CTIMR Work Area 3 Recompete (Summary of Changes)
Solicitation number
HSBP1015R0040
Issued by

About this file

CTIMR WA Contract Site Visit held on 11-13 August 2015 Informational Brief

View the file

Other files

File Type Posted
Amendment_0004_CTIMR_Work_Area_3_date_changed_on_Question_1POST9SEP2015.docx DOCX document
CTIMR_WA_3_SF1442-14aREVISEDAW992015.pdf PDF
Amendment_A0004_Sample_Work_Plan_Request_CTIMR_WA3_(Attachment_3).docx DOCX document
Amendment_0004_CTIMR_Work_Area_3_FINAL_Questions_and_Responses_9-2-15_(3).docx DOCX document
Amendment_A00004_for_CTIMR_WA_3_HSBP1015R0040_FINAL_Solicitation_2_September_2015_.docx DOCX document
Amendment_0004_CTIMR_WA_3_New_Mexico_Wage_Determination_(3).txt TXT text file
Amendment_0004_CTIMR_WA_3_Wage_Determination_Dona_Ana_New_Mexico_NM14.txt TXT text file
Amendment_0004_CTIMR_WA_3_Wage_Determination_Otero_NM8.txt TXT text file
Amendment_0004_ATTACH_12-_WA3RecompetePre-Award_LTR_to_Contractor_HSBP1015R0040_(2).docx DOCX document
Amendment_A0004_Pictures_of_Legacy_PF_Fence.docx DOCX document
Amendment_A0004_CTIMR_WA_3_SF1442-14a.pdf PDF
CTIMR_WA_3_Recompete_Technical_Site_Visit_13_August_2015_HH.pptx PPTX presentation
CTIMR_CTIMR_WA_3_HSBP1015R0040_A00003_13_August_2015_RA-_Copy.docx DOCX document
CTIMR_WA3_HSBP1015R0040_Offeror_Bidder's_Question_Template_dated_13_August_2015.doc DOC document
CTIMR_WA_3_SITE_VIST_ATTENDEES_11-13_August_2015.xlsx XLSX spreadsheet
CTIMR_CTIMRWork_Area_(WA)_3_Solicitation__HSBP1015R0040_Amendment_0002_FINAL_RS.docx DOCX document
CTIMRWA3_Attachment_5_Cost_Template__CTIMR_WA3_RecompeteUPDATE5AUG.xlsx XLSX spreadsheet
CTIMR_WA3_Recompete_SF1449_Cover_Page_SOLICITATION.docx DOCX document
ATTACHMENT 4Instructions to the Cost Template_CTIMR WA3Recompete.docx DOCX document
ATTACH 2-WA 3 Notice Regarding Landlord-HSBP1015R0040.docx DOCX document
ATTACH 3 Sample Work Plan Request_CTIMR WA3_Recompete HSBP1015R0040.docx DOCX document
ATTACH 12- WA3RecompetePre-Award LTR to Contractor_HSBP1015R0040.docx DOCX document
ATTACH 8- WA3RecompeteClient Authorization Letter_HSBP1015R0040.docx DOCX document
ATTACH 7- WA3RecompeteConsent Letter HSBP1015R0040.docx DOCX document
ATTACH 14- CTIMR WA 3 RECOMPETE HSBP1015R0040 Appendix A_Road Maintenanc....docx DOCX document
ATTACH 13- WA3Recompete Pre-Award Survey-SF-1408_Hsbp1015R0040.docx DOCX document
CTIMR Work Area —
ATTACH 1- CTIMRWorkArea3RecompeteHSBP1015R0040 TX TIMR BMPs.pdf PDF
ATTACH 10 CTIMR Recompete HSBP1015R0040 CBP TI Standard Designs pdf.pdf PDF
ATTACH 6- WA3Recompete Past Perf Questionaire _HSBP10154R000040.docx DOCX document
ATTACH 15 Site Visit Notice_WA_3_Recompete HSBP1015R0040.docx DOCX document
Attachment 5_Cost Template_ CTIMR WA3 Recompete_72915.xlsx XLSX spreadsheet
ATTACH 9 - WA3RecompeteGFM Instruc-HSBP1015R0040.docx DOCX document
ATTACH 11 EL Paso Texas Wage Determination TX150052 WA 3 HSBP1015R0040.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Area 3

Pre-Proposal Site Visit

HSBP1015R0040

Sectors

EL PASO/ BIG BEND, TX

11-13 AUGUST 2015

Potential Offerors

Senior Contract Specialists

Alicia Williams/ Rochelle Allen

Program Manager/COR

Abel Anderson/Harry Hart

WELCOME

Government Points of Contact

Government Procurement Team

Senior Contract Specialist – ALICIA WILLIAMS Phone: 202-325-2711 E-mail: alicia.williams@cbp.dhs.gov Senior Contract Specialist – ROCHELLE ALLEN Phone: 202-325-3887 E-mail: rochelle.a.allen@cbp.dhs.gov

Contracting Officer – KERRI A. BISHOP Phone: 202-344-1193 E-mail: kerri.a.bishop@cbp.dhs.gov

