N0002415R4202_Amendment_0005_Attachment_CDRL_A047_DD_Form_2794.pdf

DoD Form PDF 37 KB Posted

Attached to
Main Reduction Gear (MRG) Shipsets for the DDG 51 Class Destroyers
Solicitation number
N00024-15-R-4202
Issued by

About this file

Amendment 0005 Attachment 1 CDRL A047 DD Form 2794

View the file

Other versions and copies of DD Form 2794

File Revision Posted Attached to
9. DD2794_Cost and Software Reporting Plan_AF-24-M-C1_20240510.xls May 10, 2024 Space Development Agency (SDA) Advanced Fire Control Ground Infrastructure (AFCGI)
Attachment_21_DD2794 Avionics CSDR Plan_21 Nov 2022.xlsx Nov 21, 2022 T-6A Avionics Replacement Program
Attachment 0005 DD2794 Sustainment CSDR Standard Plan 23-R-0075 PRID 2022H018.xlsx 2022 Fuel Tank Combo-Pack for the Apache AH-64
Attachment 9 - RMWT LEO GEPs DD2794 CSDR Plan.xlsx Revision not stated Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs)
DHMS Deployment DD2794 CSDR Plan.xlsx Revision not stated Program Executive Office (PEO) Defense Healthcare Management Systems (DHMS) Deployment Solutions
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf Revision not stated KC-135 Center Console Refresh (CCR) Revision 2
Attachment 0004 - DD2794 CSDR.xls Revision not stated Head, Rotary Wing for the Apache AH-64
Attachment 0005 - DD2794 Sustainment CSDR Standard Plan 23-B-0037.cplan.XML_Finalized.pdf Revision not stated Head, Rotary Wing for the Apache AH-64
ATTACHMENT 8 DD 2794 IDIQ CSDR Plan v2.xlsx Revision not stated RFP - Space Test Experiments Platform (STEP) 2. 0
J-16 DD 2794 CSDR Plan for BVY-1 ISIS TI-26-28-30 (2023-08-04) FINALIZED MEMO.pdf Revision not stated BVY-1 ISIS TI-26 TI-28 TI-30 Solicitation
DRAFT CSDR Plan F100 RDN DD Form 2794.xls Revision not stated Regional Depot Network (RDN) Re-manufacture of F100-PW-220/-220E/-229/-229EEP Series Engine Modules
DD2794 COST AND SOFTWARE DATA REPORTING PLAN.xls Revision not stated KC-135 Center Console Refresh (CCR)
TMIP-J Attachment 7 DD2794 CSDR Standard Plan.xls Revision not stated Theater Medical Information Program Joint (TMIP-J) Sustainment
Attachment 15 - DD2794 MK41 VLS Launcher.xls Revision not stated FY 22-27 MK 41 Vertical Launching System (VLS) Production
Attachment_0001_DD2794_CSDR_Plan.xls Revision not stated F-16 Brake Control System Redesign (BCSR)
Exhibit A1 A004 DD Form 2794 DISC_CSDR_Plan.xls Revision not stated Directorate for Test Resources (DTR) Instrumentation Support Contract (DISC) Draft RFP
N0010419RK082 Attach 1 - CSDR Co-Plan, DD Form 2794.pdf Revision not stated JSF C/P Cartridges IDIQ
APPENDIX_C_CSDR__DD2794_Attachment.xlsx Revision not stated KC-135 Aero-I SATCOM Replacement
Attachment_J-5_DD_2794_Co-Plan_for_MMM-_Procurement.xlsx Revision not stated Multifunction Modular Mast
Attachment_J-6_-_DD_2794_Co-Plan_for_MMM-_Development.xlsx Revision not stated Multifunction Modular Mast
Show all 20

Who attaches DD Form 2794

Other files

File Type Posted
Amendment_0008_Final.pdf PDF
Amendment_0007_Final.pdf PDF
MRG_Amendment_0006_Final.pdf PDF
Amendment_0005_dtd_2_10_15.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002__1_14_15.pdf PDF
Amendment_0001_dtd_1_8_15.pdf PDF
N0002415R4202_Section_L_Attachments.zip ZIP file
N0002415R4202_Section_J_Attachments.zip ZIP file
N00024-15-R-4202_Final_RFP_12_23_2014.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

d. AS OF DATE e. DUE DATE

(YYYYMMDD) (YYYYMMDD)

