Att_J-1_-_SD_PSA_Execution_CDRLs_-_29-JUL-16.pdf
PDF 242 KB Posted
- Attached to
- San Diego DDG 51 Post-Shakedown Availability Execution Federal contract opportunity
- Solicitation number
- N00024-16-R-2310
About this file
Attachment J-1 - CDRLs
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
DDG 113 PSA
CONTRACTOR'S PROGRESS, STATUS AND
MANAGEMENT REPORT
METRIC REPORT
DI-MGMT-80227 (BLK 16) (BLK 16) PMS 400D
(BLK 16) (BLK 16)
G. PREPARED BY
C. GRAHAM, PMS 400D76
A001
A
Page _____ of _____ Pages
(BLK 16)
Public reporting burden for this collection of information is estimated to average 110 hours per response. Including the time for reviewing instructions. Searching existing data sources. Gathering and maintaining the data needed. And completing and reviewing the collection of information: Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suite 1204. Arlington, VA 22202-4302. And to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188). Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _____ TM _____ OTHER
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION 14.
16. REMARKS
a. ADDRESSEE b.
Draft Final
Reg Repro
H. DATE I. APPROVED BY J. DATE
X
1 1
SUBSTITUTE PARA 10.2 WITH "THIS REPORT SHALL BE DEVELOPED IN
AN ELECTRONIC FORMAT." IN PARA 10.3, CONTENTS SHALL BE IN
ACCORDANCE WITH SOW. SUBMIT IN ACCORDANCE WITH ATTACHMENTS
001 THROUGH 012.
CLINS 0001, ITEMS 1, AND 10/CLINS 0005, ITEMS 1 AND 3.
(BLKS 10/12/13)
SUBMIT INITIAL REPORT 30 DAYS PRIOR TO START OF PSA AND WEEKLY
THEREAFTER.
(BLKS 14/15)
ELECTRONIC SUBMITTAL SHALL BE IN MICROSOFT EXCEL.
PROVIDE ONE ELECTRONIC COPY TO THE DESIGNATED PMS 400D6 ON
SITE REPRESENTATIVE.
THE NAVAL SUPERVISING AUTHORITY (NSA) IS DETERMINED BY THE
SUPERVISOR OF SHIPBUILDING (SUPSHIP) THAT HAD OVERSIGHT OF
CONSTRUCTION OF THE SHIP. FOR SHIPS BUILT BY HUNTINGTON
INGALLS INDUSTRIES, SUPSHIP GULF COAST WILL BE THE NSA. FOR
SHIPS BUILT BY BATH IRON WORKS, SUPSHIP BATH WILL BE THE
NSA. THE ADMINSTRATING CONTRACTING OFFICER (ACO) WILL BE
DETERMINED AT CONTRACT AWARD, AND CAN BE EITHER SUPSHIP OR A
REGIONAL MAINTENANCE CENTER.
IN THE EVENT THAT THE OPTION IS EXCERCISED, ITEMS 0101-0106,
0201-0206, AND 0301-0306 APPLY.
0 15. TOTAL
(BLK 4)
(BLK 5)
0 3
PMS 400D
NSA
(BLK 16)
Total Exhibit "A"Pages: 011
13. DATE OF SUBSEQUENT
SUBMISSION
11-FEB-16 29-JUL-16
CDRL A001
USS ________ (DDG ___ PSA)
WEEKLY PSA
METRICS REPORT
Week XX
MILESTONE ORIG START REVISED START ORIGIN COMP REVISED COMP ACTUAL COMP
Ship Arrival Complete Defuel Ship Crew Move Ashore Start PSA Drydock Ship (IF APPLICABLE) Undock Ship (IF APPLICABLE)* Aviation Tech Assist Visit Combat Systems (PCD) / AEGIS Lightoff (ALO)* Production Completion Date (PCD)* Load Fuel Hab Spaces Available Crew Move Aboard Aviation Certification Light Off Assessment (LOA) GTG Light-off
MELO
Dock Trials* Fast Cruise* Sea Trial* Perform Inclining PSA Completion*
* INDICATES CERTIFICATION EVENT
CDRL A001 Attachment 001
USS ___________ (DDG ___ PSA ) PSA MILESTONES
BCWS = Budgeted Cost of Work Scheduled BAC = Budgeted at Completion BCWP = Budgeted Cost of Work Performed EAC = Estimate at Completion (ACWP + (BAC - BCWP)/CPI) ACWP = Actual Cost of Work Performed CPI = Cost Performance Index (BCWP/ACWP) SPI = Scheduled Performance Index (BCWP/BCWS)
Earned Value Data (Dollars)
CDRL A001 Attachment 002
USS ___________ (DDG ___ PSA)
BCWS and BCWP figures include growth and subcontractor costs
CUMULATIVE
EARNED VALUE
(BCWP)
CPI SPI BACWEEK
WEEK
ENDING
CUMULATIVE
PLANNED VALUE
(BCWS)
CUMULATIVE
ACTUAL COST
(ACWP)
EAC
BCWS = Budgeted Cost of Work Scheduled BAC = Budgeted at Completion BCWP = Budgeted Cost of Work Performed EAC = Estimate at Completion (ACWP + (BAC - BCWP)/CPI) ACWP = Actual Cost of Work Performed CPI = Cost Performance Index (BCWP/ACWP) SPI = Scheduled Performance Index (BCWP/BCWS)
BCWS and BCWP figures include growth and subcontractor manhours
CUMULATIVE
EARNED VALUE
(BCWP)
CPI SPI BACWEEK
WEEK
ENDING
CUMULATIVE
PLANNED VALUE
(BCWS)
CUMULATIVE
ACTUAL COST
(ACWP)
EAC
CDRL A001 Attachment 003
USS ___________ (DDG ___ PSA)
Earned Value Data (Man Hours)
CDRL A001 Attachment 004
CSCS CHART
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
M A
N H
O U
R S
(t h o u sa n d s)
WEEK
BCWS
BCWP
ACWP
EAC HOURS
BAC HOURS
CDRL A001 Attachment 005
CPI/SPI CHART
0.75
0.875
1.125
1.25
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
V A
L U
E
WEEK
CPI SPI
WEEK WEEK ENDING BAC $ EAC $ VARIANCE
CDRL A001 Attachment 006
EAC/BAC
CDRL A001 Attachment 007
EAC/BAC Totals
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
E A
C /B
A C
T h o u sa n d s)
WEEK
EAC $ BAC $
PERCENT COMPLETE = (BCWPCUM/BAC)
PERCENT SPENT = (ACWPCUM/BAC)
USS ___________ (DDG ___ PSA)
CDRL A001 Attachment 008
WEEK WEEK ENDING
PERCENT
COMPLETE
PERCENT SPENT
TIME ELAPSED
Overall Status
NOTE 1: MANNING INCLUDES PRIME CONTRACTORS AND SUBCONTRACTORS
USS ___________ (DDG ___ PSA)
CDRL A001 Attachment 009
WEEK WEEK ENDING
CUMULATIVE
PLANNED
MANNING
ACTUAL MANNING
(EQUIV MAN/DAY)
DELTA
(EQUIV MAN/DAY)
PLANNED
MANNING
(PROJECTED MAN/DAY)
CUMULATIVE
ACTUAL MANNING
MANNING PROFILE
CDRL A001 Attachment 010
WEEKLY MANNING
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
M A
N /D
A Y
WEEK
PLANNED MANNING
(PROJECTED MAN/DAY)
ACTUAL MANNING (EQUIV
MAN/DAY)
USS ___________ (DDG ___ PSA) Overall Status CDRL A001 Attachment 011
WEEK WEEK ENDING
ACTUAL
PROGRESS %
DELTA
(ACTUAL-PLANNED) %
PLANNED
PROGRESS %
TIME ELAPSED
PRODUCTION SCHEDULE
Work Items Mod Delivery Order#
Prime
DPL ST
Hours
Prime
DPL OT
Hours
Prime Labor OT Cost ($)
Sub DPL ST Hours
Sub DPL OT Hours
Prime
DPL ST
Hours
Prime
DPL OT
Hours
Prime Labor OT Cost ($)
Sub DPL ST Hours
Sub DPL OT Hours
123-11-001 123-11-001 001 123-11-002 123-11-001 123-11-003
Note 1: Re-work manhours are expended after accomplishment of the work item in order to correct a deficiency or quality problem identified during inspection or testing.
