ATTACH 13- WA3Recompete Pre-Award Survey-SF-1408_Hsbp1015R0040.docx

Standard Form DOCX document 21 KB Posted

Attached to
CTIMR Work Area 3 Recompete (Summary of Changes)
Solicitation number
HSBP1015R0040
Issued by

About this file

Pre-Award Survey

View the file

Other versions and copies of SF 1408

File Revision Posted Attached to
B08 - Attachment 0006 - Preaward Survey of Prospective KTR Accounting Sys (SF 1408) - 11SEP2025.pdf Sep 11, 2025 EAGLE Fort Irwin, CA W519TC-25-R-0009
B08 Attachment 0006 Preaward Survey of Prospective KTR Accounting Sys (SF 1408).pdf Revision not stated EAGLE Fort Riley KS W519TC-26-R-A054
Standard Form 1408 - Pre-Award Survey.pdf Revision not stated Next Generation Ammunition & Munitions Equipment (NGAME) for MMHE RFP/Solicitation
Attachment 10-SF1408-14f.pdf Revision not stated Mid-Atlantic Regional Maintenance Center (MARMC) Technical and Professional Services
Attachment 11 - SF1408-14f.pdf Revision not stated Submarine Peculiar Special and Support Equipment (PSSE) Support Services for the Mid-Atlantic Regional Maintenance Center
47QFHA25R0017_T10_08_PRISM MATOC Attachment 4_Modified Preaward Survey (SF 1408).pdf Revision not stated Personnel & Readiness Infrastructure Support Management Services (PRISM) MDoDS Pool Small Business On-Ramp
B08 - Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Picatinny Arsenal, NJ W519TC-25-R-0023
Attachment 7 Pre-Award Survey (SF1408).pdf Revision not stated Joint Safety Health Institutional Facilities Team (JSHIFT) 80LARC25R7001
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Dugway Proving Ground, UT: W519TC-25-R-0008
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Ft. Bliss, TX, W519TC-25-R-0007
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Huachuca, AZ W519TC-24-R-0027
1305M325R0002 - Attachment 6 - SF1408-14f.pdf Revision not stated Phased Array Radar (PAR) Test Article
SF1408-14e.pdf Revision not stated PNW Regional Planning Facilitator
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort McCoy, WI - W519TC-23-R-0119
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort Knox, KY W519TC-23-R-0088
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Fort Jackson, SC W519TC-24-R-0026
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Cavazos, TX W519TC-23-R-0102
Attach 4a - SF 1408.pdf Revision not stated USSOCOM Intelligence Support Services -- DRAFT RFP (H92402-24-R-0001)
J.1.b.3 - SF1408-14e.pdf Revision not stated NASA Ames Research Center - Request for Proposal - Aerospace Research Technology and Simulations (ARTS)
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Presidio of Monterey, CA, W519TC-23-R-0104
Show all 20

Who attaches SF 1408

Other files

File Type Posted
Amendment_0004_CTIMR_Work_Area_3_date_changed_on_Question_1POST9SEP2015.docx DOCX document
CTIMR_WA_3_SF1442-14aREVISEDAW992015.pdf PDF
Amendment_A0004_Sample_Work_Plan_Request_CTIMR_WA3_(Attachment_3).docx DOCX document
Amendment_0004_CTIMR_Work_Area_3_FINAL_Questions_and_Responses_9-2-15_(3).docx DOCX document
Amendment_A00004_for_CTIMR_WA_3_HSBP1015R0040_FINAL_Solicitation_2_September_2015_.docx DOCX document
Amendment_0004_CTIMR_WA_3_New_Mexico_Wage_Determination_(3).txt TXT text file
Amendment_0004_CTIMR_WA_3_Wage_Determination_Dona_Ana_New_Mexico_NM14.txt TXT text file
Amendment_0004_CTIMR_WA_3_Wage_Determination_Otero_NM8.txt TXT text file
Amendment_0004_ATTACH_12-_WA3RecompetePre-Award_LTR_to_Contractor_HSBP1015R0040_(2).docx DOCX document
Amendment_A0004_Pictures_of_Legacy_PF_Fence.docx DOCX document
Amendment_A0004_CTIMR_WA_3_SF1442-14a.pdf PDF
CTIMR_WA_3_Recompete_Technical_Site_Visit_13_August_2015_HH.pptx PPTX presentation
CTIMR_CTIMR_WA_3_HSBP1015R0040_A00003_13_August_2015_RA-_Copy.docx DOCX document
CTIMR_WA3_Contract_Site_Visit_Slide_Information_13_August_2015_RA.pptx PPTX presentation
CTIMR_WA3_HSBP1015R0040_Offeror_Bidder's_Question_Template_dated_13_August_2015.doc DOC document
CTIMR_WA_3_SITE_VIST_ATTENDEES_11-13_August_2015.xlsx XLSX spreadsheet
CTIMR_CTIMRWork_Area_(WA)_3_Solicitation__HSBP1015R0040_Amendment_0002_FINAL_RS.docx DOCX document
CTIMRWA3_Attachment_5_Cost_Template__CTIMR_WA3_RecompeteUPDATE5AUG.xlsx XLSX spreadsheet
CTIMR_WA3_Recompete_SF1449_Cover_Page_SOLICITATION.docx DOCX document
ATTACHMENT 4Instructions to the Cost Template_CTIMR WA3Recompete.docx DOCX document
ATTACH 2-WA 3 Notice Regarding Landlord-HSBP1015R0040.docx DOCX document
ATTACH 3 Sample Work Plan Request_CTIMR WA3_Recompete HSBP1015R0040.docx DOCX document
ATTACH 12- WA3RecompetePre-Award LTR to Contractor_HSBP1015R0040.docx DOCX document
ATTACH 8- WA3RecompeteClient Authorization Letter_HSBP1015R0040.docx DOCX document
ATTACH 7- WA3RecompeteConsent Letter HSBP1015R0040.docx DOCX document
ATTACH 14- CTIMR WA 3 RECOMPETE HSBP1015R0040 Appendix A_Road Maintenanc....docx DOCX document
CTIMR Work Area —
ATTACH 1- CTIMRWorkArea3RecompeteHSBP1015R0040 TX TIMR BMPs.pdf PDF
ATTACH 10 CTIMR Recompete HSBP1015R0040 CBP TI Standard Designs pdf.pdf PDF
ATTACH 6- WA3Recompete Past Perf Questionaire _HSBP10154R000040.docx DOCX document
ATTACH 15 Site Visit Notice_WA_3_Recompete HSBP1015R0040.docx DOCX document
Attachment 5_Cost Template_ CTIMR WA3 Recompete_72915.xlsx XLSX spreadsheet
ATTACH 9 - WA3RecompeteGFM Instruc-HSBP1015R0040.docx DOCX document
ATTACH 11 EL Paso Texas Wage Determination TX150052 WA 3 HSBP1015R0040.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 13

Preaward Survey of Prospective Contractor Accounting System Checklist – SF-1408

Instructions:

1. Mark “X” in the appropriate column.

2. On Page 2 provide a narrative describing how the current accounting system supports your response to each item.

Contractor Name:

Point of Contact:

CAGE Code:

DUNS Code:

Yes
No
N/A
Note

1. Is the accounting system in accord with generally accepted accounting principles?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.)

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note
Narrative

File details come from the government source that posted it. Updated .