CTIMR WA 3 Re-compete Solicitation - Responses to Offeror's Questions

View the file

Other files for this federal contract opportunity

Other files attached to CTIMR Work Area 3 Recompete (Summary of Changes), newest first.
File Type Posted
Amendment_0004_CTIMR_Work_Area_3_date_changed_on_Question_1POST9SEP2015.docx DOCX document
CTIMR_WA_3_SF1442-14aREVISEDAW992015.pdf PDF
Amendment_0004_CTIMR_WA_3_Wage_Determination_Dona_Ana_New_Mexico_NM14.txt TXT text file
Amendment_0004_CTIMR_WA_3_Wage_Determination_Otero_NM8.txt TXT text file
Amendment_0004_ATTACH_12-_WA3RecompetePre-Award_LTR_to_Contractor_HSBP1015R0040_(2).docx DOCX document
Amendment_A0004_Pictures_of_Legacy_PF_Fence.docx DOCX document
Amendment_A0004_CTIMR_WA_3_SF1442-14a.pdf PDF
Amendment_A0004_Sample_Work_Plan_Request_CTIMR_WA3_(Attachment_3).docx DOCX document
Amendment_0004_CTIMR_WA_3_New_Mexico_Wage_Determination_(3).txt TXT text file
Amendment_A00004_for_CTIMR_WA_3_HSBP1015R0040_FINAL_Solicitation_2_September_2015_.docx DOCX document
CTIMR_WA3_HSBP1015R0040_Offeror_Bidder's_Question_Template_dated_13_August_2015.doc DOC document
CTIMR_WA_3_SITE_VIST_ATTENDEES_11-13_August_2015.xlsx XLSX spreadsheet
CTIMR_CTIMR_WA_3_HSBP1015R0040_A00003_13_August_2015_RA-_Copy.docx DOCX document
CTIMR_WA_3_Recompete_Technical_Site_Visit_13_August_2015_HH.pptx PPTX presentation
CTIMR_WA3_Contract_Site_Visit_Slide_Information_13_August_2015_RA.pptx PPTX presentation
CTIMR_CTIMRWork_Area_(WA)_3_Solicitation__HSBP1015R0040_Amendment_0002_FINAL_RS.docx DOCX document
CTIMRWA3_Attachment_5_Cost_Template__CTIMR_WA3_RecompeteUPDATE5AUG.xlsx XLSX spreadsheet
CTIMR_WA3_Recompete_SF1449_Cover_Page_SOLICITATION.docx DOCX document
ATTACH 3 Sample Work Plan Request_CTIMR WA3_Recompete HSBP1015R0040.docx DOCX document
ATTACH 1- CTIMRWorkArea3RecompeteHSBP1015R0040 TX TIMR BMPs.pdf PDF
CTIMR Work Area —
ATTACH 6- WA3Recompete Past Perf Questionaire _HSBP10154R000040.docx DOCX document
ATTACH 15 Site Visit Notice_WA_3_Recompete HSBP1015R0040.docx DOCX document
ATTACH 9 - WA3RecompeteGFM Instruc-HSBP1015R0040.docx DOCX document
Attachment 5_Cost Template_ CTIMR WA3 Recompete_72915.xlsx XLSX spreadsheet
ATTACH 11 EL Paso Texas Wage Determination TX150052 WA 3 HSBP1015R0040.docx DOCX document
ATTACHMENT 4Instructions to the Cost Template_CTIMR WA3Recompete.docx DOCX document
ATTACH 2-WA 3 Notice Regarding Landlord-HSBP1015R0040.docx DOCX document
ATTACH 14- CTIMR WA 3 RECOMPETE HSBP1015R0040 Appendix A_Road Maintenanc....docx DOCX document
ATTACH 10 CTIMR Recompete HSBP1015R0040 CBP TI Standard Designs pdf.pdf PDF
ATTACH 12- WA3RecompetePre-Award LTR to Contractor_HSBP1015R0040.docx DOCX document
ATTACH 8- WA3RecompeteClient Authorization Letter_HSBP1015R0040.docx DOCX document
ATTACH 7- WA3RecompeteConsent Letter HSBP1015R0040.docx DOCX document
ATTACH 13- WA3Recompete Pre-Award Survey-SF-1408_Hsbp1015R0040.docx DOCX document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.Question (Page #)

RFP Section
Question
Response
1
Solicitation Section(s): Attachment 12 and Attachment 13, pages within the 2 attachments

Please reference attachment 12 and 13 and the requirement to submit by Alicia Williams via email.

