Request for Proposal
HSBP1015R0040
(Area 3) U.S. Department of Homeland Security U.S. Customs and Border Protection Secure Border Initiative
Facilities Management & Engineering Tactical Infrastructure Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Work Area 3
29 JULY 2015
U.S. Customs and Border Protection Secure Border Initiative Acquisition Office 1331 National Place 9th Floor Washington, DC 20004
TABLE OF CONTENTS
Table of Contents
| SECTION A | SOLICITATION/CONTRACT FORM | 6 |
| SECTION B | SUPPLIES OR SERVICES & PRICES OR COSTS | 7 |
| B.1 | SCHEDULE OF SUPPLIES/SERVICES | 7 |
| B.2 | DELIVERY SCHEDULE | 9 |
| B.3 | CONTRACT TYPE (OCT 2008) | 10 |
| SECTION C | SPECIFICATIONS/SOW | 11 |
| C.1 | STATEMENT OF WORK | 11 |
| SECTION D | PACKAGING & MARKING | 30 |
| SECTION E | INSPECTION & ACCEPTANCE | 31 |
| E.1 | 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 31 |
| E.2 | 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996) | 31 |
| SECTION F | DELIVERIES OR PERFORMANCE | 33 |
| F.1 | 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 33 |
| F.2 | PERIOD OF PERFORMANCE (MAR 2003) | 33 |
| F.3 | TERM OF CONTRACT WITH OPTION(S) (MAR 2003) | 33 |
| F.4 | FAR 52.217-5 EVALUATION OF CONTRACT OPTION(S) (JUL 1990) | 33 |
| SECTION G | CONTRACT ADMINISTRATION DATA | 34 |
| G.1 | 3052.242-72 CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (DEC 2003) | 34 |
| G.2 | CONTRACTING OFFICER'S AUTHORITY (MAR 2003) | 34 |
| G.3 | PAYMENT AND INVOICE INSTRUCTIONS (APR 2014) | 34 |
| SECTION H | SPECIAL CONTRACT REQUIREMENTS | 37 |
| H.1 | INSURANCE UNDER COST REIMBURSEMENT CONTRACTS - GROUP PLANS (OCT 2007) | 37 |
| H.2 | GOVERNMENT CONSENT OF PUBLICATION/ENDORSEMENT (MAR 2003) | 37 |
| H.3 | SECURITY PROCEDURES (OCT 2009) | 37 |
| H.4 | DISCLOSURE OF INFORMATION (MAR 2003) | 40 |
| H.5 | NON-PERSONAL SERVICE (MAR 2003) | 40 |
| H.6 | TRAVEL COSTS (AUG 2008) | 41 |
| H.7 | ADDITIONAL CONTRACTOR PERSONNEL REQUIREMENTS (OCT 2007) | 41 |
| H.8 | POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE (JUL 2014) | 42 |
| H.9 | HOLIDAYS AND ADMINISTRATIVE LEAVE (MAR 2003) | 43 |
| H.10 | SPECIAL SECURITY REQUIREMENT - CONTRACTOR PRE-SCREENING (SEP 2011) | 43 |
| H.11 | PRE-SCREENING( MAY 2015) | 44 |
H-12 3025.215-70 KEY PERSONNEL OR FACILITIES (DEC 2003)…………………… …………………………...45
H-13 POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE……………………………………………….46
| SECTION I | CONTRACT CLAUSES | 48 |
| I.1 | 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 48 |
| I.2 | 52.202-1 DEFINITIONS (NOV 2013) | 48 |
| I.3 | 52.203-3 GRATUITIES (APR 1984) | 48 |
| I.4 | 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014) | 48 |
| I.5 | 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006) | 48 |
| I.6 | 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014) | 48 |
| I.7 | 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) | 48 |
| I.8 | 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) | 48 |
| I.9 | 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010) | 48 |
| I.10 | 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010) | 48 |
| I.11 | 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014) | 48 |
| I.12 | 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011) | 55 |
| I.13 | 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JUL 2013) | 48 |
| I.14 | 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (AUG 2013) | 48 |
| I.15 | 52.210-1 MARKET RESEARCH (APR 2011) | 48 |
| I.16 | 52.215-2 AUDIT AND RECORDS-NEGOTIATION (OCT 2010) | 48 |
| I.17 | 52.215-8 ORDER OF PRECEDENCE-UNIFORM CONTRACT FORMAT (OCT 1997) | 48 |
| I.18 | 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009) | 48 |
i-19 52,216-7 ALLOWABLE COST AND PAYMENT (DEC 2002)…………………………………………………………..48
| I.20 | 52.216-9 FIXED FEE-CONSTRUCTION (JUN 2011) | 48 |
| I.21 | 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 49 |
| I.22 | 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 49 |
I-23 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)…………………………… ………..49
| I.24 | 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (oCT 2014) | 50 | |||
| I.25 | 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011) | 50 | |||
| I.26 | 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) | 50 | |||
| I.27 | 52.222-3 CONVICT LABOR (JUN 2003) | 50 | |||
| I.28 | 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014) | 50 | |||
| I.29 | 52.222-7 WITHHOLDING OF FUNDS (MAY 2014) | 50 | |||
| I.30 | 52.222-9 APPRENTICES AND TRAINEES (JUL 2005) | 50 | |||
| I.31 | 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988) | 50 | |||
| I.32 | 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) | 50 | |||
| I.33 | 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014) | 50 | |||
| I.34 | 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY 2014) | 50 | |||
| I.35 | 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988) | 50 | |||
| I.36 | 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014) | 50 | |||
| I.37 | 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015 | 50 | |||
| I.38 | 52.222-26 EQUAL OPPORTUNITY (APR 2015) | 50 | |||
| I.39 | 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015) | 50 | |||
