Amendment_0003.pdf

PDF 84 KB Posted

Attached to
Main Reduction Gear (MRG) Shipsets for the DDG 51 Class Destroyers
Solicitation number
N00024-15-R-4202
Issued by

About this file

Amendment 0003 - Q A and changes to Section B and Section C

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002414NR58060

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

See Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Jan-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-15-R-4202

X 9B. DATED (SEE ITEM 11)

23-Dec-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 5 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Jan-2015

CODE

NAVAL SEA SYSTEMS COMMAND

1333 ISAAC HULL AVE SE - MAIL STOP 2030

WASHINGTON NAVY YARD DC 20376-2030

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00024-15-R-4202

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this Amendment 0003 to solicitation N00024-15-R-4202:

1. Under SECTION B - SUPPLIES OR SERVICES AND PRICES

a. the CLIN 0001 extended description has changed from NRE for a Main Reduction Gear Shipset to

NRE for a Main Reduction Gear Shipset, See Note C.

b. the following is added:

NOTE C: The amount of LLTM included in CLIN 0001 shall not exceed $2,000,000 regardless of the number of shipsets exercised via CLIN 0003.

2. Under Section C DESCRIPTIONS AND SPECIFICATIONS

a. paragraph C.2.6.2 is modified as follows:

C.2.6.2. PDR: The PDR is a technical review which will assess the MRG’s preliminary design as captured in the item performance specifications for each configuration item and ensures that each function in the functional baseline has been allocated to one or more configuration items. Successful completion of the PDR formally starts detail design and triggers authorization of the Contractor to procure Long Lead Time Material (if requested).

b. the following is added:

C.2.13. LONG LEAD TIME MATERIAL

C.2.13.1. Long Lead Time Material may be ordered as needed for first article production and testing. Items shall be reviewed and accepted by the Government during PDR.

3. The following question is answered:

Question 24: Based on the Government’s response to Question 11 in Amendment 0002, will the Government consider either adding a long lead time material CLIN for each production and spare CLIN or change the delivery date for all option CLINs to 36 months after option exercise with subsequent MRG deliveries in six month intervals thereafter.

Answer 24: See changes made by Amendment 0003.

File details come from the government source that posted it. Updated .