Manhours required to initially complete Work Items Re-work Manhours
CDRL A001 Attachment 012
USS _______________________(DDG ___ PSA)
Re-Work Manhours (by Work Item)
TOTAL PRICE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
DDG 113 PSA
CONTRACTOR'S PROGRESS, STATUS AND
MANAGEMENT REPORT
EAC STATUS REPORT
DI-MGMT-80227 (BLK 16) CLIN 0001, ITEM 10 PMS 400D
(BLK 16) (BLK 16)
G. PREPARED BY
C. GRAHAM, PMS 400D76
A002
A
Page _____ of _____ Pages
(BLK 16)
Public reporting burden for this collection of information is estimated to average 110 hours per response. Including the time for reviewing instructions. Searching existing data sources. Gathering and maintaining the data needed. And completing and reviewing the collection of information: Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suite 1204. Arlington, VA 22202-4302. And to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188). Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _____ TM _____ OTHER
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION 14.
16. REMARKS
a. ADDRESSEE b.
Draft Final
Reg Repro
H. DATE I. APPROVED BY J. DATE
X
1 1
SUBSTITUTE PARA 10.2 WITH "THIS REPORT SHALL BE DEVELOPED IN
AN ELECTRONIC FORMAT IAW ATTACHMENT 001." IN PARA 10.3,
CONTENTS SHALL BE IN ACCORDANCE WITH SOW.
(BLKS 10/12/13)
SUBMIT REPORT MONTHLY, BEGINNING 3 MONTHS PRIOR TO START OF PSA,
THEN WEEKLY DURING PSA UNTIL SCN OBLIGATION WORK LIMITING DATE.
(BLKS 14/15)
ELECTRONIC COPY SHALL BE IN MICROSOFT EXCEL AND ADOBE ACROBAT.
PROVIDE ONE ELECTRONIC COPY TO THE DESIGNATED PMS 400D6 ON
SITE REPRESENTATIVE.
THE NAVAL SUPERVISING AUTHORITY (NSA) IS DETERMINED BY THE
SUPERVISOR OF SHIPBUILDING (SUPSHIP) THAT HAD OVERSIGHT OF
CONSTRUCTION OF THE SHIP. FOR SHIPS BUILT BY HUNTINGTON
INGALLS INDUSTRIES, SUPSHIP GULF COAST WILL BE THE NSA. FOR
SHIPS BUILT BY BATH IRON WORKS, SUPSHIP BATH WILL BE THE
NSA. THE ADMINSTRATING CONTRACTING OFFICER (ACO) WILL BE
DETERMINED AT CONTRACT AWARD, AND CAN BE EITHER SUPSHIP OR A
REGIONAL MAINTENANCE CENTER.
IN THE EVENT THAT THE OPTION IS EXCERCISED, ITEMS 0101-0106,
0201-0206, AND 0301-0306 APPLY.
0 15. TOTAL
(BLK 4)
0 3
PMS 400D
NSA
(BLK 16)
Total Exhibit "A"Pages: 011
13. DATE OF SUBSEQUENT
11-FEB-16 29-JUL-16 C. GRAHAM, PMS 400D76
NOTE 1: CONTRACTOR FIGURES IN THIS TABLE INCLUDE SUBCONTRACTOR FEES AND FOR CPAF
ORDERS, THE BASE FEE. THE GOVERNMENT OBLIGATED AMOUNT TOTALS DO NOT INCLUDE THE
AWARD FEE FOR CPAF ORDERS BUT DO INCLUDE ALL FIXED FEES IF CPFF OR FFP.
MANHOURS (PRIME &
SUBCONTRACTORS)
USS ___________ (DDG ___ PSA)
EAC
CDRL A002 Attachment 1
WEEK WEEK ENDING
CONTRACTOR
OBLIGATED
(NEGOTIATED)
EACGOVERNMENT
OBLIGATED
% SPENT OF GOV'T
OBLIGATED FUNDS
TOTAL PRICE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
DDG 113 PSA
PROGRAM PROTECTION IMPLEMENTATION PLAN
(PPIP)
PLANT PROTECTION PLAN
DI-ADMN-81306 C-30 PMS 400D
ASREQ (BLK 16)
G. PREPARED BY
C. GRAHAM, PMS 400D76
A003
A
Page _____ of _____ Pages
(BLK 16)
Public reporting burden for this collection of information is estimated to average 110 hours per response. Including the time for reviewing instructions. Searching existing data sources. Gathering and maintaining the data needed. And completing and reviewing the collection of information: Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suite 1204. Arlington, VA 22202-4302. And to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188). Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _____ TM _____ OTHER
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION 14.
16. REMARKS
a. ADDRESSEE b.
Draft Final
Reg Repro
H. DATE I. APPROVED BY J. DATE
X
1 1
THIS PLAN SHALL DEFINE THE ACTIONS AND PROCEDURES FOR
PROTECTION OF THE SHIP(S), MATERIAL AND EQUIPMENT.
(BLK 12)
NO LATER THAN 30 DAYS AFTER IDENTIFICATION OF CHANGE.
(BLK 13)
SUBSEQUENT SUBMITTALS TO BE 30 DAYS AFTER IDENTIFICATION OF
CHANGE.
(BLKS 14/15)
ELECTRONIC SUBMITTAL SHALL BE IN ADOBE ACROBAT ON CD-ROM.
PROVIDE ONE ELECTRONIC COPY TO THE DESIGNATED PMS 400D6 ON
SITE REPRESENTATIVE.