Please clarify when the submittal should be made (for examples: prior to submittal of offer; after submittal of offer; after notice of intent to award.

Amendment 0004 provides 16 September 2015 as due date.

2
Solicitation Section (s): Standard Form 1449, page 1

Please clarify the delivery address for the submittal of hardcopies of our offer (original and copies) as detailed in box #13 of the AF – 1449. Note that box #8 is left blank

Amendment 0004 provides address in block 8 and corrected block 7.

3
Solicitation Section (s): Attachment 11.
Attachment 11 of the RFP provides a copy of Wage Determination TX 150052 for construction type Heavy in El Paso County of the State of Texas. We believe that work will be performed in multiple counties in Texas and New Mexico under the contract. Please clarify the requirement for the Wage Determination(s) applicable to this contract
Amendment 0004 provides New Mexico wage determination information
4
N/A
Please clarify the requirements for the value (dollar amount) of payment and performance (P&P) bonds. Are P&P bonds issued per work plan, annually, or for the entire term of the contract?

P&P bonds are issued for the entire term of the contract.

5
Table 3.1.1-1. Work Area 3 Fence Quantities, Pgs. 15-16
I saw some chain link, and welded wire mesh fencing SF/ T1 Style.

Is that part of the CTIMR 3 contract, and if so can we get the quantities of the SF/ T1 type fencing per each section/sector?

The specific types of fence and quantity for each type of fence included under this contract are contained in the SOW under Table 3.1.1-2.

However, offerors are reminded that the fence types, quantities, and number of activities that are required to be priced (and included in the cost proposal) are stated in Attachment 3 (Sample Work Plan Request).

6
3.1.1.1

Fence and Gates - Type of Damage. Pg. 16

Can you clarify the average number of breaches per month, per section?
Section 3.1.1.1 of the SOW states that “based on historical data, CBP experiences on average over 1000 Fence breaches per year within this Work Area, predominately located in the El Paso AOR”.

However, offerors are reminded that the specific activities (including fence repairs and breaches) that are required to be priced (and included in the cost proposal) are stated in Attachment 3 (Sample Work Plan Request).

7
Section C.3.4

Pg. 27 CBP has developed a web site that shows the most current and up-to-date information available regarding the existing assets as well as documentation regarding the CTIMR requirements. The information is located in the section titled “Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Overview” on the Website (http://cbp.gov/xp/cgov/border_security/ti).

Using the link provided, the “Can’t Find Needed Content?” is presented. Is there another link that should be used?

The website is not currently operational, therefore the RFP has been revised to remove this from the SOW.

Offerors are reminded to review the SOW, Attachment 10 (CBP TI Standards Design), and the Sample Work Plan Request for information regarding CBP’s TI assets in Work Area 3.

Period of Performance Pg. 33

When does the Period of Performance (PoP) for CTIMR3 begin? Section F.2 specifies: The period of performance of this contract shall be from the date of award through 365 days. Four (1) one-year option periods, if exercised, will begin immediately following the base period on day 366.
Amendment 0004 corrects to read “the next calendar day after the base period ends”
9
L.12 Pg. 78

The proposals shall be submitted as Volumes I and II, electronically to, Primary Point of Contact: Alicia Williams and Rochelle Allen, Senior Contract Specialists at the following e-mail addresses, Alicia.Williams@cbp.dhs.gov and Rochelle.A.Allen@cbp.dhs.gov (telephone contact information are: (202) 325-5711 and (202) 325-3887 respectfully. The Contracting Officer is Kerri Bishop: at the following e-mail address Kerri.Bishop@cbp.dhs.gov.: Ph. (202) 344-1173. The proposals shall also be submitted in two complete CD-ROM copies (one Technical Vol. I and one Cost Vol. II) to the individual designated to receive proposals in the solicitation.

Should proposals also be sent to Kerri Bishop?

No proposals should be sent to Kerri Bishop.