| I.40 | 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUL 2014) | 50 | |||
| I.41 | 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUL 2014) | 50 | |||
| I.42 | 52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUL 2014) | 50 | |||
| I.43 | 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 500I.44 | 52.222-41 SERVICE CONTRACT LABOR STANDARDS (MAY 2014) | 50 | |
| I.45 | 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) | 50 | |||
| I.46 | 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013) | 50 | |||
| I.47 | 52.223-6 DRUG-FREE WORKPLACE (MAY 2001) | 50 | |||
| I.48 | 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011) | 58 | |||
| I.49 | 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008) | 50 | |||
| I.50 | 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) | 51 | |||
| I.51 | 52.228-11 PLEDGES OF ASSETS (JAN 2012) | 51 | |||
| I.52 | 52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION (OCT 2010) | 51 | |||
| I.53 | 52.232-17 INTEREST (MAY 2014) | 51 | |||
| I.54 | 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) | 51 | |||
| I.55 | 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014) | 51 | |||
| I.56 | 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (JUL 2013) | 58 | |||
| I.57 | 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013) | 51 | |||
| I.58 | 52.233-1 DISPUTES (MAY 2014) | 51 | |||
| I.59 | 52.233-3 PROTEST AFTER AWARD (AUG 1996) | 51 | |||
| I.60 | 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) | 51 | |||
| I.61 | 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984) | 51 | |||
| I.62 | 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991) | 51 | |||
| I.63 | 52.236-18 WORK OVERSIGHT IN COST-REIMBURSEMENT CONSTRUCTION CONTRACTS (APR 1984) | 51 | |||
| I.64 | 52.236-19 ORGANIZATION AND DIRECTION OF THE WORK (APR 1984) | 51 | |||
| I.65 | 52.242-1 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984) | 51 | |||
| I.66 | 52.242-3 PENALTIES FOR UNALLOWABLE COSTS (MAY 2014) | 51 | |||
| I.67 | 52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997) | 51 | |||
| I.68 | 52.242-13 BANKRUPTCY (JUL 1995) | 51 | |||
| I.69 | 52.243-2 CHANGES - COST-REIMBURSEMENT (AUG 1987) ALTERNATE III (APR 1984) | 51 |
| I.70 | 52.243-7 NOTIFICATION OF CHANGES (APR 1984) | 51 |
| I.71 | 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996) | 53 |
| I.72 | 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (APR 2015) | 53 |
| I.73 | 52.249-6 TERMINATION (COST-REIMBURSEMENT) (MAY 2004) ALTERNATE I (SEP 1996) | 53 |
| I.74 | 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) | 53 |
| I.75 | 52.203-14 DISPLAY OF HOTLINE POSTER(S) (DEC 2007) | 53 |
| I.76 | 52.204-1 APPROVAL OF CONTRACT (DEC 1989) | 54 |
| I.77 | 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013) | 54 |
| I.78 | 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) 55 | |
| I.79 | 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014) | 57 |
| I.80 | 52.225-9 BUY AMERICAN--CONSTRUCTION MATERIALS (MAY 2014) | 56 |
| I.81 | 52.228-14 IRREVOCABLE LETTER OF CREDIT (MAY 2014) | 59 |
| I.82 | 52.244-2 Subcontracts (Oct 2010) Alternate I (JUNE 2007) | 63 |
| I.83 | 3052.203-70 INSTRUCTIONS FOR CONTRACTOR DISCLOSURE OF VIOLATIONS (SEP 2012) | 63 |
| I.84 | 3052.205-70 ADVERTISEMENTS, PUBLICIZING AWARDS, AND RELEASES (SEP 2012) | 63 |
| I.85 | 3052.209-70 PROHIBITION ON CONTRACTS WITH CORPORATE EXPATRIATES (JUN 2006) | 63 |
| I.86 | 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) | 65 |
| SECTION J | LIST OF ATTACHMENTS | 66 |
| J.1 | LIST OF ATTACHMENTS | 66 |
| SECTION K | REPRESENTATIONS, CERTIFICATIONS, OTHER STATEMENTS OF OFFEROR | 67 |
| K.1 | 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC2014) | 67 |
| K.2 | 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) | 70 |
| K.3 | 52.225-20 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OPERATIONS IN SUDAN--CERTIFICATION (AUG 2009) | 71 |
| K.4 | 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR TRANSACTIONS RELATING TO IRAN--REPRESENTATION AND CERTIFICATIONS (DEC 2012) | 72 |
| K.5 | 52.236-28 PREPARATION OF PROPOSALS-CONSTRUCTION (OCT 1997) | 73 |
| K.6 | 3052.209-79 REPRESENTATION BY CORPORATIONS REGARDING A FELONY CRIMINAL VIOLATION UNDER ANY FEDERAL OR STATE LAW OR UNPAID FEDERAL TAX LIABILITY (FEB 2014) (DHS FAR CLASS DEVIATION 14-02) | 73 |
| SECTION L | INSTRUCTIONS, CONDITIONS, & NOTICES TO OFFERORS | 75 |
| L.1 | 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 75 |
| L.2 | 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991) | 75 |
| L.3 | 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991) | 75 |
| L.4 | 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004) ALTERNATE I (OCT 1997) | 75 |
| L.5 | 52.216-1 TYPE OF CONTRACT (APR 1984) | 75 |
| L.6 | 52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA (OCT 2010) ALTERNATE IV (OCT 2010) | 75 |
| L.7 | 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY 2014) | 75 |
| L.8 | 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 76 |
| L.9 | 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014) | 77 |
| L.10 | 52.233-2 SERVICE OF PROTEST (SEP 2006) | 77 |
| L.11 | 52.250-2 SAFETY ACT COVERAGE NOT APPLICABLE (FEB 2009) | 78 |