THE NAVAL SUPERVISING AUTHORITY (NSA) IS DETERMINED BY THE
SUPERVISOR OF SHIPBUILDING (SUPSHIP) THAT HAD OVERSIGHT OF
CONSTRUCTION OF THE SHIP. FOR SHIPS BUILT BY HUNTINGTON
INGALLS INDUSTRIES, SUPSHIP GULF COAST WILL BE THE NSA. FOR
SHIPS BUILT BY BATH IRON WORKS, SUPSHIP BATH WILL BE THE
NSA. THE ADMINSTRATING CONTRACTING OFFICER (ACO) WILL BE
DETERMINED AT CONTRACT AWARD, AND CAN BE EITHER SUPSHIP OR A
REGIONAL MAINTENANCE CENTER.
IN THE EVENT THAT THE OPTION IS EXCERCISED, ITEMS 0101-0106,
0201-0206, AND 0301-0306 APPLY.
0 15. TOTAL 0 3
PMS 400D
NSA
(BLK 16)
Total Exhibit "A"Pages: 011
13. DATE OF SUBSEQUENT
TOTAL PRICE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
DDG 113 PSA
FUNDS AND MAN-HOUR EXPENDITURE REPORT ACTUAL WORK ITEM MAN-HOUR/MATERIAL
EXPENDITURE REPORT
DI-FNCL-80331A (BLK 16) CLIN 0001, ITEM 10 PMS 400D
LT (BLK 16) (BLK 16)
G. PREPARED BY
C. GRAHAM, PMS 400D76
A004
A
Page _____ of _____ Pages
(BLK 16)
Public reporting burden for this collection of information is estimated to average 110 hours per response. Including the time for reviewing instructions. Searching existing data sources. Gathering and maintaining the data needed. And completing and reviewing the collection of information: Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suite 1204. Arlington, VA 22202-4302. And to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188). Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _____ TM _____ OTHER
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION 14.
16. REMARKS
a. ADDRESSEE b.
Draft Final
Reg Repro
H. DATE I. APPROVED BY J. DATE
X
PARAS 3, 4.1 AND 4.14 APPLY. IN PARA 4.1, REPLACE "(SEE
FIGURE 1)" WITH "(SEE ATTACHMENTS 001 THROUGH 003)". IN PARA
4.14, REPLACE "FUNDS AND OUTSTANDING COMMITMENTS" WITH
"DOLLARS, OVERHEAD, AND FEE." AFTER "REPORTING PERIOD FOR",
DELETE THROUGH "COSTS" AND REPLACE WITH "ALL WORK ITEMS".
IN THE ACTUAL FUNDS AND MAN-HOUR EXPENDITURE REPORT,
CONTRACTOR IS REQUIRED TO PROVIDE LABOR, MAN-HOURS AND COSTS
FOR ALL SUBCONTRACTORS AND NOT TO INCORPORATE SUBCONTRACTOR
LABOR COSTS UNDER MATERIAL EXPENSES.
IF THE CONTRACTOR DESIRES TO USE A FORMAT FOR REPORTING OTHER
THAN THAT PROVIDED IN ATTACHEMENT 001, 002, AND 003 IT SHALL BE
SUBJECT TO APPROVAL BY THE ON-SITE COR AND CONTRACTING OFFICER,
AND SHALL BE SUBMITTED FOR APPROVAL NO LATER THAN 90 DAYS PRIOR
TO THE START OF THE PSA. A CHANGE IN REPORTING FORMAT DOES NOT
CORRELATE TO A CHANGE IN THE METRICS REQUIRED TO BE REPORTED.
COST ELEMENTS ARE TO BE ADDRESSED FOR EACH WORK ITEM TASKED BY
CLINS 0001, 0002, 0003, 0004, AND IF OPTIONS ARE EXERCISED 0005,
AND 0006
0 15. TOTAL
(BLK 4)
(BLK 5)
0 3
PMS 400D
NSA
(BLK 16)
Total Exhibit "A"Pages: 011
13. DATE OF SUBSEQUENT
SUBMISSION
(BLKS 10/12/13)
SUBMIT WEEKLY BEGINNING AT THE START OF PSA THROUGH THE END OF
PSA FOLLOWED BY A DELIVERABLE 30 DAYS AFTER PSA AND A FINAL
DELIVERABLE 90 DAYS AFTER PSA.
TOTAL PRICE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
DDG 113 PSA
FUNDS AND MAN-HOUR EXPENDITURE REPORT ACTUAL WORK ITEM MAN-HOUR/MATERIAL
EXPENDITURE REPORT
DI-FNCL-80331A (BLK 16) CLIN 0001, ITEM 10 PMS 400D
LT (BLK 16) (BLK 16)
G. PREPARED BY
C. GRAHAM, PMS 400D76
J. DATE
A004
A
Page _____ of _____ Pages
(BLK 16)
Public reporting burden for this collection of information is estimated to average 110 hours per response. Including the time for reviewing instructions. Searching existing data sources. Gathering and maintaining the data needed. And completing and reviewing the collection of information: Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suite 1204. Arlington, VA 22202-4302. And to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188). Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _____ TM _____ OTHER
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION 14.
16. REMARKS
a. ADDRESSEE b.
Draft Final
Reg Repro
H. DATE I. APPROVED BY
X
2 2
(BLKS 14/15)
SUBMIT IN MICROSOFT EXCEL.
PROVIDE ONE ELECTRONIC COPY TO THE DESIGNATED PMS 400D6 ON
SITE REPRESENTATIVE.
THE NAVAL SUPERVISING AUTHORITY (NSA) IS DETERMINED BY THE
SUPERVISOR OF SHIPBUILDING (SUPSHIP) THAT HAD OVERSIGHT OF
CONSTRUCTION OF THE SHIP. FOR SHIPS BUILT BY HUNTINGTON
INGALLS INDUSTRIES, SUPSHIP GULF COAST WILL BE THE NSA. FOR
SHIPS BUILT BY BATH IRON WORKS, SUPSHIP BATH WILL BE THE
NSA. THE ADMINSTRATING CONTRACTING OFFICER (ACO) WILL BE
DETERMINED AT CONTRACT AWARD, AND CAN BE EITHER SUPSHIP OR A
REGIONAL MAINTENANCE CENTER.
IN THE EVENT THAT THE OPTION IS EXCERCISED, ITEMS 0101-0106,
0201-0206, AND 0301-0306 APPLY.