Contract TypeHybrid Cost Reimbursable Plus Fixed Fee (CPFF) and Firm Fixed Price (FFP)
DurationBase year plus 4 option years (total of 5 years)
Set-AsideTotal Small Business
Small Business SizeNAICS Code 237990, $35.5M
Award DeterminationBest Value

Acquisition Strategy

Total of nine (9) CLINs in the Base Period and each Option Period CPFF CLINs Fence/Gates Roads/Bridges Drainage/Grates Lighting/Electrical Vegetation Control/Debris Removal G&A Fee Improvement Activity (Optional)

FFP CLIN

Program Management Support Section B CLIN Structure

Key personnel under the contract include:

Program Manager (1) Supervisor (Sector) (1/per Sector, total of 2) Program Analyst (1/per Sector, total of 2) Roles and responsibilities of key personnel are stated in the RFP Before removing or replacing key personnel, the Contractor shall:

Notify the Contracting Officer, in writing Receive approval of change from Contracting Officer Section H Key Personnel

Proposal shall be submitted in two separate volumes Volume I – Technical Proposal Volume II – Cost/Price Proposal Proposal Due Date: September 16, 2015 5:00PM EST Proposals shall be submitted both:

Electronically via e-mail to alicia.williams@cbp.dhs.gov and rochelle.a.allen@cbp.dhs.gov In hard copy to the stated address in the RFP Any proposal that is not in compliance with Section L instructions will not be given further consideration.

Section L Proposal Submission Requirements

Technical Proposal Format Limited to 50 pages Proposal Sections:

Section 1 - Transmittal Letter Section 2 - Executive Summary and Table of Contents Section 3 - Management/Technical Tab A: Management Approach If teaming arrangements are proposed, copies of Teaming Agreements or Letters of Commitment are required Tab B: Technical Capabilities Tab C: Past Performance Submit past performance for maximum of three (3) contracts performed within the last 3 years preceding RFP issuance date If teaming arrangement proposed, prime offeror must submit past performance for a minimum of two (2) of the three (3) contracts Past Performance Questionnaires are due by AUGUST 26, 2015, by 5:00PM EST

Technical Proposal Format (Cont’d) Proposal Sections (Cont’d) Section 3 - Management/Technical (Cont’d) Tab D: Sample Work Plan Based on Sample Work Plan Request (Attachment 3 to the RFP) Sample Work Plan format and requirements stated in RFP Hours, materials and equipment for Program Management should be included separately under the Program Management CLIN Tab E: Assumptions, Exceptions, and Deviations

Cost/Price Proposal Format Cost proposal submitted using cost model (Attachment 5 to the RFP) Cost model and basis of estimate must be in Excel 2010 (or later) format only Proposal Sections:

Section 1 – Executive Summary and Table of Contents Section 2 – Solicitation, Offer, and Award Section 3 – Exceptions Section 4 – Financial Capability Section 5 – Cost or Pricing Data Tab A: Cost/Price Supporting Information Summary schedule based on Sample Work Plan Request (Attachment 3) that includes estimated Total, Not-To-Exceed Amount Full back-up documentation for each work category and Program Management CLIN is required Back-up documentation requirements and level of detail required are stated in RFP

Cost/Price Proposal Format (Cont’d) Proposal Sections (Cont’d) Section 5 – Cost or Pricing Data (Cont’d) Tab B: Subcontractor Supporting Information Supporting cost/price documentation shall be provided in the same format for each subcontractor Subcontractors should submit proprietary data directly to CO in separate, sealed envelope Tab C: Assumptions Tab D: Written Statement on Approved Purchasing System Tab E: Written Statement on Estimating System Tab F: Written Statement on Approved Accounting System Section 6 – Offeror’s Addendum

Evaluation Factors Factor 1: Management/Technical (Non-Cost) SubFactor 1(a): Management Approach SubFactor 1(b): Technical Capabilities Factor 2: Past Performance (Non-Cost) Factor 3: Sample Work Plan (Non-Cost) Factor 4: Cost/Price Section M Evaluation Criteria

Evaluation Criteria The adjectival ratings below will be assigned to:

Factor 1 (Management/Technical) Subfactor 1(a): Management Approach Subfactor 1(b): Technical Capabilities Factor 3: Sample Work Plan

Factor 4 (Cost/Price) will be evaluated for:

Cost/Price Realism to determine if proposed cost/prices are:

Realistic for work to be performed Reflect a clear understanding of requirements Are consistent with various elements of proposal Government will calculate most probable cost for use in analysis of realism

Evaluation Criteria

Questions?

All offerors are advised that questions pertaining to this solicitation or site visit held in El Paso, Texas on 11-13 August 2015 shall be submitted in writing to: Rochelle Allen, via email rochelle.a.allen@cbp.dhs.gov not later than 21 August 2015 5:00pm eastern standard time. Any questions submitted after the due date will not be accepted.

image3.jpeg image4.emf image5.jpeg image1.jpeg

File details come from the government source that posted it. Updated .