| L.12 | GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS (OCT 2008) | 78 |
| L.13 | 52.237-1 SITE VISIT (APR 1984) | 87 |
| L.14 | AGENCY LEVEL PROTEST NOTICE (APR 2003) | 87 |
| SECTION M | EVALUATION FACTORS FOR AWARD | 88 |
| M.1 | 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 88 |
| M.2 | 52.217-5 EVALUATION OF OPTIONS (JUL 1990) | 88 |
| M.3 | GENERAL EVALUATION INFORMATION (OCT 2008) | 88 |
| M.4 | EVALUATION CRITERIA (JUN 2007) | 89 |
| M.5 | COST OR PRICE EVALUATION (MAR 2003) | 95 |
SECTION A SOLICITATION/CONTRACT FORM
SECTION B SUPPLIES OR SERVICES & PRICES OR COSTS
B.1 SCHEDULE OF SUPPLIES/SERVICES
| ITEM # |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| EXT. PRICE |
| 10 |
| CLIN 1- Fences and Gates WA3 |
| 1.000 |
| AU |
| 20 |
| CLIN 2- Roads and Bridges WA3 |
| 1.000 |
| AU |
| 30 |
| CLIN 3-Drainage and Grates WA3 |
| 1.000 |
| AU |
| 40 |
| CLIN 4- Lighting and Electrical WA3 |
| 1.000 |
| AU |
| 50 |
| CLIN 5- Vegetation & Debris Removal WA3 |
| 1.000 |
| AU |
| 60 |
| CLIN 6- Program Management WA3 |
| 1.000 |
| AU |
| 70 |
| CLIN 7- G&A WA3 |
| 1.000 |
| AU |
| 80 |
| CLIN 8- Fee WA3 |
| 1.000 |
| AU |
| 90 |
| *CLIN 9- Improvement Activity |
| 1.000 |
| AU |
| $750,000 |
| $750,000.00 |
SUBTOTAL
Option Year 1
| 110 |
| CLIN 1- Fences and Gates WA3 |
| 1.000 |
| AU |
| 120 |
| CLIN 2- Roads and Bridges WA3 |
| 1.000 |
| AU |
| 130 |
| CLIN 3-Drainage and Grates WA3 |
| 1.000 |
| AU |
| 140 |
| CLIN 4- Lighting and Electrical WA3 |
| 1.000 |
| AU |
| 150 |
| CLIN 5- Vegetation & Debris Removal WA3 |
| 1.000 |
| AU |
| 160 |
| CLIN 6- Program Management WA3 |
| 1.000 |
| AU |
| 170 |
| CLIN 7- G&A WA3 |
| 1.000 |
| AU |
| 180 |
| CLIN 8- Fee WA3 |
| 1.000 |
| AU |
| 190 |
| *CLIN 9- Improvement Activity |
| 1.000 |
| AU |
| $750,000.00 |
| $750,000.00 |
Option Year 2
| 210 |
| CLIN 1- Fences and Gates WA3 |
| 1.000 |
| AU |
| 220 |
| CLIN 2- Roads and Bridges WA3 |
| 1.000 |
| AU |
| 230 |
| CLIN 3-Drainage and Grates WA3 |
| 1.000 |
| AU |
| 240 |
| CLIN 4- Lighting and Electrical WA3 |
| 1.000 |
| AU |
| 250 |
| CLIN 5- Vegetation & Debris Removal WA3 |
| 1.000 |
| AU |
| 260 |
| CLIN 6- Program Management WA3 |
| 1.000 |
| AU |
| 270 |
| CLIN 7- G&A WA3 |
| 1.000 |
| AU |
| 280 |
| CLIN 8- Fee WA3 |
| 1.000 |
| AU |
| 290 |
| *CLIN 9- Improvement Activity |
| 1.000 |
| AU |
| $750,000.00 |
| $750,000.00 |
Option Year 3
| 310 |
| CLIN 1- Fences and Gates WA3 |
| 1.000 |
| AU |
| 320 |
| CLIN 2- Roads and Bridges WA3 |
| 1.000 |
| AU |
| 330 |
| CLIN 3-Drainage and Grates WA3 |
| 1.000 |
| AU |
| 340 |
| CLIN 4- Lighting and Electrical WA3 |
| 1.000 |
| AU |
| 350 |
| CLIN 5- Vegetation & Debris Removal WA3 |
| 1.000 |
| AU |
| 360 |
| CLIN 6- Program Management WA3 |
| 1.000 |
| AU |
| 370 |
| CLIN 7- G&A WA3 |
| 1.000 |
| AU |
| 380 |
| CLIN 8- Fee WA3 |
| 1.000 |
| AU |
| 390 |
| *CLIN 9- Improvement Activity |
| 1.000 |
| AU |
| $750,000.00 |
| $750,000.00 |
Option Year 4
| 410 |
| CLIN 1- Fences and Gates WA3 |
| 1.000 |
| AU |
| 420 |
| CLIN 2- Roads and Bridges WA3 |
| 1.000 |
| AU |
| 430 |
| CLIN 3-Drainage and Grates WA3 |
| 1.000 |
| AU |
| 440 |
| CLIN 4- Lighting and Electrical WA3 |
| 1.000 |
| AU |
| 450 |
| CLIN 5- Vegetation & Debris Removal WA3 |
| 1.000 |
| AU |
| 460 |
| CLIN 6- Program Management WA3 |
| 1.000 |
| AU |
| 470 |
| CLIN 7- G&A WA3 |
| 1.000 |
| AU |
| 480 |
| CLIN 8- Fee WA3 |
| 1.000 |
| AU |
| 490 |
| *CLIN 9- Improvement Activity |
| 1.000 |
| AU |
| $750,000.00 |
| $750,000.00 |
TOTAL
Option To Extend Services 6 months
| 510 |
| CLIN 1- Fences and Gates WA3 |
| 1.000 |
| AU |
| 520 |
| CLIN 2- Roads and Bridges WA3 |
| 1.000 |
| AU |
| 530 |
| CLIN 3-Drainage and Grates WA3 |
| 1.000 |
| AU |
| 540 |
| CLIN 4- Lighting and Electrical WA3 |
| 1.000 |
| AU |
| 550 |
| CLIN 5- Vegetation & Debris Removal WA3 |
| 1.000 |
| AU |
| 560 |
| CLIN 6- Program Management WA3 |
| 1.000 |
| AU |
| 570 |
| CLIN 7- G&A WA3 |
| 1.000 |
| AU |
| **580 |
| CLIN 8- Fee WA3 |
| 1.000 |
| AU |
* Improvement Activity Option CLIN The Improvement Activity Option CLIN shall be exercised as required and will be independent of all other option CLINS during the option periods. The Government anticipates a total of one (1) improvement activity each year, including the base period and each exercised option period over the life of the contract.
The estimated not-to-exceed (NTE) amount of each improvement activity is $750,000. Exercising of the Improvement Activity Option CLIN shall be at the sole discretion of the government and may be exercised at any time during the contract’s period of performance, unless the time remaining on the contract is inadequate to complete the required improvement. Applicable Overhead (OH) and G&A for the improvement activities shall be included in the Improvement Activity Option CLIN. However, the Improvement Activity NTE amount should not include fee. All fees (including the fee for the Improvement Activity) should be included in the Fee CLIN under Section B.1.
** If the option to extend services is exercised for a period of less than six months, the fee specified in CLIN 580 will be prorated accounting to the length of the extension.