1 CWBS Dictionary Contract Award 1st Option Award

2 1921, 1921-1 Ship Sets 1 - 3 Initial Report *** *** 3 1921, 1921-1 Ship Sets 1 - 3 Annual Interim Report *** *** 4 1921, 1921-1 Ship Sets 1 - 3 Final Report* *** ***

2nd Option Award 5 1921, 1921-1 Ship Sets 1 - 3 Initial Report *** *** 6 1921, 1921-1 Ship Sets 1 - 3 Annual Interim Report *** *** 7 1921, 1921-1 Ship Sets 1 - 3 Final Report* *** ***

3rd Option Award 8 1921, 1921-1 Ship Sets 1 - 3 Initial Report *** *** 9 1921, 1921-1 Ship Sets 1 - 3 Annual Interim Report *** ***

10 1921, 1921-1 Ship Sets 1 - 3 Final Report* *** *** 4th Option Award

11 1921, 1921-1 Ship Sets 1 - 3 Initial Report *** *** 12 1921, 1921-1 Ship Sets 1 - 3 Annual Interim Report *** *** 13 1921, 1921-1 Ship Sets 1 - 3 Final Report* *** ***

5th Option Award 14 1921, 1921-1 Ship Sets 1 - 3 Initial Report *** *** 15 1921, 1921-1 Ship Sets 1 - 3 Annual Interim Report *** *** 16 1921, 1921-1 Ship Sets 1 - 3 Final Report* *** ***

6th Option Award 17 1921, 1921-1 Ship Sets 1 - 3 Initial Report *** *** 18 1921, 1921-1 Ship Sets 1 - 3 Annual Interim Report *** *** 19 1921, 1921-1 Ship Sets 1 - 3 Final Report* *** ***

7th Option Award 20 1921, 1921-1 Ship Sets 1 - 3 Initial Report *** *** 21 1921, 1921-1 Ship Sets 1 - 3 Annual Interim Report *** *** 22 1921, 1921-1 Ship Sets 1 - 3 Final Report* *** *** 23 1921, 1921-1 Final Cumulative Report**

1. Recurring/Non-Recurring: Refer to the specific definitions and requirements in the CSDR Manual, DoD 5000.04-M-1 and the definitions in the DIDs for DD Forms 1921, 1921-1

2. Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.

3. DD Form 1921-3 Contractor Business Data Report

a. The Contractor Business Data Report is prepared by and for the business entity (e,g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government

b. Reports are submitted annually at the end of the contractor's fiscal year.

14. CSDR SUBMISSION DATES

15. REMARKS

c.

EVENT

a.

SUBMISSION

b.

FORM(S)

DD FORM 2794 (PAGE 2), MAY 2011 PREVIOUS EDITION IS OBSOLETE

* Final report when all end items of the CLIN have been delivered to the shipyard and 95% of CLIN costs have been incurred.

** Final cumulative report when all contract end items have been delivered to the shipyard and 95% of total contract costs have been incurred. ***Dates are TBD and will be added upon contract award and in the event that subsequent options are awarded. Additional events will be included if options are exercised for battlespares.

c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.

d. Blocks 14a through 14e: An Initial Report may be submitted: (1) within 60 days after completion of the Integrated Baseline Review (IBR) or (2) within 180 days of contract award, whichever is earlier. An Interim Report is a DD Form 1921 that is prepared at any time after the Initial Report and before submission of the Final Report. A Final Report is a DD Form 1921 that is submitted when the contractual effort is either complete or substantially complete. A Final Report is required within 180 days after the last day of the month in which the final end item is accepted. This consists of 120 days for transaction processing, the end of which establishes the report “As of Date” and an additional 60 days for report preparation and submission.

DD Form 2794, Pg 2 (CSDR Plan)

File details come from the government source that posted it. Updated .