0 15. TOTAL 0 3
Total Exhibit "A"Pages: 011
13. DATE OF SUBSEQUENT
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
CDRL A004 Attachment 001
USS ___________ (DDG ___ PSA)
Actual Work Item Man-Hour/material Expenditure Report For Each CLIN (by Work Item)
Labor Manhours
Labor Dollars (Fully Burdened)
EST MAT'L
at
Completion Variance
Uninvoiced Material
EAC Variance
Material Dollars (Fully Burdened)
EST MAT'L
to Complete
Sub Labor
ST
Sub Labor
OT
BAC ACWP
BAC ACWP EAC
CLIN 0001
Work Items
(WI)
Mod
Delivery Order #
Budgeted Material
Invoiced Material
Prime Labor
OT
BCWPBCWS
Sub Labor
ST
Sub Labor
OT
BCWS BCWP Variance
CLIN 0001
Work Items
(WI)
Mod
Delivery Order #
Prime Labor
ST
Prime Labor
OT
CLIN 0001
Work Items
(WI)
Mod
Delivery Order #
Prime Labor
ST
234-11-002 345-11-001 222-12-003
TOTALS *
* Transfer totals to SUMMARY SHEET
Prime = Prime Contractor Sub = Subcontractor ST = Straight Time OT = Overtime Mat'l = Material
BCWS = Budgeted Cost of Work Scheduled BCWP = Budgeted Cost of Work Performed ACWP = Actual Cost of Work Performed
BAC = Budgeted at Completion EAC = Estimate at Completion Variance (Labor) = BAC - EAC
Variance (MAT'L) = Budgeted - EST at Completion % Variance = Variance/Total Budget
Summary Dollars (Fully Burdened) Total At
Completion
(EAC)
Variance % Variance
CLIN 0001
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
Total Budget Total
Actuals Uninvoiced
Total to Complete
(ETC)
234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
EST MAT'L
at
Completion Variance
EAC Variance
Material Dollars (Fully Burdened)
CLIN 0002
Work Items
(WI)
Mod Delivery Order #
Budgeted Material
Invoiced Material
Uninvoiced Material
EST MAT'L
to Complete
Sub Labor
ST
Sub Labor
OT
BCWS BCWP BAC ACWP
BAC ACWP EAC Variance
Labor Dollars (Fully Burdened)
CLIN 0002
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
Prime Labor
OT
Labor Manhours
CLIN 0002
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
Prime Labor
OT
Sub Labor
ST
Sub Labor
OT
BCWS BCWP
Summary Dollars (Fully Burdened)
123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
* Transfer totals to SUMMARY SHEET
Variance (MAT'L) = Budgeted - EST at Completion % Variance = Variance/Total Budget
Total At Completion
(EAC)
Variance % Variance
Prime = Prime Contractor Sub = Subcontractor ST = Straight Time OT = Overtime Mat'l = Material
BCWS = Budgeted Cost of Work Scheduled BCWP = Budgeted Cost of Work Performed ACWP = Actual Cost of Work
BAC = Budgeted at Completion EAC = Estimate at Completion Variance (Labor) = BAC - EAC
CLIN 0002
Work Items
(WI)
Mod
Delivery Order #
Prime Labor
ST
Total Budget Total
Actuals Uninvoiced
Total to
234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
EST MAT'L
at
Completion Variance
EAC Variance
Material Dollars (Fully Burdened)
CLIN 0003
Work Items
(WI)
Mod Delivery Order #
Budgeted Material
Invoiced Material
Uninvoiced Material
EST MAT'L
to Complete
Sub Labor
ST
Sub Labor
OT
BCWS BCWP BAC ACWP
BAC ACWP EAC Variance
Labor Dollars (Fully Burdened)
CLIN 0003
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
Prime Labor
OT
Labor Manhours
CLIN 0003
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
Prime Labor
OT
Sub Labor
ST
Sub Labor
123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
* Transfer totals to SUMMARY SHEET
Variance (MAT'L) = Budgeted - EST at Completion % Variance = Variance/Total Budget
Total At Completion
(EAC)
Variance % Variance
Prime = Prime Contractor Sub = Subcontractor ST = Straight Time OT = Overtime Mat'l = Material
BCWS = Budgeted Cost of Work Scheduled BCWP = Budgeted Cost of Work Performed ACWP = Actual Cost of Work
BAC = Budgeted at Completion EAC = Estimate at Completion Variance (Labor) = BAC - EAC
CLIN 0003
Work Items
(WI)
Mod
Delivery Order #
Prime Labor
ST
Total Budget Total
Actuals Uninvoiced
Total to
234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
EST MAT'L
at
Completion Variance
EAC Variance
Material Dollars (Fully Burdened)
CLIN 0004
Work Items
(WI)
Mod Delivery Order #
Budgeted Material
Invoiced Material
Uninvoiced Material
EST MAT'L
to Complete
Sub Labor
ST
Sub Labor
OT
BCWS BCWP BAC ACWP
BAC ACWP EAC Variance
Labor Dollars (Fully Burdened)
CLIN 0004
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
Prime Labor
OT
Labor Manhours
CLIN 0004
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
Prime Labor
OT
Sub Labor
ST
Sub Labor
123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
* Transfer totals to SUMMARY SHEET
Variance (MAT'L) = Budgeted - EST at Completion % Variance = Variance/Total Budget
Total At Completion
(EAC)
Variance % Variance
Prime = Prime Contractor Sub = Subcontractor ST = Straight Time OT = Overtime Mat'l = Material
BCWS = Budgeted Cost of Work Scheduled BCWP = Budgeted Cost of Work Performed ACWP = Actual Cost of Work
BAC = Budgeted at Completion EAC = Estimate at Completion Variance (Labor) = BAC - EAC
CLIN 0004
Work Items
(WI)
Mod
Delivery Order #
Prime Labor
ST
Total Budget Total
Actuals Uninvoiced
Total to
234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
EST MAT'L
at
Completion Variance
EAC Variance
Material Dollars (Fully Burdened)
CLIN 0005
Work Items
(WI)
Mod Delivery Order #
Budgeted Material
Invoiced Material
Uninvoiced Material
EST MAT'L
to Complete
Sub Labor
ST
Sub Labor
OT
BCWS BCWP BAC ACWP
BAC ACWP EAC Variance
Labor Dollars (Fully Burdened)
CLIN 0005
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
Prime Labor
OT
Labor Manhours
CLIN 0005
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
Prime Labor
OT
Sub Labor
ST
Sub Labor
123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
* Transfer totals to SUMMARY SHEET