Page
B.2 DELIVERY SCHEDULE
| DELIVER TO: |
| ITEM # |
| QTY |
Customs and Border Protection El Paso and Big Bend, TX
| 10 |
| 1.000 |
| 20 |
| 1.000 |
| 30 |
| 1.000 |
| 40 |
| 1.000 |
| 50 |
| 1.000 |
| 60 |
| 1.000 |
| 70 |
| 1.000 |
| Click here to enter text. |
| 80 |
| 1.000 |
| 90 |
| 1.000 |
| 110 |
| 1.000 |
| 120 |
| 1.000 |
| 130 |
| 1.000 |
| 140 |
| 1.000 |
| 150 |
| 1.000 |
| 160 |
| 1.000 |
| 170 |
| 1.000 |
| 180 |
| 1.000 |
| 190 |
| 1.000 |
| 210 |
| 1.000 |
| 220 |
| 1.000 |
| 230 |
| 1.000 |
| 240 |
| 1.000 |
| 250 |
| 1.000 |
| 260 |
| 1.000 |
| 270 |
| 1.000 |
| 280 |
| 1.000 |
| 290 |
| 1.000 |
| 310 |
| 1.000 |
| 320 |
| 1.000 |
| 330 |
| 1.000 |
| 340 |
| 1.000 |
| 350 |
| 1.000 |
| 360 |
| 1.000 |
| 370 |
| 1.000 |
| 380 |
| 1.000 |
| 390 |
| 1.000 |
| 410 |
| 1.000 |
| 420 |
| 1.000 |
| 430 |
| 1.000 |
| 440 |
| 1.000 |
| 450 |
| 1.000 |
| 460 |
| 1.000 |
| 470 |
| 1.000 |
| 480 |
| 1.000 |
| 490 |
| 1.000 |
B.3 CONTRACT TYPE (OCT 2008)
The Government contemplates award of a Cost-Plus-Fixed Fee (CPFF) contract with one Firm Fixed Priced (FFP) CLIN, resulting from this solicitation. The FFP contract line item number (CLIN) is for Program Management requirements. There is also an Improvement Activities CLIN that will be an optional CLIN to be exercised (via modification) on either a CPFF or FFP basis This contract will include a full range of maintenance and repair work elements for this Area known as Work Area 3. The contract will require the Contractor to prepare a proposed work plan, as specified in Section C, Paragraphs, 3.1.7 and 3.2., for Work Area 3. The proposed work plans will be used to aid the Government in determining the continuing work requirements in subsequent performance periods. The contract will contain a not-to-exceed dollar limit for the period of performance identified in the contract. Specific work requirements and quantities may be adjusted as required under direction of the COR. However, the Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract (in accordance with Clause G.2).
[End of Clause]
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
COMPREHENSIVE TACTICAL INFRASTRUCTURE MAINTENANCE AND REPAIR (CTIMR) STATEMENT OF WORK (SOW)
1.0 Introduction
The purpose of this Statement of Work (SOW) is to acquire contractor Maintenance and Repair (M&R) support along the Southern Texas Border and surrounding areas. The support shall consist of: fence and gates; roads and bridges; drainage and grate systems; lighting and electrical systems and; vegetation control and debris removal.
1.1 Background
Section 102 of the Secure Fence Act requires the Department of Homeland Security (DHS) to construct – in the most expeditious manner possible – the infrastructure necessary to deter and prevent illegal entry on our Southern Texas Border, including pedestrian and vehicle fencing, roads, and technology. Gaining effective control of our Nation’s borders is a critical element of national security, and U.S. Customs and Border Protection (CBP) is constructing tactical infrastructure (TI) to better execute this vital mission.
Under the Facilities Management and Engineering (FM&E) Division of CBP, the Border Patrol Facilities and Tactical Infrastructure (BPFTI) Program Management Office (PMO) – originally part of the Secure Border Initiative (SBI) – was established to acquire, maintain, and sustain all TI. The program develops and installs physical components (consisting mainly of roads, bridges, pedestrian and vehicle fences, gates, and lights) designed to consistently slow, delay, and act as persistent impedance to illicit cross-border activity. The TI requirements vary in scope by each Sector, and may also include, but not be limited to tower sites (not including the towers or equipment on the towers) and patrol roads as defined by the government. TI, in turn, helps increase the level of operational control by the Border Patrol between the Land Ports of Entry (LPOEs). Fencing is but one element of this layered defense-in-depth plan. Each Border Patrol Sector identifies specific TI requirements that if fulfilled will enable agents to perform their mission more efficiently and increase the Sectors’ level of effective control based upon the current-day threat.
The TI program addresses the goals and objectives established by both the U.S. Department of Homeland Security Strategic Plan for Fiscal Years (FY) 2012-2016 and 2012-2016 Border Patrol Strategic Plan. The TI program directly aligns with the achievement of the DHS Strategic Plan’s Goal 2.1 – “Secure U.S. Air, Land, and Sea Borders,” and corresponding Objective 2.1.1 – “Prevent illegal entry.” The TI program also directly aligns with the achievement of the Border Patrol Strategic Plan’s Goal 1 – “Secure America’s Borders,” and corresponding Objective 1.1 – “Prevent Terrorists and Terrorist Weapons from Entering the United States.”
1.2 Scope
This work effort addresses the M&R of TI along Work Area 3 of the Southern Texas Border as defined in Table 1.2-1 – Work Areas below. It also addresses, at the discretion of the Government, improvements incidental to the M&R of existing TI. Architectural and Engineering (AE) design is not part of this contract.
Maintenance includes work activities that preserve or sustain the ability of an asset to continue to carry out its intended function or preserve its established level of performance.
Repairs include work to restore an existing asset to pre-existing condition and level of performance so that it may be effectively utilized for its designated purpose.
Improvements include work that enhances the mission and functional capabilities of an asset through an addition, expansion, or adaptation. For example, a replacement of fence sections with more permanent fence structures, improving the condition of a roadway by adding improved base or surfacing material on a large section of road, and replacing a drainage culvert with a larger diameter culvert. Any improvements included in this work effort will be confined to the existing TI footprint and will not exceed a dollar level threshold of $750,000 per activity. All improvements shall be assessed for Environmental, Engineering and Real Estate compliance requirements.
While the Border Patrol divides the Southwest Border into nine (9) unique Sectors, for internal contract management purposes, CBP has aggregated the Sectors into four (4) work area-oriented groupings, of which the focus of this acquisition is Work Area 3 (as shown in Table 1.2-1 below). This was done to align Sectors with similar characteristics to promote efficiency and ensure consistency with other CBP programs. While the TI within each Sector is similar, the specific TI types and quantities vary, driving the different M&R requirements for each Sector.
| Work Area |
| Sectors |
| Length of border (miles) |
| 3 |
| El Paso, TX & NM (EPT) |
| 268 |
| Marfa, TX/OK (BBT) |
| 510 |
| Total |
| 778 |
Table 1.2-1. Work Area 3
As shown in Table 1.2-1 above, Work Area 3 is divided into two Sectors: El Paso (EPT) & Big Bend (BBT). EPT is located in El Paso, TX and BBT located in Marfa, TX.
El Paso Sector (EPT) border responsibility extends 268 border miles from the western Lordsburg County line to the Southeast Hudspeth County line covering 125,500 square miles, of which 4,500 square miles are located in Texas. The Sector consists of 12 stations located at Alamogordo, Albuquerque, Deming Lordsburg, Las Cruces, Truth of Consequences, Santa Teresa, NM & one substation in Silver City, NM and El Paso, Clint, Ysleta, and Fort Hancock, TX. Temperatures typically vary from 40°F to 105°F and rarely below 32°F or above 115°F.