Proposals shall be sent Alicia Williams and Rochelle Allen as instructed by solicitation.

10
L.12, Page Limits

Pg. 79

To allow for a comprehensive response to the technical requirements of the proposal, will the government consider excluding the Past Performance Information, Client and Consent letters (Attachments 7 and 8) and Transmittal Letter from the 50 page limit of Volume I?
Section L of the RFP has been updated to exclude Past Performance Information, Client and Consent letters (Attachments 7 and 8), and the Transmittal Letter from the 50-page limit of Volume I.
11
L.12.A Tab B.a, Pg. 81

Section L.12.B.a states:

How the offeror’s technical approach will benefit the CTIMR Work Area 4 Program, in terms of capability, timeliness, and the ability to meet routine or urgent M&R requirements (as needed);

Can we assume that it should be Work Area 3?

Yes. Solicitation will be corrected to state Work Area 3

12
L.12(B)(Section 5)(Tab A) Cost/Price Supporting Documentation Page Number(s) 85

Requirements state that back-up documentation shall include detailed cost/price amounts of all resources required to accomplish each work requirement (i.e., labor categories, labor hours, number of employees for each labor category, labor rates, specific equipment proposed and its usage, proposed quantities of materials and supplies, travel, proposed specific support items and their estimated costs, and a total cost breakdown (to include a summary total for each cost component, e.g., labor, overhead, or G&A), and the proposed fee..

Since this data is provided in RFP Attachment 5, does Attachment 5 satisfy this requirements with the exception of detailed buildup of the travel and materials/other direct costs (ODC) which is not in Attachment 5?

Attachment 5 does not satisfy all back-up documentation required for cost reimbursable costs. We need adequate support or basis of estimates for your labor categories, labor rates, hours, indirect rates, material rates, equipment rates, and ODC. Basically, what is the rational or support for your estimates?

13
Attachment 3 Sample Work Plan 3.1.1 El Paso Fences Items 2, 3, and 4

Pg. 3 Job Visit did not visit any of the types of fence listed in 3.1.1 El Paso Fences Item 2, Legacy Secondary-PF, Item 3, Legacy Tertiary –PF and Item 4 Legacy Tertiary -PF

There are several types of fence repair specified in the work plan for chain link fences. 1 X 9 Gauge, 2 X 9 Gauge, 2X6 Gauge, none of these fences were visited on the site tour.

Since all of these are Legacy fence design the Specification Standards are not addressed for example the secondary fence requires ½” mesh. Can pictures, dimensions description height width, etc. or sketches be provided?

The majority of the fence types included under the CTIMR Work Area 3 contract are outlined in Attachment 10 (CBP TI Standards Design).

For Legacy fence types (including Legacy Secondary-PF, Legacy Tertiary –PF, and Legacy Tertiary –PF), pictures of these fence types have been included in the Amendment to assist offerors with correlating the fence types to the requirements stated in the SOW and Sample Work Plan Request.

However, offerors are reminded that the specific activities (including the specific repairs for these fence types) that are required to be priced (and included in the cost proposal) are stated in Attachment 3 (Sample Work Plan Request).

14
Attachment 3 Sample Work Plan 3.1.1, 4 Big Bend section Item No. 1 Pg. 4
P-22 Bollard Fence Perform corrosion treatment on 200 TI bollards each quarter. Number of incidents per year is 200 total. Should this yearly total be a quantity of 800?
The Sample Work Plan Request has been revised to reflect the number of incidents as 800 repairs per year.
15
Amendment 1 Pg.

Section L Pg.78 Amendment 1 states in box 13, item A. specifies that the proposal … THE WORK REQUIRED ARE DUE AT THE PLACE SPECIFIED IN ITEM 8 …Box 8 is blank, should we use the address in Section L.12, pg. 78 of the solicitation?

See response to Question # 2 above.

16
Attachment 5 – Cost Template
There are subcontractor worksheets for each CLIN that mimics the Prime worksheets for each CLIN. These subcontractor worksheets contain proprietary data.

Should the subcontractor’s labor rates be fully burdened through Fee to be included in the Prime’s submission given that the G&A is proprietary to the subcontractor and will be included in the subcontractors sealed package?