Variance (MAT'L) = Budgeted - EST at Completion % Variance = Variance/Total Budget
Total At Completion
(EAC)
Variance % Variance
Prime = Prime Contractor Sub = Subcontractor ST = Straight Time OT = Overtime Mat'l = Material
BCWS = Budgeted Cost of Work Scheduled BCWP = Budgeted Cost of Work Performed ACWP = Actual Cost of Work
BAC = Budgeted at Completion EAC = Estimate at Completion Variance (Labor) = BAC - EAC
CLIN 0005
Work Items
(WI)
Mod
Delivery Order #
Prime Labor
ST
Total Budget Total
Actuals Uninvoiced
Total to
234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
EST MAT'L
at
Completion Variance
EAC Variance
Material Dollars (Fully Burdened)
CLIN 0006
Work Items
(WI)
Mod Delivery Order #
Budgeted Material
Invoiced Material
Uninvoiced Material
EST MAT'L
to Complete
Sub Labor
ST
Sub Labor
OT
BCWS BCWP BAC ACWP
BAC ACWP EAC Variance
Labor Dollars (Fully Burdened)
CLIN 0006
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
Prime Labor
OT
Labor Manhours
CLIN 0006
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
Prime Labor
OT
Sub Labor
ST
Sub Labor
123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
* Transfer totals to SUMMARY SHEET
Variance (MAT'L) = Budgeted - EST at Completion % Variance = Variance/Total Budget
Total At Completion
(EAC)
Variance % Variance
Prime = Prime Contractor Sub = Subcontractor ST = Straight Time OT = Overtime Mat'l = Material
BCWS = Budgeted Cost of Work Scheduled BCWP = Budgeted Cost of Work Performed ACWP = Actual Cost of Work
BAC = Budgeted at Completion EAC = Estimate at Completion Variance (Labor) = BAC - EAC
CLIN 0006
Work Items
(WI)
Mod
Delivery Order #
Prime Labor
ST
Total Budget Total
Actuals Uninvoiced
Total to
234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
Mod Delivery Order #
Budgeted Material
Invoiced Material
Uninvoiced Material
EST MAT'L
to Complete
CLIN 0010
Work Items
(WI)
Mod
Delivery Order #
Prime Labor
ST
Prime Labor
OT
EST MAT'L
at
Completion
Sub Labor
OT
BCWS
Material Dollars (Fully Burdened)
CLIN 0010
Work Items
(WI)
BAC
EAC
EAC Variance
Labor Manhours
Labor Dollars (Fully Burdened)
BCWP BAC ACWP Variance Sub Labor
ST
Sub Labor
ST
Sub Labor
OT
BCWS BCWP
Variance
ACWP
CLIN 0010
Work Items
(WI)
Mod Delivery Order #
Prime Labor
ST
123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
* Transfer totals to SUMMARY SHEET
Total At Completion
(EAC)
Variance (MAT'L) = Budgeted - EST at Completion % Variance = Variance/Total Budget
BAC = Budgeted at Completion EAC = Estimate at Completion Variance (Labor) = BAC - EAC
Variance % Variance
Prime = Prime Contractor Sub = Subcontractor ST = Straight Time OT = Overtime Mat'l = Material
Total Budget Total
Actuals Uninvoiced
Total to Complete
(ETC)
BCWS = Budgeted Cost of Work Scheduled BCWP = Budgeted Cost of Work Performed ACWP = Actual Cost of Work
CLIN 0010
Work Items
(WI)
Mod
Delivery Order #
234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
EAC Variance
Material Dollars (Fully Burdened)
CLIN 0011
Work Items
(WI)
Mod Delivery Order #
Budgeted Material
Invoiced Material
Uninvoiced Material
EST MAT'L
to Complete
Sub Labor
ST
Sub Labor
OT
BCWS BCWP
EST MAT'L
at
Completion Variance
BAC ACWP
BAC ACWP EAC Variance
Labor Dollars (Fully Burdened)
Prime Labor
OT
Sub Labor
ST
Sub Labor
OT
CLIN 0011
Work Items
(WI)
Mod
Delivery Order #
Prime Labor
ST
Prime Labor
OT
Labor Manhours
CLIN 0011
Work Items
(WI)
Mod Delivery Order #
Prime Labor
123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
* Transfer totals to SUMMARY SHEET
CLIN 0011
Work Items
(WI)
Mod
Delivery Order #
Prime Labor
ST
Total Budget Total
Actuals Uninvoiced
Total to Complete
(ETC)
Variance (MAT'L) = Budgeted - EST at Completion % Variance = Variance/Total Budget
Total At Completion
(EAC)
Variance % Variance
Prime = Prime Contractor Sub = Subcontractor ST = Straight Time OT = Overtime Mat'l = Material
BCWS = Budgeted Cost of Work Scheduled BCWP = Budgeted Cost of Work Performed ACWP = Actual Cost of Work Performed
BAC = Budgeted at Completion EAC = Estimate at Completion Variance (Labor) = BAC - EAC
234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
Prime Mat'l
Cost ($)
Sub Mat'l
Cost ($)
Fixed Fee ($)
Base Fee
Award Fee ($)
Total Cost ($)
Prime
DPL OT
Hours
Prime Labor OT Cost ($)
Sub DPL ST Hours
Sub Labor ST Cost ($) (fully burdened)
Sub DPL
OT
Hours
Sub Labor OT Cost ($)
Sub Mat'l
Cost ($)
Fixed Fee ($)
Base Fee
Award Fee ($)
Total Cost ($)
CLIN 0003
Work Items
Mod Delivery Order #
Prime
DPL ST
Hours
Prime Labor ST Cost ($) (fully burdened)
Prime Labor OT Cost ($)
Sub DPL ST Hours
Sub Labor ST Cost ($) (fully burdened)
Sub DPL
OT
Hours
Sub Labor OT Cost ($)
Prime Mat'l
Cost ($)
CLIN 0002
Work Items
Mod Delivery Order #
Prime
DPL ST
Hours
Prime Labor ST Cost ($) (fully burdened)
Prime
DPL OT
Hours
Prime Mat'l
Cost ($)
Sub Mat'l
Cost ($)
Fixed Fee ($)
CLIN 0001
Work Items
Prime
DPL ST
Hours
Prime Labor ST Cost ($) (fully burdened)
Prime
DPL OT
Hours
Prime Labor OT Cost ($)
Sub DPL ST Hours
Sub Labor ST Cost ($) (fully burdened)
Actual Work Item Man Hour/Material Expenditure Report For Each CLIN (by Work Item)
USS ___________ (DDG ___ PSA)
CDRL A004 Attachment 1
Mod Base Fee
Award Fee ($)
Total Cost ($)
Delivery Order #
Sub DPL
OT
Hours
Sub Labor OT Cost ($)
234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
123-11-001 123-11-001 001 234-11-002 345-11-001 222-12-003
TOTALS *
* Transfer totals to SUMMARY SHEET
Sub Labor OT Cost ($)
Prime Mat'l
Cost ($)
Prime Labor OT Cost ($)
Sub DPL ST Hours
Total Cost ($)
Prime = Prime Contractor Sub = Subcontractor ST = Straight Time OT = Overtime Mat'l = Material
Sub Mat'l
Cost ($)
Fixed Fee ($)
Base Fee
Award Fee ($)
Sub Labor ST Cost ($) (fully burdened)
