIME MISSION PRODUCT2. WBS SYSTEM TYPE3. SUBMISSION TYPE4. CURRENT SUBMISSION DATE (YYYYMMDD)5. LAST APPROVED PLAN DATE (YYYYMMDD)
Pre-ABxC-FRPPSA Post Shakedown AvailabilitySea SystemXINITIAL
AC-LRIPO&SCHANGE
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)6b. TELEPHONE NUMBER (Include Area Code)6c. FAX NUMBER (Include Area Code)6d. E-MAIL ADDRESS
Juan Rivera

1333 Isaac Hull Ave SE

Washington, DC 20376202-781-0458juan.rivera8@navy.mil
7. PLAN TYPE8. PREPARING ORGANIZATION9a. CONTRACTOR NAME/ADDRESS9b. CONTRACT NUMBER9c. APPROPRIATION10. APPROVED PLAN NUMBER
XPROGRAMCONTRACT (PRIME)i. PERFORMING ORGANIZATIONii. DIVISIONRDT&E
CONTRACT (SUB)PMS 400DRefer to RDTRefer to RDTPROCUREMENT
O&M
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):DD 1921-1 / 1921-5 EAC:EVM Reporting:
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYCCDRg. SRDR
FORMATSh. IPMR

FORMAT 1

b. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. EAC
1Sea SystemXXX
1.1ShipXXX
1.1.1Hull StructureXXX
1.1.2Propulsion PlantXXX
1.1.3Electric PlantXXX
1.1.4Command, Communications and SurveillanceXXX
1.1.5Auxiliary SystemsXXX
1.1.6Outfit and FurnishingsXXX
1.1.7ArmamentXXX
1.1.8Total Ship Integration/EngineeringXXX
1.1.9Ship Assembly and Support ServicesXXX
1.2System EngineeringXXX
1.3Program ManagementXXX
1.4System Test and EvaluationXXX
1.4.1Development Test and EvaluationXXX
1.4.2Operational Test and EvaluationXXX
1.4.3Mock-ups / System Integration Labs (SILs)XXX
1.4.4Test and Evaluation SupportXXX
1.4.5Test FacilitiesXXX
1.5TrainingXXX
1.5.1EquipmentXXX
1.5.2ServicesXXX
1.5.3FacilitiesXXX
1.6DataXXX
1.6.1Technical PublicationsXXX
1.6.2Engineering DataXXX
1.6.3Management DataXXX
1.6.4Support DataXXX
1.6.5Data DepositoryXXX
1.7Peculiar Support EquipmentXXX
1.7.1Test and Measurement EquipmentXXX
1.7.2Support and Handling EquipmentXXX
1.8Common Support EquipmentXXX
1.8.1Test and Measurement EquipmentXXX
1.8.2Support and Handling EquipmentXXX
1.9Operational/Site ActivationXXX
1.9.1System Assembly, Installation and Checkout on SiteXXX
1.9.2Contractor Technical SupportXXX
1.9.3Site ConstructionXXX
1.9.4Site/Ship/Vehicle ConversionXXX
1.9.5Sustainment/Interim Contractor SupportXXX
1.10Industrial FacilitiesXXX
1.10.1Construction/Conversion/ExpansionXXX
1.10.2Equipment Acquisition or ModernizationXXX
1.10.3Maintenance (Industrial Facilities)XXX
DD FORM 2794, AUGUST 2015PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):DD 1921-1 / 1921-5 EAC:EVM Reporting:
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYCCDRg. SRDR
FORMATSh. IPMR

FORMAT 1

b. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. EAC
1.11Initial Spares and Repair PartsXXX
DD FORM 2794, AUGUST 2015PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 2

14. CSDR SUBMISSION DATES
a.
SUBMISSIONb.
FORM(S)c.
EVENTd.
REPORT TYPEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1CWBS DictionaryInitial CWBS Submission
21921, 1921-1Initial Report
31921, 1921-1DDG 113 Final Report
41921, 1921-1DDG 115 Final Report
51921, 1921-1DDG 120 Final Report
61921, 1921-1Final Report, (DDG 121 Final)
15. REMARKS
PROGRAM OVERVIEW AND CONTRACTING APPROACH
1. Program Overview

Provide those services which support the total Post Shakedown Availability (PSA) effort for JOHN FINN (DDG 113), and if options are exercised, for RAFAEL PERALTA (DDG 115), CARL M. LEVIN (DDG 120), and FRANK E. PETERSON, JR, (DDG 121), to include program management, planning, engineering, design, liaison, scheduling, and participation in PSA Planning Conferences and Design Reviews.

2. Contracting Approach
3. Quantity Overview

Support for one (1) PSA, with three (3) options foe one (1) PSA each.

DD FORM 2794 (PAGE 2), AUGUST 2015 PREVIOUS EDITION IS OBSOLETE

File details come from the government source that posted it. Updated .