The Big Bend Sector (BBT) border responsibility extends 510 miles from the western edge of Hudspeth County line southeast to the Val Verde County line and covers 165 Counties with an area of 165,154 square miles. The Sector consists of 12 stations located at Presidio, Van Horn, Big Bend, Sanderson, Alpine, Sierra Blanca, Fort Stockton, Lubbock, Midland, Marfa, Pecos and Amarillo. Temperatures typically vary from 30°F to 90°F and occasionally below 32°F or rarely above 100°F.
1.3 Objectives
The Government seeks a Contractor that has the proven management and technical capability and sufficient, directly-related experience and resources to perform a wide variety of urgent and routine M&R activities for different types of assets dispersed along Work Area 3 (see Table 1.2-1) of the Southern Texas Border of the United States. The Contractor must have demonstrated management and technical capability to efficiently and effectively manage its personnel, equipment, and other resources to satisfy all Government requirements.
2.0 References
The Contractor shall comply with all applicable Federal, State, International Boundary and Water Commission (IBWC) regulations, local, and Native American Nation laws, regulations, policies and other requirements while executing the SOW requirements, including any errata and/or changes. Relevant documents include, but are not limited to:
· Occupational Safety and Health Administration (OSHA) Manual Regulations
· Code of Federal Regulations, Title 29, Part 1926 – Safety and Health Regulations for Construction and Engineering Manual, US Army Corps of Engineers (USACE) Engineering Manual (EM) 385-1-1 (September 2008)
· Code of Federal Regulations, Title 49, Part 105, “Hazardous Materials Program Definitions and General Procedures”
Roads/Bridges:
· American Association of State Highway and Transportation Officials (AASHTO) Standard specification for Highway Bridges, 17th Edition, dated 2002
· Federal Highway Administration (FHWA) Manual of Uniform Traffic Control Devices (MUTCD)
· American Welding Society Standards and Specifications (AWS) AASHTO/AWS D1.5M/D1.5:2008; Bridge Welding Code, dated 2008
· Texas Department of Transportation manuals & specifications for bridges and roads - http://onlinemanuals.txdot.gov/manuals/AlphaList.html and http://www.dot.state.tx.us/business/specifications.htm
Concrete/Steel:
· American Concrete Institute (ACI) Manual of Concrete Practice, dated 2013
· American Institute of Steel Construction (AISC), Steel Construction Manual, 14th Edition
· American Welding Society Standards and Specifications (AWS)
· American Society for Testing and Materials (ASTM) Standards
Electrical:
· National Fire Protection Association (NFPA) 101, Life Safety Code, dated 2012
· National Electrical Code (NEC), NFPA 70, dated 2014
Environmental:
· Code of Federal Regulations, Title 40, Part 122.26, Storm Water Discharges (for Storm Water Pollution Prevention Plans)
· National Environmental Policy Act (NEPA)
· DHS MD 023.1 Environmental Planning Program
· DHS MD 023.2 Environmental Compliance
· DHS MD 025.01 Sustainable Practices for Environmental, Energy and Transportation Management
· Code of Federal Regulations, Title 40: Protection of the Environment, Chapter I -- Environmental Protection Agency
· Subchapter A -- General (Parts 1 - 29)
· Subchapter C -- Air Programs (Parts 50 - 99)
· Subchapter D -- Water Programs (Parts 100 - 149)
· Subchapter E -- Pesticide Programs (Parts 150 - 189)
· Subchapter G -- Noise Abatement Programs (Parts 201 - 211)
· Subchapter I -- Solid Wastes (Parts 239 - 282)
· Subchapter J -- Superfund, Emergency Planning, and Community Right-to-Know Programs (Parts 300 - 399)
· Subchapter Q -- Energy Policy (Parts 600 - 699)
· Subchapter R -- Toxic Substances Control Act (Parts 700 - 799)
· Subchapter U -- Air Pollution Controls (Parts 1027 - 1074)
· Approved State Hazardous Waste Management Programs:
· Code of Federal Regulations Title 40: Council on Environmental Quality (Parts 1500-1508) Building/Construction Codes:
· IBC 2012
· NEC 2014
· Applicable City, Local, and County Codes
3.0 Work Requirements
The Government requires maintenance and repair (M&R) and improvement support in five work categories:
1) Fence and Gates
2) Roads and Bridges
3) Drainage and Grate Systems
4) Lighting and Electrical Systems
5) Vegetation Control and Debris Removal
A Program Management contract line item (CLIN) is included to capture appropriate, allowable and allocable program management support for the work plan development and other program management tasks (e.g., report development/submission), and is described in Section 3.1.7.
An optional Improvement Activity CLIN is also included for the performance of specific improvement activities relative to the program, and is described in Section 3.1.8.
The work required to support the TI varies based on the inventory quantities for each work category, the number and type of incidents, type and recurrence of road washouts/deterioration, time of year (variances in illegal border traffic fluctuate with the time of year), economic conditions, weather events, and location. There is typically a higher frequency of damage in and around the more urbanized areas.
As the basis for routine M&R work requirements, the Contractor will be required to develop the appropriate work plan (typically in sequential, 90 day performance periods, but at the discretion of the Government, may be extended to 180, 270 or 365 days).
The Contractor must also collect, store, and report certain data in contract deliverables (e.g., recurring reports) and/or into an automated system for use by the Government.
As part of this contract, the Government will divide and classify the M&R work to be performed as either urgent or routine. The classifications are defined as:
Urgent – Urgent work consists of M&R work requirements resulting from willful or other destruction, a natural event such as severe weather, or premature failure of the TI asset and poses an immediate risk to operations, systems, equipment or components. Urgent work requirements are typically completed to promote Agent safety and alleviate the situation before injury occurs, equipment or property is damaged, or the condition worsens. Urgent work requirements (such as breaches for fences, gates, and grates, certain road washouts, etc.) may be performed five (5) days a week, as required. The contractor must respond immediately to urgent work requirements (as defined in Table 3-1 below) to support mission requirements.
Routine – Routine work consists of all non-urgent M&R work requirements that can be planned or scheduled at a designated frequency. The work requirements do not pose an immediate risk to systems, equipment or components and can be performed on a routine planned and scheduled basis. Routine work requirements will be performed five (5) days a week from Monday to Friday. The contractor’s response to routine work requirements is typically greater than five (5) business days in duration or as scheduled in the approved contractor work plan.