Sub DPL
OT
Hours
CLIN 0006
Work Items
Mod Delivery Order #
Prime
DPL ST
Hours
Prime Labor ST Cost ($) (fully burdened)
Prime
DPL OT
Hours
Prime Mat'l
Cost ($)
Sub Mat'l
Cost ($)
Fixed Fee ($)
Base Fee
Award Fee ($)
Total Cost ($)
Prime
DPL OT
Hours
Prime Labor OT Cost ($)
Sub DPL ST Hours
Sub Labor ST Cost ($) (fully burdened)
Sub DPL
OT
Hours
Sub Labor OT Cost ($)
Sub Mat'l
Cost ($)
Fixed Fee ($)
Base Fee
Award Fee ($)
Total Cost ($)
CLIN 0005
Work Items
Mod Delivery Order #
Prime
DPL ST
Hours
Prime Labor ST Cost ($) (fully burdened)
Prime Labor OT Cost ($)
Sub DPL ST Hours
Sub Labor ST Cost ($) (fully burdened)
Sub DPL
OT
Hours
Sub Labor OT Cost ($)
Prime Mat'l
Cost ($)
CLIN 0004
Work Items
Mod Delivery Order #
Prime
DPL ST
Hours
Prime Labor ST Cost ($) (fully burdened)
Prime
DPL OT
Hours
Prime Labor ST Prime Labor OT Sub Labor ST Sub Labor OT
TOTAL MANHOURS
BCWS
BCWP
BAC
ACWP
EAC
VARIANCE
Prime Labor ST Prime Labor OT Sub Labor ST Sub Labor OT TOTAL Labor Dollars
BCWS
BCWP
BAC
ACWP
EAC
VARIANCE
Budgeted Material Invoiced Material Uninvoiced Material Estimated Material to Complete Estimated Material at Completion
VARIANCE
Total Budget Total Actuals Uninvoiced Total to Complete (ETC) Total at Completion (EAC)
VARIANCE
% VARIANCE
Note: All Labor and material costs are fully burdened
Note: All Labor costs are fully burdened
CLIN 0010 CLIN 0011
CDRL A004 Attachment 002
Actual Work Item Man Hour/Material Expenditure Report (Summary)
CATEGORY CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006CLIN 0001
USS ___________ (DDG ___ PSA)
CLIN 0002
BCWS = Budgeted Cost of Work Scheduled BCWP = Budgeted Cost of Work Performed ACWP = Actual Cost of Work Performed
Variance (MAT'L) = Budgeted - EST at Completion % Variance = Variance/Total Budget
L A
B O
R M
A N
H O
U R
S L
A B
O R
D O
L L
A R
S
M A
T E
R
IA
L
D O
L L
A R
S S
U M
M A
R Y
D
O L
L A
R S
Prime = Prime Contractor Sub = Subcontractor ST = Straight Time OT = Overtime Mat'l = Material
BAC = Budgeted at Completion EAC = Estimate at Completion Variance (Labor) = BAC - EAC
BASIC
BASIC Deletes New Work Total Distributed Budget
Prime Labor (ST) Prime Labor (OT) Sub Labor (ST) Sub Labor (OT) Materials Total Actual Cost ETC for Budgeted Work EAC for Budgeted Work
Cost Funding (on Contract for Estimated Cost -no Fee) De-obligation Base Fee Award Fee Pool Total Funding
TOTAL
Authorized Work
Summary Cost Status
Funding
CDRL A004 Attachment 003
USS ___________ (DDG ___ PSA)
Financial Summary Report
CLIN 0010 CLIN 0011CATEGORY CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006
TOTAL PRICE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
DDG 113 PSA
TECHNICAL REPORT STUDY/SERVICES TEST PLAN
DI-MISC-80508B (BLK 16) CLIN 0002, ITEM 3 PMS 400D
A
ASREQ (BLK 16)
G. PREPARED BY
C. GRAHAM, PMS 400D76
A005
A
Page _____ of _____ Pages
(BLK 16)
Public reporting burden for this collection of information is estimated to average 110 hours per response. Including the time for reviewing instructions. Searching existing data sources. Gathering and maintaining the data needed. And completing and reviewing the collection of information: Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suite 1204. Arlington, VA 22202-4302. And to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188). Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _____ TM _____ OTHER
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION 14.
16. REMARKS
a. ADDRESSEE b.
Draft Final
Reg Repro
H. DATE I. APPROVED BY J. DATE
X
1 1
AS WORK SPECIFICATIONS ARE REVIEWED, INCORPORATE TESTS INTO
TEST PLAN AND ALSO INCLUDE THE FOLLOWING IN THE PLAN:
- TEST INDEX, TEST PROCEDURES AND TEST SCHEDULE THAT ADDRESS
ALL EQUIPMENT AND SYSTEMS IMPACTED BY WORK PERFORMED DURING
THE PSA. TEST DOCUMENTATION NOT FURNISHED BY THE GOVERNMENT
SHALL BE DEVELOPED BY THE CONTRACTOR.
(BLKS 12/13)
SUBMIT TEST PLAN AT START OF AVAILABILITY. SUBMIT REVISIONS
AS REQUIRED UNTIL COMPLETION OF TRIALS.
(BLKS 14/15)
PROVIDE ONE ELECTRONIC COPY TO THE DESIGNATED PMS 400D6 ON
SITE REPRESENTATIVE.
THE NAVAL SUPERVISING AUTHORITY (NSA) IS DETERMINED BY THE
SUPERVISOR OF SHIPBUILDING (SUPSHIP) THAT HAD OVERSIGHT OF
CONSTRUCTION OF THE SHIP. FOR SHIPS BUILT BY HUNTINGTON
INGALLS INDUSTRIES, SUPSHIP GULF COAST WILL BE THE NSA. FOR
SHIPS BUILT BY BATH IRON WORKS, SUPSHIP BATH WILL BE THE
NSA. THE ADMINSTRATING CONTRACTING OFFICER (ACO) WILL BE
DETERMINED AT CONTRACT AWARD, AND CAN BE EITHER SUPSHIP OR A
REGIONAL MAINTENANCE CENTER.
IN THE EVENT THAT THE OPTION IS EXCERCISED, ITEMS 0101-0106,
0201-0206, AND 0301-0306 APPLY.
0 15. TOTAL
(BLK 4)
0 3
PMS 400D
NSA
(BLK 16)
Total Exhibit "A"Pages: 011
13. DATE OF SUBSEQUENT
TOTAL PRICE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
DDG 113 PSA
CRAFT TRIAL REPORT POST REPAIR SEA TRIAL(S) REPORT
DI-MISC-81615 (BLK 16) CLIN 0002, ITEM 4 PMS 400D
ASREQ (BLK 16)
G. PREPARED BY
C. GRAHAM, PMS 400D76
A006
A
Page _____ of _____ Pages
30 DARC
Public reporting burden for this collection of information is estimated to average 110 hours per response. Including the time for reviewing instructions. Searching existing data sources. Gathering and maintaining the data needed. And completing and reviewing the collection of information: Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suite 1204. Arlington, VA 22202-4302. And to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188). Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _____ TM _____ OTHER
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION 14.
16. REMARKS
a. ADDRESSEE b.
Draft Final
Reg Repro
H. DATE I. APPROVED BY J. DATE
X
1 1
IN PARAS 1 AND 2, CHANGE "CRAFT TRIAL REPORT" TO "SHIP TRIAL
REPORT".