Where in the Cost Template, should the Prime apply the Prime’s loadings to the subcontractors fully burdened costs?

Yes, the subcontractor’s labor rates should be fully burdened with fee in the subcontractor worksheets in Attachment 5. The subcontractor’s total costs and hours are linked to the applicable summary tabs. The prime’s G&A and profit/fee rates would be applied in the “Summary Total Contract” tab in Attachment 5. The subcontractor should send any proprietary information or data showing the breakdown of cost elements of the fully burdened labor rates with fee as well as support for their indirect rates in a sealed package to the Government. Also note, that the prime’s labor rates in Attachment 5 should be burdened with any fringe and overhead with no G&A and fee. The prime G&A and fee rates would be applied in the “Summary Total Contract” tab in Attachment 5.

17
Attach_11_El_Paso_Texa_Wage_Determination_TX150052_WA_3_HSBP1015R0040.docx.
The RFP only provided Attach_11_El_Paso_Texa_Wage_Determination_TX150052_WA_3_HSBP1015R0040.docx. Is this the only WD that should be used? Will the government be providing other WD attachments for NM and other areas within Texas?

Amendment 0004 adds Wage Determination Information for New Mexico.

18
Section (I) Pgs. 48-65

There are no Limitation of Liability clauses provided within the RFP. Would the Government please consider including FAR clauses 52.228-7 and 52.246-25?

Offeror are advised that the Solicitation includes clause 52.236-7 Permits and Responsibilities which applies.

19
Section (I) I.69 Changes-Cost Reimbursement
Pg.51

Clause 52.243-2 Changes-Cost-Reimbursement (Aug 1987) Alternate III (Apr 1984) is included however since there is a Firm Fixed Price CLIN, should Clause 52.243-4 Changes also be included?

Amendment 0004 adds clause, I-70 -Change clause 52.243-4 which applies to the Firm Fixed Price CLIN.

20
Wage Determination Attachment
Is NMGRT applicable to this contract given the scope of work for the Sample Work Plan crosses the Texas/New Mexico border?

Same response as number 17.

21
Amendment 1 Pg. 1_
On the SF1442 it states an offer guarantee is required but there is no other specification on bond amount in the solicitation. Can you clarify bond amount and where to put bond in proposal?
Amendment 0004 adds clause I-82, Bid Guarantee clause.
22
Amendment 1 Pg. 1 Section L Pg. 78
On the SF1442 it states original and 3 copies but on pg. 78, it states to submit Volume I and II electronically and also submit two CD copies. Can you clarify submission requirements
Amendment 0004 revises SF 1442 Cover page to state original and 1 copy. Offeror should comply with submitting Volume 1 and II electronically with two (2) CD copies.
23
SOW 3.1.1.3 Gates – Type of Work Pgs. 17-18
Please confirm that the Santa Teresa gate is the only gate requiring weekly maintenance. If so, please also confirm that pricing for this weekly maintenance is to be included in the “monthly” figures for the “F&G” tabs in the cost template.
Please reference Attachment 3 (Sample Work Plan Request), which includes all maintenance and repair requirements for Gates in both El Paso and Big Bend Sectors that should be included in the offeror’s cost proposal.
24
SOW 3.1.1.3 Gates – Type of Work Pgs. 17-18
Is contractor to include in its pricing the estimated costs for replacement parts/supplies that may be incurred during routine preventive maintenance of gates?
Please reference Attachment 3 (Sample Work Plan Request), which includes all maintenance and repair requirements for Gates in both El Paso and Big Bend Sectors that should be included in the offeror’s cost proposal.
25
SOW 3.1.4.2 Lighting and Electrical Systems - Type of Work

Pg. 20

Is contractor to include in its pricing the estimated costs for replacement parts/supplies (bulbs, ballasts, wires) that may be incurred during routine preventive maintenance of lights in the L&E tab of the Cost Template under Task 3? If so, please identify types and sizes.
Please reference Attachment 3 (Sample Work Plan Request), which includes the Lighting & Electrical maintenance requirements for El Paso Sector that should be included in the offeror’s cost proposal. Also reference Section 3.1.4.1 of Attachment 3 for lighting and electrical systems assumptions (including bulb, ballasts, and breaker types).
26
SOW 3.1.4.2 Lighting and Electrical Systems - Type of Work