During urgent work requirements, the Contractor shall provide services to restore TI asset conditions to its pre-existing condition. It is anticipated that the majority of all urgent work requirements will result from breaches of fences, gates, grates, and roads for which repair work will be completed during normal business hours. However, based on mission requirements, the Contracting Officer’s Representative (COR) may direct the Contractor to perform a limited amount of urgent work requirements beyond or after normal business hours.
Table 3-1 provides typical urgent services response and support times. The COR will set the time to start and completion of the M&R work will be based on the severity and location of the urgent service required.
| Contractor Acknowledgement |
| Government Prescribed Time |
to Start and Finish Notification of Completion Time
| Thirty minutes from notification by the COR, the Contractor shall provide a mobilization response 2 |
| As defined by the COR, work shall typically start within twenty-four hours after the Contractor is notified by the COR. |
| Within two hours of arriving at the repair site the Contractor shall notify the COR of the estimated completion time 3 |
1 Both mobilization response and completion times are established from the time of notification (or identification).
2 Mobilization Response is when the Contractor verbalizes to the COR the plan of action to complete the urgent repair, including justification for any time needed outside of the Government prescribed times. Exceptions are made only by the COR.
3 Completion is defined as when TI assets are restored back to pre-existing conditions. If estimated completion time is greater than 24 hours, Contractor shall provide COR verbal or email explanation as to why and the plan to complete said work.
Table 3-1. Typical Urgent Services Support Times 1
The Government shall have the primary TI inspection responsibility to identify M&R work requirements. The Contractor shall report to the Government any work requirements that it observes while performing maintenance, repair or improvement activities. Also, the Government may require the Contractor to formally survey and inspect select TI on a periodic basis.
Within these Sectors, M&R and Improvement needs may exist for TI for which environmental clearance has not yet been obtained, or for which real estate rights have not yet been established. Work on these TI assets is considered to be within the scope of this contract, and may be tasked in accordance with the contract provisions once the TI is cleared for work. The Government will notify the contractor when clearance is received.
3.1 Description of Work
3.1.1 Fence and Gates
There are two general types of fencing: pedestrian fencing and vehicle fencing. Each fence type has several different designs (e.g., for pedestrian fence, there is chain link, wire mesh, landing mat, steel bollards, and other designs).
Many fence segments and roads have gates that will also require periodic M&R. The gates are manually, mechanically, and/or electromechanically-operated. All electrical work is covered in section 3.1.4.
The Contractor shall perform maintenance and repair on approximately 190 miles of fence and 136 gate/panels (depicted by Sector in Table 3.1.1-1) consisting of multiple types of fence (shown in Table 3.1.1-2). All fence and gate maintenance and repairs shall be performed in accordance with the CBP Tactical Infrastructure (TI) Standard Designs as noted in Section J, Attachment (10).
| El Paso Sector |
| Total |
| Fence (miles ) |
| 184 |
| Gate/Panels (count) |
| 133 |
| Big Bend Sector |
| Total |
| Fence (miles ) |
| 5.4 |
| Gate/Panels (count) |
| 3 |
Table 3.1.1-1. Work Area 3 Fence Quantities
El Paso Sector
Big Bend Sector
| Fence Type |
| Miles |
| Fence Type |
| Miles |
| PF 225 |
| 53 |
| PF 70 |
| 4.0 |
| PF 70 |
| 6 |
| Legacy Primary |
| 5.5 |
| Legacy Secondary |
| 13.4 |
| Legacy Tertiary |
| 4 |
| VF 300 (Mobile) |
| 1.8 |
| VF 300 (Fixed) |
| 99.41 |
Table 3.1.1-2. Work Area 3 Miles of Fence by Type
El Paso sector has approximately 190 miles of non-continuous fencing located within the 268 miles of border. To move from one fence segment to another requires driving off the TI, onto public roads, and re-entering the TI. 122 manual gates are located throughout the TI fencing area located in Texas and 2 manual gates are located in Santa Teresa NM. 12 vehicle gates in NM are in various areas across the entire fence segment with the extreme being in Animas/Antelope Wells area.
3.1.1.1 Fence and Gates - Type of Damage
Based on historical data, CBP experiences on average over 1000 Fence breaches per year within this Work Area, predominately located in the El Paso AOR.
Damage to fencing can be caused by two primary elements: Natural and Manmade.
Natural elements refer to the forces of nature that will act upon the fencing and include corrosion, erosion, water pooling, sand drifting, debris build-up, wind loading, temperature change (i.e., thermal expansion and contraction cycles that may create cracks) and ground shift.
Manmade elements refers to damage made by vandalism and includes, but may not be limited to, the following attack/defeat vectors: cutting, burrowing below, climbing, prying/twisting, disassembly, ramming, ramping/bridging, pulling down, graffiti, cryogenic and fire/heating/burning. Fence segments have varying levels of susceptibility to the aforementioned damage elements depending on design and location. Within Work Area 3, 98% of the breaches are a result of cutting.
3.1.1.2 Fence - Type of Work
The Contractor, at a minimum, shall perform the following types of work as directed by the COR:
· Making repairs that restore the structural integrity to pre-existing state, are tamper proof, and do not significantly change the design
· Fixing damage caused by burrowing, water, and wind erosion
· Fixing damage to fence foundations and all erosion control elements
· Preparing the fence for potential floods by taking preventative actions such as removing and storing fence panels, and then reinstalling them after flood events subside
· Moving and storing fence panels so levee and other work can be performed and then reinstalling them
· Abate graffiti by methods approved by the Government
3.1.1.3 Gates - Type of Work
The Contractor, at a minimum, shall perform the following types of M&R work as directed by the COR:
· Making repairs that restore the structural integrity to pre-existing state, are tamper proof, and do not significantly change the design
· Fixing damage caused by rodents, vandalism, weather, ramming, burrowing, water, wind, and erosion.
· Inspections and repairs to electrical or electronic components of electromechanically operated gates must be done by a certified and licensed electrician as directed by the Government.