(BLK 12)
NLT 21 DAYS AFTER POST REPAIR SEA TRIAL(S).
(BLKS 14/15)
PROVIDE ONE ELECTRONIC COPY TO THE DESIGNATED PMS 400D6 ON
SITE REPRESENTATIVE.
THE NAVAL SUPERVISING AUTHORITY (NSA) IS DETERMINED BY THE
SUPERVISOR OF SHIPBUILDING (SUPSHIP) THAT HAD OVERSIGHT OF
CONSTRUCTION OF THE SHIP. FOR SHIPS BUILT BY HUNTINGTON
INGALLS INDUSTRIES, SUPSHIP GULF COAST WILL BE THE NSA. FOR
SHIPS BUILT BY BATH IRON WORKS, SUPSHIP BATH WILL BE THE
NSA. THE ADMINSTRATING CONTRACTING OFFICER (ACO) WILL BE
DETERMINED AT CONTRACT AWARD, AND CAN BE EITHER SUPSHIP OR A
REGIONAL MAINTENANCE CENTER.
IN THE EVENT THAT THE OPTION IS EXCERCISED, ITEMS 0101-0106,
0201-0206, AND 0301-0306 APPLY.
0 15. TOTAL
(BLK 4)
0 3
PMS 400D
NSA
(BLK 16)
Total Exhibit "A"Pages: 011
13. DATE OF SUBSEQUENT
TE
18. ESTIMATED
TOTAL PRICE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
DDG 113 PSA
CONTRACTOR'S PROGRESS, STATUS AND
MANAGEMENT REPORT
COMPARTMENT CLOSE-OUT SCHEDULE
DI-MGMT-80227 (BLK 16) CLIN 0001, ITEM 11 PMS 400D
A (BLK 16)
WKLY (BLK 16)
G. PREPARED BY
C. GRAHAM, PMS 400D76 C. GRAHAM, PMS 400D76
J. DATE
A007
A
Page _____ of _____ Pages
(BLK 16)
Public reporting burden for this collection of information is estimated to average 110 hours per response. Including the time for reviewing instructions. Searching existing data sources. Gathering and maintaining the data needed. And completing and reviewing the collection of information: Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suite 1204. Arlington, VA 22202-4302. And to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188). Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _____ TM _____ OTHER
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION 14.
16. REMARKS
a. ADDRESSEE b.
Draft Final
Reg Repro
H. DATE I. APPROVED BY
X
IN DI-MGMT-80227, REPLACE 10.3.a - 10.3.p WITH: "BEFORE THE
START OR COMPLETION OF SEVERAL CRITICAL MILESTONE EVENTS,
PRODUCTION WORK IN COMPARTMENTS THAT IMPACT THOSE MILESTONES
MUST BE COMPLETED AND THE COMPARTMENTS FORMALLY CLOSED OUT AND
TURNED OVER TO THE GOVERNMENT. ALL COMPARTMENTS ASSOCIATED
WITH THE FOLLOWING MILESTONES ARE TO BE IDENTIFIED AND
COMPARTMENT CLOSE-OUT SCHEDULES ARE TO BE DEVELOPED AT THE
START OF THE PSA AND UPDATED THEREAFTER USING ATTACHMENT 001.
UNDOCKING
COMBAT SYSTEMS PRODUCTION COMPLETION DATE (PCD) / AEGIS LIGHT
OFF (ALO)
COMPLETE HABITABILITY SPACE TURNOVER
PRODUCTION COMPLETION DATE (PCD)
COMPLETE EXTERIOR NON-SKID (BY ZONE)"
APPROVE THE INITIAL SCHEDULE AND REVIEW UPDATES THEREAFTER.
BEGINNING OF WEEK 3 OF PSA.
LAST SUBMISSION TO OCCUR WHEN ALL COMPARTMENTS ARE TURNED
OVER.
(BLKS 14/15)
ELECTRONIC SUBMITTAL IN MICROSOFT EXCEL AND ADOBE ACROBAT.
PROVIDE ONE ELECTRONIC COPY TO THE DESIGNATED PMS 400D6 ON
0 15. TOTAL
(BLK 4)
(BLK 8)
(BLK 12)
(BLK 13)
0 3
PMS 400D
NSA
(BLK 16)
Total Exhibit "A"Pages: 011
13. DATE OF SUBSEQUENT
SUBMISSION
TOTAL PRICE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
DDG 113 PSA
CONTRACTOR'S PROGRESS, STATUS AND
MANAGEMENT REPORT
COMPARTMENT CLOSE-OUT SCHEDULE
DI-MGMT-80227 (BLK 16) CLIN 0001, ITEM 11 PMS 400D
A (BLK 16)
WKLY (BLK 16)
G. PREPARED BY
C. GRAHAM, PMS 400D76
A007
A
Page _____ of _____ Pages
(BLK 16)
Public reporting burden for this collection of information is estimated to average 110 hours per response. Including the time for reviewing instructions. Searching existing data sources. Gathering and maintaining the data needed. And completing and reviewing the collection of information: Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suite 1204. Arlington, VA 22202-4302. And to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188). Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _____ TM _____ OTHER
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION 14.
16. REMARKS
a. ADDRESSEE b.
Draft Final
Reg Repro
H. DATE I. APPROVED BY J. DATE
X
2 2
SITE REPRESENTATIVE.
THE NAVAL SUPERVISING AUTHORITY (NSA) IS DETERMINED BY THE
SUPERVISOR OF SHIPBUILDING (SUPSHIP) THAT HAD OVERSIGHT OF
CONSTRUCTION OF THE SHIP. FOR SHIPS BUILT BY HUNTINGTON
INGALLS INDUSTRIES, SUPSHIP GULF COAST WILL BE THE NSA. FOR
SHIPS BUILT BY BATH IRON WORKS, SUPSHIP BATH WILL BE THE
NSA. THE ADMINSTRATING CONTRACTING OFFICER (ACO) WILL BE
DETERMINED AT CONTRACT AWARD, AND CAN BE EITHER SUPSHIP OR A
REGIONAL MAINTENANCE CENTER.
IN THE EVENT THAT THE OPTION IS EXCERCISED, ITEMS 0101-0106,
0201-0206, AND 0301-0306 APPLY.