Pg. 20

Please confirm that inspection of lighting systems may require work to be performed outside of normal business hours and this requirement should be incorporated into the bidder’s pricing.
Please reference Attachment 3 (Sample Work Plan Request), which includes the Lighting & Electrical inspection requirements for El Paso Sector that should be included in the offeror’s cost proposal.
27
SOW 3.4 Assumptions

Pg. 27

SOW references the link (http://cbp.gov/xp/cgov/border_security/ti) which includes CTIMR introduction, work categories, considerations, asset photos, and inventory of assets. This link does not work. Please provide a corrected link or an inventory of assets, in EXCEL format if available.
The website is not currently operational, therefore the RFP has been revised to remove this from the SOW.

Offerors are reminded to review the SOW, Attachment 10 (CBP TI Standards Design), and the Sample Work Plan Request for information regarding CBP’s TI assets in Work Area 3.

28
Cost Template Page Number(s) TAB F&G EPT (Prime)
Tasks 1, 2, and 3 are for replacement of damaged areas. Please confirm what the term “PF” means “per foot”.
The names of Tasks 1, 2, and 3 in the costs template correspond with the names of the activities contained in the Attachment 3 (Sample Work Plan Request) under El Paso Fences (Tasks 1, 2, and 3).

Additionally, as noted in Section 3.1.1 of Attachment 3 (Sample Work Plan Request), PF stands for “pedestrian fence”.

29
Cost Template Page Number(s) TAB F&G EPT (Prime)
Please clarify what is required for Task 5 Shadow Fence Crew.
The scope of work required for each “Shadow Fence Crew” activity includes shadowing the incumbent contractor (for the number of hours stated in the Sample Work Plan Request) with the intent of becoming familiar with the different types of fence, access points, and access roads within each Sector.
30
Cost Template Page Number(s) TAB F&G EPT (Prime)
For Task 7 Bollard Corrosion Repair, please identify the number of repairs to be made and frequency (example: 3 per quarter/12 per year).
Please reference Attachment 3 (Sample Work Plan Request), which includes the number of repairs to be made for Task 7 (Bollard Corrosion Repair) that should be included in the offeror’s cost proposal.
31
Cost Template Page Number(s) TAB F&G EPT (Prime)
For Task 10 Replace Hinges on Manual Vehicle Gates, is the bidder to assume that all hinges on all manual vehicle gates will need to be replaced
Please reference Attachment 3 (Sample Work Plan Request), which includes the number of repairs for 10 hinges for one gate per year that should be included in the offeror’s cost proposal and Attachment 5.
32
SOW 3.1.5.2 Vegetation Control and Debris Removal – Type of Work

Pg. 20

SOW states that vegetation control includes mowing, removing and disposing of grass and other vegetation longer than 6”. It was stated during the site visit that vegetation control along fence lines occurs basically twice per year and much of the vegetation exceeded a 6” measure. Please clarify.
The requirements stated in the SOW encompass the full scope of the vegetation control requirements required for the entire Work Area 3.

The specific requirements for vegetation control within each Sector will be identified by the COR after award.

33
RFP Amendment 3, Section L, Volume II/Section 4 Financial Capability

Volume II Cost/Price Proposal Section 4 – Financial Capability states, “specify the financial capacity, working capital and other financial resources availability to perform the contract.”

Is the Offeror to include a statement and provide additional documentation (Bank Letter, Letters of Good Standing)? Please clarify.

Yes. Additional documentation (e. g., Projected Business expected, Current and Future cash flow, Lines of Credit, Bank Letter and Letters of Good Standing, etc.)

34
Volume II Cost/Price Proposal. Section 2 Solicitation, Offer, and Award- Pg. 84

The Offeror shall incorporate information described in Section M, Paragraph M.4, Factor 4.

The Offeror shall also incorporate the information required as part of Attachment 3 into this Section.

Attachment 3 is the Sample Work Plan. Could the government please clarify what information should be incorporated into this section?

Amendment 0004 revised language in Section L. Volume II Cost/Price Proposal. Section 2 Solicitation, Offer, and Award- Pg. 84.