In addition to these repairs, the Contractor shall also perform monthly preventative maintenance to ensure that the gates are maintained in good working order. This systemic maintenance will be performed and documented on a completed check sheet and submitted to the COR within 2 work days. This maintenance includes, but is not limited to:
· Electrically operate gate, check for binding, and adjust/grease/repair as per the approved maintenance manual (minor repairs for preventative maintenance only)
· Remove all accumulated debris, dirt and corrosion build up from inside each unit
· Check for any broken welds on the vehicle gate frame structure or fence panels
· Reinforce the operator stands (minor repairs)
· Clean and remove all of the accumulated debris from the bottom track rail,
· Inspect the I beam and trolley system for debris or binding
· Remove any accumulated corrosion from the drive chains
· Remove any dirt or corrosion damage from the controller boards or any electronic components
· Lubricate all grease fittings, drive chains, gate wheels, guide rollers if applicable
· Check gear box oil or hydraulic oil if applicable, refill if necessary
· Check for oil leaks, repair as necessary (minor repairs)
· Check alignment of motor and condition of belt- adjust or replace as needed
· Check hardware for tightness (Important: Contractor to conduct load test and check shear pins)
· Check travel stop limit switches for proper opening and closing, and adjust if necessary
· Check all safety/reverse devices for proper operation
· Check amperage readings, compare with the unit data and adjust settings on control panels as needed
· Observe standard safety procedures
· Use lock-out/tag out
· Check all electrical wires for damage (e.g., fraying) - repair as necessary (minor repairs)
· Check all access covers and enclosure covers for rain tight, replace any missing screws
· Test the entire gate system
· Manual operating gates (swing gates) will include inspection of hinges, checking for binding, and adjust/grease/repair as needed.
· Manual sliding gates will include inspection of hinges, checking for binding, and adjust/grease/repair as needed. All noted components listed above must be maintained as well if associated with any sliding gate.
· Santa Teresa Gate is the only gate which requires weekly maintenance.
Gate maintenance will include replacement of parts. Any repair requirements identified by the Contractor during the gate maintenance inspection will be recommended to the COR for subsequent repair approval.
3.1.2 Roads and Bridges
Approximately 451 miles of roads in El Paso and Big Bend Sectors are used for patrolling and access to TI. The roads can be sand, dirt, gravel, or paved, and require different types of maintenance and varying levels of repair. Culverts, low water crossings, cattle guards, guardrails, and bridges are also part of the road system. Many of the roads belong to public agencies other than CBP, or to private individuals, creating some challenges to road M&R, such as acquiring Rights of Entry and maintaining accurate mileage information and location data. The Government will coordinate the Rights of Entry and mapping for all roads.
CBP classifies its roads as follows:
FC-1: any type of surface paved road. These roads may include surfaces consisting of bituminous asphalt and aggregate, hot-mix asphaltic concrete, portland cement concrete or some combination of these types of improved surface courses; generally overlaying an aggregate base course of varying depths.
FC-2: an all-weather road. These roads generally consist of 6” minimum depth well-graded aggregate (may be native or imported) roadbeds, shaped with a defined crown section and including adequate parallel ditches and cross-culverts to ensure proper drainage both parallel and transverse to the road alignment. These roads should allow travel even during inclement weather, with service disruption only in the case of severe localized flooding of the road.
FC-3: a graded earth road. These roads should generally consist of a defined crown section and parallel ditches, similar to the FC-2 roads. However, the graded earth roadbed will consist of shaped and compacted in-situ materials of varying depth. These roads will be more susceptible to service disruption during storms of only moderate severity. Wet weather traction may also be compromised in areas with clay or silt soils.
FC-4: a two-track road. These roads may also be described as un-improved roads, wagon trails, or 4-wheel drive roads. The two track name implies that the road consists of two parallel tracks created by the loss of vegetation where the tires contact and compact the earth; between which may lay a strip of low-growth vegetation. These roads generally receive very little maintenance consisting primarily of occasional brush and boulder clearing, and possibly, but much less frequently, box-blading. Two-track roads have no crown, and generally do not have any improved drainage features or ditches.
The Contractor shall perform maintenance and repair on approximately 451 miles of road, 160 v-ditches, 2 vehicle barriers and 10 bridges/crossovers (depicted by Sector in Table 3.1.2-1) consisting 4 types of classifications (shown in Table 3.1.2-2). All road maintenance and repairs shall be performed in accordance with the CBP Tactical Infrastructure (TI) Standard Designs as noted in Section J, Attachment (10).
| El Paso Sector |
| Total |
| Roads (miles ) |
| 427 |
| V-Ditches |
| 160 |
| Bridges |
| 10 |
| Big Bend Sector |
| Total |
| Roads (miles ) |
| 23.4 |
| Vehicle Barriers |
| 2 |
Table 3.1.2-1. Work Area 3 Roads and Bridges Quantities
| El Paso Sector |
| Big Bend Sector |
| Miles |
| FC-1 |
| FC-2 |
| FC-3 |
| FC-1 |
| FC-2 |
| FC-3 |
| 0 |
| 427 |
| 0 |
| 0 |
| 5.4 |
| 29 |
Table 3.1.2-2. Work Area 3 Roads and Bridges Classifications
3.1.2.1 Roads and Bridges – Frequency of Repairs
Each Sector’s M&R work requirements vary across the different road classifications. Road maintenance is relatively predictable and can usually be scheduled in advance as routine work. Access roads to fence and technology facilities need to be inspected after major natural events (such as rainstorms) as directed by the COR.
Roads located in Alpine and Marathon are not continuous and may require moving equipment from site to site to complete the repairs. Each segment is (Marathon13 miles) and (Alpine 16 miles). Roads located in Sierra Blanca (L1) are continuous and do not require moving equipment from site to site to complete the repairs.
3.1.2.2 Roads and Bridges – Type of Work
The Contractor, at a minimum, shall perform the following types of work (as directed by the COR):
· Regrading, or Adding New Material to FC-2 and FC-3 roads to facilitate traffic and provide proper drainage. (See Appendix A for definitions of road maintenance techniques, as used in this contract).
· Performing spot surfacing, patching potholes, deep patching of asphalt surface, skin patching of asphalt surfaces, and patching asphalt berms. The work includes preparing the area, furnishing, hauling, and placing all necessary materials.
· Removing and/or clearing vegetation so that roads are drivable
· Furnishing, hauling, and placing erosion resistant materials and protective materials for use on designated locations such as embankments and culvert inlets.
· Returning road sections damaged by weather events or excessive use to a serviceable condition.
· Adding binding and/or stabilizing agents to roads for dust suppression and road stabilization efforts.
· Repair or replace damaged safety barriers, guardrails, signs, etc.
· Inspecting bridges (to include cross-overs), as required by applicable codes, to evaluate the structural integrity and determine M&R requirements. Bridge inspections and evaluations are to be performed by personnel properly trained or certified to perform bridge inspections.
· Perform periodic maintenance to bridges/crossovers and repair damage related to weather-related events and willful/accidental destruction.
· Removing of silt and debris buildup within establish v-ditches and re-setting of catch dams.