0 15. TOTAL 0 3
Total Exhibit "A"Pages: 011
13. DATE OF SUBSEQUENT
COMPARTMENT PLANNED COMPARTMENT CLOSE-OUT DATE ACTUAL COMPARTMENT CLOSE-OUT DATE
Note 1: A compartment close-out schedule is to be provided for each Milestone as required in the CDRL
ACTUAL MILESTONE START/COMP DATE:
CDRL A007 Attachment A001 Compartment Close-out Schedule by Milestone Event
USS______________(DDG ___ PSA)
MILESTONE EVENT:
ORIGINAL MILESONE START/COMP DATE:
TOTAL PRICE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
DDG 112 PSA
INTEGRATED MASTER SCHEDULE (IMS) INTEGRATED MASTER SCHEDULE (IMS)
REPORT
DI-MGMT-81650 (BLK 16) CLIN 0001, ITEM 12 PMS 400D
A (BLK 16)
(BLK 16) (BLK 16)
G. PREPARED BY
C. GRAHAM, PMS 400D76
A008
A
Page _____ of _____ Pages
(BLK 16)
Public reporting burden for this collection of information is estimated to average 110 hours per response. Including the time for reviewing instructions. Searching existing data sources. Gathering and maintaining the data needed. And completing and reviewing the collection of information: Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suite 1204. Arlington, VA 22202-4302. And to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188). Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _____ TM _____ OTHER
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION 14.
16. REMARKS
a. ADDRESSEE b.
Draft Final
Reg Repro
H. DATE I. APPROVED BY J. DATE
X
IN DI-MGMT-81650, REPLACE PARAGRAPH (d) UNDER “USE/RELATIONSHIP” WITH "(d) THE IMS SHALL BE STATUSED
ACCORDING TO THE CONTRACTOR'S MANAGEMENT CONTROL SYSTEM AND
SHALL BE SUBMITTED NO LESS FREQUENTLY THAN WEEKLY DURING THE
PSA. THE IMS SHALL REFLECT EVM DATA CONSISTENT AND TRACEABLE
TO THE OTHER WEEKLY COST AND SCHDULE REPORTS SUBMITTED BY THE
CONTRACTOR."
IN PARAGRAPH "2. CONTENT" UNDER “REQUIREMENTS” REPLACE:
"THE SCHEDULE SHALL HAVE A NUMBERING SYSTEM THAT PROVIDES
TRACEABILIITY TO THE IMS (IF APPLICABLE) AND SOW"
WITH "THE SCHEDULE SHALL HAVE A NUMBERING SYSTEM THAT PROVIDES
TRACEABILITY TO THE SOW".
REPLACE PARAGRAPH "2.5 MONTHLY ANALYSIS" UNDER “REQUIREMENTS”
WITH “2.5 ANALYSIS. DURING THE PSA THE CONTRACTOR WILL
PROVIDE AN ANALYSIS IN CONJUNCTION WITH HIS WEEKLY IMS
SUBMITTAL THAT INCLUDES: CHANGES TO SCHEDULE ASSUMPTIONS,
VARIANCES TO THE BASELINE SCHEDULE, CAUSES FOR THE VARIANCES'
POTENTIAL IMPACTS' AND RECOMMENDED CORRECTIVE ACTIONS TO
RECOVER AND MINIMIZE SCHEDULE DELAYS. THE ANALYSIS SHALL ALSO
IDENTIFY POTENTIAL PROBLEMS AND AN ASSESSMENT OF THE CRITICAL
PATH AND NEAR-CRITICAL PATHS."
IN ADDITION TO DI-MGMT-81650, THE FOLLOWING APPLY:
1) ALL WORK ITEMS SHALL BE INCORPORATED IN THE IMS.
2) ALL ACTIVITIES IN THE IMS SHALL BE APPROPRIATELY LINKED TO
PROVIDE VISIBILITY TO THE KEY MILESTONES, CRITICAL PATHS AND
0 15. TOTAL
(BLK 4)
0 3
PMS 400D
NSA
(BLK 16)
Total Exhibit "A"Pages: 011
13. DATE OF SUBSEQUENT
SUBMISSION
TOTAL PRICE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
DDG 113 PSA
INTEGRATED MASTER SCHEDULE (IMS) INTEGRATED MASTER SCHEDULE (IMS)
REPORT
DI-MGMT-81650 (BLK 16) CLIN 0001, ITEM 11 PMS 400D
A (BLK 16)
(BLK 16) (BLK 16)
G. PREPARED BY
C. GRAHAM, PMS 400D76
A008
A
Page _____ of _____ Pages
(BLK 16)
Public reporting burden for this collection of information is estimated to average 110 hours per response. Including the time for reviewing instructions. Searching existing data sources. Gathering and maintaining the data needed. And completing and reviewing the collection of information: Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports. 1215 Jefferson Davis Highway. Suite 1204. Arlington, VA 22202-4302. And to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188). Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _____ TM _____ OTHER
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION 14.
16. REMARKS
a. ADDRESSEE b.
Draft Final
Reg Repro
H. DATE I. APPROVED BY J. DATE
X
2 2
NEAR-CRITICAL PATHS.
3) ALL LABOR HOUR ESTIMATES TO COMPLETE AND PROJECTED SCHEDULE
DATES (BOTH CALCULATED AND ESTIMATED) SHALL BE INCLUDED.
4) STATUS SHALL BE UP TO DATE AND ACCURATE.
5) IMS DATA SHALL BE TRACEABLE TO THE EVMS SYSTEM AND LOWER
LEVEL SCHEDULES AND WORK AUTHORIZATIONS.
APPROVAL FOR FIRST SUBMISSION ONLY. ALL SUBSEQUENT SUBMITTALS
TO BE REVIEW AND COMMENT.
(BLKS 10/12/13)
FIRST SUBMISSION IS REQUIRED 30 DAYS PRIOR TO PSA. SUBSEQUENT
SUBMISSIONS ARE REQUIRED WEEKLY.
(BLKS 14/15)
DOWNLOAD AND PROVIDE THE IMS IN MICROSOFT PROJECT FORMAT.
PROVIDE ONE ELECTRONIC COPY TO THE DESIGNATED PMS 400D6 ON
SITE REPRESENTATIVE.
THE NAVAL SUPERVISING AUTHORITY (NSA) IS DETERMINED BY THE
SUPERVISOR OF SHIPBUILDING (SUPSHIP) THAT HAD OVERSIGHT OF
CONSTRUCTION OF THE SHIP. FOR SHIPS BUILT BY HUNTINGTON
INGALLS INDUSTRIES, SUPSHIP GULF COAST WILL BE THE NSA. FOR
SHIPS BUILT BY BATH IRON WORKS, SUPSHIP BATH WILL BE THE
NSA. THE ADMINSTRATING CONTRACTING OFFICER (ACO) WILL BE
DETERMINED AT CONTRACT AWARD, AND CAN BE EITHER SUPSHIP OR A
REGIONAL MAINTENANCE CENTER.
IN THE EVENT THAT THE OPTION IS EXCERCISED, ITEMS 0101-0106,
0201-0206, AND 0301-0306 APPLY.
0 15. TOTAL
(BLK 8)
0 3
Total Exhibit "A"Pages: 011
13. DATE OF SUBSEQUENT
| 2016-07-29T09:11:32-0400 | |
| GRAHAM.CYNTHIA.D.1253383395 |
| 2016-07-29T09:13:02-0400 | |
| GRAHAM.CYNTHIA.D.1253383395 |
File details come from the government source that posted it. Updated .