3.1.3 Drainage and Grate Systems
Drainage systems comprise items such as catch basins, storm drainage grates, and conveyance structures used for peak water flow mitigation and runoff control/containment, water quality improvement, and flood plain compensation. They can range in size from two-foot diameter pipes to tunnels large enough to accommodate trucks.
The Contractor shall perform maintenance and repair on approximately 5 grates and 16 low water crossings (depicted by Sector in Table 3.1.3-1):
| El Paso Sector |
| Total |
| Low Water Crossings (count) |
| 96 |
| Grates (count) |
| 1 |
| Big Bend Sector |
| Total |
| Low Water Crossings (count) |
| 6 |
| Grates (count) |
| 0 |
Table 3.1.3-1. Work Area 3 Drainage and Grates Quantities
3.1.3.1 Drainage and Grate Systems – Type of Damage
Repairs are required to keep drainage systems operating efficiently. The periodic removal of debris, silt and trash is required to reduce the risk of flooding and to ensure proper functioning. Water flowing at or near the border may be contaminated, at times requiring special hazardous material (HAZMAT) equipment and procedures to perform the work.
The drainage system gates and grates are subject to frequent vandalism. The most common form of vandalism is cutting the gate or grate with a saw or torch to allow for illicit traffic/activities to pass. Other forms of vandalism occur such as using hydraulic jacks to pry openings in the structure.
3.1.3.2 Drainage and Grate Systems – Type of Work
The Contractor, at a minimum, shall perform the following types of work as directed by the COR:
· Making repairs that restore the structural integrity, are tamper proof, and do not change the design without prior COR approval
· Fixing damage caused by water and wind erosion
· Removing and replacing existing culverts and appurtenances with new ones
· Cleaning and reconditioning culverts, appurtenances, other drainage structures, and ditches
· Restoring drainage system function by removing debris, silt and other obstacles
3.1.4 Lighting and Electrical Systems
Lighting systems and electrical equipment range from power supply and distribution (both above and below ground), utility pole-style lights are used to illuminate the border at night. Also included are electrical components of gates, grates, and boat ramps.
The Contractor shall perform maintenance and repair on 255 lights, 107 poles and associated electrical components (electrical panels and electronic components). (Depicted by Sector in Table 3.1.4-1):
| El Paso Sector |
| Total |
| Lights Poles (count) |
| 107 |
| Lights Fixtures (count) |
| 255 |
| Big Bend Sector |
| Total |
| Lights (count) |
| 0 |
Table 3.1.4-1. Work Area 3 Lighting and Electrical Systems Quantities
3.1.4.1 Lighting and Electrical Systems – Type of Damage
Damage to lighting and electrical systems may be caused by a variety of events such as shooting out lights, theft of lighting system copper wire, rodents damaging wiring, or poles downed by storms or vehicles.
3.1.4.2 Lighting and Electrical Systems – Type of Work
The Contractor, at a minimum, shall perform the following types of work as directed by the COR:
· Performing preventive, routine maintenance, repairs, and replacements (e.g., bulbs, ballasts, lens covers, rodent damaged wiring, etc.)
· Repositioning lights to properly illuminate border areas as dictated by operational needs
NOTE: inspection of lighting systems will at times require work before/after normal business hours.
3.1.5 Vegetation Control and Debris Removal
Vegetation control and debris removal are critical to the Border Patrol for three primary reasons: to eliminate areas in which illicit activity operators can hide; to eliminate cover for illicit activities such as vandalize fencing, gates, grates and other TI; and remove debris that collects on fencing, gates and grates, which may cause damage to infrastructure and result in local flooding.
Note: Hazardous materials/substances may be encountered during performance of debris removal requirements and shall be handled and disposed of as needed in accordance with federal, state/local and other relevant laws and regulations. Should hazardous materials be encountered during the execution of work requirements, the Contractor shall stop only that work specifically affected by the hazardous material/substance and immediately notify the COR for further instructions.
The Contractor shall perform vegetation control for approximately 224 miles and debris removal on 197 miles including 33 tower sites (depicted by Sector in Table 3.1.5-1):
| El Paso Sector |
| Total |
| Vegetation Control (miles) (Avg. width = 10 ft) |
| 195 |
| Debris Removal (miles) (Avg. width = 10 ft) |
| 195 |
| Debris Removal culverts (each) |
| 20 |
| RVSS Towers (each) (50ft by 50ft) |
| 33 |
| Big Bend Sector |
| Total |
| Vegetation Control (miles) (Avg. width = 20 ft) |
| 29 |
| Debris Removal (miles) (Avg. width = 10 ft) |
| 1.2 |
| Debris Removal vehicle Barriers (20 ft X 100 ft) |
| 2 |
Table 3.1.5-1. Work Area 3 Vegetation Control and Debris Removal Quantities
3.1.5.1 Vegetation Control and Debris Removal – Type of Damage The Sectors have vastly different needs for vegetation control. It is critical though that all local, county, State, Native American Nation, and Federal environmental regulations and statutes be followed when performing vegetation control work. The accumulation of organic debris is driven largely by weather events such as flashfloods and wind. Inorganic debris is primarily left behind by those attempting to illegally cross the border. Its exact makeup varies greatly and can include vehicles and other large items. The accumulation of debris may also include dead animals and/or other hazardous materials.
3.1.5.2 Vegetation Control and Debris Removal – Type of Work
The Contractor, at a minimum, shall perform the following types of work as directed by the COR:
· Mowing, removing, and disposing of grass and other vegetation in the vicinity of TI is required if particles are longer than 6 inches. Approved herbicides may be used under certain circumstances
· Clearing and grubbing in the vicinity of TI
· Collecting, removing and disposing of both organic and inorganic material that collects in the vicinity of TI. The Contractor shall be responsible to find suitable disposal sites that can accept all debris material and document the Contractor Work Plan appropriately. The Contractor shall also maintain proper records for any HAZMAT disposal
· Burning of debris is approved within specific locations within Work Area 3 and will require a burn plan. The requirements for burning of debris are included in the BMPs contained in Attachment (1).
· Hazardous materials incidents are subject to occur at any point in time, day or night, and in populated as well as remote areas of Work Area 3. The potential for encountering a hazardous material incident in the El Paso and Big Bend Sectors depends on the volume, distribution, and/or use of hazardous, toxic and other hazardous related substances and matter in a particular area. Should hazardous materials be unexpectedly encountered during the execution of work requirements, the Contractor shall stop only that work specifically affected by the hazardous material/substance and immediately notify the COR for further instructions.
3.1.6 Collecting, Storing, and Reporting Data
The Government has established a web-based work management system (WMS) that will house relevant data for all TI M&R work categories during the life of this contract.
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .